HomeMy WebLinkAboutSite Inspection 11.20.23 Bridge 26 on NC 106Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210555
TPB NCDOT - Replace Bridge 26 on NC 106
(B-0029)Macon
TPB NCDOT - Replace Bridge 26 on NC 106 (B-0029)
NC DOT Division 14 - Sylva
11/20/2023
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 19' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
- Cover any bare areas within the 25' trout buffer. This includes disturbed areas underneath the bridge that may be
vulnerable to deck drain discharge.
- NPDES records were up to date.
- Need to adhere to NPDES cover requirements. Inspector informed me that the cut slope is scheduled to be matted this
week.
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted on November 20, 2023 by Kevin Mitchell with the Asheville Regional Office.
Kevin Barnett and Jordan Talley were present during the inspection.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210555
11/20/2023
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2