Loading...
HomeMy WebLinkAboutNC0003433_Figure H-5 - Time v. Concentration - Bedrock Wells - Arsenic, Barium, Boron_2015090210 6 0 . I I- 12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015 Sampling Date 1000 - - - - - - - - - - - - - - - - - - - - 1 ' 12/15/2010 1/19/2012 2/22/2013 3/29/2014 Sampling Date 10000 1000 J bu0 =L 100 r- OHO O O O O --0- O n 0 m 10 — — 15 NCAC 02L Standard BGTMW-4 (Background) O CTMW-1 --4— CTMW-2 CTMW-7 CTMW-8 — — 15 NCAC 02L Standard --4—BGTMW-4 (Background) O CTMW-1 --4— CTMW-2 O CTMW-7 CTMW-8 5/3/2015 — — 15 NCAC 02L Standard BGTMW-4 (Background) O CTMW-1 CTMW-2 O CTMW-7 CTMW-8 12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015 Notes: Open symbols represent non detects Sampling Date FIGURE H-5 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS PHONE www.s n86ter4-421-9999 racor .corn BEDROCK DRAWN BY: J. GILMER DATE: JUNE 2015 ARSENIC, BARIUM, BORON sync ra PROJECT MANAGER C SUTTELL LAYOUT: P:\Duke Energy Progress. 1026\100. Cape Fear Ash Basin CAPE FEAR STEAM ELECTRIC PLANT GW Assessment\1.11 CSA Reporting\Figures\Stats\Time- 500 CP&L ROAD series MONCURE, NORTH CAROLINA 27559