Loading...
HomeMy WebLinkAboutWQ0000484_Permit Renewal_20180516State of North Carolina j. Division of Water Resources t -Water Quality Regional_ -Operations Section Environmental Staff Report cQuality To: ❑ NPDES Unit ® Non- Discharge Unit Application No.: WQ000048.4 Attn: Tessa Monday Facility name: Mountaire Farms Inc..- Lumber Bridge From: Jim Barber Fayetteville Regional Office Note: This form has been adapted from the non -discharge- fa.cilily staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as theme applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site vikt:16 May 2018 b. Site visit conducted by: Jim Barber and Tony Honevcutt c. Inspection report attal hed?. ❑ Yes or ® No d. Person contacted:: R I bert Jackson and their contact information: 910 359.' 5275 ext. riackson(i�mountaire.com I. e. Driving directions: From the intersection of NC 11wy20 and NC Hwv 71 in Lumber. Bridge, take Hwy 71 west towards Red Springs and drive approx..1.70 miles. The Mountaire Farms plant site is on the right. 2. Discharge Point(s): N/A Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: Big Marsh Swamp Classification: C Sw, " River Basin and Sub -Basin No.: Lumber River/LBR53/14-22-2 Describe receiving stream features and pertinent downstream uses: Predominantly agriculture and forest management. Sanderson Farms spray irrigation fields are approx. 6 miles downstream, St.'Pauls WWTP'is approx. 8 miles downstream, Robeson County LF is approx.- 12.miles downstream and Prestage Foods 'spray irrigation . fields are approx. 13 miles downstream oust before Big Marsh Swamp discharges into Gallberry Swamp forming:Big Swamp which is also a C = Sw'classificati H. PROPOSED FACILITIES: NEW APPLICATIONS 1: Facility Classification: (Please attach completed rating sheet to be attached to issued permit) Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate *for the type of waste and disposal system? ❑ Yes or ❑ No If no, explain: . 3. Are site conditions (soils, (depth to water table; etc) consistent with the submitted reports? ❑ Yes ❑ No .❑ N/A - If no, please explain: FORM: WQROSSR 04-14 Page 1 of 6 ' 4. Do the plans and site magi If no, please explain: . -_ . 5. , Is the proposed residuals If no, please explain: _ 6. Are the proposed applica If no, please explain: _ 7. Are there any setback coi If yes, attach a map shorn 8. Is the proposed or existin If no, explain and recomi 9._ For residuals, will seasor. If yes, attach list of sites Describe the residuals ha 10. Possible.toxic impacts to 11. Pretreatment Program (P1 M. EXISTING FACILITIES: 1. Are there appropriately ORC: Robert Jackson ORC: Derrick Mallety 2. Are the design, mainten system? ® Yes or ❑ I If no, please. explain: Description of existing'I represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ N/A management plan adequate? ❑ Yes ❑ No ❑ N/A rates (e.g., hydraulic; nutrient) acceptable? ❑ Yes ❑ No ❑ N/A licts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No g conflict areas. groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A ,nd any changes to the groundwater monitoring program: or other restrictions be required? ❑ Yes ❑ No ❑ N/A th restrictions (Certification B) [ling and utilization scheme: cc waters: . s only): DIFICATION AND. RENEWAL APPLICATIONS :red Operators in Charge (ORCs) for the facility? ® Yes ® No ❑ N/A ificate #: SI-14876 Backup ORC: Derrick Mallety .Certificate #: SI-993134 ificate #: WW-4/1004828 Backup ORC: Robert Jackson Certificate and operation of the treatment facilities adequate for the type of waste and disposal As written in the eurrent spray irrigation Permit W00000484. Facility treatment and aeration in storage basin. Domestic flow will still go thru the BioWheel TM treatment unit Proposed flow:-2.55 M( Current permitted flow: Explain anything obsery for the permit writer to 1 etc.) 3. Are the site conditions assimilating the waste? If no, please explain: 4. Has the'site changed in boundary, new developr If yes, please explain: _ 5. Is the residuals manager If no, please explain: A 6. Are the existing appli If no, please explain: 7. Is the existing ground If no, explain and reci FORM: WQROSSR 04-14 v i�ivy during the site visit that needs to be addressed by the permit, or that may important w (i.e.; equipment condition, function, maintenance, a change in facility .ownership, soils, topography, depth to water table, etc) maintained appropriately and adequately Yes or ❑ No way that may affect the permit (e.g., drainage added, new wells inside.the compliance t, etc.)? ❑ Yes or ® No plan adequate? ® Yes or ❑ No ion. rates (e.g.,'hydraulic, nutrient) still. acceptable? ® Yes or ❑.No monitoring program adequate? ❑ Yes ® No ❑ N/A ad any changes to the groundwater monitoring program: Duncklee & Dunham Page 2 of 6 �. consultants has -.prepared an revised monitoring plan for the facility to install new wells at the appropriate review and complianceboundary locations to upgrade the groundwater monitoring system 8. Are there any setback 'c inflicts for existing treatment, storage and disposal sites? ❑ Yes or 0 No If yes, attach a map sho l mg conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ® Yes ® No ❑ N/A If no, please explain: See comment #7. New groundwater monitoring wells have not been drilled at this time and are wart of the upcoming contract for the wastewater plant improvements. FORM:. WQROSSR 04-14 Page'3 of 6 s , 11. Are the monitoring well coordinates correct in BIMS? ® Yes No N/A 'If no. please comnlete the following (exnand tnhle if nenngwgrvl- ❑ 0 Monitoring Well Latitude Longitude , ri O I II _ O I II O / H _ O 1 it O I II _ O Y 1/ O 1 11 - O / 1/ 12. Has a review of all self-n Please summarize any fir White. Provide input to help the 13. Are there any permit chap If yes, please explain: _ 14. Check all that apply: ® No compliance issu ❑ Notice(s) of violatii Please explain and. attach Mountaire Farms is not this time. If the -facility has had cot working with the Permitt Have all compliance dat, If no, please explain:. 