Loading...
HomeMy WebLinkAbout20071890 Ver 1_Closeout Report w Notes_20150831Ctr+1e,,�m.� �orno�aa yr, ao I S) li Zoo? Blockhouse Creek Mitigation Project Polk County, North Carolina Post Closeout Contingency Update CONTRACT NUMBER: D06027 -A; PROJECT TYPE: Stream, NCDMS IMS #92516 USACE ACTION ID #: SAW -2007- 03874; NCDWQ Project: 401 #07 -1890 Project Setting and Classifications County Polk General Location Tryon, NC Basin Broad Physiographic Region Piedmont Province- Borders Blue Ridge Escarpment Ecoregion Southern Inner Piedmont USGS Hydro Unit 03050105. 150020 NCDWQ Sub -basin 03 -08 -06 Wetland Classification Aug -10 Thermal Regime Cool Trout Water Trout County, Not Trout Water Year 4 Monitoring Oct -12 Project Performers Jun -12 Source Agency DMS Provider Michael Baker Engineering Designer Michael Baker Engineering Monitoring Firm Michael Baker Engineering Channel Remediation River Works Plant Remediation River Works Property Interest Holder State of NC y. 2 I�er.Oyk-S J 7 V 1 lV� LN gar",,, Ovo., �`'`-``J slr� vo� rctJ " Overall Project Activities and Timeline Milestone Month -Year Project Instituted Jun -06 Permitted Dec -07 /Jan -08 Construction May-08 As -built (Year 0 Monitoring — baseline) Dec -08 Year 1 Monitoring Nov -09 Repairs /Beaver Dam Removal Jun -10 Year 2 Monitoring Aug -10 Year 3 Monitoring Oct -I I Repairs/Invasives Treatment Apr -12 Year 4 Monitoring Oct -12 Invasives Treatment Jun -12 Year 5 Monitoring Jun -13 Beaver Dam Removal Jul -13 Invasives Treatment Jul -13 Closeout Submission Aug -13 Repair at last meander Feb -14 �-wrr 3 t a";ae+rW_V w/ L o 6<A4 JW I-G—V q + ,G� n M Q