HomeMy WebLinkAbout20060411 Ver 2_401 Application_20150831CurrY
ENGINEERING-
TRANSMITTAL FORM
TO: Ms. Karen Higgins
NCDENR - Division of Water Resources
401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699 -1617
919 - 807 -6364
SUBJECT: Transept Court Maintenance
Holly Springs, NC
CURRY PROJECT NO: 2014 -049
We are sending you the following items
COPIES ITEM
DATE: August 27, 2015
SENT BY: Jared Matthews
3 Document PCN Application
3 Exhibit Maintenance Area Plan
3 Letter Original Disturbance Permit
1 Check Review Fee Check
These are transmitted as checked below:
DESCRIPTION
For Information
Approved as Noted - Revise and Resubmit
As Requested
Not Approved - Revise and Resubmit
For Review and Comments
For Record and File
For Revision
Submittal
x For Approval
For Recording
Approved
For Signature, then return to
REMARKS:
Enclosed is a PCN Application, Fee, and Exhibit outlining the work to be done Please let us know if
you have any questions or concerns
T (919) 552 -0849 205 5 Fuquay Avenue
F (919) 552 -2043 Fuquay - Varina, NC 27526
E 11
F�
EST Q �
Z 10
0
\y
CAR 0�.�
C-)CO(.p DLf I ( U d_
of W A TF9
p Office Use Only
'0 Corps action ID no
DWQ protect no
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a Type(s) of approval sought from the Corps Section 404 Permit Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number 3 or General Permit (GP) number.
1c Has the NWP or GP number been verified by the Corps?
1 d Type(s) of approval sought from the DWQ (check all that apply)
❑X 401 Water Quality Certification — Regular
❑ 401 Water Quality Certification — Express
❑R Yes ❑ No
❑ Non -404 Jurisdictional General Permit
❑X Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ
because written approval is not required? 401 Certification
❑ Yes ❑ No
1f Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program
1 g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h
below.
1 h Is the project located within a NC DCM Area of Environmental Concern (AEC)?
2. Project Information
2a Name of project Alexander Woods - Bartizan Drive
2b County Wake
2c Nearest municipality / town. Holly Springs
2d. Subdivision name Alexander Woods
2e NCDOT only, T I P or state project no
3. Owner Information
3a. Name(s) on Recorded Deed Geremy Knapp, Kimberly Knapp
3b Deed Book and Page No 015568, 01004
3c. Responsible Party (for LLC if
applicable)
3d Street address 4616 Transept Court
3e City, state, zip Holly Springs, NC 27540
3f Telephone no:
3g Fax no
3h Email address
For the record only for Corps Permit,
❑X Yes ❑ No
❑ Yes ❑X No
❑ Yes ❑X No
❑ Yes ❑X No
IIDI L c,��;
l�lll =f'`3 n�
1 1 AUG � � zu6
401 a .4
& BUFFER P �OURC[S
Page 1 of 10
PCN Form — Version 1 4 January 2009
4. Applicant Information (if different from owner)
4a Applicant is ❑ Agent
14b Name Chris Mullen
4c Business name
(if applicable)
4d. Street address.
4e City, state, zip.
4f Telephone no
4g Fax no..
X❑ Other, specify Developer of Subdivision
5225 Wade Nash
Holly Springs, NC 27540
919- 906 -0812
4h
Email address
mullencmb @embargmail com
5.
Agent/Consultant Information
(if applicable)
5a
Name.
Jared Matthews
5b
Business name
Curry Engineering, PLLC
(if applicable)
5c
Street address
205 S. Fuquay Avenue
5d City, state, zip
5e Telephone no
5f Fax no
5g Email address
Fuquay- Vanna, NC 27526
919- 552 -0849
dared @curryeng corn
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a Property identification no (tax PIN or parcel ID) 1 0658012857
1 b Site coordinates (in decimal degrees) I Latitude 35 619999 Longitude -78 83
1c Property size 1 17 acres
2. Surface Waters
2a Name of nearest body of water to proposed project Basal Creek
2b Water Quality Classification of nearest receiving water Stream
2c River basin Neuse River Basin
3. Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
Residential use The culvert under Transept Court needs maintenance and houses an Unnamed Tributary to Basal Creek
3b List the total estimated acreage of all existing wetlands on the property 0
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0
3d Explain the purpose of the proposed project.
Repair culvert oufall area to remove 'perched' oufall condition and prevent erosion
3e Describe the overall project in detail, including the type of equipment to be used
Debris will be removed from the outfall area and stone will be placed to alleviate any erosion by high stream flows
4. Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the ❑ Yes ❑ No ❑X Unknown
Corps or State been requested or obtained for this property / Comments
protect (including all prior phases) in the past?
4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final
of determination was made9
4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company
Name (if known) Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5. Project History
5a Have permits or certifications been requested or obtained for ❑X Yes ❑ No ❑ Unknown
this project (including all prior phases) in the past?
