Loading...
HomeMy WebLinkAbout20230198 Ver 2_SouthCarterInd_Storm_Addendum #1 sealedSTORMWATER REPORT ADDENDUM 1 SOUTH CARTER INDUSTRIAL PARK SANFORD, NC NOVEMBER 7, 2023 PREPARED FOR: Mike Lyczkowski South Carter Industrial Park, LLC 144 Hawkins Ave. Sanford, NC 27330 (919) 842-0334 PREPARED BY: Timmons Group, NC License No. 022530 Rick Baker, PE 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 (919) 866-4939 Rick.Baker@timmons.com www.timmons.com 0 0 0 0 Z 0 4 F TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. South Carter Industrial Park Sanford, NC Proiect Number: 41353.012 Table of Contents 1) Stormwater Narrative..................................................................................................................................1 Proposed Stormwater Management Summary ...............................................................................................1 ProposedConditions......................................................................................................................................1 CalculationMethodology................................................................................................................................2 Hydrology....................................................................................................................................................... 2 2) Runoff Calculations....................................................................................................................................... 3 Worksheet - SCS Curve Numbers.................................................................................................................. 3 HydroCADReport..........................................................................................................................................3 Pre/Post Development Drainage Area Maps..................................................................................................3 South Carter Industrial Park Sanford, NC Proiect Number: 41353.012 1) Stormwater Narrative Preface This addendum is a supplement to the original stormwater report dated October 5th, 2023, titled, "STORMWATER REPORT — SOUTH CARTER INDUSTRIAL PARK". This addendum will address comments received from North Carolina Department of Environmental Quality on October 61h, 2023. The site for designated as South Carter Industrial Park was analyzed one step further and with the assumption that the Industrial Park would be developed, and Stormwater Control Measures (SCM's) were preliminarily designed to demonstrate that the requirements established in 15A NCAC 02H 0.1003(3) were met. This Report will demonstrate the pre- and post -development conditions and how the site will be preliminarily designed to meet state stormwater requirements. Proposed Stormwater Management Summary Proposed Conditions Post development runoff from the proposed road will drain to ditches on either side of the road section, that will drain to proposed points of crossing. Ditches that drain upstream of the proposed road will be accounted for with new culvert design. Ditches that drain downstream of the proposed road will drain to wetlands, stream extents, or top of bank. All ditch outlets will be protected using riprap dissipator pads. Additional site improvements to be designed and permitted separately. The Industrial Park development will drain underground via stormwater conveyance and discharge into assoc. wet ponds throughout the site. These wet ponds will detain/treat the water to state requirements, and then discharge to the four (4) respective Points of Analysis. Since the industrial park has not been designed, the design for the wet ponds is preliminary and to establish that stormwater measures will, generally, be provided to minimize unmanaged runoff. It has been assumed for each wetpond that 70% of its drainage area will be impervious. All these assumptions are subject to change once the industrial park programming is established/finalized. The original report assumed there would be one (1) Point of Analysis, which is where the site generally outfalls to (Upper Little River), but with providing wet ponds and analyzing the site in more detail, there are four (4) minor outfalls which will be analyzed for compliance (wetlands and intermittent streams). The minor outfalls do converge to the Upper Little River further South from the site. Detention and treatment will be required for this project per 15A NCAC 02H.1003(3 & 44), as the annual runoff volume after development is greater than ten percent higher than the pre -development condition. The pre and post development runoff volume summary is shown below. Pre & Post Development Runoff Summary — Point of Analysis 1 (POA 1) SITE CONDITION STORM EVENT (Cu. Ft.) 1-YR 2-YR 10-YR 100-YR PRE -DEVELOPMENT 4,818 9,984 30,139 74,623 POST -DEVELOPMENT 59,521 76,153 121,099 192,602 % INCREASE 1135 663 302 158 See Runoff Calculations Section for detailed calculations. ..0000 TIMMONS GROUP 1 1 www.timmons.com YOUR VISION ACNILVfD TIROUGN OURS. South Carter Industrial Park Sanford, NC Proiect Number: 41353.012 Pre & Post Development Runoff Summary — Point of Analysis 2 (POA 2) SITE CONDITION STORM EVENT (Cu. Ft.) 1-YR 2-YR 10-YR 100-YR PRE -DEVELOPMENT 7,241 15,026 45,430 112,581 POST -DEVELOPMENT 51,112 71,543 131,318 233,838 % INCREASE 606 376 189 108 See Runoff Calculations Section for detailed calculations. Pre & Post Development Runoff Summary — Point of Analysis 3 (POA 3) SITE CONDITION STORM EVENT (Cu. Ft.) 1-YR 2-YR 10-YR 100-YR PRE -DEVELOPMENT 34,094 68,461 200,068 486,492 POST -DEVELOPMENT 299,237 397,142 670,854 1,117,755 % INCREASE 778 480 235 130 See Runoff Calculations Section for detailed calculations. Pre & Post Development Runoff Summary — Point of Analysis 4 POA 4 SITE CONDITION STORM EVENT (Cu. Ft.) 1-YR 2-YR 10-YR 100-YR PRE -DEVELOPMENT 68,804 127,184 339,372 782,527 POST -DEVELOPMENT 431,306 572,468 967,174 1,612,023 % INCREASE 527 350 185 106 See Runoff Calculations Section for detailed calculations. Calculation Methodology A pre -development and post -development hydrologic analysis was completed for the site using the SCS TR20 method. A hydraulic analysis was completed using HydroCAD modeling software to route these storm events through the site. Hydrology The SCS TR20 method was used to determine the volume of runoff for the pre and post development conditions. The site was analyzed as four (4) drainage areas with the most downstream analysis point being the Upper Little River. Rainfall data used in the analysis was taken from published NOAA data for the City of Sanford. SCS runoff curve numbers were based on Table 2-2 in the TR55 manual. The Time of Concentration (Tc) values were determined using the TR55 method for sheet, shallow, and concentrated flows. Since the proposed development is preliminary, a conservative estimate of halving the pre -development Tc for the post - development Tc was assumed. TIMMONS GROUP 21 www.timmons.com YOUR VISION ACNILVLD TIROUGN OUR South Carter Industrial Park Sanford, NC Proiect Number: 41353.012 2) Runoff Calculations Worksheet - SCS Curve Numbers HydroCAD Report Pre/Post Development Drainage Area Maps . • • • . • '. T I M M O N S GROUP 3 www.timmons.com PROPOSED CONDITIONSK• • WORKSHEET FOR SCS HYDROLOGIC PARAMETERS WORKSHEET FOR SCS HYDROLOGIC PARAMETERS WORKSHEET FOR SCS HYDROLOGIC PARAMETERS WORKSHEET FOR SCS HYDROLOGIC PARAMETERS S Carter Industrial Park =�z S Carter Industrial Park S Carter Industrial Park S Carter Industrial Park Off -Site Land Use: . RUNOFF CURVE NUMBER RUNOFF CURVE NUMBER RUNOFF CURVE NUMBER RUNOFF CURVE NUMBER _ Soil Land Use or Zoning Soil Land Use or Zoning Land Use or Zoning Land Use or Zoning E Group Group U LU Other Agricultural .. "Mr. - M, Other Agricultural Woods/Grass - Good Agricultural icultural Open Space - Good ���Wpen Space - Good Open Space - Good < .6 LU :.LL • • 00 • • • .F Weighted RCN CY% • Total Area 7.96 Ar' 0. 0124 SQ M I Weighted RCN Total Area= IL Weighted RCN 79.9 Weighted RCN I Tntal Arp;; 0. 0188 SQ M I F --I Lu TIME OF CONCENTRATION TIME OF CONCENTRATION TIME OF CONCENTRATION Velocity Type of Flow Type of Flow Type of Flow mm Type of Flow (fps) . Shallow Concentrated Flow Shallow Concentrated Flow Tt=L/(360OV) Shallow Concentrated Flow Shallow Concentrated Flow "M Tt=L/(3600V) Ile _ 111 PIPE FLOW ASSUMED BE 4FT/SEC. PIPE FLOW ASSUMEDTO BE 4FT/SEC. 1110712023 332 DESIGNED BY REEN 332 MEN ImmENEEN, Since the proposed development is preliminary, a conservative estimate of halving Since the proposed development is preliminary, a conservative estimate of halving the pre -development Te for the post -development Tc was assumed. IT-tal (T,/27F 3.51 the pre -development Te for the post -development Te was assumed. Votal (T,/2) =1 14.83 CHECKED BY R. BAKER SCALE WORKSHEET FOR SCS HYDROLOGIC PARAMETERS WORKSHEET FOR SCS HYDROLOGIC PARAMETERS WORKSHEET FOR SCS HYDROLOGIC PARAMETERS WORKSHEET FOR SCS HYDROLOGIC PARAMETERS NO SCALE S Carter In dustrial Park =�u S Carter Industrial Park S Carter Industrial Park S Carter Industrial Park a Number: '!Post ON -SITE DA for POA 3 aNumber: Post ON -SITE DA for POA4 I Off -Site Land Use. and Use- Off -Site Land Use: =��Ia Off -Site Land Use - RUNOFF CURVE NUMBER RUNOFF CURVE NUMBER RUNOFF CURVE NUMBER RUNOFF CURVE NUMBER Soil Land Use or Zoning Soil Land Use or Zoning Soil Land Use or Zoning Soil Land Use or Zoning Area Group =��M= Group Group Group =�� (acres) Other Agricultural Woods/Grass - Good Other Agricultural Other Agricultural �Mffl .2 Open Space -Good OpenSpace-Good Open Space - Good • • • • .. .. • . Total Area= 50.21 AC 0.0785 SQ MI Weighted RCN 85.8 Total Area 72.48 AC 0. 1133 SQ M I Weighted RCN Total Area= 50.21 AC 0.0785 SQ MI Weighted RCN ��A �T�Iff#%Twql Weighted RCN. • Type of Flow (f ps)t Type of Flow LU mm �w < TIME OF CONCENTRATION TIME OF CONCENTRATION TIME OF CONCENTRATION (A< lr)� 0��u R." FoR M�._ T,=L/(360OV) Shallow Concentrated Flow Tt=L/(360OV) Shallow Concentrated Flow --- ----------- Tt=L/(360OV) Shallow Concentrated Flow 0 0 LL .. Channel Flow WNW Tt=L/(360OV) Channel Flow PIPE FLOW ASSUMED TO BE 4FTISEC. 0-yalreTTWITMI .• Since the proposed development is preliminary, a conservative estimate of halving Total Tc =1 Total Tc 31.35 the pre -development Tc for the post -development Tc was assumed. .. NO. ..---.SHEET NO. 0 0 s ■ �o� L TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM1 Pollutant /Nutrient Removal Total Suspended Solids (TSS) 85°,, Nitrogen 30'% Phosphorus nra Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 12.46 LOT#1 1 542,790 12.46 Impervious R/W 0.51 Managed Pervious 5.56 Wooded S ubtota I 12.46 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 734 30 0.51 0.00 S ubtota I 0.51 Other Total to Pond 18.53 Pond Basin CN 80 Grand Total 12.97 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool (Forebay &Main Pond Combined) Impervious Area Acres Offsite Impervious Area 0.00 Onsite Impervious Area 12.97 Average Depth (ft) = 5.0 Total Impervious Area 12.97 SA/DA Ratio Required SA (ft2) = 14,529 Total Drainage Area To SCM 18.53 SA as Shown (ft2) = 14,813 Percent Impervious Area 70% SA/DA Ratio from latest NCDENR BMP Manual SA / DA Pond Volumes and Areas (Below Permanent /Normal Pool) Elevation (ft) Main Area (sf) Forebay Area (sf) Depth (ft) Main Inc. Vol (cf) Forebay Inc. Vol (cf) Total Vol (cf) 50.0 Bottom of Sediment Storage 51.0 7,729 - 0.0 Top of Sediment Storage 52.0 8,404 1.0 8,066 0 8,066 53.0 9,107 2.0 8,755 0 16,822 54.0 9,837 2,560 3.0 9,472 1,280 27,574 55.0 10,595 2,981 4.0 10,216 2,771 40,560 56.0 11,379 3,423 5.0 10,987 3,202 54,749 Total 5.0 47,496 7,253 54,749 Verify the Forebay Volume Is Approximately (15%- 20%) of the Permanent Pool Volume. 15% �P VO E 0 U n vi o C o E N w U E H z Z w a �� 2 ow ro� z 2 oaC 14 -1 O OU Q w 0 O a rL a H ce o no tY LLI W a 2 c7 U � U` �' LO W W Q 4 LL Q Z 0 o O O w rn � rZ NW L'D w v J L.1- o CO O LU rLn rn U � U Z w H (n O p 2 Z ('j N 2 H LU N N w LU 0 0 U in 0 0 Q � - Z 0 O cj) DATE 1110712023 O DRAWN BY 332 • DESIGNED BY • 332 • CHECKED BY • R. BAKER • • SCALE NO SCALE • V 1 z O `0N z < �° Q o Q � Z) U J < U O Q Q z o U W r W L) z z U z o Q J I-' U J Q w a z �.0 J 0 i I t___ I I I 0 ce � U O Q U z I� U = U ZI- o Q 0 O ~ r� z V) LL 0 O U� JOB NO. 41353.012 NOTE: THIS SHEET IS PROVIDED FOR CALCULATION PURPOSES ONLY & IS SHEET NO. NOT TO BE USED FOR CONSTRUCTION C6.04 rLU UJ e rqF f • it i TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM 5 Pollutant/ Nutrient Removal Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc A TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM2 Pollutant /Nutrient Removal Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 16.16 LOT#2 1 703,953 16.16 Impervious R/W 0.22 Managed Pervious 7.02 Wooded Subtotal 16.16 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 317 30 0.22 0.00 Subtotal 0.22 Other Total to Pond 23.40 Pond Basin CN 86 Grand Total 16.38 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool (Forebay &Main Pond Combined) Impervious Area Acres Otfsite Impervious Area 0.00 Onsite Impervious Area 16.38 Average Depth (ft) = 5.0 Total Impervious Area 16.38 SA/DA Ratio = 1.80 Required SA (ft2) = 18,347 Total Drainage Area To SCM 23.40 SA as Shown (ft2) = 19,019 Percent Impervious Area 70% SA/DA Ratio from latest NCDENR BMP Manual SA / DA Pond Volumes and Areas (Below Permanent /Normal Pool) Elevation (ft) Main Area (sf) Forebay Area (sf) Depth (ft) Main Inc. Vol (cf) Forebay Inc. Vol (cf) Total Vol (cf) 50.0 Bottom of Sediment Storage 51.0 9,430 - 0.0 Top of Sediment Storage 52.0 10,464 1.0 9,947 0 9,947 53.0 11,525 2,377 2.0 10,994 1,188 22,130 54.0 12,614 2,935 3.0 12,069 2,656 36,855 55.0 13,732 3,524 4.0 13,173 3,230 53,258 56.0 14,877 4,142 5.0 14,304 3,833 71,395 Total 5.0 60,488 10,907 71,395 Verify the Forebay Volume Is Approximately (15% -20%) of the Permanent Pool Volume. 18% • t► E TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM 6 Pollutant/ Nutrient Removal Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus n%a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 7.10 LOT #6 1 309,350 7.10 Impervious R/W 0.39 Managed Pervious 2.56 Wooded 0.65 Subtotal 7.10 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 1,068 15 0.37 Curve Adjustment 58 15 0.02 Subtotal 0.39 Other Total to Pond 10.70 Pond Basin CN 87 Grand Total 7.49 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool (Forebay &Main Pond Combined) Impervious Area Acres Offsite Impervious Area 0.00 Onsite Impervious Area 7.49 Average Depth (ft) = 5.0 Total Impervious Area 7.49 SA/DA Ratio = 1.80 Required SA (ft2) = 8,390 Total Drainage Area To SCM 10.70 SA as Shown (ft2) = 8,520 Percent Impervious Area 70% SA/DA Ratio from latest NCDENR BMP Manual SA / DA Pond Volumes and Areas (Below Permanent 1 Normal Pool) Elevation (ft) Main Area (sf) Forebay Area (sf) Depth (ft) Main Inc. Vol (cf) Forebay Inc. Vol (cf) Total Vol (cf) 50.0 Bottom of Sediment Storage 51.0 2,967 - 0.0 Top of Sediment Storage 52.0 3,705 1.0 3,336 0 3,336 53.0 4,473 761 2.0 4,089 381 7,806 54.0 5,268 1,003 3.0 4,871 882 13,558 55.0 6,093 1,275 4.0 5,681 1,139 20,378 56.0 6,946 1,574 5.0 6,519 1,424 28,322 Total 5.0 24,496 3,826 28,322 Verify the Forebay Volume Is Approximately (15%-20%)ofthe Permanent Pool Volume. 16% TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM3 Pollutant /Nutrient Removal Total Suspended Solids (TSS) 85°6 Nitrogen 30% Phosphorus n/a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 13.68 LOT #3 1 595,869 13.68 Impervious R/W 1.00 Managed Pervious 6.29 Wooded Subtotal 13.68 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 1,087 30 0.75 15' Section wlCurve Adj 725 15 0.25 Subtotal 1.00 Other Total to Pond 20.97 Pond Basin CN 86 Grand Total 14.68 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Su • � i TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM 7 Pollutant/ Nutrient Removal Total Suspended Solids (TSS) 85°6 Nitrogen 30% Phosphorus n/a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 14.57 LOT #7 1 634,537 14.57 Impervious R/W 0.29 Managed Pervious 1.93 Wooded 4.44 Subtotal 14.57 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 840 15 0.29 0.00 Subtotal 0.29 Other Total to Pond 21.23 Pond Basin CN 87 Grand Total 14.86 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool (Forebay &Main Pond Combined) Impervious Area Acres Offsite Impervious Area 0.00 Onsite Impervious Area 14.86 Average Depth (ft) = 5.0 Total Impervious Area 14.86 SA/DA Ratio Required SA (ft2) = 16,646 Total Drainage Area To SCM 21.23 SA as Shown (ft2) = 17,034 Percent Impervious Area 70% SA/DA Ratio from latest NCDENR BMP Manual SA / DA Pond Volumes and Areas (Below Permanent/ Normal Pool) Elevation (ft) Main Area (sf) Forebay Area (sf) Depth (ft) Main Inc. Vol (cf) Forebay Inc. Vol (cf) Total Vol (cf) 50.0 Bottom of Sediment Storage 51.0 9,077 - 0.0 Top of Sediment Storage 52.0 9,928 1.0 9,503 0 9,503 53.0 10,806 2,084 2.0 10,367 1,042 20,912 54.0 11,712 2,501 3.0 11,259 2,293 34,464 55.0 12,645 2,949 4.0 12,179 2,725 49,368 56.0 13,606 3,428 5.0 13,126 3,189 65,682 Total 5.0 56,433 9,249 65,682 Verify the Forebay Volume Is Approximately (15%-20%)ofthe Permanent Pool Volume. 16% TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM 8 Pollutant/ Nutrient Removal Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 7.11 LOT #8 1 309,772 7.11 Impervious R/W 0.73 Managed Pervious 2.64 Wooded 0.72 Subtotal 7.11 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 961 30 0.66 Tumlane 203 15 0.07 Subtotal 0.73 Other Total to Pond 11.20 Pond Basin CN 80 Grand Total 7.84 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool (Forebay &Main Pond Combined) Impervious Area Acres Offsite Impervious Area 0.00 Onsite Impervious Area 7.84 Average Depth (ft) = 5.0 Total Impervious Area 7.84 SA/DA Ratio = 1.80 Required SA (ft2) = 8,782 Total Drainage Area To SCM 11.20 SA as Shown (ft2) = 9,190 Percent Impervious Area 70% SA/DA Ratio from latest NCDENR BMP Manual SA / DA Pond Volumes and Areas (Below Permanent /Normal Pool) Elevation (ft) Main Area (sf) Forebay Area (sf) Depth (ft) Main Inc. Vol (cf) Forebay Inc. Vol (cf) Total Vol (cf) 50.0 Bottom of Sediment Storage 51.0 4,288 - 0.0 Top of Sediment Storage 52.0 4,811 1.0 4,550 0 4,550 53.0 5,363 963 2.0 5,087 482 10,118 54.0 5,944 1,278 3.0 5,654 1,121 16,893 55.0 6,554 1,623 4.0 6,249 1,451 24,592 56.0 7,192 1,998 5.0 6,873 1,811 33,276 Total 5.0 28,413 4,863 33,276 Verify the Forebay Volume Is Approximately (15%-20%)ofthe Permanent Pool Volume. 17% TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Luck Stone Lee County Project No.: 41353.006 Calculated By: JDR Date: 11/07/2023 Wet Pond Design Calculations SCM4 Pollutant /Nutrient Removal Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post -Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Oty Inc Area Total Area Impervious Lots 12.08 LOT#4 1 526,157 12.08 Impervious R/W 0.04 Managed Pervious 5.20 Wooded Subtotal 12.08 Streets and SW Description Length Imp/Ft Total Area Impervious Streets 80 15 0.03 Curve Adjustment 36 15 0.01 Subtotal 0.04 Other Total to Pond 17.32 Pond Basin CN 87 Grand Total 12.12 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool (Forebay &Main Pond Combined) Impervious Area Acres Offsite Impervious Area 0.00 Onsite Impervious Area 12.12 Average Depth (ft) = 5.0 Total Impervious Area 12.12 SA/DA Ratio = 1.80 Required SA (ft2) = 13,580 Total Drainage Area To SCM 17.32 SA as Shown (ft2) = 13,673 Percent Impervious Area 70% SA/DA Ratio from latest NCDENR BMP Manual SA / DA Pond Volumes and Areas (Below Permanent /Normal Pool) Elevation (ft) Main Area (sf) Forebay Area (sf) Depth (ft) Main Inc. Vol (cf) Forebay Inc. Vol (cf) Total Vol (cf) 50.0 Bottom of Sediment Storage 51.0 7,219 0.0 Top of Sediment Storage 52.0 7,898 1.0 7,559 0 7,559 53.0 8,606 1,558 2.0 8,252 779 16,590 54.0 9,342 1,933 3.0 8,974 1,745 27,309 55.0 10,107 2, 338 4.0 9, 724 2,135 39,168 56.0 10,899 2,774 5.0 10,503 2,556 52,227 Total 5.0 45,012 7,216 52,227 Verify the Forebay Volume Is Approximately(15%-20%)ofthe Permanent Pool Volume. 16% L 1E 2E 3E (4E DA1-EX DA2-EX DA3-EX DA4-EX 1P 2P (3P (4P DA1-PR DA2-PR DA3-PR DA4-PR SubCa EHyd ReachLRouting Diagram for SOUTH CARTER INDUSTRIAL Prepared by Timmons Group, Printed 11/7/2023 roCAD®10.10-7a s/n 06538 ©2021 HydroCAD Software Solutions LLC SOUTH CARTER INDUSTRIAL Prepared by Timmons Group Printed 11/7/2023 HydroCAD®10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing Event# Event Name Storm Type Curve Mode Duration (hours) B/B Depth (inches) AMC 1 1YR Type II 24-hr Default 24.00 1 3.04 2 2 2YR Type II 24-hr Default 24.00 1 3.68 2 3 10YR Type II 24-hr Default 24.00 1 5.39 2 4 100YR Type II 24-hr Default 24.00 1 8.10 2 SOUTH CARTER INDUSTRIAL Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (sq-ft) (subcatchment-numbers) 4,352,080 98 Impervious (1 P, 2P, 3P, 4P) 1,530,263 61 Managed Turf, Good (1 P, 2P, 3P, 4P) 2,275,574 61 Open Space, Good (2E, 3E, 4E) 4,274,107 55 Woods, Good (1 E, 1 P, 2E, 2P, 3E, 4E, 4P) 12,432,024 72 TOTAL AREA SOUTH CARTER INDUSTRIAL Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchmei (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Numbers 0 0 0 0 4,352,080 4,352,080 Impervious 0 0 0 0 1,530,263 1,530,263 Managed Turf, Good 0 0 0 0 2,275,574 2,275,574 Open Space, Good 0 0 0 0 4,274,107 4,274,107 Woods, Good 0 0 0 0 12,432,024 12,432,024 TOTAL AREA SOUTH CARTER INDUSTRIAL Type 11 24-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Paae 5 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1E: DA1-EX Runoff Area=7.960 ac 0.00% Impervious Runoff Depth>0.17" Tc=7.0 min CN=55 Runoff=1.00 cfs 4,818 cf Subcatchment 1P: DA1-PR Runoff Area=7.960 ac 84.30% Impervious Runoff Depth>2.06" Tc=3.5 min CN=92 Runoff=31.57 cfs 59,521 cf Subcatchment 2E: DA2-EX Runoff Area=12.050 ac 0.00% Impervious Runoff Depth>0.17" Tc=14.8 min CN=55 Runoff=1.00 cfs 7,241 cf Subcatchment 2P: DA2-PR Runoff Area=12.050 ac 51.12% Impervious Runoff Depth>1.17" Tc=7.4 min CN=80 Runoff=25.80 cfs 51,112 cf Subcatchment 3E: DA3-EX Runoff Area=50.210 ac 0.00% Impervious Runoff Depth>0.19" Tc=22.4 min CN=56 Runoff=4.37 cfs 34,094 cf Subcatchment 3P: DA3-PR Runoff Area=50.210 ac 69.51 % Impervious Runoff Depth>1.64" Tc=11.2 min CN=87 Runoff=128.97 cfs 299,237 cf Subcatchment 4E: DA4-EX Runoff Area=72.480 ac 0.00% Impervious Runoff Depth>0.26" Tc=31.3 min CN=59 Runoff=9.82 cfs 68,804 cf Subcatchment 4P: DA4-PR Runoff Area=72.480 ac 71.94% Impervious Runoff Depth>1.64" Tc=15.7 min CN=87 Runoff=161.05 cfs 431,306 cf Total Runoff Area = 12,432,024 sf Runoff Volume = 956,134 cf Average Runoff Depth = 0.92" 64.99% Pervious = 8,079,944 sf 35.01% Impervious = 4,352,080 sf SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1 E: DA1-EX Runoff = 1.00 cfs @ 12.05 hrs, Volume= 4,818 cf, Depth> 0.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 7.960 55 Woods, Good 7.960 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 Direct Entry, Subcatchment 1E: DA1-EX Hydrograph ', I I I I ❑Runoff 1.00 cfs 1 TYpe II 24hr 1YR Rainfall=3.04" Runoff Area=7.960 !ac Runoff'Vol',ume=4,818', cf Runoff De'Pth>0.1'7" o LL Tc=7�O min CN=!55 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1 P: DA1-PR [49] Hint: Tc<2dt may require smaller dt Runoff = 31.57 cfs @ 11.94 hrs, Volume= 59,521 cf, Depth> 2.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 0.570 55 Woods, Good 0.680 61 Managed Turf, Good 6.710 98 Impervious 7.960 92 Weighted Average 1.250 15.70% Pervious Area 6.710 84.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 Direct Entry, Subcatchment 1P: DA1-PR Hydrograph ---'-- -- --- 31�fs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2E: DA2-EX Runoff = 1.00 cfs @ 12.16 hrs, Volume= 7,241 cf, Depth> 0.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 11.350 55 Woods, Good 0.700 61 Open Space, Good 12.050 55 Weighted Average 12.050 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 Direct Entry, Subcatchment 2E: DA2-EX Hydrograph ❑ Runoff 1.00 cfs 1 Type 11 24-h r 1YR Rainfall=3.0!4" Runoff Area12.050 ac Runoff', Vol',ume=7,241', cf Runoff De',pth>0.1'7" Tc=14.8 min CN='55 o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 2P: DA2-PR Runoff = 25.80 cfs @ 11.99 hrs, Volume= 51,112 cf, Depth> 1.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 0.150 55 Woods, Good 5.740 61 Managed Turf, Good 6.160 98 Impervious 12.050 80 Weighted Average 5.890 48.88% Pervious Area 6.160 51.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 Direct Entry, Subcatchment 213: DA2-PR 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 3E: DA3-EX Runoff = 4.37 cfs @ 12.27 hrs, Volume= 34,094 cf, Depth> 0.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 44.600 55 Woods, Good 5.610 61 Open Space, Good 50.210 56 Weighted Average 50.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.4 Direct Entry, Subcatchment 3E: DA3-EX Hydrograph ', ', ❑Runoff 4.37 cfs Type 11 24-hr 4 1YR':Rainfall=3.04" Runoff Area=50.210',ac Runoff�Volume-- 4. 094T 3 cf- Runoff Depth,>0.19.. Tc=22.4_min LL 2 CN=56 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 3P: DA3-PR Runoff = 128.97 cfs @ 12.03 hrs, Volume= 299,237 cf, Depth> 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 15.310 61 Managed Turf, Good 34.900 98 Impervious 50.210 87 Weighted Average 15.310 30.49% Pervious Area 34.900 69.51 % I m pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.2 Direct Entry, 14 13 12 11 10 80 V 3 70 _o LL 60 0 Subcatchment 313: DA3-PR Hydrograph 128.97 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 4E: DA4-EX Runoff = 9.82 cfs @ 12.38 hrs, Volume= 68,804 cf, Depth> 0.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 26.550 55 Woods, Good 45.930 61 Open Space, Good 72.480 59 Weighted Average 72.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.3 Direct Entry, w 6 0 3 0 5 LL .- I Subcatchment 4E: DA4-EX Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 1 YR Rainfall=3.04" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 4P: DA4-PR Runoff = 161.05 cfs @ 12.08 hrs, Volume= 431,306 cf, Depth> 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1YR Rainfall=3.04" Area (ac) CN Description 6.940 55 Woods, Good 13.400 61 Managed Turf, Good 52.140 98 Impervious 72.480 87 Weighted Average 20.340 28.06% Pervious Area 52.140 71.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.7 Direct Entry, ■ Runoff SOUTH CARTER INDUSTRIAL Type 11 24-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Paae 14 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1E: DA1-EX Runoff Area=7.960 ac 0.00% Impervious Runoff Depth>0.35" Tc=7.0 min CN=55 Runoff=3.65 cfs 9,984 cf Subcatchment 1P: DA1-PR Runoff Area=7.960 ac 84.30% Impervious Runoff Depth>2.64" Tc=3.5 min CN=92 Runoff=39.68 cfs 76,153 cf Subcatchment 2E: DA2-EX Runoff Area=12.050 ac 0.00% Impervious Runoff Depth>0.34" Tc=14.8 min CN=55 Runoff=3.69 cfs 15,026 cf Subcatchment 2P: DA2-PR Runoff Area=12.050 ac 51.12% Impervious Runoff Depth>1.64" Tc=7.4 min CN=80 Runoff=35.86 cfs 71,543 cf Subcatchment 3E: DA3-EX Runoff Area=50.210 ac 0.00% Impervious Runoff Depth>0.38" Tc=22.4 min CN=56 Runoff=13.68 cfs 68,461 cf Subcatchment 3P: DA3-PR Runoff Area=50.210 ac 69.51 % Impervious Runoff Depth>2.18" Tc=11.2 min CN=87 Runoff=169.07 cfs 397,142 cf Subcatchment 4E: DA4-EX Runoff Area=72.480 ac 0.00% Impervious Runoff Depth>0.48" Tc=31.3 min CN=59 Runoff=23.53 cfs 127,184 cf Subcatchment 4P: DA4-PR Runoff Area=72.480 ac 71.94% Impervious Runoff Depth>2.18" Tc=15.7 min CN=87 Runoff=211.67 cfs 572,468 cf Total Runoff Area = 12,432,024 sf Runoff Volume = 1,337,961 cf Average Runoff Depth = 1.29" 64.99% Pervious = 8,079,944 sf 35.01% Impervious = 4,352,080 sf SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 1 E: DA1-EX Runoff = 3.65 cfs @ 12.02 hrs, Volume= 9,984 cf, Depth> 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 7.960 55 Woods, Good 7.960 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 Direct Entry, Subcatchment 1E: DA1-EX Hydrograph ❑ Runoff 3.65 cfs Type 11 24hr 2YR Rainfall=3.68" 3- Runoff Area=7.960'ac Runoff'Vol',ume=9,984', cf w IRunoff De'pfh>0.35" Tc=7�0 min CN=!55 1 .. II 1 SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 1 P: DA1-PR [49] Hint: Tc<2dt may require smaller dt Runoff = 39.68 cfs @ 11.94 hrs, Volume= 76,153 cf, Depth> 2.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 0.570 55 Woods, Good 0.680 61 Managed Turf, Good 6.710 98 Impervious 7.960 92 Weighted Average 1.250 15.70% Pervious Area 6.710 84.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 Direct Entry, Subcatchment 1P: DA1-PR Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 2E: DA2-EX Runoff = 3.69 cfs @ 12.12 hrs, Volume= 15,026 cf, Depth> 0.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 11.350 55 Woods, Good 0.700 61 Open Space, Good 12.050 55 Weighted Average 12.050 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 Direct Entry, Subcatchment 2E: DA2-EX Hydrograph ❑ Runoff 3.69 cfs Type 11 24-h r 2YR'Rainfa11=3.68" 3-Runoff Area=12.050',ac Runoff 'Volume'=15026' cf Runoff Dep#h'.>0.34" 3 2 0 Tc=14.8 min CN=55 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2P: DA2-PR Runoff = 35.86 cfs @ 11.99 hrs, Volume= 71,543 cf, Depth> 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 0.150 55 Woods, Good 5.740 61 Managed Turf, Good 6.160 98 Impervious 12.050 80 Weighted Average 5.890 48.88% Pervious Area 6.160 51.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 Direct Entry, Subcatchment 213: DA2-PR Hydrograph 40 ' " ■Runoff 38 ,' -- -- -- -- 35.86 cfs 36 " -' : hr- - 34 32 - -- - -' -- -- -- --'' - -- -- -- -'' -- -- - - -- -- -- --' --Type-1'124 2YR; Rain#all'-3.68" 2$ Runoff Area-- �2 .050 iac 26 . Runoff '::Volume=71 543' cf- - 24 0 22 _ .' "'. -- -- -- - -- -- -- - --Runoff Depth'>1.64"- - 3 20 s 18 " � 1 tC'= -.4min 16 �� V 14 .' -- -- -- -- - -- -- -- --- -- - -- -- -- -- - -- -- -- -' -- -- -- - 12 .'' -- -- -- -'-- -- -- -' ------------------------- -- -- -' 10 .' - --------J 8 6 . 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 3E: DA3-EX Runoff = 13.68 cfs @ 12.22 hrs, Volume= 68,461 cf, Depth> 0.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 44.600 55 Woods, Good 5.610 61 Open Space, Good 50.210 56 Weighted Average 50.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.4 Direct Entry, I 0 Subcatchment 3E: DA3-EX Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 3P: DA3-PR Runoff = 169.07 cfs @ 12.03 hrs, Volume= 397,142 cf, Depth> 2.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 15.310 61 Managed Turf, Good 34.900 98 Impervious 50.210 87 Weighted Average 15.310 30.49% Pervious Area 34.900 69.51 % I m pervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 11.2 Direct Entry, Subcatchment 313: DA3-PR Hydrograph ❑ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 4E: DA4-EX Runoff = 23.53 cfs @ 12.34 hrs, Volume= 127,184 cf, Depth> 0.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 26.550 55 Woods, Good 45.930 61 Open Space, Good 72.480 59 Weighted Average 72.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.3 Direct Entry, ❑ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 2YR Rainfall=3.68" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 4P: DA4-PR Runoff = 211.67 cfs @ 12.08 hrs, Volume= 572,468 cf, Depth> 2.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2YR Rainfall=3.68" Area (ac) CN Description 6.940 55 Woods, Good 13.400 61 Managed Turf, Good 52.140 98 Impervious 72.480 87 Weighted Average 20.340 28.06% Pervious Area 52.140 71.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.7 Direct Entry, Subcatchment 413: DA4-PR ■ Runoff 211.67 cfs -- -Type-11-24*h 2YR Rainfall= 8 Runoff iArea=72 : 480'i a, -I RunVolume -572,468 -c off - Runoff Depth?2,1 8 -1 - q= = 5.7 mii CN 8' Time (hours) SOUTH CARTER INDUSTRIAL Type 11 24-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Paae 23 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1E: DA1-EX Runoff Area=7.960 ac 0.00% Impervious Runoff Depth>1.04" Tc=7.0 min CN=55 Runoff=14.75 cfs 30,139 cf Subcatchment 1P: DA1-PR Runoff Area=7.960 ac 84.30% Impervious Runoff Depth>4.19" Tc=3.5 min CN=92 Runoff=61.13 cfs 121,099 cf Subcatchment 2E: DA2-EX Runoff Area=12.050 ac 0.00% Impervious Runoff Depth>1.04" Tc=14.8 min CN=55 Runoff=16.01 cfs 45,430 cf Subcatchment 2P: DA2-PR Runoff Area=12.050 ac 51.12% Impervious Runoff Depth>3.00" Tc=7.4 min CN=80 Runoff=64.25 cfs 131,318 cf Subcatchment 3E: DA3-EX Runoff Area=50.210 ac 0.00% Impervious Runoff Depth>1.10" Tc=22.4 min CN=56 Runoff=55.58 cfs 200,068 cf Subcatchment 3P: DA3-PR Runoff Area=50.210 ac 69.51 % Impervious Runoff Depth>3.68" Tc=11.2 min CN=87 Runoff=277.40 cfs 670,854 cf Subcatchment 4E: DA4-EX Runoff Area=72.480 ac 0.00% Impervious Runoff Depth>1.29" Tc=31.3 min CN=59 Runoff=78.77 cfs 339,372 cf Subcatchment 4P: DA4-PR Runoff Area=72.480 ac 71.94% Impervious Runoff Depth>3.68" Tc=15.7 min CN=87 Runoff=349.01 cfs 967,174 cf Total Runoff Area = 12,432,024 sf Runoff Volume = 2,505,453 cf Average Runoff Depth = 2.42" 64.99% Pervious = 8,079,944 sf 35.01% Impervious = 4,352,080 sf SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 1 E: DA1-EX Runoff = 14.75 cfs @ 12.00 hrs, Volume= 30,139 cf, Depth> 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 7.960 55 Woods, Good 7.960 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 Direct Entry, Subcatchment 1 E: DA1-EX Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 1 P: DA1-PR [49] Hint: Tc<2dt may require smaller dt Runoff = 61.13 cfs @ 11.94 hrs, Volume= 121,099 cf, Depth> 4.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 0.570 55 Woods, Good 0.680 61 Managed Turf, Good 6.710 98 Impervious 7.960 92 Weighted Average 1.250 15.70% Pervious Area 6.710 84.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 Direct Entry, Subcatchment 1P: DA1-PR Hydrograph 65 61.13 cfs 60 : Type II 24-hr 55 1'0YR Rainfall=5.39" 50 Runof# Area=T960,:ac 45 R-u-noff-Volume-1121,099 cf- 40 Runoff D e th>4.1 n --- ', ---', ---', ---' 3 35 Tc -3.5 min M 30 CN=92 25 20 15 10 10 11 12 13 14 15 16 17 18 19 IN: ❑ Runoff SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 2E: DA2-EX Runoff = 16.01 cfs @ 12.09 hrs, Volume= 45,430 cf, Depth> 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 11.350 55 Woods, Good 0.700 61 Open Space, Good 12.050 55 Weighted Average 12.050 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 Direct Entry, Subcatchment 2E: DA2-EX Hydrograph ❑ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 2P: DA2-PR Runoff = 64.25 cfs @ 11.99 hrs, Volume= 131,318 cf, Depth> 3.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 0.150 55 Woods, Good 5.740 61 Managed Turf, Good 6.160 98 Impervious 12.050 80 Weighted Average 5.890 48.88% Pervious Area 6.160 51.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 Direct Entry, Subcatchment 213: DA2-PR Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 3E: DA3-EX Runoff = 55.58 cfs @ 12.18 hrs, Volume= 200,068 cf, Depth> 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 44.600 55 Woods, Good 5.610 61 Open Space, Good 50.210 56 Weighted Average 50.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.4 Direct Entry, Subcatchment 3E: DA3-EX Hydrograph 60 --------------------------------------------------- ❑Runoff 55.58 cfs - -' 55 Type I 1 24: h r 50 10YR Rainfal'',1=5.39" 45 "' Runoff 50 off Area = ! 210 ac 40 ' I Runoff Volume =20Q -,068 cf w 35 U ff D Runoepth>1.1 0 30 - T'c--22.4 nlin 25.., ',CN=56 20 15 10 ------------ ------------- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 3P: DA3-PR Runoff = 277.40 cfs @ 12.03 hrs, Volume= 670,854 cf, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 15.310 61 Managed Turf, Good 34.900 98 Impervious 50.210 87 Weighted Average 15.310 30.49% Pervious Area 34.900 69.51 % I m pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.2 Direct Entry, Subcatchment 3P: DA3-PR Hydrograph ■ Runoff 277.40 cfs 60 .. 40 20 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 4E: DA4-EX Runoff = 78.77 cfs @ 12.29 hrs, Volume= 339,372 cf, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 26.550 55 Woods, Good 45.930 61 Open Space, Good 72.480 59 Weighted Average 72.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.3 Direct Entry, Subcatchment 4E: DA4-EX Hydrograph -- ---- --- KA ❑ Runoff 78.77 cfs Tr .. 11 A A 1.- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 10YR Rainfall=5.39" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 4P: DA4-PR Runoff = 349.01 cfs @ 12.07 hrs, Volume= 967,174 cf, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10YR Rainfall=5.39" Area (ac) CN Description 6.940 55 Woods, Good 13.400 61 Managed Turf, Good 52.140 98 Impervious 72.480 87 Weighted Average 20.340 28.06% Pervious Area 52.140 71.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.7 Direct Entry, ■ Runoff SOUTH CARTER INDUSTRIAL Type 11 24-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Paae 32 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1E: DA1-EX Runoff Area=7.960 ac 0.00% Impervious Runoff Depth>2.58" Tc=7.0 min CN=55 Runoff=38.21 cfs 74,623 cf Subcatchment 1P: DA1-PR Runoff Area=7.960 ac 84.30% Impervious Runoff Depth>6.67" Tc=3.5 min CN=92 Runoff=94.66 cfs 192,602 cf Subcatchment 2E: DA2-EX Runoff Area=12.050 ac 0.00% Impervious Runoff Depth>2.57" Tc=14.8 min CN=55 Runoff=43.14 cfs 112,581 cf Subcatchment 2P: DA2-PR Runoff Area=12.050 ac 51.12% Impervious Runoff Depth>5.35" Tc=7.4 min CN=80 Runoff=110.58 cfs 233,838 cf Subcatchment 3E: DA3-EX Runoff Area=50.210 ac 0.00% Impervious Runoff Depth>2.67" Tc=22.4 min CN=56 Runoff=148.93 cfs 486,492 cf Subcatchment 3P: DA3-PR Runoff Area=50.210 ac 69.51 % Impervious Runoff Depth>6.13" Tc=11.2 min CN=87 Runoff=447.30 cfs 1,117,755 cf Subcatchment 4E: DA4-EX Runoff Area=72.480 ac 0.00% Impervious Runoff Depth>2.97" Tc=31.3 min CN=59 Runoff=195.24 cfs 782,527 cf Subcatchment 4P: DA4-PR Runoff Area=72.480 ac 71.94% Impervious Runoff Depth>6.13" Tc=15.7 min CN=87 Runoff=565.88 cfs 1,612,023 cf Total Runoff Area = 12,432,024 sf Runoff Volume = 4,612,441 cf Average Runoff Depth = 4.45" 64.99% Pervious = 8,079,944 sf 35.01% Impervious = 4,352,080 sf SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 1 E: DA1-EX Runoff = 38.21 cfs @ 11.99 hrs, Volume= 74,623 cf, Depth> 2.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 7.960 55 Woods, Good 7.960 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 Direct Entry, Subcatchment 1E: DA1-EX Hydrograph 42 -- -- -- - ■Runoff 40 -- -- -- --' 38.21 cfs 38 ' . - hype 124-hr 36 34 ,' -- -- -- --',-------- 10YR Rai n#al 1=8.10" 32 30 .' Q##area-7. 