HomeMy WebLinkAboutWQ0044756_Application (FTSE)_20230913DWR
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 06-21 & SUPPORTING DOCUMENTATION
Application Number: 1_00,1--�5to be completed by Dwlt)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Goodwill Industries of Central North Carolina, Inc. (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ❑ Municipal ❑ Other
3. Signature authority's name: Christopher Gorham per 15A NCAC 02T .0106(b)
Title: President/CEO-Registered Agent
4. Applicant's mailing address: 1235 South Eugene Street
City: Greensboro State: NC Zip: 27406-
5. Applicant's contact information:
Phone number: (336) 544-5260 Email Address: cgorham a.triadRoodwill.org
1I. PROJECT INFORMATION:
1. Project name: Goodwill -Gate City Blvd.
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date: ,
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Guilford
4. Approximate Coordinates (Decimal Degrees): Latitude: 36.010796' Longitude:-79.899805'
5. Parcel ID (if applicable): 7832339812 (or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Ryan S. Thompson License Number: 048858
Firm: Davis -Martin -Powell & Associates
Mailing address: 6415 Old Plank Road
City: High Point State: NC Zip: 27265-
Phone number: (336) 886-4821 Email Address: rthompsonadmp-inc.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: High Point Eastside WWTP Permit Number: NCO024210
Owner Name: City of High Point
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ
2. Downstream (Receiving) Sewer Information: 8 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS00010
Owner Name(s): Cityof Hieh Point
FORM: FTA 06-21 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
[—]Yes ❑ No ® N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑ No ® N/A
3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and
supplementary documentation as required by 15A NCAC 02T.0115(c) been attached?
❑ Yes [—]No ® N/A
4. Origin of wastewater: (check all that apply):
❑ Residential (Individually Owned) ® Retail (stores, centers, malls) ❑ Car Wash
❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater : % Domestic 50 % Commercial 50 % Industrial (See 15A NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? ❑ Yes® No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No
➢ If yes. provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow "b
No. of Units
Flow
Warehouse (3 Bays)
100 gal/bay
3
300 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
300 GPD
a See 15A NCAC 02T .0114(b), (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 300 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 06-21 Page 2 of 5
Vll. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8" 297 DIP
➢ Section It & III of the MDC for Permitting of Gravity Sewers contains infonnation related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: aLongitude: - °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day (firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify)
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B).
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation, quick -connection receptacle and telemetry -
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 06-21 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? ® Yes [:]No
15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
18 inches
2Water mains (vertical - water over sewer preferred, including in benched trenches)
18 inches
2Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class Il impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as WL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ If noncompliance with 02T.0305(f) or (0, see Section X.I of this application
* 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A
➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ❑ Yes [:]No ® N/A
➢ Please provide supplementary inforration identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules'? ❑ Yes Basin name: ® No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No
➢ This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No
or 401 Water Quality Certifications'?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [:]No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No
Per 15A NCAC 02T.0402, "high -priority sewer" ineans any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 06-21 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the hlininntm Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Mininiu n Design Criteria (latest version) as applicable?
[/ /m��MM
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the hermit, and proiects requiring a variance approval may be subject to longer
review times. For proiects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the proiect, the full technical review is required.
2. Professional Engineer's Certification:
I, Ryan Thompson attest that this application for Goodwill -Gate City Blvd.
(professional Engineer's name from Application Item III I) (Project Name from Application Item 11.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers ( latest version), and the Minimum Design Criteria for the Fast -Track Permitting
Of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application
information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject
the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
1. Christopher Gorham. Registered Agent attest that this application for Goodwill -Gate City Blvd.
(Signature Authority Name from Application Item 13) (Project Name from Application Item 11.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil -enalties up to $25,000 per violation.
