HomeMy WebLinkAboutNC0003433_Figure H-6 - Time v. Concentration - Bedrock Wells - Cadmium, Chloride, Iron_20150902E
3
.E
'00.1
V
0.01
12/15/2010
1000
J
100
t � 10
U
1/19/2012 2/22/2013 3/29/2014
Sampling Date
5/3/2015
0 0 0 e g e g 8 8 0 a 0 O
1
12/15/2010
100000
10000
J
1000
C 100
i
1/19/2012 2/22/2013 3/29/2014
Sampling Date
5/3/2015
— — 15 NCAC 02L Standard
—+—BGTMW-4 (Background)
A CTMW-1
CTMW-2
O CTMW-7
CTMW-8
— — 15 NCAC 02L Standard
--+—BGTMW-4 (Background)
O CTMW-1
CTMW-2
O CTMW-7
CTMW-8
— — 15 NCAC 02L Standard
--$---BGTMW-4 (Background)
—O CTMW-1
CTMW-2
O CTMW-7
CTMW-8
1 -I
12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015
Sampling Date
Notes: Open symbols represent non detects
FIGURE H-6
148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN
GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS
PHONE
www.s n86ter4-421-9999 racor .corn BEDROCK
DRAWN BY: J. GILMER DATE: JUNE 2015 CADMIUM, CHLORIDE, IRON
sync ra PROJECT MANAGER C SUTTELL
LAYOUT:
Fp,-
:\Duke Energy Progress. Cape Fear Ash Basin CAPE FEAR STEAM ELECTRIC PLANT
W Assessment\1.11 CSA Reporting\Figures\Stats\Time- 500 CP&L ROAD
ries MONCURE, NORTH CAROLINA 27559