HomeMy WebLinkAboutNC0003433_Figure H-8 - Time v. Concentration - Bedrock Wells - Selenium, Sulfate, TDS_2015090270
50
J
to 40
E 30
3
'= 20
N 10
0
12/15/2010
800
700
600
-j 500
dA
E 400
+°r 300
co
3 200
Vf
100
0
12/15/2010
1400
1200
1000
J
CIA 800
E
N 600
400
140101
1/19/2012 2/22/2013 3/29/2014
Sampling Date
1/19/2012 2/22/2013 3/29/2014
Sampling Date
— — 15 NCAC 02L Standard
BGTMW-4 (Background)
O CTMW-1
CTMW-2
O CTMW-7
CTMW-8
5/3/2015
— — 15 NCAC 02L Standard
--4—BGTMW-4 (Background)
O CTMW-1
CTMW-2
O CTMW-7
CTMW-8
5/3/2015
— — 15 NCAC 02L Standard
—$—BGTMW-4 (Background)
O CTMW-1
CTMW-2
O CTMW-7
CTMW-8
0
12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015
Sampling Date
Notes: Open symbols represent non detects
FIGURE H-8
148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION - COMPARISON BETWEEN
GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS
PHONE6
www.s n84-421-9999 terracor .corn BEDROCK
DRAWN BY: J. GILMER DATE: JUNE 2015 SELENIUM, SULFATE, TDS
sync ra PROJECT MANAGER C SUTTELL
LAYOUT: CAPE FEAR STEAM ELECTRIC PLANT
P:\Duke Energy Progress. 1026\100. Cape Fear Ash Basin 500 CP$L ROAD
GW Assessment\1.11 CSA Reporting\Figures\Stats\Time- MONCURE, NORTH CAROLINA 27559
series