'ac ' r RuM �60 - 26 -- -- -- -' -- -- -- --'.- -- -- -- - ! 623if Runoff Volume-74 w 24 V -- -- -- -'2-58�� Runoff De th 22 3 0 20 Tc=7.0 mi n M: 16------------- 18 -------------------------------------- ----------- -- -- -- --' - - - --' - - - -; - - - --+- - - - -' - - ---�-�_------------ 55 14 .' -- -- -- - '" - -- -- --'-- -- -- - 12 -- -- -- -- 10 8 " ". -- -- -- - 6 . 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 1 P: DA1-PR [49] Hint: Tc<2dt may require smaller dt Runoff = 94.66 cfs @ 11.94 hrs, Volume= 192,602 cf, Depth> 6.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 0.570 55 Woods, Good 0.680 61 Managed Turf, Good 6.710 98 Impervious 7.960 92 Weighted Average 1.250 15.70% Pervious Area 6.710 84.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 Direct Entry, N V 3 0 LL 105 100 751 70 15 10 5 0 5 Subcatchment 1P: DA1-PR Hydrograph 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 2E: DA2-EX Runoff = 43.14 cfs @ 12.08 hrs, Volume= 112,581 cf, Depth> 2.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 11.350 55 Woods, Good 0.700 61 Open Space, Good 12.050 55 Weighted Average 12.050 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 Direct Entry, Subcatchment 2E: DA2-EX Hydrograph ❑ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 2P: DA2-PR Runoff = 110.58 cfs @ 11.98 hrs, Volume= 233,838 cf, Depth> 5.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 0.150 55 Woods, Good 5.740 61 Managed Turf, Good 6.160 98 Impervious 12.050 80 Weighted Average 5.890 48.88% Pervious Area 6.160 51.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 Direct Entry, ■ Runoff SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 3E: DA3-EX Runoff = 148.93 cfs @ 12.17 hrs, Volume= 486,492 cf, Depth> 2.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 44.600 55 Woods, Good 5.610 61 Open Space, Good 50.210 56 Weighted Average 50.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.4 Direct Entry, Subcatchment 3E: DA3-EX Hydrograph ❑ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 3P: DA3-PR Runoff = 447.30 cfs @ 12.02 hrs, Volume= 1,117,755 cf, Depth> 6.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rai nfall=8.10" Area (ac) CN Description 15.310 61 Managed Turf, Good 34.900 98 Impervious 50.210 87 Weighted Average 15.310 30.49% Pervious Area 34.900 69.51 % I m pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.2 Direct Entry, Subcatchment 3P: DA3-PR Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 4E: DA4-EX Runoff = 195.24 cfs @ 12.27 hrs, Volume= 782,527 cf, Depth> 2.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 26.550 55 Woods, Good 45.930 61 Open Space, Good 72.480 59 Weighted Average 72.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.3 Direct Entry, Subcatchment 4E: DA4-EX Hydrograph r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SOUTH CARTER INDUSTRIAL Type 1124-hr 100YR Rainfall=8.10" Prepared by Timmons Group Printed 11/7/2023 HydroCADO 10.10-7a s/n 06538 © 2021 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 4P: DA4-PR Runoff = 565.88 cfs @ 12.07 hrs, Volume= 1,612,023 cf, Depth> 6.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100YR Rainfall=8.10" Area (ac) CN Description 6.940 55 Woods, Good 13.400 61 Managed Turf, Good 52.140 98 Impervious 72.480 87 Weighted Average 20.340 28.06% Pervious Area 52.140 71.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.7 Direct Entry, ■ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) I 1 1 1 1 \ 1 1 \ \ � � 1 , \ OCi1000, Qj \ � 1 \ 1 \ , ` 1 1 .BOO OF \ awo / / ' T \ \ 1wop I THIS DESIGN ASSUMES OFF -SITE RUN ON WILL BE BYPASSED AROUND/THROUGH THE ,� s / /\ SITE WITHOUT SCM'S, AND ALL ON -SITE ° / / o�a� \ \\ \ �\ DRAINAGE WILL BE ROUTED TO SCM'S. ° v ° ° °/ / 0 ° / \ o / p 1 (n `\\ \ �\ EXISTING ° \ "o Q `� \ \ WETLAND o O ° — _ 1 C� 1 1 --- _--- :$•:::::•:: O— / \ 1 ° EXISTING \ EXISTING _------ ---�`� \\ � 0 100YR / / \ / WETLAND o� FLOODPLAIN o ° p O 0 °o oo ° ` 1 O O / �o O 0 ° / ° O / o O ° / V ° 0 p \ 1 �� p — � ~ .00 0 \ / \ i / �0 °° °° O °° /° 0 0 ° ��% ° 0 EXISTING / ° O ° 100YR \ �� \ o [ o °° o- FLOODPLAIN p Gj\ p ° p oo \ O o p 0 0 o EXISTING ° ` ^ 0 0 WETLAND p 1 o J / ° \/ \ O c \ O p / \ ,\� 0 0 O O ° ° ° ° o o I p ° / / THIS DESIGN ASSUMES OFF -SITE RUN ON \ O I ° `\ o // /' WILL BE BYPASSED AROUND/THROUGH THE 1 ° ° /' // SITE WITHOUT SCM'S, AND ALL ON -SITE o o ` 0 // // , DRAINAGE WILL BE ROUTED TO SCM'S. EXISTING _ \ ° �/ \ 0)° // / o o ° � 100YR �, owe p��p ° \ ° 0 p 00 ° ° 0 FLOODPLAIN X p ovro o p 00 \ -i ° �/ �/ �/ °tea // // o O °° p ZONE ° ° ° ° \ ° \ - p 4 V� �/ �/ °° ° �/ // °° °° p° p °o o° ° o o O° Oo O ° EA` °° / p 0 JONESBORO TOWNSHIP ° 0 o o° 0 0 0 0 °° o o° \ IS DESIGN ASSUMES OFF -SITE RUN ON \ _ WIL B BYPASSED AROUND/THROUGH THE / \ // / o O ° / GREENWOOD TOWNSHIP o I S ITHOUT SCM'S, AND ALL ON -SITE \ / � - DRA A E WILL BE ROUTED TO SCM'S. ` I , /' ° � W \ / \ ° PERENNIAL STREAM ` \ ° / UPPER LITTLE RIVER p �/ V ? ° ° o o 0 \ O ` ° ' \ \ ° � � / ° 0 0 0 0 O / ` / o 0 0 ° .0001 r` O o O O = I 0 0 p / 00 o \ / ° ° J \ ° ° ° ° ° 0 / °o°O000 o ° ° . \ / / / / THIS DESIGN ASSUMES OFF -SITE RUN ON / WILL BE BYPASSED AROUND/THROUGH THE \ SITE WITHOUT SCM'S, AND ALL ON -SITE \ DRAINAGE WILL BE ROUTED TO SCM'S. loe °o \ / O _ / \ \/0001 \ 1 1 / \ / / \ C7 co Q z SCALE 1 "=200' MIR 0 260' 400' ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF SANFORD, NCDEQ AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS E 0 U U) CD CD \o 0 r- N w U •9 z a Lu U C2 N LL N LuooM m W 0, J X Y LL U Ln TCIA LL ko r o� LnM J W H O H z Lu O O U c/) U > Lli V) W Q Q Of O p LL L1J > Q W Lu � la�LL O� �Q U z co cy) c\l IN LL N N Q oo i Q o 0 0 DATE 1110712023 DRAWN BY 332 DESIGNED BY 332 CHECKED BY R. BAKER SCALE AS NOTED LLr) z Z QJ Q a U u O Q z 0� 00 cn } Q z J Lu U 0 o L.0 U Q Lu V) z w_j J O Q O Q U LL z Z U Q LL ° J O O a z u) U JOB NO. 41353.012 SHEET NO. C4.00 a U c N 0 0 m 0 O a ,z T 0 0 co 70 c co V_ co CL ° 0 3 c aCL �0 O Ur CL �0 22 0 c >. H (6 Q -a c coU) co N 0-o c � 3 zN 0 � a g x 0 .� 0 °° o w 0.0) Y V7 � U C O O d U i (6 O w° �a ° Ea U N a d � (6 � �U O c N th O co U �2 c N 0 c U m a ° L v _ ` _ \ \ \ ` - " - / / / - - - - , - i \ \ I r J/- I ` / - � _� - - . / / Jzz / \ J \ \\ I \I \\ I\ `\ \ \ \ ' `� - / I I ; \\�\ 1 \\\�\ / // II / I / /I / / /\ / // \11 �_ _ ` _ 1 \\ 1\ �— � �\ 1Q // \I . "" \\\\\ \ \\ \ J\ / � \_�- /-�\; �\ // I j / /I / 1/ � /,� -\ �_1 11 % 1 IR 1 / ' / 1 \ \ \ ` \ I\ ` \ / f ` \ , `l\ I / I ' �CSS / ` \ \ ` \ 1 � O� 11 .1i / \ /"Ii \ \ 1 I \- -/-\ ` _ / / 11 \ / /, \ \\ // /I / \ ��/// � � / / I / / � & _`- _\ \ \ \ \ / /­ "I (_, - -\ I- \ _ / \ \ \ / �i / 1\ \ �,e \ \ ( - C I �p� \\ ' / 1 ` 1 / \\ \ / 1 / // t 1 // � h� // / I \ / J zk \1 "\ y//. Ow\ /'I\ I(�___oI I -\_,__I// / (1\ \/ / \ //1 1 % \ _ \\ \ -/ I l 1 \\ '\ \\ 7N / I / I 1 ( / \J ( � ` / / / / \ _ -� - - - M �� \ \ \ \ , \ Z'\,,/ / -X­ ) 'o, o O \ �11 \ ) \ `--1 \ -\ --- I /'\ I / I I I II\(1 (\ ,jSQ ,C / � �� / / \_i 1 \ z \ I 1 4 ,- , / \ / / \ \ 1 � / / IIII-ICI \\ / 1 ' _ , _ -' \ \ \ \ \ / l II I I ( I I 100'OFSHEETFLOW@4.3% ) / I�1�1 \\ / I / / / ,/ \ E `\ '�/ / , \ � I I I I I Tc=6.72MIN. YI \\\ / / / / / - - -' �.1 \ I ` \ E \'- I'll _\ I `� \ II \_ I / I ) �I���;4� �\\\ / / / / ' _-'`-`-, /- ` \o c\ I , \ \ I I l ( I 1 \1 \ ) / / 1 I / / , \ , \ I � o 17111 \ / I / / I \ \ I / / � —�I �� � I�� \ ( / I I I 1 ' / � ` � U .E U) \ / , 1 I \ �II�I I�� / , , SCALE 1'=200' = z \ \1 I I I I I / \ ,• \ w � � / \ 1 I \ _ � I� I I - MITI - `\ I I / 1 � Z \ i ///, \ \ \ ( I I \ - _ - T 1 Ir1 1 - 1 - -\ I -ICI �I \ ° / / / I .0. —, \ \ I--- 0) 3 W \ _­1 \ _ \ - ^ I I r \ \ - ACT T I III_ �I� I I I \ ` 100 OF SHEET FLOW@9.0/ / / / I/ \ I Q 2 {�, ST L� / \ " 11 0 200' 400' o W T) z 2 \ '� " I^ \\ \ \ I I I / I I rI -��I-I- - 0 q - I Tc = 5. 04 MIN. / ri ti o I \ I\ \ > ) w Lu ro N O O \ \ \ / / ~ I/ l \ \ \ \ \ I II I ( II I /` I �- BBJ, 96,.-)P 7 Z , i ` / _ " \ I cry / `� I \ \ - \ \ , 11 < LL °o a � F- \ / \ I f � I - - 1- 1 1 1 I 1 / i N M � z r \ \ I I ) �' I I /I I�I K I- -` *-I I 1I\ /.�\\ ( I / I � \ , \1 \ / / ors� W W I I I I I I I I I I/ I I \,, - _ I / \ \ / 1 / \ \ \ / I / 1 I ` / \ � a=�co U \ -' \ � I I l / \ / 1�1 I � ICI ` I / I - _ - 1 \ U � O1 � > 2 \ \ \ / I I r .� � l \ \ v I ) c� ,.., .- W \ - I v / I �� V A / �� - y �� V` I v \ I V A \ z W D m w \ �� I / / v I I V �q V /� V, 1 V I( / v _ v \ V / I �n i O I I / �v A / I 1 r 1�.� * �I (I �I �� v-l\\ I- v ) I ) A I I l - \ \ V l 1 Q o z _ x 0 U \ -, / 1 I \ I I I I - -I � 1 -1, \ I ` ���1` � \ / I / I \ \ ` \ \ i O p � / I I \ ) I I I 1 1 1 I I I I 1- - �� � I I I \� \ _ I I O \\ \ / \, I I\, \ \ I / (- I I 1-\1 11 I 1 I 1 � �� �� I -ICI � 1 1 j 1. I\v rtl I� J / l \ \ \ \ 1 o QY Ln Ln U) w w \ \ / I y ) I \ I % ly 1 �I� 11 ��111�-� \�\�1/ I ) \ \- \ ; \� �\ HATCH LEGEND c w UJ I \ I 1 I 11 I I I I ' -u I u-v I I 11 I- �1 \ r,- , r \ \ \ I \ \ -1 ) = C > Q W \ / ( / 1 I 1111/1-tom II I \ \ \ 1 I I/ \ I I 1 I _/ w I I\ � �1� y I \ � \ \ \ I I _� w + �T1-.� .� �111��.� .�-III �\� , � \ � C� \ \ / I /I , / / 1\ I , I I -, / 1-lrl+l I I' (1 J1 1 1 J j- - - 1 � 41 \I' I I �` 1 � \ -,A \ \ 1-1-1-1-1-1-1-1 0°°0,- O w I \ I l -A �1 !, l� A KELLY J I \ \ 1 \ \ \ - - - - - I - I - I WOODS - � � O \ \ I 1 I ► I \ \ �1 - 1�1*1 I I % as �11 I -ICI -I ICI ����\ \I�� \ , - - - - -I-I-I Ln Q1 � U r \ I III /I� 1 1-t1 qq Sow 11I- � III \ I � ` \ \ \ t \ t \ I-I-I--1-1-1-1 _j U z � '__� � I � 3 I \ \ / I I II I I 6�uyiyl- �! 