5b If yes, explain in detail according to "help file" instructions
There is an approved DWQ stream disturbace permit I have attached the first page of this permit
6. Future Project Plans
6a. Is this a phased project? ❑ Yes ❑X No
6b. If yes, explain
The subdivision that the culvert is located in was a phased protect, but the maintenance is not
Page 3 of 10
PCN Form — Version 1 4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la Which sections were completed below for your project (check all that apply).
❑X Wetlands ❑X Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a 2b 2c 2d 2e
2f
Wetland Impact Type of Impact Type of wetland Forested Type of jurisdiction
Area of
number Corps (404,10) or
impact
Permanent (P) or DWQ (401, other)
(acres)
Temporary (T)
W1 T Culvert Maintenance Small -Basin Wetland No Corps
<001
W2 P
I Choose one Choose one Yes /No
W3
I Choose one Choose one Yes /No -
W4
Choose one Choose one Yes /No -
W5
Choose one Choose one Yes /No -
W6 -
Choose one Choose one Yes /No -
2g Total Wetland Impacts:
001
2h. Comments
Wetlands encapsulate culvert outlet area to be repaired
3. Stream Impacts
If there are perennial or Intermittent sti=eam Impacts (Including temporary Impacts) proposed on the site, then complete this
question for all stream sites impacted
3a 3b 3c 3d 3e 3f
3g.
Stream Impact Type of Impact Stream name Perennial (PER) or Type of Average
Impact
number Intermittent (INT)? jurisdiction stream
length
Permanent (P) or width
(linear
Temporary (T) (feet)
feet)
S1 T Culvert Maintenance UT to Basal Creek INT Corps I 4
5
S2 Choose one -
S3 - Choose one
S4 - Choose one -
S5 - Choose one - -
S6 - Choose one -
31 Comments
Stream flows through culvert to be repaired
3h Total stream and tributary impacts 5
Page 4 of 10
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries,
sounds, the Atlantic Ocean, or any other open water of
the U S then individually list all open water Impacts below
impacts
4a 4b. 4c
4d 4e
Open water Name of waterbody
6a. Project is in which protected basin?
Impact number (If applicable)
Type of Impact Waterbody Area of Impact (acres)
Permanent (P) or
type
Temporary (T)
01 -
Choose one Choose
Stream name Buffer
02 -
Choose one Choose
number —
03 -
Choose one Choose
impact
O4 -
Choose one Choose
(square
4f Total open water impacts I 0
4g Comments
S. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a 5b 5c 5d 5e
Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland
purpose of pond (acres)
Flooded Filled Excavated Flooded Filled Excavated
P1 Choose one
P2 Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
51 Size of pond watershed (acres)
5k Method of construction.
6. Buffer Impacts (for DWQ)
If project will Impact a protected riparian buffer, then complete the chart below If yes, then Individually list all buffer
impacts
below If any Impacts require mitigation, then you MUST fill out Section D of this form
6a. Project is in which protected basin?
❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman
❑ Other
6b 6c
6d 6e 6f
6g
Buffer Impact Reason for impact
Stream name Buffer
Zone 1
Zone 2
number —
mitigation
impact
impact
Permanent (P) or
required?
(square
(square
Temporary (T)
feet)
feet)
61 T Stream
Unnamed Tributary to Basal Creek No
20
0
1 B2 Stream
Unnamed Tributary to Basal Creek No
B3
Yes /No
B4
Yes /No
B5 -
Yes /No
B6 -
Yes /No
6h Total Buffer Impacts:
I
20
0
61 Comments Temporary impact is only for maintenance activities
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
No design will be provided
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Minimal area will be disturbed in maintenance activities
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for ❑ Yes ❑X No
impacts to Waters of the U S or Waters of the State?
2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps
❑ Mitigation bank
2c If yes, which mitigation option will be used for this ❑ Payment to in -lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
Type Choose one
Quantity
3b Credits Purchased (attach receipt and letter) Type Choose one
Quantity*
Type Choose one
Quantity
3c Comments
4. Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c. If using stream mitigation, stream temperature Choose one
4d Buffer mitigation requested (DWQ only),
square feet
4e Riparian wetland mitigation requested
acres
4f Non - riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
S. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No
buffer mitigation?
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c 6d 6e
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1
3 (2 for Catawba)
Zone 2 1 5
6f Total buffer mitigation required:
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a Does the project Include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b If yes, then Is a diffuse flow plan included? If no, explain why
There is no perpendicular penetration to the existing creek
❑ Yes ❑X No
1 2. Stormwater Management Plan
2a. What is the overall percent Imperviousness of this project? 0
2b Does this project require a Stormwater Management Plan? ❑ Yes No
I
2c If this project DOES NOT require a Stormwater Management Plan, explain why
No impervious surfaces will be installed, nor groundcover removed
2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
2e Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a In which local qovernment's jurisdiction is this project?
3b Which of the following locally - Implemented stormwater management programs
apply (check all that apply)
3c Has the approved Stormwater Management Plan with proof of approval been
attached?
