Loading...
HomeMy WebLinkAboutNCC233461_Site Plan or Location Map_20231121 ySS X T{ERR°.. // ///II \4182.,// //// CONSTRUCTION \\ �\ \ \\ R��ER ` E / / \ \ I j DATE: PAGE _ / / CONSTRUCTI N / --1�'- I / // / // A/ / LIMITS P �8 r 31 �� 301 I �S�xxO L n `N t"�sx-1451 LOWER / ,// / r- I Am I Lot Plan •• Lot Plan I I 25 I I I IA" "B" LAMER / / ,D -== IMI N I ~ - /// / �Ae4- 41 , pit= I - - B�� j otE a rNSTRUC 10 I I ) I I T u q b 1i' p iP ✓! ``` =ot Pl- - J ` HOUSE// ////////// I I ®/ O r^ 1L L TSI I I I I , �, =J z 32 �� I caAPEL wLLxow / / // / -I' 29 I ¢, I 24 Du sF HOUSE// // 1 ::T- Lot Plan Lot Plan Lot an I I I I / 1 I R HOUSE¶ ti o s ti , 1 �� 2' n0u5 I SITE sR1•t / i// / / / tee 40 ° -\\ s A 1 , ✓. / _\ _ -R!- d II L. '' -, L.23� I // /i % I AYLEDaEOFDDA ,,- / / /� / / - a� _NaA AY LNI -1t, „AY -Ra AY -RO AY RO a AY r I I / 3e / pp a,.MCUEB DWO -Z,. / / , / / / // \ I I Lo2An I \ Lot I I 1 / _ Notes / / / reford D B" -I r 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland I2 ( \ _J / / / / /// / \ �1d rl rt+ P•a -_,L-••� \-�1a_-1 ¢5' / 1 / / / I LEGEND DIRECTION boundary and/or arountl protectetl trees prov d rig a red us of a[least 1 25 feet for each O \ / T one C '., pp7 / --- Inchof ilt Fenrunk ce ontr. UR \ / / / // / \/ L I I ✓ r'- -1 / / / / / z.msWn ant Fence on the law elevation strles m each lot.Install slu Fence nwms shown on 3 ( / ///// r \ 8 � 34 2722 / ( Ischematic/diagram and field adjusted,if necessary,for placement at low points.If lots are ` / b / / / / \ I 1 I 9 N Lo[Plan I I Lot Plan \ I / / I contiguous and have different land owners or builders,each lot should have individual Silt / / / / (jN 39 \ yp- g�� Lot Plan / / / / Fences. / / / CONSTRUCTISILT FENCE OUTLET ..SPRING .� v . / / MITS I Lot Plan mC I•=--L ' I-F„ I / Ery R N 3.Install required Silt Fence w hin 10 feet of propertyline to ensure there is nowdidwith CONSTRUCTION septic system.It Is the responsibility of the builder to ensure the installation of sediment r 1 \ // / / ////�/ ""'? z 35 �� 1 :s V / / CURB INLET control measures does not impacune septic system ana repair area(a). LAKE 1 _,/ / / / / , 26 T / / 4.At least one Construction Entrance/Exit is to be installed per lot. ' ` ,', / / / / / g '� Lot Plan (I• ••IGFeNcey /o/ / ( s.waste rims and Omer areas aea�eatea for mono building renal waata anal)beat .�. \ I / / / / // \ �n ��C.,��p.� LB°Plan (TYPJ 5 4b / / mn9 gma / ^ / ayl / ( l least 50 feet away from storm drain Inlets or drainage ditches unless it can be shown that �,.�,,,'` \ / /// /////// // \ I ] i L - j I '' / / / no other alternative exists.If this separation Cann.be achieved,these areas must be VICINITY MAP `� �� 8 wA LE , contained behind Silt Fence. N.T.S. ``��,, ♦ // / / // / li LotPlan $ �\ a / \ DInlete downstream mdisturbances should be protected streets should be swept when �� ` / / / / / \ .. a e:4%36 / ° / It 4 \^d .',..b.... v ,4 ,REINFQQF2CED sediment from the construction activity is present. \ / / // / / // / / / CONSTRUCTION \ a: I� .�. Lot Plan 1 ?J F, /\ /SILTFENCE \ \ ..\NC-Environmental CONSTRUCTION SCHEDULE \� / \ / / / / / LIMITS S;v; °.,'` o /saT ce �"�'. y ,,,,, \ - - - IP g z oetailsforsnt Fence,sihPlcnE Otlets,d sedim tit EMfancesls are not drawntosare / I \-J / / / /' / vi ,�( o CON \ dad on aadNonal aneeb Eros on ana aed'me Hcontml datana are not drawn to scale. I Obtain ell n«essery permits arld plan epProvals erosion end Sed'mem Conwl(effiSC)perm t end a Cedifcate of Cpvemge J V/ / / / / / \ O's /yLJ CO TRUCTION -"-" T LAYOUT WITH CURB AND GUTTER (COC)m bobtainedbfre any land Asnmbneg activities once A copy of the EffiSC permit,We COC and a hard copy of the \ J / / \ //� / / / / \ J 1Q@� \• 37 \ �- Y42 'yp,'v! / / LIMITS \ \ \ plan must be keptpreferably box and accessible during inspection. / // \�,////� /// / LOt Pldn ° WATTLE 1 2 Install gavel first,N silt fences,reinforced silt fence / /f I CONSTRUCTION t, ye REINFORCED \ outlets d / / --__ / / / „Ge ENTRANCE G SILT FENCE \ DATE: PAGE: 3.Finish clearingd b' the lots as they are started. ----� i// / / 15 \ I✓ / \ // "'s' 'yy "-OUTLET \ 4 Begin to J J /house construction activities. 11- _/ / / (I \\Lot Plan t �f / \ /aILT,FENCE Fh \ 6.Fi5. nin or continue ish all rough ding and house -' ' ''/ // / / __188�/\\ \\8 Qv\`S 'INS j/\� Y�''((TT1Tt''9 / `` // \ �I I / B.Be7. ginl driveways,fin d' flsareas .� I ' // / \\ Lot 4 n \\ ] A r�r /\� � ��\ WATT REINFOL/q,CED 1 I I / I,v 9 Final grassing, dstabilizing f I 1 h' ill involve me installation of sod on the lot The silt fence will O / --- // / \\ B \ \ O� !/ \ /� \ LO[P -a0 SILT FENCE_ I I ( 7~ nit pl 'Ito 1 is"dried & 11 b'I' d drak hold Not - 1 �_ / ` \• \. A �� / OUTLET - f / / r t IO.The Gonna h ll d sit'pe fthe d d'meoktion contml...es and complete the following �q / \ ( \\ 13 \\• / \\ 16LOtA do \\\ --- A / / _� / I I V 110?"6 t 1 combined If pe t found W DEMLR b Lot Plan / / / / \ `- / .4.....IP. M1tlps//www.de9. g /b Vd - gY 1 and d [omit program/npdes consWetion Program / J "B„ / Lo[Ph \ / / / / / / \ G Twelve. N f complete- p f hell be kept on site ends available f -spa-na[all times.I[is rewmmrndeda [)� I \ \ g \\ Ef \\\/ / \ 1 >�\N '"°rT copy be kept' perm b ttG.S.13 through G.S. 3 7S« CAC 04.001 through ISA �7. \� \ \ CONSTRUCTION / m \ //J 2 / // / // \ \ I / QJ ,Oe NCAC o4. 04G 1 CGo 000 Sf C � A LIMITS \/ A tam \/ / / // / \ I / MOOe'e 11.1f insp f w J J' be performed Nastcalendar days and \ \ CONS UCTION q��/ L \ / designed.within 24 hours of All ESC ry b of greater maintained inch.Any needed pashalle construction d be_ d ls on -plan. y to gauge m measuall be res rolled \ I \ \ c / /IMITS / I \ \ MN& t! at die Pto f /4 _._ 64� Lr 12Isp«ao dC 1 P I Whenthe project PI We permit..shall DEMLRcloseout the EffiSC / /� \\ \ �'; iQ4/ // // /// �^ \\\` �\ \ \ `�r1�a'z'�` Plan After DEMLR'f theP of the project I t pet' Mort M1 Perm shall 1 \ r / / / \\ ` ,y L _ Y `deg...goy/N.01 to submit electronic Noticef termination(c NOT}A 9100 animal general pe[mlt fee will be charged y \ 12 \ / / / / \ \ \ \ , Y ) t until thee NOT has been filled out \ 188_ \ LotPlan •••=c sONSTRUCTION / / I / /� 1 '/ \ -vis _ ,W SODDING P \ / \ G �N\TRArvcE / -1 // // �\ \ ' II \ / ',,,,, 10 / J / t.Clear on: Maintenance: 11 / / 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 inspect at least once a week and after each 1 inch or �� ( \ ` / \ Lot Plan/ I \/ // // / / 1 / / material and properly grade it greater rainfall:make any required repairs immediately. 