1 1�1 1, I 1= \�\1 \- � \ \ v- --- - -- \ / �' \ \ -1 1�1�1 1 � I ' �\ \ I 1� \ ( I \ 1424.9'OFSHALLOW �� \ \ \ 11 \ � �IIII II I IIII III �� �, ,- � \ ` .. v I I I 1 v -1 1 1 1 1 1V1 vI �I �I I � -I �I -1 14 I Iv ` \ L. `� ° \ \ I -L J I �r 1 1 , _ CONCENTRATED FLOW @ 2.2/0 \ \- _ THIS DESIGN ASSUMES OFF -SITE RUN ON IIIII IIIII I�� \ \ \ - - / ' � v v v 1 1 V 1,yr F1 / T ) 1 �v111�1� ; 1 ��� 1 1 h� - I I i,\I v, 1 v Tc = 9.84 MIN. - ` , v I WILL BE BYPASSED AROUND/THROUGH THE v \ � �I -. � � I v� - - I - - \ V - , v v - SITE WITHOUT SCM'S, AND ALL ON -SITE v \ I \ � I 1 1 � II v ��-I I ` \ v v v / A v ` MANAGED TURF V � % I I I I I v VI :, - A v v A A � , v \j,� \j, \I, \I, \I, \I, \I, \I, DRAINAGE WILL BE ROUTED TO SCM'S. � 11 V' � 1 1 1 + 1 1 I - � \,/ 1 \A , 1 � I � ` \ \ /I � / \ \ O v // I v v / / ) v11 v11 �k��� �� T ■ 1 1 �( Ir mot- �� �� ��� � y1-)� v �V ) v vIN T -? I 1 1 1 v �I-fit v� v v I v THIS DESIGN ASSUMES OFF -SITE RUN ON v v J / = j v \ / �9 / 1 I r �� / f:1*11 J��l� �1(1 1 +- 1 �� v I- �I / Q _ \ / I \ \ I� - II, � I-1�1 ` \ - / \ - / O w v v/ \ /' y I ( I v / / \ I /' ����� 1 - - -�-�- - - - - ���� - - I�'t- w 1- � - WILL BE BYPASSED AROUND/THROUGH THE v 1 '� DRAINAGE DELINEATIONcill al / \ \ I /� �, rt 1 - 1 - - I� �- - - - I r 11 I -� � _i w1 _� ` \��,Z SITE WITHOUT SCM'S AND ALL ON -SITE \ \ -- � m m m m m = I / 1 - -11-1 � I-1 -1-I-I i-1 I -v I-I-1-1-� - - -I-I- \ " / - / I / \ I 1 �/ - _ y T - 1, _ \\ BOUNDARY 1 I ) -I-11- i�l-ICI-I - - - - - -I-I I -I-I � I I ^� ° ° \ ' � / / I / \ I j a - )-j 1 L� - s � � - � -` \ DRAINAGE WILL BE ROUTED TO SCM S. o Cl)N Co / l � I I .� /.� .� I� .� .� �l � � v; �, -II I ICI- I I I I I-I-1= �-FI-I I-" /�, � I -I- � � ` _ \ �" / I / / \ 1 I j T 1 v �, - . .0 w 1- )I�11-1 , � \ .✓ w N N o / rrt#---1-I----ICI--- ------ -1-1- , \ \ — 11 / $- / I / / / / I I �/� �,� vL - I -II- 1 ICI \,1 -1- - -�z -1 'T- -1- � - �����; -I w y -1 , \�� - , /�' I / _ `� v w No No v v' / ► I I i / / / � � -I4) � �I- � -Iv I--I-I-I-I-I-T�I-I-b-I -I � - - I-1- - �� I-P� I -\ 1 ` � - � � � -1 v �v = Q °o r� -�- -t-1- •�I 11-1- - ° 1 \ _ /-`-11-r-1 11-1 1-�-1- �1�-1-1-1-1-1 -1-1-h-1-1-I I �- -1 � , _ \ ` v U n C) 0 2198.3'OFSHALLOW , ,--I =ICI -I-I o\ \ I \ � - _ / / l i' �I - _r1-1- I- - -1�- - --I-1-1- -/ - L -� - - - _ \ 100'OFSHEETFLOW@6.8% I r\ Q V / / / / CONCENTRATED FLOW@2.1% �'-1-II - 1-1-1�- A--I�1-�-I-1�=�- I -�'- -II- -I-I' -1-,} -I- ,� \ o V ' \ -1 v � / / / ' Tc= 15.66MIN. � .I/ \1._ I II I - I -I I-1�1-I � I-1-1-1 - I-I-I-1-1-1 /I - � Tc=5.58M1N. v I- I .�V ' O o \ / / T— — r — — — —ICI—_— —Imo._---I— — — — — �— — del � T OA2 N/A � , ( \ ° / - / N V A \ / i' �� l I / �/ - '� � - - - - - - - - --�1-1-11-1 -� - - - •��-1Ah- 1- `-' A , U1 DATE _ �- I — -1-1-1—I—I—I—'h— — — —1_1 ——�—I—I—I � I —I —ICI 1 05Acre 3 / v v> 0 / c� V \ / / ) �/ �1 - - - -I-�-I-�-Iv_I NI - I I-1 -I-I-IrtI j A I 'i- 353.6'OFSHALLOW \ V v v�� `�C v v - I _- I v 11/07/2023 ° 0/ v v `v - - -' / / , / /� T �( � � v-I II �� _ -I-I `I OA 3 N/A 1-1- 1 -1 v� 1 � 1 - �� 1 - 1 - 1 - ° `�- �/ CONCENTRATEDFLOW@6.5% I v \ I � 'Al o n o o / / � �/� � � - � _ --- -ICI-- _ _+6/oMANAGEDTUR I \ \ \ , _ _ - / 11 / / / \ - ,I1 T-�1 N' _t1 I -I-1 -I -ICI-I �I-I-I �1 J I o . . . . . _ 0.21 Acre L �L �A ± 94°/ WOODS ` Tc = 1.44 MIN. \ — — — / / , /� � �G !/ w � � — — —1 — — 1-1�1— —�-1-1 ° \ �� — A A A/ / DRAWN BY 11 a \ 1 54 - - I -I I -I- -_- -I-I ,-V -ICI-I-I I-1-I-/P,P--I!'✓1 0� ��� �' _ ' � o _ _ _ - - - V' _ _ _ -+11%MANAGEDTURF -I ,l-I _ I-1 y I -1-r I- _/ i �I 1 I 1 - cr c) 332 0\ / - � ��� ��� � � � � � � 1 I11I�1 I -I- ± ° �- - -I I , Tc=701MIN. / \ o Co / .v .v � � v 89/oWOODS -I I - - - -1 - I -I I -I \ - m o V / \ v� --1-1_1�_\1-1 �� - - - - -h-1--1-1-1- - -� - - �-I-q-l�� 1- , �C DESIGNED BY -� / / �v w � ,1 ,,- �I-I-I -ICI- I -I ICI -I J "� I -ITIrt1 1-1 �. -1-1 -1-1-1 � -1--� 1-1 �1--1-1-1-1- I I 1-1 I �y�I- I� I 1 1-i- =-�-r- -1-I STORMWATER MANAGEMENT NARRATIVE 00 v � / � - - `I -ter- �k, �----�-v--J------ --1- � K- �l� / --I -- �11-r -- ---I , � 332 1 / v/-1-%-1�� -1 -1-1- �1-1,1-1-1--1-1-1-L-1-1-1-1 �v L - 1 00 - , / ,� �. ���v, II- ( \- 1-1 I 1 I VI -I � -� -1-1 1 T --I- ,1-1-rzl-I- -�1- I�-v�---I�I-II-I-�-I---�-I-I-1��=1-II-I-T-P -�I-I- -T I -I -I J=#�II------L-=-I \� v STORMWATERMANAGEMENTFORTHISPROJECTSHALLBEINACCORDANCE 0 0 0 v I / I\� i�i - fft d 1-1-1-I-ICI-----=f-I-i- ,- r ° I � � ��� �/� �/ - - - - -- - - - - - - - - + -,I �1- P� t-L--4-1- - - - 1- 4 1-T- -h w/THE NORTH CAROLINAADMINISTRATIVE CODE NCAC STORMWATER CHECKED BY o16 ) �/ I - � ✓ �� -_ _ /_ b- _ -I-1-I IrI _ . �T- _,L- I - I - I - I L - T - -V- - - = I - �, � � � � \ � I � � I —�— — — \—� I — — — _ / ��� � - -T- I-144541 (- -�� 1 - -,-- I - �- ICI -� I - I C I - I - I -T� I�L I �I - I - I -A I�- � ��-=1--I- '�I - - I - I - ` �/ \ - MANAGEMENT SECTION (15A-NCAC 02H 0.1001). THE INFORMATION BELOW /' ��� ° / // II ����� �y� 'I, 'I, ; ��'����� ������������� �- ` 1/-1=-FY-i� Tc= 14.83MIN. t'-1-I I- I+ - _---I-I- v R. BAKER % I -I -I -1-1 J-1 � v - --T-IrtI-J-I-I-I-IrtI-I-I-I-I-L=f= - 1-1-1 -1-11 1 1= 1 -1-I! I I—I-1-1-�_ -1-1-1 v ` PROVIDESASUMMARYOFTHEOVERALLSTORMWATERCOMPLIANCE 0 41 / 1 \ ° 1 EXISTING - - �I I, I � � � a � /� � ,� � � q I-I-I-1�-I-I-�.-- �-� fi\ I -1'-I -T-I � i1 I-I\I-1--t-_4-�=f T-I-I-l--I-a t 1-�-I�I - - - - - -- -1-1- I-/ -1- -1-1-� � 0) 1 1, 4, 4, � l \ � / .,, � -�I- --`F-1-1 � 1�) � -1� `� - I 1_---I-=--7-T I -I 7 - - --I��-I-I y - - -I-I-I-1-/I-1 ' -V- -�-I-I \ STRATEGY FOR THIS PROJECT. SCALE ` 100YR 1-\I, \I, \I, \I, �,�,,4�1 I g/v��,I/�,�/ v,11 �,� v, \/ y \I, \I, \I, �, .�% v,'v,'-1 I -I -I-_-I-_-Ivrtl� - -1--I -� '1L -I-I� -+�t-= -T-I-I - - ICI-1-I-I- 'f, -It-1 II I OA 1 N/A �,-I I I o/ 1-1-I-1-I 1-\1-ICI--I-I-I `I �1-`4-I-I 11-----t=1=f-I- -�- - �- 11 \ II- y ,�� -II -I-I -ICI-I- �l ICI-_- --I�x� �I �I-I-I- - 1 I I - )I,--1�-I --I -I- -I- 7.96Acres-I I- \ , \ o FLOODPLAIN II,, 3318.1 OF SHALLOW -II �- \ -$-I- -I-I-I-ICI-� It�l -I-I-I WATER QUALITY AS NOTED I I I y�, o �!� �/� -I I I -I-I-� I-I-1-`f-I--,1r11-1 -I I-1�/I- -I \ I\ / J-I-I-I I- Itl-h-I y \ \ 01 ( ,i, CONCENTRATEDFLOW@2.4/0 ,i, 1-1-1-1 --I�I�I- --��I-�-I I- -��r I { �- p�zn_ �n a�_nF _ \I I I -I I _ _ _ _ \ \ I I \ I -I -I -I -I- -I-1- � �I-I- I- , \ \ o - I � 1 - - I -1- I I - - I - V- \I - I - I`� I - -1� 1 / I- 1 + ° + \ THE TOTAL WATER QUALITY COMPLIANCE AREA FOR THE PROJECT IS 0 I Tc=22.08MIN. -L � 1 - \ \ 11� 1-I I -I � _ 100% WOODS - -I-I-I \III----I-1-I -II -ICI- tl-'\ \-- 1 I I I I�I N. -ICI-11- d q� - -I-I I- I ° ''� � � � I � �-1-1-1-1-1-I1-1/-1-1-� / POINTOFANALYSISZ _ - > I I ,, y � � � ,,,,_ 1-1 - 1 - 1 - - -1-1-/ - I - 1/ Tc = 22.39 MIN. I ( / 1 \ - - -`�- 1-1-1- f - - - _ - I - APPROX. 140 ACRES. PROJECT DISTURBANCE WITHIN THIS AREA INCLUDES: \ o I I -ICI- !�_\ , - I - � � G;-/d�i�1_i-rJi- - - I —I I I �1 ��� ;s! �\1����I���I �.� y' I �� �� � - - - - 1 I �I - \ \ _ - ) �I - - - - - ` CLEARING UNDEVELOPED LAND FOR AN INDUSTRIAL PARK, AN ACCESS I o \\ �' � �� � � I � I�I � I � I � I I- i-I-I_-T-�..= I� �`I- \ / / \ ITI-I \ \ III iI ,*� � � � \k)�\�I y _ _ - } ,� . / 1 j� ICI -I -I 1�I-1-� PO/NT OF ANALYS/S i , \ of I � I I I I y I - .I/ � � � �-N �\ \ �� _ - I , �I I -I - . 1 TIC-11 \\ ` // I I / I I \ ` DTI IT I � I I I T I I 1 1-1 1-1-1-1- i-1-1-11-1=1 fi \ \ ROAD, AND INSTALLATION OF ASSOCIATED STORMWATER DETENTION U o - I � � � � � �"' ,v `' � / � � .1- T _ -2 / I \ ` SYSTEMS. THE WATER QUALITY COMPLIANCE BOUNDARY CAN BE SEEN ON \ III_IIIIII I\- - - �� �� \� \� III _ _ 1 I I I I I rtl I- T-1�1-I ICI -I -I -I -I -I ► / ` z ° I I-IrtI I II I I - � \ � I I I I -I- - - �- - �K-11 \ \ \ I \ ` - ICI-1- - - -f\-I- Ill 1 , , - i-*�.� I � � � ��� � � � � � � 1 @ 0 I I I I I I \ C6.00. WET PONDS HAVE BEEN PROPOSED TO MEET THE WATER QUALITY o `f1 \, � � _ 100 OF SHEET FLOW 1.9 _ / \ \ I 1 \ / / \ \ 1 ° / I I I I I I \I 1 1 1 1 � I - .i � \I, \1,1 \1, \V � � � � �\� I � � �\ I I I I � 1 1 \ \ - � / � - REQUIREMENTS OF THE PROJECT, DUE TO THE NATURE OF Q a I%I-I-I-I 1-1-1-1-I-I--I-I-I Tc=9.30MIN. -1 I \ I I POINT OF ANALYSIS 3 \ \ I / _ _ III °\� I o1 - I-1-1-1- I - I\L 1- I - I - - I �I �� �` �\� - - - - {' - - / I I I I \ I \ \ / , / MASTERPLANNING, DETAILED CALCULATIONS COULD NOT BE PROVIDED, BUT J °\ - - -1-1 � 1- - - - -_ \I -_ 1= �I �\ l - 1-1-1-1- 1 - I I - - I - I -DTI i I I I / I \ I I \ \ \ \ / / \ I 1 1 WET PONDS HAVE BEEN PROPOSED, AND ROUGHLY SIZED BASED ON a \ 9 I R----- - I -I-I It-1� h \ - /I/€d6z I_rrd-1-1-II-r1�\1- I t 1 , \ ' 1 \ I \ \ \ \ \ , I �� - 1 \ Q \ - - - - �y - h i.� \ a �� I 1'" 1- �'I - - - r I>r - I \ \ \ l \ _ \ \ ASSUMPTIONS THAT EACH OF THEIR DRAINAGE AREAS WILL BE ROUGHLY > > - - - - - - - - - - - - - -�- f\ /� 4>ai 11 I I 85 \ I l / \ _ �0 70% IMPERVIOUS COVER. WET POND SIZING CALCULATIONS HAVE BEEN w w\� w w w yl 1-I Q-lrI-I�1F I I 1\ \ \ \ \ \ \ \\ 1 1 L O �- 0, -�r�-I- -I-I I/°1- --1-1-`� — ��� �w� -I-I-I � I - -I-I-I T _I I I \ I , I \ \ , \ \ I I I 1 \ \ , ` - -\ i `I -I L = - - - - - -I-� � 1 (- - - -I-I-I / ,ICI- - - -I-I-I - '_ I ) t \ \ 1 t I I l� 3&s � PROVIDEDONSHEETC6.04. -I�� of -I I---I-I- �I--I-I�� ��� �, � � -V 1-1-1-I--I�1=1-I--1-1-1-1- I , I I( / \ I \ \ \ 1 I \ 1 , \ I U -----------I)-/�-----q--------I"I----I-I� i \ _ \ I \ I°-I-I-I-1-1-1-I-I-I 1 ICI C �I� � � � -I -I-I-I-I I -I -I- - - -I-I- - I -I - -ICI �I I- / I I I 1 I I I I \ \ \ I / ) , / \ \ 1 � 'r\ 1 - _ _ joOlt--1 I_ IIIII I 1 11-�, j \ \ \ \ \ ( ( - -\ J WATER QUANTITY_�-----------V--I-II-1-V-1-I-I � I------------y-I� , I I I I I 1 \ ► I \ l I \ ICI -I -I_/=_ - - - -I-I-I �-I-\I-� !� OA4 N/A �1I' I-I-I-I-I-I-T-I- -1-1�' =!