HomeMy WebLinkAboutNCC201229_NOT Closeout Documents_20231116 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
FB-Fort Bragg Special Operations
County: Cumberland Project: Facility-PN92594 River basin: Cape Fear
Person financially responsible:US Army Public Works Department-Monica Project#: CUMBE-2020-060
Stephenson,Directorate NCC201229
Address: 2175 Reilly Road,Stop A,Fort Bragg,NC
1. Project Location: Malvesti Street,Fort Bragg
Pictures: No
2. Weather and soil conditions: cloudy/workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Anthony Byrd Title: Corp-Rep
Inspection report: Sent Report Date given/sent: November 15,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present: Lee Ward
Date of inspection: November 15,2023 Time arriving on site: 10:20 AM Time leaving site: 10:28 AM
cc: