HomeMy WebLinkAboutNCG140518_COC (Signed)_20231122 STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE No. NCG140518
STORMWATER&WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1, other
lawful standards and regulations promulgated and adopted by the North Carolina
Environmental Management Commission, and the Federal Water Pollution Control Act, as
amended,
The Lane Construction Corporation
is hereby authorized to operate wastewater treatment system(s) and discharge
stormwater and wastewater from a facility located at
Lane Temporary Concrete Batch Plant-Chapel Hill
7201 -UT NC 86 South
Chapel Hill
Orange County
to receiving waters designated as Old Field Creek, class WS-V;NSW,waters in the Cape Fear
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in General Permit No. NCG140000 which can be downloaded by
entering"deq.nc.gov/SW-industrial" in a browser window and navigating to the "NPDES
Stormwater General Permits"web page.
This Certificate of Coverage shall become effective November 22, 2023.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 22nd day of November 2023.
Brittany Cook
NPDES Stormwater Permit Coordinator
Division of Energy, Mineral and Land Resources