=1-1 _1=L /-I- I I I , I I ( \ \ \ \ \ \ _\ �` \ / 1 - - - - PTI-1-1-1-1-1-1-1-1-1-1-ICI-IT I � � �/� \1,I.I-1-�-I-I-I-I-h.I-ITT-I-I-1=i-1-1-1-1•c I I- / / \ 1 I I I \ ( \ / \1 � � WATER QUANTITY COMPLIANCE CALCULATIONS FOR THIS PROJECT HAVE H - - - - - - - _01-1-1-I 1-1- - - - - - -- � 1 2.48Acre I y-I-1- - - -t- -I-1- - - -I-I-I-ICI-� / / / I I I I 1 I \ 1 \ \ \ I I I \ \ I \ i I \ \ I ` - �2Z5 � - - � - - - - ) - � I -1-1 � 1-1- - I - I - 1- II-Y-' � 1-1-1- I -I - - - - I�'I - I� 4- J - I - I - I - I; - I f / / / I I I \ I I \ \ ` I ) I \ 1 ` � \ y BEEN DEVELOPED PER THE DESIGN REQUIREMENTS FOR HIGH DENSITY N Z (/) �- 171-I-I-I-I-I-I-I-I - -T-1 1-1 w� I - I -I .L-1-1-1-� I-1-1-1-1--f -1�17-1�� - -1 �/ / \ \ ( ` \ - - - - - ICI- -I-I-I I -I- I -.ICI -I- -I ,- �� ±37%MANAGEDTURF-I-I-I-I-I-I-I� ,- - --I-I-I-I-I-I it PROJECTS 15A-NCACO2H0.1001 AND WILL BE MEETING THE RUNOFF '� - -I-I-I - ICI----I�----I-I-I 1+I-I�Ii-IJ�� ICI-------I-I-I-ICI--I-I-I-ICI � 1I )l -� / \ - -I- -I TI- - - - - -I�1- - - - -I'-I -I- w ±63%WOODS -ICI-I-I-I-I-I-I-I-I-�-I-T--I -1- L�1-k-I / �' I r \ \ \ ` / 1 / I / / � VOLUME MATCH REQUIREMENT AS SET IN SUBSECTIONS 3OFTHEABOVE0. J b 1 O / —I— — �I �1-1-1-1-1——1-1-1-1-1-1 1 Ill , \ \ I-1�45 1— 1--I- i1 4-1—+—'f—I—I—I—I—I—I�I�I, I /I _ / / I \ \ \ �` 1 I / r ,—I a - - ICI -I -I -I -I -I- - -I-I- ICI-1-I �, v/ \1 \I, \1\1, \1,�-1-1-1-1-1-1-1-1-1-1-1- I 1-1-�-ICI- � � ' / 1 1 I 1 \ \ \ \ ) I \ _ ( � -N - � LISTED CODE SECTION WHICH REQUIRES MAINTAINING THE ANNUAL RUNOFF Q Q / � I-I-1-1-1-1-1-1-1-111-1-1-1 \�, w \ w w � \ w wow w - - - -I-I-ll I>I - - -d' �I- 11 / / / 11 � - I I I ( \ \ \ \ \ / I 1 I I \ \ / I 1 I ( �_ >� VOLUME BY NO GREATER THAN 10% FROM THE PRE -DEVELOPMENT U J U z - - I_I-d 1-1-I�JI- - -I-k3� -I-I-ICI-ICI-� v -,\ i _i-I I- 4-i� T- I -I J- --'I�I'�t - - \ I I ` \ \ \ �( � / P� o I M P I,, L L 1 1 I'T 1-1-Al-IN-1 T�T 1 �v�\� -1 I I T 1 I T I T I T 1'T t -1-1-1-1-1-1- 1 I 1,r I_I 1 z/I I '11 / / /I I I 1 I I 1 \ \ \I I 11�/\ `` I\ \1 \ ,- ( \ , CONDITION. BY COMPLETING THESE CALCULATIONS & PROVIDING ADEQUATE Q 2 Q 11 / p °o b\o I -I -I -I oI-I-I-IrI i I � I � I i`l i ICI-I-I-I��,-I-ICI �I-I�, I-I_-1-J-I--T� � I -I -I -I -I _I-I-L �-}`I- _ - i -� 1 I I I I \ � \ 1 \ / / \ I 1 \ / i --• DESIN, THE REQUIREMENTS OF (15A-NCAC 02H 0.1001)ARE DEEMED TO BE � ./ ti o -. P-I-I�1 `3$I-I-1- I-t�1-1-1-� 1 I)-I-I-I-T--t-1-1--1-1-1-I_t�+-1 I-1`-1 I I- - � �( I/ \ I \ l I I( I I \ \ \ 1 z W / 0 * - P-o1$ I - - Io- I - EXISTING 1� 1- I 4- - - I - - - - - I - I - I - I-�-I--1- 1 1-1-1-1- L 1`,-�t�l � - - - ' / l \ \ \ 1 I I li I \ MET. THIS PROJECT CONTAINS FOUR (4) POINTS OF ANALYSIS (POA 1, POA 2, O 0 O��) o -1 I .I-�I"l Io=T1-100YR -I �I-I-ICI-II-I-1- - - - - -I� -1-I- t�1-I-I -h-ICI-' / - - 11 / / \ \ I � / \ I I I � \ \ 1 \ - I \ \ � Z o �ti i - - to - -I- -I-I- -1-� =1 =-1-t-I- I-I-I-I-I'-f I- -1= - / - - - I 1 1 \ _ \ POA3, & POA POINT OF ANALYSIS ONE POA 1 IS THE WETLANDS ON THE w _ - o ( \ _ _ _ / - _ - - / 1 \ 1 I \ \ I I 1 I I I 1 i )' ( ) (n , I --I 0 1-I-I I- 1-la--FLOODPLA/N•---I--I-I-I L------I�It't- ICI- ,f� , \ \ I I / / \ \ \ (n o► -1 `�- - I -IL P V 1� - - - - - - - - - - - �-L- _ f - / / \ I \ \ \ \ / / 1 l / \ I / ) / \ EASTERN SIDE OF THE SITE NEAREST NC HWY-87, POINT OF ANALYSIS 2 (POA (n ° 1 J 1 °\ -I-I �-9-I-I-h I -I -I -I -I- 1 1-IlT-� �l-I- � -i-1�1--T�-I�-I-=1�1- 1-T ,1 .� � _ - - _ 1 - y / 1z I- o� \ - - - _ , / \ 3a I I \ I / \ ._� 2) IS THE CREEK THAT FLOWS ONTO THE NEIGHBORING PARCEL (PIN: J \ -ICI-I- 4-�1-1-I� 1-1-1-1-1-1-1-1-1-1 1-1-1-1-r T-1-1-1-/I-1-1-1-1-1 1 /h-y-1 1 1\\ Iz Ur 0 \ °o o I -I�-I- -01-1 - - - -I-I-I I-X-ICI-1-1-1- -I�-j I =1-I 1) A I4I � - � � - - _ -' / 1 I \ \ \ I I I \ I \ l \ I \- - - \ 9660-42-2929-00 ), POA31S THE CREEK TO THE WEST OF THE CREEK SHOWN w � � oli \ \_ � `o Q I-I-�I 1�1 II -I -I -I -I -I -I I-I-I-I-`�-I'�I-I-�L-I-I-X-1 �-1 I-1=1-i\-� I 1 _ - - - / \ I ( I ! I ► / \ 1 \ \ U Z o z \ -\ Q 1-1- -I 1-1-1 1-1-1 -- - -\I-I-1` In I-1-T-1-ICI-ICI- - - -I->k Ir�l - / � I I I 1 \ 1 I \ AS POA2, AND POINT OF ANALYSIS (POA IS THE LITTLE RIVER WHICH IS � /°I \ \ I-1--0-1-1--1-1-1-1-1-1-1=t=1-I\_I-I\ 1-1-1 �,y1-I/-1--1-1-1-I�I� _ - - o \ � \ to -I 1- -1-1- 'I-1- -1 -I- - `f-1- -1-L, 1-1- -1� --1-1-1-1 IfI-I /'� /' I I \\ \ \ -�>0�/ ) 111% O I 1 I �\ THE WESTERNMOST BOUNDARY OF THE SITE AREA. J I --I ~ ° I t, - / _ "I \ �- o-b-I-1 �1-1-1 - I -I- -1-'T �I-� I -I ' � I--f--I-I-I-I =1#ICI- - - - - � 'A \ \ I I - - - 1 1 t \ w I � - - I I \o - 1' Ind I 1- -1 ___f__ �1 1 �1 1-1-1-1-/1-1-I-I�I'�IGI�I I- \ \ \ 1 I I I I I I \ ,' / Q 0 I i I - 1� 1-1 T 1-1-1- - - - - - ' I -1- I - I - I - I� I - I - I _ � � THERE HAVE BEEN A HANDFUL OF ASSUMPTIONS MADE THROUGHOUT THE � (n / 1 1 I -I-IV-IAI-1-1- - - -I-I- I �t��1-1-L1�i-1-1-1�1_f- - - - - / ` \ 1 1 \ \ ( I \ \ /\ z W o I 1 � I I I I I \ ` DESIGN OF THE STORMWATER MANAGEMENT; ALL OFF -SITE RUN ON WILL BE i--i x / , , / - - -- �I- ICI - - - - -I-I-I �� -I-I-I ./ 11--1 -1 K I 1 I \ \ - 1 I \ \ \ I \ \ J X o I % - I - I - I I -I -ICI -I -I -I- L -I-I - I I-I-I-I-I-I-I-I-I-ICI-1'-I - `-' -� p I I/ 1� / /I I - - I - gyp- I - I `l =I-ft t- I �� - - ,1- 1-1- r - - - -'( � J � \ \ ` ✓ /- l 1 1 \ � J 1 \ BYPASSED OR DIVERTED AROUND/THROUGH THE SITE AND WILL NOT BE O oC � LU / / 1-1 I �- I��-1-1-1-1-1-1-1 I-1-- 1-1 _ 51'-1-1-I-I-i _ / �I 1 1 � \ / I I \ 1 \ /\ \ MANAGED BY THE PROPOSED SCM (STORMWATER CONTROL MEASURES). p o I c / 11 1-I I 10-1-1-1-1-1-1-1-1-1-1 1-1-1 I-1-1-1-1-r I- t \ � Q 0 / /- I l ( I I -1-1 II I.- b- I-1-1-1-1-1- I 1 1- - - - - - I - I - I - / I � I � -I I � \ \ / ) (I \) \ \V ALL ON -SITE RUNOFF WILL BE COLLECTED AND DETAINED PRIOR TO Q U z p ) / 11-1-I- ~I f, 1-1-1-1- -I- 1-'V�-1-1-1-I-I ,4 I I / I , I l \\ ° / \ �/ / / / \ L,; 1-1�1 - � �I-I-I-I-I- --I-I-I-I-I-I-I I rv?j-, I- \ \ 1 \ / \ 30� I I I \ OUTFALLINGTOTHEIRRESPECTIVEPOINTOFANALYSIS. U Q o / \ I / ) \ -I\ I �- 1 6-1-1-1-1-1-1 -1 �1-I-1-ICI- I-1L1� I- t \ \` / / I \ \ / (!) 0 \ 1 I f -d- -�-°I -1 - 1-1-1- I I- - IT - \ \ \ / / \ \ I I 1 \ \ ` / \ \ IN THE PROPOSED CONDITIONS, THE SITE WILL BE INCREASING THE ANNUAL = _ L / -� / I o \ �`f,-I- - 6-1-1-1 °1-1-1CI- - - - - --ITI -/I-I 1 � / \ \ c I � / \ / p III ° �-I - I - 1--)-I�-1-1-ICI- --1-1-1-17-1 f- \ \ / r 1 I o /r\\ I ) I I I ° o o, - I 1 -1-1 y 10 1-1-1- - -� -1- I -17-1 /h- I� I 1 ) \ / / .- -\ \ `` _ 0d / I I / I I i I ^) \ / RUNOFF VOLUME BY MORE THAN 10%, SO SCM (STORMWATER CONTROL � Z) > I I --1-1-1-1- - .-- - I - I /I - THIS DESIGN ASSUMES OFF -SITE RUN ON / / / / \ \`-3 / / o \ / 1-1�� - - I - - - - -1- 1- \ \ / I \ I I \ MEASURES) WILL BE PROVIDED TO REDUCE RUNOFF TO WITHIN 10 /o OF THE I- - Z l 1 PERENNIAL STREAM / 1 / / _ - ' l O O '~ o \ I I \ 1 - - - - - - - - - �I -k- _ - WILL BE BYPASSED AROUND/THROUGH THE J \ -I� � ` - — � ) // I S I , PREDEVELOPMENT. THE SITE WILL BE CAPTURED BY MULTIPLE WET PONDS, U Q \1/ o I I I UPPER LITTLE RIVER - 1-�I-1- - - - -1-1- I -I �f-l�l / / -- / 1 / I I I - I - I - I - I - I - I - I - I -X- I� SITE WITHOUT SCM'S, AND ALL ON -SITE - - � - - - - - - / WET POND 1 AND 8 WILL OUTFALL TO POA2. WET PONDS 2 AND 3 OUTFALL TO z o I t \ d \l, � � 1-1-1- - I - - I -e- It I DRAINAGE WILL BE ROUTED TO SCM'S. EXISTING \ - - _ _ _ _ ,/ I ( \ 0 / )b -1-1- - I - I - I � I f I _ _ - � I 100YR _ - _ - ' ` - - o - - - / 1 POA 3, WET PONDS 4, 5, 6, AND 7 WILL OUTFALL TO POA 4. � ° (( �\ I ^ 1 0 o / / �-I I IIIII I III�� �I / / ° ° o\ 100 R� o FLOODPLAIN X' o ° � � ° 0 0 ° 0 - / / I / \ o I ��, �__� / I ° o\ / \O / pNE_ ° - - - _ _ I ) \ THE WET PONDS HAVE BEEN PRELIMINARILY SIZED TO HANDLE THE ° ° �\ \ / - 1 _ `° / I I �0- I .._I 111 I'1I 10/ o �° 0 ( ° o . - ' ° `° / / - Z '0 ° 0' " 0 \ I / / DRAINAGE AREA OUTFALLING TO THEM. DUE TO THE VOLATILITY OF THE ° / � \ THIS DESIGN ASSUMES OFF -SITE RUN ON - -1- I�/I - i- 0\ - - o ° ° o ° - , \0 � - ' - \ ° ` \ w 11 �� / o \ I o 0 0 0 ° / \ - o E PE ° \ I ( I PROGRAMMING OF THE INDUSTRIAL PARK, THE WET POND CALCULATIONS � WILL BE BYPASSED AROUND/THROUGH THE I T - 1- I �- / 0 q / 0 0 / o / Q \ - ,zOI�fEJ�' � 6 y o - ZQN \ ° SITE WITHOUT SCM'S AND ALL ON -SITE \I - -1-1- - 6 o JONESBORO T am - '° ° ° / \� o $ o-o-o ° ° - - \ o ` 1 \ -1 / ARE MINIMAL, BUT ARE SIZED TO SHOW THE GENERAL INTENT. THE WET Q / I--I-I- OWNSHIP 60 0 _ _ \ 0 1► I i - _ \II \ DRAINAGE WILL BE ROUTED TO SCM'S. 1-1-1- y 1= - - - - V ° ° - -ZONE0 � PONDS HAVE BEEN SIZED WITH THE FOLLOWING ASSUMPTIONS: THE / 1 r ' �(� \ \ \ - o - - W �/_ � ,I I I �� GREENWOOD TOWNSHIP - � - / l \ \ ° 1I ) � � � � / / DRAINAGE ARE TO THE WETPOND IS ASSUMED TO BE 70% IMPERVIOUS �� - I _ \\\�� \V \ji \ji \L/ T \ ° 1 .0. COVER, THE WET POND WILL NEED +/-4-5' OF DEPTH FOR THE PERMANENT / I1 \- f\ , �� ���No I I � l- \ o I / POOL TO HANDLE THE WATER QUALITY REQUIREMENTS SET WITHIN NORTH \° \1/ \1/ \j/ _' \ � 0 1 / / /�/ - \\ _ 11�\\° \1/ \1/ - � > °° / / CAROLINA. IT WILL NEED +/-T OF DEPTH FOR VOLUME STORAGE, AND +/-40' O \ ` I \ / / / BUFFER HAS BEEN PROVIDED TO ACCOUNT FOR FOREBAYS, SPILLWAYS, J/ -/ - _ `\ \� \A \ � ° o � � � � � ° ) � —� �� ? _ _ _ _ _ _ - - - - - - - � ° ° 00 0 � / MAINTENANCE ACCESS, AND GENERAL TIE OUT GRADING. REFER TO C6.04 / \\\\\"I, ,_ �, POINTOFANALYS/S4 /�11 — __—_-------- ° f ) \�\\\\�� �\ Tc = 31.35, IN. � � f� / 0.��0-0 _ - -i _ - _ _ - - - - - o° / FOR THE CALCULATIONS OF THE PONDS. — r ) III, " - _ \ \ ` � � 1 I N,p /- `� \ _ `/ _ _ " u -o `0 �/_ - \ I - - — — — _ o / / / JOB NO. - - I I �,, ` ^ _ \ ° , (� ���_, , , / p _ , ; , 1 I _ _ _ _ _ _ _ o / / / ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL 41353.O1Z \��1 / -� /� \moo\ o //- i _° - /_ o \ //I l/ / _ \ I III I _ \ \` \ _ _ _ `_ i � \� ( % /, \ I / I I - - _ ° \ I/ / \ I, ,� 1\, (� \\�\\\` - - -� �;\ \\ o2B---a� �� _ I --___° _ - �__,\ o / CITY OFSANFORD,NCDEQAND NCDOTSTANDARDS, SHEET NO. � \ ► I I I l / \ \ / / - — - �-=� )` i I I - - _ _ � / / SPECIFICATIONS AND DETAILS L / - ( _- .40 1 1006. w A � / / 1 / 1 � w w �w w w w w w w w w w \ THIS DESIGN ASSUMES OFF -SITE RUN ON `\ w ww wwwwww�k WILL BE BYPASSED AROUND/THROUGH THE `\ w wwwwwwww SITE WITHOUT SCM'S, AND ALL ON -SITE DRAINAGE WILL BE ROUTED TO SCM'S. .00/�w wlwwwwwwwwwl \ w w w w w w ° O w w\w w\w w o� p oA O O O w w w w.