Loading...
HomeMy WebLinkAboutSW6231108_Supplement-EZ Form_20231121 SUPPLEMENT-EZ COVER PAGE FORMS LOADED :PROJECT INFORMATION 1 Project Name Hoke County Apartments 2 Project Area(ac) ..___.� 17.56_.. _ ...... 3 Coastal Wetland Area(ac) 0 ..... 4 Surface Water Area(ac) 5 Is this project High or Low Density? High?. 6 Does this project use an off-site SCM? _ No COMPLIANCE WITH 02H;.1003(4)' 7 'Width of vegetated setbacks provided(feet) w N/A 8 Will the vegetated setback remain vegetated? N/A 9 III BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? —-- _•___.__._No__.__._..._ NUMBER AND TYPE OF SCMs: . 11 Infiltration System r 12 Bioretention Cell 0 13 Wet Pond ._._....__._...._.._.___._.__._.w_..___.� 14 Stormwater Wetland �--------------------'---:0___._" "-"'—__ 15 Permeable Pavement 0 16 Sand Filter --•---•—•—_._..._...__ 0 17 Rainwater Harvesting(RWH) _._ 0 18 Green Roof ._._..____..._.__._. 0 19 Level Spreader-Filter Strip(LS-FS) 0____. 20 Disconnected Impervious Surface(DIS) � 0 21 Treatment Swale 0 22 D Pond l : R 23 EStormFiiter I 0 24 !Silva Cell 0 25 Bayfilter .............._...W. _:..... ._O 25 Bayfilter Filterra — -- 0 _ FORMS LOADED (DESIGNERICERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,!Ltd.. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: j cpardo@bowman.com Ce ifcabon Staternant: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is to the best of my knowledge and belief;;true,accurate,and complete;;,and that the engineering plans; specifications,operation and maintenance agreements and other supporting Information are consistent with the information provided here. Designer 01\11111111/i//////r , • SEAL Signature of Designer 051571 i • 4:14 0 E ?),",„\ efibta3 .;,Seal' Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 � 3 Does this project have low density areas? I No 4 If so,number of low density drainage areas 0 ____ Is all/part of this project subject to previous rule ' 5 'versions? No FORMS LOADED DRAINAGE AREA INFORMATION t__ h ( 1 4 T •e of SCM , . Wet Pond 5 Total drainage area s• ft 764974 sf 1 716241 ' 6 I Onsite draina•e area s• ft 764974 sf 716241 7 Offsite drains•e area s• ft E 8 Total BUA in •ro'ect s•ft 458579 sf 448705 sf New BUA on subdivided lots(subject to permitting)j 9 s•ft New BUA not on subdivided lots(subject to 10 •ermitting)(sf) 458579 sf 448705 sf 11 Offsite BUA s• ft 12 Breakdown of new BUA not on subdivided lots: -Parkint) -Sidewalk(sq ft) 1 26527 sf 26527 sf • -Roof(sq ft) 105582 sf - 105582 sf -Roadway(sq ft) 217896 sf 208022 sf -Future(sq ft) w _ -Other,please specify in the comment box below(sq ft) 108574 sf t 108574 sf New infiltrating permeable pavement on 1 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to a 15 permitting)(sq ft) a 16 Existing BUA that is already permitted(sq ft) _ 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 1 59.95% :62.6% _ 19 'Design storm(inches) 1.0 in 20 Design volume of SCM(Cu ft) i 38972 cf 21 Calculation method for design volume -Simple Method I ADDITIONAL INFORMATION. Please use this space to provide any additional information about the 22 'drainage area(s): gOther BUA refers to 80%of parcel 494560301440 allocated for future development. _ .v WET POND 1 Drainage area number I 1 2 Minimum required treatment volume Cu( ft 36637 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 , 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? Are the inlets,outlets,and receiving stream protected from erosion P- _..__......_.......___.' 7 10- -ar storm? Yes e Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred 10 If a.plicable,will the SCM be cleaned out after construction? Yes_ 11 Does the maintenance access comply with General MDC(8)? _ Yes 12 Does the drainage easement comply with General MDC(9)? Yes13 mm If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? j Yes . Does the SCM follow the device specific MDC? Yes_u 17 Was the SCM deli.ned b an NC licensed •rofessional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used J SA/DA 19 Has a stage/storage table been provided in the calculations? ( Yes 20 Elevation of the excavated main pool depth(bottom of sediment j 245.00 removal fmsl 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 246.00 22jElevation of the bottom of the vegetated shelf(fmsl) 254.00 23 Elevation of the permanent pool(fmsl) f 254.50 24 Elevation of the top of the vegetated shelf(msl) j 255.00 25 Elevation of the temporary pool(fmsl) 256.10 26 Surface area of the main permanent pool(square feet) l 14170 27 Volume of the main permanent pool(cubic feet) 76763 cf 28 Average depth of the main pool(feet) 6.07 ft. 291Average depth equation used ] Equation 3_ 301 If using equation 3,main pool perimeter(feet) 635.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the foreba cubic feet j 3155 cf EIs this 15-20%of the volume in the main pool? Yes Clean-out depth for forebay(inches) 18 in ©Design volume of SCM(cu ft) 36637.cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 2.50 in Y" 38 If weir,weir height(inches) _ 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool{days) (_ 2.92 41 Are the inlet(s)and outlet located in a manner that avoids short Yes circuiting? 42 Are berms or baffles provided to improve the flow path? j _ Yes 43 Depth of forebay at entrance(inches) 30 in 44 Depth of forebay at exit(inches) 24 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) j 6 ft 47 Slope of vegetated shelf(H:V) ( 6:1 Does the orifice drawdown from below the top surface of the48 Yes permanent pool? Does the pond minimize impacts to the receiving channel from the 1- 49 yr,24-hr storm? I Yes Are fountains proposed?(If Y,please provide documentation that 50 MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52[Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment I H rid Bermuda 54 Has •lantin. .1an been •rovided for the vegetated shelf? I W Yes ADDITIONAL INFORMATION _ Please use this space to provide any additional information about the 55 wet pond(s): Wet Pond 1 3:07 PM 11/6/2023