Loading...
HomeMy WebLinkAboutNCG140518_COC (Signed)_20231122 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE No. NCG140518 STORMWATER&WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Lane Construction Corporation is hereby authorized to operate wastewater treatment system(s) and discharge stormwater and wastewater from a facility located at Lane Temporary Concrete Batch Plant-Chapel Hill 7201 -UT NC 86 South Chapel Hill Orange County to receiving waters designated as Old Field Creek, class WS-V;NSW,waters in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in General Permit No. NCG140000 which can be downloaded by entering"deq.nc.gov/SW-industrial" in a browser window and navigating to the "NPDES Stormwater General Permits"web page. This Certificate of Coverage shall become effective November 22, 2023. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 22nd day of November 2023. Brittany Cook NPDES Stormwater Permit Coordinator Division of Energy, Mineral and Land Resources