\w w w 00 o / / awwwwwwwwwwwww�w OA 3 N/A /A O O w ° ` fv w w w w w w w w w w w w 0.21 Acre � o` o 30% MANAGED TURF o / w w w w w w w w N w w w w w\ w v ± 70% IMPERVIOUS O S� / / / v A www wwww www y w wwwwwwlw4, www �w�� w�� ° o ° O O O o o O \ w w/ w wear ww w w wv w w� w� w w w w w w O / 0 / w w w/ w w w www w w/ w w w w www \w"Nw\ w w w w / O v ' / ° EXISTINGm w �w w w w/ w w w w w/w w w w� EXISTING 000, �z , X / i w w ` '350400 loolz 000, Z�,/ - r 1 wwwww w wwV i wwwwlww / v w w www 'wwwwl/ww��w w�w woo ` wwwwwwwww w w w '0� w w wwwwwww �w 1 A 345 A THIS DESIGN ASSUMES OFF -SITE RUN ON \ wwwww \ WILL BE BYPASSED AROUND/THROUGH THE 1 SITE WITHOUT SCM'S, AND ALL ON -SITE DRAINAGE WILL BE ROUTED TO SCM'S. -33o / POINT OF ANAL YS/S 1 OA 2 N/A EXISTING v �2.05Acre wyw WETLAND o ±1%WOODS ±48% MANAGED TURF i ± 51 % IMPERVIOUS - 1 , r o w w�w�ww w w wwf ww -wa/ ww ww w ww - ww w O.A 7 NIAw WETLAND O 100YR 0 w w w 96 AFLOODPLAIN V O \ of w w ww I w vl/ 7% WOODS v 9/MANAGED TURF yw POINT OF ANAL YS/S 2 '� ± , v °I 84% IMPERVIOUS w w w �w wwwww- w °v V of 0 1 0 ° / OA 4 NZA POINT OF ANAL YS/S 3— ov ♦ of d 2.48 Acre - - I d \ a , w as ± 10% WOODS \ o ± 18% MANAGED TURF °I ± 72% IMPERVIOUS / w w w \w w w \ w wl w w w w w / y✓ C� w°w .v w w w w w w°w w w w w w \/ w w w _- w 3 2s/ / w w w OV/ w w w w w w w w w w 280 \ � w w w O 0 ��� EXISTING 0 10 of 100YR ° 4�i01 i i FLOODPLAIN `° 0 6- ol \ _\ Q wwwwww 0 _ o w w w w w w --- �/ \ `�_- 310- 111 o I _ o O /\ o I 1 I EXISTING / wow . w w w w w v o / l q WETLAND v - v � .� w0 w w � w w � v� � / O / / �° I C: r w w w w w I 0 w w w w I ol v � � �no ,wwwww i \ \ \ � � \ 305 \ °/ ° °/'o� v v v v 0 o Iv I v ° \ THIS DESIGN ASSUMES OFF -SITE RUN ON ` / 300 o v 0 v WILL BE BYPASSED AROUND/THROUGH THE o // �� o SITE WITHOUT SCM'S, AND ALL ON -SITE EXISTING DRAINAGE WILL BE ROUTED TO SCM'S. _ oo /-265 T a ,0 100YR -- ' — �°� °��- i l\ I i 1 o ` I, ` I, I, � 7► 0 0 00 00 O FLOODPLAIN / ON��( -6 o o ° o O O O ` �� \ \� l i 10 W W W W / 270 O O O �.. _ - O \ O ° / J q J O O°---- --- O ° / / 0 0 p i O / \ \ �/ �/ 6 �/ �� �f / �/ / ° 0 . 0 0 0 0 0 ° O vo 0 0 0 0 - I ° — — � o NE P 0 ° �/ �/ �/ �/ � , / / o O ° 4 / � ° o 0 0 0 / \ Q � ZOIyE:,X� � 6 Cr° - Z0 \ o .6 0= ONESBORO TOWNSHIP '0 6 0 0 ° 0 ° �► / / THIS DESIGN ASSUMES OFF -SITE RUN ON a e o 0 0 0 \ 0 0 WILL BE BYPASSED AROUND/THROUGH THE - - V o 0-n �QRIE: AE \ GREENWOOD TOWNSHIP o o / II SITE WITHOUT SCM'S, AND ALL ON -SITE _ � � � r`° / ' � � DRAINAGE WILL BE ROUTED TO SCM'S. 0 .00 / - PERENNIAL STREAM \ _ 0 / 0 / UPPER LITTLE RIVER \ �/ _ _ _ _ _ — — — — — 0 0 0 ° o ° \� '� PO/NTOFANALYS/S4 _ i -� --- _--------- o / O O, _ - - o � -0 — --- - - o / 0 _o o' i _ _ _ 1 / _ o -0 0� �Y / o 000, r - _ - / J \1 0 / 0 (+) 00 O z 0 U CN o� 1-O p rl N 9 � SCALE 1 "=200' = z z W MIR 0 260' 400' o wz W U N O O a,! U c/) a u- a z U,� � a x 00 U i c2 � LO W G W O Z- J U) °% Q < mil O 0 HATCH LEGEND z > � L� LL o °O O W IMPERVIOUS "t rn U U Z W H w w w w w w w w w w w w w w w w w \ \ qI \ \ \11 MANAGED TURF w w w w w w w w w O p 2 Z > W c WOODSCo m = W N N W 0 0 Lu N N - - DRAINAGE DELINEATION v QQ o 0 BOUNDARY z o O U) DATE 1110712023 O DRAWN BY 332 • DESIGNED BY SINCE THE PROPOSED DEVELOPMENT IS PRELIMINARY, A CONSERVATIVE ESTIMATE OF HALVING THE PREDEVELOPMENT Tc FOR THE • 332 POST -DEVELOPMENT Tc WAS ASSUMED. • CHECKED BY • R. BAKER • • SCALE • AS NOTED • • • 0 w 0 m 0 Lr) l0 0 U Q V / J u Q == J O ~' I L z o z w ur) Q z Z w Lu U � o ~ _j 1--i U J Q ln. Lu Lu z w 0 ~ Q 0 LL U a Q U) = I— 0 0, DC 0 O °C z V) u w Q 0 JOB NO. 41353.012 SHEET NO. C6. 01 0 c N U c 0 0 w Co t 0 0 a T C m `o w 7 N O c Co 5) 70 c Co V_ 0 a c a 0 3 c L T ° 0 0 T a N N Cl) N 0 N 0 0 a p> 0 a .000 ,00000� 0#1 `13 O M 06, 00, \7 / 00 350 / z le \ \ \ \\ / SCALE 1 "=200' \ 0 0 200' 400' ' / 1 1 HATCH LEGEND ` \ WET POND #1 i AVERAGE DEPTH 5.0 FT -�, ET ND 2 N/A ' �A/ \ SURFACE AREA 14,813 SO FT / IMPERVIOUS 3.40 Acre ' ,, �40' OFFSET FROM PRELIMINARY ` / THIS DESIGN ASSUMES OFF -SITE RUN ON ASSUMED 70% POND DESIGN TO ACCOUNT FOR GRADING OF: SPILLWAY, � � � � q, / WILL BE BYPASSED AROUND/THROUGH THE IMPERVIOUS COVER V �, �, y-.,� �, , , �` �, �, �, \ SITE WITHOUT SCM'S, AND ALL ON -SITE � / Vl/ �'�'` \, MAINTENANCE BERM AND TIE ��� � � � MANAGED TURF DRAINAGE WILL BE ROUTED TO SCM'S. BACK INTO GRADE ` \ FOREBAY VOLUME / �� 15% OF PERMANENT / ► \� � � � �\ / POOL VOLUME 1 \ ! /v\ \ , m m m WOODS \ A 3q5 o FOREBAY VOLUME , ��w� \�\ / �'q0 THIS DESIGN ASSUMES OFF -SITE RUN ON / 0 \\ 18% OF PERMANENT �� ` WILL BE BYPASSED AROUND/THROUGH THE DRAINAGE DELINEATION o ND 4 N/A �� \ \\� POOL VOLUME �� ' �\ SITE WITHOUT SCM'S, AND ALL ON -SITE ` �1 , BOUNDARY � w� WE ND 1 N/A V, , \ DRAINAGE WILL BE ROUTED TO SCM'S. 17.32 Acre 0 N ��\I,� WET POND #2 18.53 Acre \ •p3p / 0 0 ASSUMED 70% AVERAGE DEPTH 5.0 FT \ POINT OF ANALYSIS ° 40' OFFSET FROM PRELIMINARY �� SURFACE AREA 19 019 SO FT ASSUMED 70% `� �� 11� IMPERVIOUS COVER � 0 0 o POND DESIGN TO ACCOUNT ��� ,` � �, � �, �, ,IMPERVIOUS COVER �� � ° FOR GRADING OF: SPILLWAY, WET POND #4 )i .� ,\ ' o , EXISTING 0 MAINTENANCE BURM AND TIE AVERAGE DEPTH 5.0 FT i �� z o BACK INTO GRADE y , ���4, `vim\., \ 40 OFFSET FROM PRELIMINARY, w \ \ WETLAND \\ o SURFACE AREA 14 813 SO FT 0 �Op POND DESIGN TO ACCOUNT m ems", \ FOREBAY VOLUME FOR GRADING OF: SPILLWAY, ` �m SINCE THE PROPOSED DEVELOPMENT IS PRELIMINARY, A CONSERVATIVE 00 ° �� �� 16% OF PERMANENT ���� �I��� ����� ��yMAINTENANCE BURM AND TIE A `\ ° o POOL VOLUME ,� BACK INTO GRADE \�\� \ c� ESTIMATE OF HALVING THE PREDEVELOPMENT Tc FOR THE \ b w w w wvw ° o 0 0 � � "' I ' ' / WET POND #3 � � � POST -DEVELOPMENT Tc WAS ASSUMED. o /�/ ��� w�� o AVERAGE DEPTH 5.0 FT 2yo °iSURFACE AREA 16,627 SO FT_.- / ° �� ,� �v EXISTING v EXISTING ` � IL �� ° �� FOREBAY VOLUME �WETLAND ° FLOODPLAIN 17% OF PERMANENT WE TP ND 8 N/A \ w \ v POOL VOLUME \� \ o WE ND 5 N/A �, �,� �, �,I , � �, , 11.20 \ 0 19.364cre ,,� I °I �� �� �'��'��' �'� � POINT OF ANALYS/S 2 �� �i� � tv ASSUMED 70% ° I ASSUMED 70% IMPERVIOUS COVER 0 \ IMPERVIOUS COVER �� �i� , WETP ND 3 N/A ` \ o \ FOREBAY VOLUME \� 0 0.97Acre 170L OF PERMANENT \ `\ 40' OFFSET FROM PRELIMINARY POOL VOLUME 0 / POND DESIGN TO ACCOUNT ASSUMED 70% ` o / FOR GRADING OF: SPILLWAY, IMPERVIOUS COVER POINT OFANALYS/S 3 WET POND #8 _. o\� °I d MAINTENANCE BURM AND TIE 40' OFFSET FROM PRELIMINARY / AVERAGE DEPTH 5.0 FT °\ d d BACK INTO GRADE POND DESIGN TO ACCOUNT SURFACE AREA 9,190 SO FT \ Q \ d ����� WET POND #516 FOR GRADING OF: SPILLWAY, 40OFFSET FROM PRELIMINAR MAINTENANCE BURM AND TIE Y 09 1 01�= AVERAGE DEPTH 5.0 FT y,� �� �- 0,� o��,�,� �\� JBACK INTO GRADE POND DESIGN TO ACCOUNT ,pas \ SURFACE AREA 15,647 SO FT FOR GRADING OF: SPILLWAY, u ��� �'p�\ ��� ��// \ / MAINTENANCE BURM AND TIE o\ FOREBAY VOLUME i p m i FOREBAY VOLUME BACK INTO GRADE 15% OF PERMANENT � � / � �1 �I iv 16% OF PERMANENT POOL VOLUME ' / 1 I I ` 325d000 / POOL VOLUME \ ' / ` / v v u� /� i i / / ( I I � d� �v �v\\ // WET POND #6 ` - AVERAGE DEPTH 5.0 FT ��' �' / 1 I �- � �\ l�� � A` SURFACE AREA 8,520 SO FT , - i / / _ 28�i - v �1 >� moop o°°� �o ETP ND N/A 0 0 �� EXISTING 10.70 Acre ti 0 O 100YR c / _ _ i 0 0ll FLOODPLAIN WE TP ND 7 N/A ASSUMED 70% / \ \ ° " o / v v v A 0— 1.23 AIMPERVIOUS COVER v 0 / � � _ ° Q� ���� ASSUMED 70% _ \ _ - IMPERVIOUS COVER \ \ 0 \ t o I �� _ 310- l i/ o ----\ �� 0/� EXISTING ��'� `\ � ��•v, ��'/ �� � I I A � o f q WETLAND o / FOREBAY VOLUME i PI — v i �Iv o / � o � I � I � /� 16% OF PERMANENT � �' � - ,�A \ V � / � \ ` �305 o/ POOL VOLUME v °�`����i'�\ v/ v o, �o °' 0 WET POND #7 - Q o r \ \ AVERAGE DEPTH 5.0 FT . , \ \ / \ ~ 300 / THIS DESIGN ASSUMES OFF -SITE RUN ON i 00 �� I I SURFACE AREA 17,034 SO FT / WILL BE BYPASSED AROUND/THROUGH THE ° SITE WITHOUT SCM'S, AND ALL ON -SITE - _ ° 140' OFFSET FROM PRELIMINARY DRAINAGE WILL BE ROUTED TO SCM'S. EXISTING ` - , _ - _ ✓ �` o / �� ( POND DESIGN TO ACCOUNT -265 o o 00 100YR �� - _ �� 0 0 0 0 o FLOODPLAIN o ° ° ° FOR GRADING OF: SPILLWAY, � � ° 0 , � 0 � o � N`�X o � - - _ �- - ° 0 0 0 ��\ \ MAINTENANCE BURM AND TIES 200 0 ° ° o \0 - - ZO -o 0 0- ' - 0 f' ° \ \ BACK INTO GRADE �/ 0 0 0 0 o �_ \ i i 0° 0 0 ° o 0 0 i \ Q oNE--X' a 0° 0 ONE �� ° l ` ° I �/ �/ ° JONESBORO TOWNSHIP 06 0 0 ° 0 ° \ e°-0 0 0- Cr 0-0 °� s ' Z \ 00 ° \ _ THIS DESIGN ASSUMES OFF -SITE RUN ON , - - �► - / WILL BE BYPASSED AROUND/THROUGH THE'/ - �_ \ o II ( SITE WITHOUT SCM'S, AND ALL ON -SITE GREENWOOD TOWNSHIP o - — I DRAINAGE WILL BE ROUTED TO SCM'S. - � � / ,� � � �- 0 o o PERENNIAL STREAM \ 0 0 0 UPPER LITTLE RIVER ° I ` POINT OF ANAL � �- - _ ------_------ - ° ° o �� _� D o 0 0-O - o / 0 - /� - - - _ - -- ---- -- -- -- - / o r` O O O O O -°— Cl0 I/ O O 0 / O O / ° / ° O �O ° O I ° R_ \z 10I �O E 0 CN 0 0 ,O 0 r�E N E Luz z w Q °' z 2 o LuO 0 Lu N w p o M a z W 0 2 .0 U > 2i (3 C7 } rn U) LuLu2i Lu M O ru Q O 0 � W cnLn Ln 7:2 m > Q Lu LLuU) ~ILL o 00 0 0 wO LuU z Ln O 0 = z N CK_ CII W > W W F_ N O N N O N u In O O Q z O 0 DATE cn 1110712023 O DRAWN BY 332 } DESIGNED BY • • 332 • CHECKED BY • R. BAKER • • SCALE • AS NOTED • • n am w U z Q G cv a O a O (� U J ~ U (J) O Q z o Q Lu � z z Q U Lu ,I z J P. o I U , ^ Q Lu Lu V, z w J I J O H 0 Q U z Z U = Ln Q _ L D o O' O O ce Ln z ( Lu G O JOB NO. 41353.012 SHEET NO. C6.02 _ U 3 -0a Z) �O a� o O �Z mO 22 02 T � O a a 0 U 3 Z y 02 � a g x H o w ° o w r 0 m 0 nY 0 3 a c 0.0 Y2 2'�5 m = Y U � o E c 0 Co a m Na f9 0 0-0 o C (o o 0 . m U -0 �N y o � U m Qo 0 0 L