Loading...
HomeMy WebLinkAboutWQ0021934_Monitoring - 10-2023_20231122 (2)Monitoring Report Submittal .................................................. Permit Number#* WQ0021934 Name of Facility:* Hasentree Month: * October Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2023 Upload Document* Hasentree NDMR October 2023.pdf 68.57KB PDF Only Hasentree NDAR October 2023.pdf 168.42KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). mdgoodson@aquaamerica.com Miranda Goodson 11 /22/2023 This will be filled in automatically Reviewer: Wanda.Gerald Is the project number correct?* WQ0021934 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Reviewer: _anonymous Review Date: 11/22/2023 FORM. NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _/_of Permit No.: WQ0021934 Facility Name: Hasentree Golf Community County: Wake Month: October Year: 2023 Did irrigation occur at this facility? ]✓ YES ❑ NO 89 Field Name: Front 9 Greens Field Name: Back 9 Greens Field Name: Front 9 Frwys Field Name: Back 9 Frwys Area (acres): 1.9 Area (acres): 1.9 Area (acres): 68.4 Area (acres): 59.6 Cover Crop:Cover Crop: R� Cover Crop: P: Cover Crop: p: Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Weather Freeboard Field Irrigated? AYES ❑ NO Field Irrigated? YES +] No Field Irrigated? ❑✓ YES ❑ NO Field Irrigated? Q YES ❑ NO a ° V}°Ld v ar0. ° c a•o- ° w Q a �> � E 2 o m F o J E o E o >a _1 O C o x° o J E2 o >a = ac0a o J a a > d O a,e. a acG E Xo>. a J 7 °F in ft tt gal min in In gal min in in gal min In in gal min in in 1 C 81 0 14 1,550 50 0.00 0.00 1,860 60 0.00 0.00 2 CL 84 0 14 1,019 43 0.02 0.02 1,753 74 0.03 0.03 3 C 83 0 14 3,199 135 0.06 0.03 4,360 184 0.08 0.03 4 CL 82 0 14 3,033 128 0.06 0.03 4,692 198 0.09 0.03 5 C 83 0 14 9,124 385 0.18 0.03 9,882 417 0.19 0.03 6 CL 80 0 14 7 PC 74 0 14 8 CL 66 0 14 4,337 183 0.08 0.03 3,768 159 0.07 0.03 9 CL 72 0 14 101 CL 1 76 0 14 4,431 187 0.09 0.03 4,503 190 0.09 0,03 992 32 0.00 0.00 63,612 2052 0.04 0.00 111 C 1 72 0 14 42,811 1381 0.02 0.00 181,691 5861 0.11 0.00 12 C 77 0 14 13 C 81 0 14 14 C 68 0 14 15 C 66 0 14 16 PC 64 0 14 17 PC 68 0 14 18 PC 71 0 14 474 20 0.01 0.01 12,834 414 0.01 0.00 54,746 1766 0.03 0.00 19 C 73 0 1 14 49,755 1605 0.03 0.00 30,535 985 0.02 0.00 20 C 72 0 1 14 21 C 70 0 1 14 22 C 72 0 14 231 R 69 0 14 241 C 1 73 0 1 14 251 C 1 78 0 14 261 PC 1 80 0 14 1 308 13 0.01 0.01 118 5 0.00 0.00 27 C 82 0 14 2,038 86 0.04 0.03 1,398 59 0.03 0.03 46,593 1503 0.03 0.00 28 CL 86 0 14 29 PC 83 0 14 30 C 85 0 14 31 CL 63 0 14 Monthly Loading: 27,963 0.54 30,474 0.59 154,535 0.08 332,444 0.21 12 Month Floating Total (in): 7.95 14.57 4.03 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page,2_1 of Permit No.: WQ0021934 Facility Name: Hasentree Golf Community County: Wake Month: October Year: 2023 Did irrigation occur at this facility? Yes No Field Name: Practice Area Field Name: Practice Greens Field Name: DR Tee Field Name: DR Frwy Area (acres): 2.3 Area (acres): 0.7 Area (acres): 4.2 Area (acres): 6.8 Cover Crop: Cover Crop: Cover Crop: Cover Crop: Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 2028 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Weather Freeboard Field Irrigated? [a YES ❑ NO Field Irrigated? ❑ YES ❑ NO Field Irrigated? QYB ❑ NO Field Irrigated? 0 YES ❑ NO �. l0 v d c ci te, 3 o o E c is a m CL in W `o m aein Gcs D2 m a 0 Ln m� E 3a >°a o Em ~ E a.c a� �� a Tc i E�� w=3 °' m £ �a >°a o� E� ~ a.c ;� 0 J Tit .9 o=� o m E �a o a >a m., E� i= �- t m ac �a G c J E y�� o% C Env m= o J a,v �.m �a o a a >I N E� p - = v� ,� p o J Earn 7 G E3n W= o J °F in ft ft gal min In in gal min in in gal min in in gal min in in 1 C 81 0 14 2 CL 84 0 14 474 20 0.02 0.02 3 C 83 0 14 1,469 62 0.08 0.07 4 CL 82 0 14 1,896 80 0.10 0.07 5 C 83 0 14 4,218 178 0.22 0.07 6 CL 80 0 1 14 7 PC 74 0 14 8 CL 66 0 14 1,611 fib 0.08 0.07 9 CL 72 0 14 10 CL 76 0 14 1,896 80 0.10 0.07 37,231 1 1201 0.33 0.02 11 C 72 0 14 28,644 924 0.25 0.02 12 C 77 1 0 1 14 13 C 81 0 1 14 141 C 68 0 14 15 C 66 0 14 16 PC 64 0 14 17 PC 68 0 14 18 PC 71 0 14 27,634 1166 0.24 0.01 19 C 73 0 14 201 C 1 72 0 14 21 C 70 0 14 22 C 72 0 14 30,008 968 1.58 0.10 23 R 69 0 14 13,454 434 0.71 0.10 24 C 73 0 14 1 15,004 484 0.79 0.10 25 C 78 0 1 14 261 PC 1 80 0 1 14 1 5,828 188 0.31 0.10 27 C 1 82 0 14 28 CL 86 0 14 29 PC 83 0 14 30 C 85 0 14 31 CL 63 0 14 Monthly Loading:1 0 0.00 75,858 3.99 93,509 0.82 0 0.00 12 Month Floating Total (in): 10.91 5.48 3.86 0.86 FORM: NDAR 1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? QQ Compliant ❑ NorrCompliant O Compliant p Non -compliant QQ Compliant ❑ Non -Compliant 0 compriant ❑ Non-cwpiont Q compliant ❑ Non -corn* t If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if netr_ssary Operator in Responsible Charge (ORC) Certification PerrnlUee Certification ORC: Seth Holland Permittee: �Q �/� _02% L4 Certification No.: 1004679 Signing Official: Grade: Phone Number: Signing Official's Title:Has the ORC changed since the previous NDAR-17 y� No Phone Number �V Per Ex i 1/154 3 Signature Date gnature Date By tnis ZI ratify that this report is accurate and complete to the best of my knonAedge. I certify, under penalty of law, that the document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the Inrormahon submitted. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for gathering the information, the Wormation submitted is, to the best of my knowledge and beW, true, accurate, and complete. 1 am aware "there are sigrrficant penalties for submitting false kdormation, including the possibility d fines and imprisorvnctt for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 HASENTREE GOLF COMMUNITY SPRAY IRRIGATION FIELDS 12 MONTH ROLLING TOTAL APPLICATION IN INCHES FIELD Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-22 Dec-22 12 MONTH TOTAL Front 9 Greens 0 0.03 0.38 0.93 0.61 1.28 1.17 1.19 0.67 0.54 0.37 0.24 7.41 Back 9 Greens 0 0.03 0.31 3.58 0.62 5.03 1.33 1.27 0.7 0.59 0.34 0.18 13.98 Front 9 Fairways 0 0.04 0.09 0.08 0.49 0.7 0.36 0.44 0.07 0.08 0.1 0.03 2.48 Back 9 Fairways 0 0 0.17 0.23 1.01 0.87 0.52 0.58 0.1 0.21 0.13 0 3.82 Practice Greens 0 0.04 0.04 0.13 0.51 0.22 0.29 0.23 0 0 0.03 0 1.49 Practice Areas 0 0.23 0.40 1.04 0.64 1.26 0.87 1.12 0.73 3.99 0.4 0.23 10.91 Driving Range Tees 0 0.04 0.04 0 0.48 0.47 0.37 0.43 0.26 0.82 0.1 0.03 3.04 Driving Range Fairways 0 0 0.05 0 0.52 0.08 0 0.01 0 0 0.16 0.04 0.86