Signature:
Date: 0"'6) ,too 3
FORIM: FTA 06-21 Page 5 of 5
State of North Carolina
Department of Environmental Quality
Division of Water Resources
U Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Goodwill Industries of Central North
Project Name for which flow is being requested: Goodwill -Gate City Blvd 5835 W Gate
More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name:
b. WWTP Facility Permit #:
All flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request 0.0003
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm Daily Flow**
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, * (Firm / po,
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD MGD
Flow, MGD
MGD
Flow
Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the NAINNITP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I W 2VJ M e55 e"y^ certify to the best of my knowledge that the addition of
the volume of Astewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing
Title ogigikifg Official
Upwh W we,ay Mess,,
MCMM
Wendy Messero.W" �,�.oue, ,"��'°
cya,v�rem, oU-cM of
(NeensOora.c ' 13 +a . :xMesser
ma: mz3 oao.ao
Date
Page 2 of 6
FTSE 10-18
State of North Carolina
3f h
?j Department of Environmental Quality
aDivision of Water Resources
Flow Tracking for Sewer Extension Applications
Division of beater Resources "NE
Entity Requesting Allocation: H gl PointNC
Project Name for which flow is being requested: Goodwill - Gate City
BUJD than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the
route of the proposed wastewater flow
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. YAM Facility name: Eastside VIWIPP
b. VAM Facility Penrat M NCO024210
All flows are in MGD
c. WWTP fackys Permitted flow
26
d. Estunated obligated flow not yet tributary to the W WTP
3.0653
e. WWTP facil ys actual average flow
14.92
f Total flow for this specific request
0.0003
g. Total actual and obligated flows to the facility
17.9856
h Percent of peniitted flow used
69.18%
IL Complete this section for each pimp station your are responsible for along the route of this proposed wastewater flow
List putM station located between the project connection point and the W WTP.
(A) (B) (C)
(D)=(B+C) (E)-(A-D)
Pr¢np Pump Design Approx Obligated
TotalCurrent
Station Station Firm Average Daily Current Not Yet
Flow Plus Available
(Nano or Pew Capacity, * Flow** Avg. Daily Tributary
Obligated Capacity***
Number) No. MGD (Finrdpfl Flow Daily Flow
Flow MGD
MGD MGD MGD
MGD
Reg6ters-Creek )YQ0000929 4.2 1.68 0.5648 0.0256
0.5904 1.0896
Riverdale W00008572 30.0887 11.4842 8.3101 1,5647
9.8748 1.6094
* The Finn Capacity of any pump station is defined as the maxinarm pumped tlowthat can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pl)
not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located bet„cen the
project connection point and the WWtP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Eastside V^VrP
Downstream Permit Nua ber (Sewer): NCO024210
Page 1 of 6
FTSE 10-18
III. Certification Statement
I, Derrick Boone, certify to the best of ury knowledge that the addition of the vokum of
wastewater to be permitted in. this project has been evakiated along the route to the receiving wastewater
treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary
sewer overflows or overbtnden any downstream pump station en route to the receiving treatment plant
inxler nom�al circm-Stances, given the implementation of the planned improvements identified in the
planning assessment where applicable. Tlvs analysis has been perfonmd in accordance with local
established policies and procedtwes using the best available data. This certification applies to those items
listed above in Sections I and lI pkts all attached planning assessrront addendtnrs for which I am the
responsible party. Signature of this form indicates acceptance of this wastewater flow.
aMA� q.a&61eV-
Siding Official Sigiawre
Job
Title ofSipuig Official
Asst. Public Services Director
9/12/23
Date
Page 2 of 6
FTSE 10-18
��(�/�(• U.S. DEPARTMENT
GEOLOGICAL SURVEY INTERIOR .- G CARaID QUADRANGLE
JUJ 'r US TO; NORTHC 7.1 �°SEN SDCWN
>i �Eb'p9pa'"E 91 93 9l 9I 95 9e 91 98 99 00 w Oi Nt u.�es,
97
Its
S
'y
I�
AFrylendvhiP -
95
_ _}r
-` GR E.I�NSR R e �' umNnm
If
91 �
91
n 11EG}I POINT
I87
JI
-)j _ H.GraJySower
,
85
91 9 58 94- _ 91
Goodwill Gate City Blvd. DAMS • MARTIN • POWELL 4:Mp 9
Greensboro, Guilford County, NC ENGINEERS & SURVEYORS
RoOu.N M� UngeB Slnra e9eI99k.I sur.el SCALE 1:14 M
r
.,.. .....•.. -cgs `"° -__--_
_
p • �,n. . , . 9.m.
,
—........... nn ...,.+ nw. ..• ...... n..., µ'"�Y .n.... ��« .,,w�.��.w�x.,..a. •"a p=S
GUILFORD, N[
2022
5/31/23, 3:40 PM 5835 W Gate City Blvd - Google Maps
Go ,gle Maps 5835 W Gate City Blvd
Goodwill
eberry
Funeral H"' G.df.,d,_
Life Storage
3—b.0
0 enb (T,ai1er-HftctwZen1'e4
T.
Prop. 8"
Gravity
Sewer
1P R- nip I
I
G"If — — '
Z' I
", Sewer
Go ,gle
Map data @)2023 Google 200 ft,
Goodwill -Gate City Blvd.
Greensboro, Guilford County, NC
DAMS - MARTIN - POWELL
ENGINEERS & SURVEYORS
dm[
5835 W Gate City Blvd
O O
(�Q.)
