HomeMy WebLinkAboutNC0003433_Figure H-5 - Time v. Concentration - Bedrock Wells - Arsenic, Barium, Boron_2015090210
6
0 . I I-
12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015
Sampling Date
1000 -
- - - - - - - - - - - - - - - - - - -
1 '
12/15/2010 1/19/2012 2/22/2013 3/29/2014
Sampling Date
10000
1000
J
bu0
=L 100
r- OHO O O O O --0- O n
0
m 10
— — 15 NCAC 02L Standard
BGTMW-4 (Background)
O CTMW-1
--4— CTMW-2
CTMW-7
CTMW-8
— — 15 NCAC 02L Standard
--4—BGTMW-4 (Background)
O CTMW-1
--4— CTMW-2
O CTMW-7
CTMW-8
5/3/2015
— — 15 NCAC 02L Standard
BGTMW-4 (Background)
O CTMW-1
CTMW-2
O CTMW-7
CTMW-8
12/15/2010 1/19/2012 2/22/2013 3/29/2014 5/3/2015
Notes: Open symbols represent non detects Sampling Date
FIGURE H-5
148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN
GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS
PHONE
www.s n86ter4-421-9999 racor .corn BEDROCK
DRAWN BY: J. GILMER DATE: JUNE 2015 ARSENIC, BARIUM, BORON
sync ra PROJECT MANAGER C SUTTELL
LAYOUT:
P:\Duke Energy Progress. 1026\100. Cape Fear Ash Basin CAPE FEAR STEAM ELECTRIC PLANT
GW Assessment\1.11 CSA Reporting\Figures\Stats\Time- 500 CP&L ROAD
series MONCURE, NORTH CAROLINA 27559