HomeMy WebLinkAbout400142_Inspection_20231109• f � .., . �.. .a JYJ4S l�)1�!JU d�11'Q�.gL,�eBO a{;. i,a.,x 4.. �- 3", � ' ;I
?G�i4 016ioalt ofQkC aud.Wte� Cou�rr�� pti
r ` �
1 7.t. ..�• 'r' OlhePe�de.,
Cype of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
2eason for Visit: 40 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: ILL�� Arrival Time: Departure Time: '® County: Region: V
gA
Farm Name: „ Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
* •' . � Guixe�tt
E St+ ne ,;Capsa . : pop:
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
air
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design ' c1fr 'e t
wetpoultxy Capado po%p. `CAU118
La er
Non -La er
Ac ign Cum*
Pou] c Poo,
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharses and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated u'me that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes [(No ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes [:]No
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes Zo
o ❑ NA ❑ NE
[:]Yes ❑ NA ❑ NE
❑ Yes VNo ❑ NA ❑ NE
Page I of 3 51I212020 Continued
Facili Number: W - FD_ateof1nspectioaLy=
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
No ❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No ❑ NA
❑ NE
Structur� Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
JZNo ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
5dNo ❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmen 1 threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ;7 o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes W(No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [✓j No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
ElYes o
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes o
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes rNo
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes [1 o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes rNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes o
JNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
ElYes
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements 00ther:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and 1" Rainfall InspectiojNo
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? [:]Yes ❑NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - d- Date of Inspection: — —�
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [�o ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes EfNo
❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes dNo
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes 2(No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ENo
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
/o
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes o
FNo
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ NA
❑ NE
Comments (refer to question # ): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
'3 = .3-07
Reviewer/Impector Name:
Phone: 953 —�V&-- "-k
Reviewer/Inspector Signature:
Page 3 of 3
Date: //— Q' — pig—:3
511212020