88� \ / _ / / / 2.Place the gravel to me specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment eta arvosarvo ralMwrvc PlEcss. l CONSTRUCTION - / / / ( I / / smooth it from leaving the construction site.This may require penotlic \, LIMITS • \ / 182/ / / / ee / / 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone. GROUND STABILIZATION ` • 10/ „AaE 4.Use geotextlle fabrics in order to improve stability of the foundation In locations 3.Immediately remove all objectionable materials spilled,washed or e AupLEp suns J \ Lgt Kan I °�EM/ / ^'n ) / / 1 subject to seepage or high water table recketl onto public roadways. SITE AREA STABILIZATION . InATIC 9DCUTFEmro- / ---� `-� r Y••r-t�, 180 / / / / / \` EXCEPTIONS E / °� > -1 / / /� / DESCRIPTION TIME FRAME Mumma CORRECTLY. / ,�' - �, / _� ""Ham msaEe.me / C / "' J / CONSTRUCTION ENTRANCE/EXIT PERIMETER DIKES, 7 DAYS NONE _ / \ / / / / / , r \ SWALES, DITCHES / / &SLOPES - \ \\ / / j 9 I \ // „/e°i / / / //�/ / \ HIGH QUALITY 7 DAYS NONE .4/ \\ // ��r Lot Plan-I \I/ / // / / // // // \ \ WATER ZONES V// I �, "H"�., _ / / DATE PAGE. 11 I \ LIMITS - ,Lot Plan /I \\ / / / // // / _is M 51-5 /.:We i S 5 / . (HOW) \\ CONSTRUCTION \ / / / / l ^MI equivalent protection SLOPES STEEPER 7 DAYS IF SLOPES ARE "AI*, .I f III _ _ he>eb>tmrem« THAN 3:1 10'OR LESS IN k11 ( IP II I \ ' z x a - use in silt sockS Or wattleS. 11=g en),w"m«mno>t LENGTH AND ARE I -`� - NOT STEEPER iPeT .aTsaaoo MOWER \ I I '"\ II \ / I / / /� ` I 5 �>dmnmdemrm IMMEDIATELY WATER wAtmw Stokes s () coot e a THAN 2:1, 14 w,Ta,Ra sot L ap000N noH a-a t. \ Met beyond the toe of a SECTION SECTIONand a eeSiusnuw DAYS ARE onT APPEARANCE OF GOOD SOD _ \ r \ \ g154// // / / // / \v hula bemum of giocated at(three edge the ALLOWED �� / Lot Plan i \ \ c / / / / / disturbance.The engame>at meal should es turned site endd ofthero SLOPES 3:1 OR 14 DAYS 7 DAYS FOR i \\ \ Sz // / / / < A,Max- Ro a,My. w✓nre from going around ea of the Sift FLATTER SLOPES GREATER Kill I I III \ / -----r -1 Pg \ M1/ / / a other�>re-nl>namwoon stakes wima THAN 50'IN II�i lII Y 111 I'i11 1116 a,ranaeam /�- -- / r- 6 �\ P'o y / / / / \ III „ z-urn erere>eninn>rona he erv>n umb.through the center of the mn LENGTH / �\ \ // I Lot Plan Tit it // // / / //// lU W �uwamaximum interval of 4 feet or a maximum interval Np ALL OTHER AREAS 14 DAYS NONE(EXCEPT nee / \ \ \ / H I m / 1 .enenof 8 feet ilthe silt sock/wattle is placed in a 4 inch WITH SLOPES FOR PERIMETERS i - a>eaoorM>r \ / w9, I _ FLATTER THAN 4:1 / \ / // s. In the event slaking is not AND HOW ZONES) .-f�c�--il�y - \\ \ l j/ i \I / / /// / /I uNTREnin. trench. Wood o i/z Mulch roloy>t ,�awo�wm....,,o,...m...Mm,.g,.�...,.