Loading...
HomeMy WebLinkAboutNC0003433_2-NCDENR E&SC Plan Appr 3-27-2015_20150902NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaarl Governor Secretary March 27, 2015 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Duke Energy ATTN: Scott Martin, Project Director PO Box 1244 Charlotte, NC 28201 RE: Project Name: Cape Fear Plant Subsurface Exploration Acres Approved: 2.96 Project ID: CHATH-2015-008 County: Chatham, City: Moncure Address: 500 CP&L Dr. River Basin: Cape Fear Stream Classification: Other Submitted By: Barbara Sease, PE, Synterra Date Received by LQS: March 23, 2015 Plan Type: New (Express) Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCG010000- Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Division of Energy, Mineral, and Land Resources Energy Section - Geological Survey Section - Land Quality Section 1628 Mail Service Center Raleigh, NC 27699-PHONE: 919-791-42001 FAX: 919-571-4718 Internet: htto:/iporial.ncdenr.org/webBr/ An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Letter of Approval w/ Modifications and Performance Reservations Scott Martin March 27, 2015 Page 2 of 3 North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, J�hn . Holley, Jr., PE, CPESC nonal Engineer Land Quality Section Enclosures: Certificate of Approval NPDES Permit cc: Barbara Sease, PE, Synterra, 148 River St., Suite 220, Greenville, SC 29601 Bill Scarborough, CCP PM/IM via email (William.scarborouah@duke-energy.com) John Toepfer, PE, via email(iohn.toepfer(u?duke-encray.com) Letter of Approval wl Modifications and Performance Reservations Scott Martin March 27, 2015 Page 3 of 3 APPROVAL MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: Cape Fear Plant Subsurface Exploration Project ID: CHATH-2015-008 County: Chatham Modifications: (1) Bridgemats must be installed without gaps between boards to ensure that sediment is contained. Further, Compost Socks or Silt Fences as detailed on C-04 must be provided where water diversions outlet, and a stone cover as detailed on C-04 must be provided at each end of the bridgemats at least through the proposed water diversion location. (15A NCAC 04B .0105) (2) Wherever drainage improvements are made along the proposed access roads, the "potential" measures must be applied. This includes the silt fence/reinforced outlets and channel matting detailed on C-04 as a minimum. (I5A NCAC 04B .0105) (3) When asphalt tack is used, the minimum application rate must be at least 300 gal/acre. 15A NCAC 04B .0105 (4) The phased self -inspections required under the provisions of the Act must be implemented using the combined self -inspection form available on our website. (15A NCAC 04B .0131) Performance Reservations: The proposed measures are accepted subject to satisfactory field performance. If problems develop, plan revisions addressing design of more particular velocity control and/or sediment containment measures will be required.