4. DWQ Stormwater Program Review
4a Which of the following state - Implemented stormwater management programs apply
(check all that apply)
4b Has the approved Stormwater Management Plan with proof of approval been
attached?
5. DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements?
5b Have all of the 401 Unit submittal requirements been met?
N/A
Wake County
❑X Phase II
❑ NSW
❑ USMP
❑ Water Supply Watershed
❑ Other
❑ Yes ❑X No
❑Coastal counties
❑HQW
❑ ORW
F1 Session Law 2006 -246
❑Other
❑ Yes ❑X No
❑ Yes ❑ No
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a Does the project Involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No
use of public (federal /state) land?
1 b If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments
2. Violations (DWQ Requirement)
2a Is the site In violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes X❑ No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b Is this an after - the -fact permit application? El Yes X❑ No
2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3. Cumulative Impacts (DWQ Requirement)
3a Will this project (based on past and reasonably anticipated future Impacts) result in ❑ Yes X❑ No
additional development, which could impact nearby downstream water quality?
3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative Impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
4. Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
No wastewater will be discharged from site or used in construction
Page 9 of 10
PCN Form — Version 1 4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No
Impacts?
5c If yes, Indicate the USFWS Field Office you have contacted
5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical
Habitat?
Previous project did not impact Endangered Species or Designated Critical Habitat
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Previous project did not impact Essential Fish Habitat
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur In or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ❑ Yes X❑ No
status (e.g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
Previous protect did not impact historic or archeological resources
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur In a FEMA - designated 100 -year floodplain?
8b If yes, explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
FEMA Panel #370368
Chris Mullen
Applicant/Agent's Printed Name
❑ Yes
Chris MuIIen DI9rta ly ne0by Ch Mullen
DIN cn =Ch o as Mullen, o ou,
email = 20m ullencbm@embargmail com c =US
` Date 15 07 29 1144 18.04 00
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided )
Page 10 of 10
x❑ No
7/29/2015
Date
Mr. Chris Mullen
5225 Wade Nash Road
Holly Springs, NC 27540
Subject Property-
Michael F Easley, Governor
William G Ross Jr, Secretary
North Carolina Department of Environment and Natural Resources
July 5, 2006
Alexander Woods Phase IV
UT to Basal Creek [030403, 27- 43 -15 -3, B, NSW]
Alan W Klimek, P E Director
Division of Water QuaMy
DWQ Project # 06-0411
Wake County
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer
Protc:tion Rules (15A NCAC 213 .0233) ovith Additional Conditions
Dear Mr. Mullen:
You have our approval, in accordance with the attached conditions and those listed below, to place fill within or
otherwise impact 0.091 acres of wetland, 60 feet of intermittent stream and 3,000 square feet of Zone 1 Neuse River
basin protected riparian buffer and 2,000 square feet of Zone 2 Neuse River basin protected riparian buffer as
described in your application dated February 21, 2006, and received by the Division of Water Quality (DWQ) on
March 13, 2006, with more information received from you on May 18, 2006, and June 29, 2006, for the purpose of
constructing the proposed residential subdivision. After reviewing your application, we have decided that the
impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows
You to use Nationwide Permit(s) NW39 when issued by the US Army Corps of Engineers (USACE). This letter
shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC
2B .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits
before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non -
discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to
waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your project, you
must notify us and you may be required to send us a new application. If the property is sold, the new owner must be
given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If
total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream,
compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to
follow the conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions of
this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental
impacts,
404 /Wetland
Stream - intermittent
Buffer — Zone 1
Buffer — Zone 2
Amount Approved (Units)
0.091 (acres)
60 (linear feet)
3,000 (square ft.)
2,000 (square ft.)
401 Oversight /Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699 -1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone 919- 733 -1786 i FAX 919- 733 -6893 / Internet h1tn. / /h2o cur state no us /ncwetlands
An l�qual Opportunity/Affirmative Action Employer — 50% Recycled /10% Post Consumer Paper
Plan Location or Reference
PCN page 8 of 12
PCN page 8 of 12
PCN page i I of 12
PCN page I 1 of 12
One
No thCarohna
Naturally
-OF -WAY
1 / �
a �
1 / E ISTING -
/106' L 72-�
DIA -RCP I
WETLANDS
-7 3 �1 MAINTENANCE , �
r
ACTIVITY
A �� 1 � RIPARIAN
� BUFFER
1 I (ZONE -1)
IAN
1 �
1 1 / BUFFER
(ZONE -2)
EXISTING ROADWAY
EDGE OF PAVEMENT
TRANSEPT COURT CULVERT - PLAN VIEW
EX-O � SCALE: 1 " = 20'
2' +/-
2 OUTLET AREA DETAIL
EX -01 SCALE: N.T.S
w
89
any
V
W
O Z
V Z
W
V Q
z�
a_
�I
w
Z
zw
w
EX-1