Loading...
HomeMy WebLinkAboutNC0003433_Figure H-6 - Time v. Concentration - Bedrock Wells - Cadmium, Chloride, Iron_20150902E 3 .E '00.1 V 0.01 12/15/2010 1000 J 100 t � 10 U 1/19/2012 2/22/2013 3/29/2014 Sampling Date 5/3/2015 0 0 0 e g e g 8 8 0 a 0 O 1 12/15/2010 100000 10000 J 1000 C 100 i 1/19/2012 2/22/2013 3/29/2014 Sampling Date 5/3/2015 — — 15 NCAC 02L Standard —+—BGTMW-4 (Background) A CTMW-1 CTMW-2 O CTMW-7 CTMW-8 — — 15 NCAC 02L Standard --+—BGTMW-4 (Background) O CTMW-1 CTMW-2 O CTMW-7 CTMW-8 — — 15 NCAC 02L Standard --$---BGTMW-4 (Background) —O CTMW-1 CTMW-2 O CTMW-7 CTMW-8 1 -I 12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015 Sampling Date Notes: Open symbols represent non detects FIGURE H-6 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS PHONE www.s n86ter4-421-9999 racor .corn BEDROCK DRAWN BY: J. GILMER DATE: JUNE 2015 CADMIUM, CHLORIDE, IRON sync ra PROJECT MANAGER C SUTTELL LAYOUT: Fp,- :\Duke Energy Progress. Cape Fear Ash Basin CAPE FEAR STEAM ELECTRIC PLANT W Assessment\1.11 CSA Reporting\Figures\Stats\Time- 500 CP&L ROAD ries MONCURE, NORTH CAROLINA 27559