�..,..,,,, possible \ CONSTRUCT(YN I S O' I / / ( NED INSTALLATION sock/wattle to old kin vlacoaumngdm�os�eme. DATE: fence. tg Max.Standard Strength Mb.with wire • cove Fenc Filter Fabric PAGE: \ I LIMITS' I niPlan I \ I / / / / / / ( IsoMErrac VIEW ' are . Inspect slit soc.attle al least weekly and .»l�t 6Max.Ex.s g h.without wrekn Wire Fence wire Bmektul trench ( \ ;yn:L ""''� �' \/ / �/ / / (I INITIAL rLow aAore ,a and Compact \ \ I / `�•-•--I 1 A / / ( I // Mulch or p,aanpnmet«Ci�oA 'osa' 4 r steel Poet w. P 1 \ I / r 4 / /1 / 1 / / Sheet eft tin m aIX i (ttt m)(.aM een)c oo ) m� 3. sock/Wattle must he re• ed to allow for adequate placed clogged -, s excessive,the silt I 1 \_._/ • rust a m F" ;� p Ito>uT gr . 4. Reinstall if damaged or dislodged. 4s A►,a- 1T \I I // i LO[Blai'J / \// / \ //' / wpwAre> r�w sock/ml�'mn(��i itas ml`is�a mi (ame,nl waa,nl eon ml PW re tea 4P a \ // I CONSTRUCTION �,%', I / //11 / / a mr�auacrp• y.4'x tm/x ytsrx m/n m/x 6 dies is peen v eves. 1` % ( J / / , mx,t. ittsocks/waftles shall be inspected until land s. i,a ;aa a, a� di eW clown • \/ COI,JSTR CTION /'"/m) /m/mJ /di/di) /di/di) /di/din 1 -- -- ------1. / a n r \ \ Lot ENT FAN I ( ( / SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION 1the 1 C /' -� 1 l Conamoeon: / Filter Fabric w 'along I / \ ` �`�\ 1 \`-, - l'>'IFe>JCE •••'r`1 use ENT I - I \ \ A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED 8Y standard1. Cons..the sediment barrier of strength°roma strength symhnicnuarredics. CROSS SECTION VIEW \ \ \ \ 5VP.I ,/ -,� / 1 I NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 2.Ensure that the height of the setiimeru fence does not exceed 24 inches...the a ground.(Ilia fences \ 1 ATfLE Y REIN READ I/ // / \ "- N. COMPLETED AS AN EXCEL SPREADSHEET. may impute.volumes of water sufficient to cause failure of Me Bch vre) mvdaldnla.when joints an \ I �` SILT FENCE / / l�1 \ \ • AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED 3.Corrstruct the Olter fabdc Morn a continuous roll cut to Me length of Me barrier to necessary.securely fasten the Nter cloth only st a support cot with 4feet minimum ovedepro me rrextEp \ \ \ I ,ye6/ '' oUTL T 1� r ( / ( `` \ EROSION AND 4.Support standard s.ngth filter fabric by wire / \ SEDIMENTAPON CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A eniretric on posts. e upslope \ \ / Oa� ) "/ I I \ NCAC 046.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY xtend minimum 50 strength. / I I \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE pa ties the wire rnesh support to the hottorn of the should posts m.Fasten ar mum ale restapae wire nM1nsuppode should be amren Ma Should U�kbr�u�el�-�'a kemifea required repairs v �e 1 / I APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING 6 re messide of Merano°h supporta minimum n.Mire or Pe Se use mptly I V / `-- _O \ I I DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, 6.Extra securely strength filter fabric wim6kot post spacing does not require ewire mesh supportknen Securely k Remeove setli entadmpos�ta as necessary promptly. to provide adequate Otago volume forme next min and reduce pressure on _ \ I \ E OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION r no.filter fabric directly posts.wire plastic p ssnouH have of pound s knee.Take care to avoid undermining me fence during \ I 1 \ \ \ I -� CONTROL PLAN." fasten recn a oat «lea c:i ee \ _ ` 7.Excavate be trench B.ai«pizfmahe.oiieen lo�the ymnpdi and side nortnetan Pao gm.propp>•al�namn»pa>tsand Remove all m" sae and unstable rlhacanelbunng \ / •I \ \ \ I \\ General Erosion Control Notes over the filter fabnnand p .Thecompactionofine..MIIis drag and red as been pmceaystsBIBedg 1 \ n \ \ \ �\ J ) 9.Backfill the trench with soil 10.m not attach finer fah.to existing tree. I \ / / l ` \ \ \ \ ( 1.Only the areas shown shall be disturbed. ,alemlmsutknce mean N, \ ------ ( \ \ \\ \ I 2. All disturbed o shall Co rassed and ..\NC-Envirgnn,enW I.lpso - \ 1 mulched°s soonover possible and maintained 1 SILT FENCE �/ ` l I \ \ 1 \\ until pemanen cover B established. DATE: PAGE: �nl t �� / I( \\ \\ \\ `-�\r \\ \\ \` ■ / ■V1� 1 of 2 - .MIN. -1 �SILTFENCE TOTAL DISTURBED ACREAGE: 6.90 ACRES + LOT EROSION CONTROL PLAN L .1111111 .11111111. 1111 1 `• MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOTS 2 - 41 I CAELIN FARMS General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be n rHE wnsHED ST j �v relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. PHASE 1 - I - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all STEEL FRonTwEw objectionable materials spilled,washed,or tracked onto public roadways. FOR VVIRE FENCE HARDWARE CLOTH Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure B E N J A M I N STOUT REAL _ FILTER cto FABRIC,ISURY WIRE FENCE, BR that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. AND HARDWARE wnsHED sroNE MAXa•D Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth ESTATE SERVICES INC. STEEL FENCE NrAPARTs Gncuue and stabilization of the mot bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. MANCHESTER TOWNSHIP CUMBERLAND COUNTY NOTES: caou„° 1.Hardware cloth and ravel should overlay the silt fence at least 12 ems_re e inches. g y Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be SCALE: 111=100' OCTOBER 2023 o0.00. 2.Stone outlets should be placed on low elevation areas of silt fence repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. GRAPHIC SCALE and based on field conditions. MAINTENANCE: Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed BURY WIRE FENCE AND B RV M OF UPPER E.E OF 1.Per NCG-01,inspect outlet at lest once a week and after each 1 Inch or sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. d 2.Freshen stone when sediment accumulation exceeds 6 inches. 3.Keep mesh tree of debris to provide adequate flow. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all SECTION VIEW 4.Remove sediment when half of stone outlet is covered. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) q"" Ito Joey5.Replace stone as needed to facilitate de-watering. t inch = 100 ft. J � SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 NC-En vir PHONE(910)484-5191 FAX(910)484-0388 LICENSE lfF-0106 LAST SAVED:10/10/2023 e:to AM LAST PLOTTED:10/10/2023 9:09 AM PLOTTED BY.Dennis Gilbert nor002n:G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-25 CAELIN FARMS-EC\PLANS\CAELIN FARMS EC-LOTS 2-41.DWG