(+�) O
Directions Save
Nearby
Send to Share
phone
5835 W Gate City
Blvd, Greensboro, NC 27407
https://www.google.com/maps/pIace/5835+W+Gate+City+Blvd,+Greensboro,+NC+27407/@36.0104752,-79.9015692,17z/data=!4m6!3m5!1sOx88531 ... 1/2
8/23/23, 10:32 AM
North Carolina Secretary of State Search Results
- Upload a PDF Filing - Order a Document Online - Add Entity to My Email Notification List - View Filings
Non -Profit Corporation
Legal Name
Goodwill Industries of Central North Carolina, Inc.
Information
Sosld: 0060541
Status: Current -Active O
Date Formed: 12/10/1963
Citizenship: Domestic
Annual Report Due Date:
Registered Agent: Gorham, Christopher B
Addresses
Reg Office
1235 S Eugene St
Greensboro, NC 27406
Principal Office
1235 S Eugene Street
Greensboro, NC 27406
Off icers
Reg Mailing
1235 S Eugene St
Greensboro, NC 27406
Mailing
1235 S Eugene Street
Greensboro, NC 27406
https://www.sosnc.gov/online_services/search/Business_Registration_ResuIts 1/1
DAMS - MARTIN - POWELL ENGINEERS & SURVEY 0 R S drn p
NC Department f
Environmental Quality
Received
TRANSMITTAL 99R 12 2022
Date: September 13, 2023
To: NCDEQ— Division of Water Resources Re: Goodwill Gate City Blvd.
Winston-Salem Regional Office Greensboro, NC
450 West Hanes Mill Road, Suite 300 Sewer Extension Application
Winston-Salem, NC 27105 DMP Project 210137
We are sending you attached the following items:
Winston-Salem
Regional Office
❑ Shop Drawings
❑
Samples
❑
Copy of Letter
❑ Prints
❑
Specifications
®
Other
❑ Plans
❑
Disk
❑
Change Order
# Copies
Drawing #
Description
Disposition
2
Narrative and Supporting Docs
For Review/Approval
2 (original +
FTA 06-21
For Review/Approval
1 copy)
1
USE 10-18
For Review/Approval
(City of Greensboro)
1
(City of High Point)
Application Fee ($480)
1
USGS Topo Map
1
Site Location Map
Remarks:
Please contact me at rthompson@dmp-inc.com or 336-819-5287 if you have any questions or
require additional information. Thank you.
Ryan Thompson, PE
File
T: 336-886-4821 - F: 336-886-4458 - License: F-0245
6415 Old Plank Road, High Point, NC 27265 9 www.dmp-inc.com
T: 336-886-4821 • F: 336-886-4458 • License: F-0245
6415 Old Plank Road, High Point, NC 27265 • www.dmp-inc.com
Proiect Overview:
DAMS • MARTIN • POWELL ENGINEERS & SURVEYORSdm p
The proposed Goodwill Gate City Blvd. development is located on an existing 6.64-acre tract in Guilford
County, within Greensboro city limits. The property is located along W. Gate City Blvd., just east of the
Queen Alice Road & W. Gate City Blvd. intersection. The proposed development will include a—13,205 SF
warehouse/retail building with a loading dock area.
Existing Site Description:
The 6.64-acre tract (Parcel No. 156286) is currently undeveloped, wooded, and is bisected by two offsite
drainage outfalls to the South and West. An existing BMP onsite will be modified to comply with
stormwater regulations. The project will disturb approximately 3.81 acres of the site. The soil on site
consists largely of 'Mecklenburg sandy clay loam' (MhB2), and a small amount of 'Enon fine sandy
loam' (EnC). The site lies within the Lower Randleman —Watershed Critical Area (Tier 4). The site is
exempt from Lower Randleman density of 50% and is allowed up to 70% BUA.
Proposed Project Description:
The proposed development consists of a—13,205 SF warehouse/retail building with a loading dock area
and 79 parking spaces — sidewalk, stormwater control device, and associated utilities. Access to the site
will be provided via a single (1) entrance on W. Gate City Blvd.
Sewer Construction:
The proposed 8" gravity sewer will follow a new alignment within a 20' utility easement with 2 manholes
to serve Parcel #156188 and will tie into an existing public 8" DIP gravity sewer via a doghouse manhole
located at the southeast corner of the lot. All proposed sewer material will consist of DIP.
Ryan Thompson, PE
Land Development Engineering Manager
704-564-7852
rthompsonCd)dmp-inc.com
Stability... Value... Experience... let our experience make yours better!