Loading...
HomeMy WebLinkAboutSite Inspection 11.20.23 Bridge 26 on NC 106Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210555 TPB NCDOT - Replace Bridge 26 on NC 106 (B-0029)Macon TPB NCDOT - Replace Bridge 26 on NC 106 (B-0029) NC DOT Division 14 - Sylva 11/20/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 19' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant - Cover any bare areas within the 25' trout buffer. This includes disturbed areas underneath the bridge that may be vulnerable to deck drain discharge. - NPDES records were up to date. - Need to adhere to NPDES cover requirements. Inspector informed me that the cut slope is scheduled to be matted this week. Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on November 20, 2023 by Kevin Mitchell with the Asheville Regional Office. Kevin Barnett and Jordan Talley were present during the inspection. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210555 11/20/2023 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2