HomeMy WebLinkAbout20071890 Ver 1_Closeout Report w Notes_20150831Ctr+1e,,�m.� �orno�aa
yr, ao I S)
li
Zoo?
Blockhouse Creek Mitigation Project
Polk County, North Carolina
Post Closeout Contingency Update
CONTRACT NUMBER: D06027 -A; PROJECT TYPE: Stream, NCDMS IMS #92516
USACE ACTION ID #: SAW -2007- 03874; NCDWQ Project: 401 #07 -1890
Project Setting and Classifications
County
Polk
General Location
Tryon, NC
Basin
Broad
Physiographic Region
Piedmont Province- Borders Blue
Ridge Escarpment
Ecoregion
Southern Inner Piedmont
USGS Hydro Unit
03050105. 150020
NCDWQ Sub -basin
03 -08 -06
Wetland Classification
Aug -10
Thermal Regime
Cool
Trout Water
Trout County, Not Trout Water
Year 4 Monitoring
Oct -12
Project Performers
Jun -12
Source Agency
DMS
Provider
Michael Baker Engineering
Designer
Michael Baker Engineering
Monitoring Firm
Michael Baker Engineering
Channel Remediation
River Works
Plant Remediation
River Works
Property Interest Holder
State of NC
y. 2 I�er.Oyk-S
J
7
V
1
lV� LN
gar",,, Ovo., �`'`-``J
slr� vo� rctJ "
Overall Project Activities and Timeline
Milestone
Month -Year
Project Instituted
Jun -06
Permitted
Dec -07 /Jan -08
Construction
May-08
As -built (Year 0
Monitoring — baseline)
Dec -08
Year 1 Monitoring
Nov -09
Repairs /Beaver Dam
Removal
Jun -10
Year 2 Monitoring
Aug -10
Year 3 Monitoring
Oct -I I
Repairs/Invasives
Treatment
Apr -12
Year 4 Monitoring
Oct -12
Invasives Treatment
Jun -12
Year 5 Monitoring
Jun -13
Beaver Dam Removal
Jul -13
Invasives Treatment
Jul -13
Closeout Submission
Aug -13
Repair at last meander
Feb -14
�-wrr
3 t a";ae+rW_V
w/ L o 6<A4
JW I-G—V q
+ ,G�
n
M Q