15. Are there any issues relal ❑ Yes ® No ❑ N/A If yes, please explain: _ 16. Possible toxic impacts to 17. Pretreatment Program (P -ing data been conducted (e.g., DMR, NDMR, NDAR, GW)? 0 Yes or ❑ No resulting from this review: Reviewed monthly by Tony Honeycutt and Kent mit writer evaluate any requests for reduced'monitoring, if applicable. s needed in order to address ongoing BIMS-violations? ❑ Yes or ® No ® Current enforcement action(s) . ❑ Currently under JOC ` ® Currently under SOC ❑ Currently under moratorium documents that may help clarify answer/comments (i.e., NOV, NOD, etc.). ater treatment facility. iance problems during the permit cycle, please explain the status. Has the RO been Is a solution underway or in place? .onditions in the existing permit been satisfied? El Yes ❑ No N/A to compliance/enforcement that should be resolved before issuing this permit? ce waters: N/A s only): N/A FORM: WQROSSR 04-14 Page 4 of 6 N. REGIONAL OFFICE RE OAMENDATIONS 1. Do you foresee any problems with issuance/renewal. of this permit? ❑ Yes or ❑ No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non-DiS-6hirgeUnit Central Office to obtain through an additional information request: Item I Reason { 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special o Condition 5. Recommendation: 6. Signature of report preparF Signature of egio al supei Date: S o or compliance schedules recommended to be included in the permit when issued: Reason Hold, pending receipt and review of additional information by regional office. Hold, pending review of draft permit by regional office Issue upon receipt of needed additional information Issue - D FORM: WQROSSR 04-14 Page 5 of 6 t' r j : V. ADDITIONAL r FORM: WQROSSR 04-14 STAFF REVIEW ITEMS Page 6 of 6 n y Division of Water Resources To: FRt O-WQROS`Trent�l. From: Tessa Monday, Water Qu Permit Number: WQ0000484 Applicant: Mountaire Farms Inc. Owner Type: Organization Facility Name: Mountaire Farm Signature Authority: Nolan Re Address: PO Box 339, Lumber Fee Category: Non -Discharge A Comments/Other Information: State of North Carolina _ Department of Environmental Quality Division of Water Resources WATER QUALITY REGIONAL OPERATIONS SECTION NON -DISCHARGE APPLICATION REVIEW REQUEST FORM April 30; 2018 RECEIVED,. i/1�Tark Brantley OEM MAY Oj 3, 2.048', ity Permitting Section - Non -Discharge Permitting Unit -.Lumber Bridge WWTF folds ridge, NC 28357 Permit ype: astewa"tear` rrigation Project Type: Major Modification Owner in.BIMS?. Yes Facility in BIMS7 Yes Title: Director of Processing Operations County: Robeson Fee Amount: 3395 - Major Modification Attached, you will find all information submitted in support of the. above -referenced application for your review,. comment, and/or action. Within 45 calendar days,.please take the following actions: . Return thisform completed. Return a completed staff report. ❑ Attach an Attachment for Certification:. ❑ Issue an Attachment B Certification. When you receive this request. form, please write your name and dates in the spaces below, make a copy of this sheet, and return it to the appropriate Central Office Water Quality Permitting Section contact person listed above. RO-WQROS Reviewer: Date:. FORM: WQROSNDARR 09-15 Page 1 of 1 Water Resources" ENVIRONMENTAL QUALITY NOLAN REYNOLDS — DIRI MOUNTAIRE FARMS INC. PO BOX 339 LUMBER BRIDGE, NORTH April 30, 2018 OF PROCESSING OPERATIONS 28357 ROY COOPER Governor MICHAEL S..REGANN Secretary LINDA CULPEPPER _ -Interim Director Subject: Acknowledgement of . Application No. WQ0000484 Mountaire Farms Lumber Bridge WWTF Wastewater Irrigation System Robeson County Dear Mr. Reynolds: The Water Quality Permitting_ Section acknowledges receipt of your permit application and . , supporting documentations received on April 27, 2018.. Your application package has been assigned the - number listed above, "and, the primary reviewer is Tessa Monday. Central and Regional Office staff will perform a detailed review of the -provided application, and may contact you with "a request for additional information. To ensure maximum efficiency in processing permit applications, the Division of Water Resources requests your assistance in -providing a timely and - complete response to any"additional information requests. Please note that processing standard review permit applications may take as long as 60 to 90 days after receipt of a complete application. If you have any questions, please contact Tessa Monday at (919) 80�7-6384 or tessa.monday@ncdenr.gov. cc: gmayeUevim Permit File Stat6 of North Sincerely, Nathaniel D. Thornburg, Supervisor Division of -Water Resources - ­5p�-Nothtng Compares_-_-__ . na I Environmental Quality I Water Resources I Water Quality Permitting I Non -Discharge Permitting 1617 MailService Center I Raleigh, North Carolina 27699-1617 919-807-6332