Loading...
HomeMy WebLinkAbout20201941 Ver 2_Credit Release Request Form - Task 4_20231121 November 20, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth (Khogarth@wildlandseng.com, 919-851-9986 x122) Through: Wildlands Holdings III, LLC We formally request a credit release for the Little River - Weaver Mitigation Bank Parcel (DWR ID# 2020-1941v2) for completion of Task 4 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been reviewed and approved by DWR for Task 4: Little River - Weaver Monitoring Year 1 Monitoring Report. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 10% 31,469.900 sq feet 314,699.000 x 0.10 = 31,469.900 Buffer Preservation NA 140.610 sq feet 1,406.096 x 0.10 = 140.610 Buffer Enhancement NA NA Generated Nitrogen Nutrient Offset 10% 5,808.712 lbs 58,087.116 x 0.10 = 5,808.712 Delivered Nitrogen Nutrient Offset (Jordan sites only) NA NA Generated Phosphorus Nutrient Offset NA NA Delivered Phosphorus Nutrient Offset (Jordan sites only) NA NA Signature: Attachments: 1) As-Built Project Credit Table 2) Approved MBI Credit Release Schedule Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Buffer Rural No I / P Restoration 0-100 UT1 & UT2 222,187 222,187 1 100% 1.00000 Yes 222,187.000 Yes 11,594.015 Nutrient Offset Rural No I / P Restoration 101-200 UT1 & UT2 199,938 1 33%No —Yes 10,433.032 Buffer Rural No Ditch Restoration 0-50 Ditch B 92,512 92,512 1 100% 1.00000 Yes 92,512.000 Yes 4,827.400 Nutrient Offset Rural No Ditch Restoration 0-100 Ditch B (50' - 100') 82,827 1 100%No —Yes 4,322.024 Nutrient Offset Rural No Ditch Restoration 0-100 Ditch A, Ditch C, Ditch D, Ditch E 343,744 1 100%No —Yes 17,937.021 Nutrient Offset Rural No Ditch Restoration 101-200 Ditch A, Ditch B, Ditch C, Ditch D, Ditch E 486,669 1 33%No —Yes 25,395.039 Rural No Ditch Restoration 0-100 Diffuse Flow Deductions 10,875 1 100%No —No — Totals (ft2):1,438,752 314,699 314,699.000 74,508.530 Total Buffer (ft2):314,699 314,699 Total Nutrient Offset (ft2):1,113,178 N/A Total Ephemeral Area (ft2) for Credit:0 0 Total Eligible Ephemeral Area (ft2):80,693 0.0%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):104,900 1.9%Preservation as % TABM Credit Type Location Subject? Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Buffer Rural No I / P 0-100 UT1 & UT2 6,517 6,517 5 100% 5.00000 1,303.400 Buffer Rural No I / P 101-200 UT2 1,556 1,556 5 33% 15.15152 102.696 Preservation Area Subtotals (ft2):8,073 8,073 Square Feet Credits 314,699 314,699.000 0 0.000 8,073 1,406.096 322,772 316,105.096 Square Feet Credits Nitrogen:58,087.116 Phosphorus:0.000 Table 1. Project Credit Table Little River - Weaver Mitigation Bank Parcel Monitoring Year 1 - 2023 1,113,178 TOTAL AREA OF BUFFER MITIGATION (TABM) TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer: Neuse 03020201 - Outside Falls Lake 19.16394 N/A Restoration: Enhancement: Mitigation Totals 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a). last updated 08/03/2020 Table 3.0 ‐ Credit Release Schedule for Riparian Buffer and Nutrient Offset Credits   Task Project Milestone  % Credit  Available for  Sale  1 Instrument and BPDP Approved by DWR, Conservation Easement  Recorded*, and Financial Assurance Posted 20  2  All Riparian Earthwork & Mitigation Activities,  Planting and  Installation of Monitoring Devices completed, easement boundaries  adequately marked, all applicable permits obtained, site visit  performed by DWR   20  3 Monitoring Financial Assurance Posted and Approval of As‐Built  Report 10  4 Monitoring Report #1: Approved by the DWR** & financial  assurance renewed 10  5 Monitoring Report #2: Approved by the DWR** & financial  assurance renewed 10  6 Monitoring Report #3: Approved by the DWR** & financial  assurance renewed 10  7  Item B (I) of Section X in this Instrument has been completed and  approved by DWR 5  No remaining credits will be released until Task 7 has been satisfied, assigning the  conversation easement to an approved land trust or long‐term steward.   8  Monitoring Report #4: Approved by the DWR** & financial  assurance renewed 5  9  Monitoring Report #5: Approved by the DWR** and final site visit  by DWR has been conducted 10  Total 100%  *For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP