Loading...
HomeMy WebLinkAbout20140090 Ver 2_ICA Report Issued for U-2579B W S Beltway_20150821 Carpenter,Kristi From:Suggs, Phillip H Sent:Friday, August 21, 2015 5:23 PM To:Guy, Jeremy M; Panek, Lindsey F; Wyrick, Scott D; Ivey, Stephen P; Marion, Johnie E; Gantt, Matt; Latham, Tim; Euliss, Amy Cc:Wanucha, Dave; John Thomas; Lee, Donald G; Puckett, Lester L; Freeman, R. Mark Subject:ICA Report Issued for U-2579B, W/S Beltway Attachments:report.ashx-16.pdf; ATT00001.txt ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 North Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report I CA / PCN Immediate Corrective Action / Permit Consultation Needed This project does not comply with the North Carolina Erosion and Sedimentation Control laws. Immediate Corrective Action is needed to resolve the situation to full compliance with the Law: (T15A: 048.0000). This project does not comply with the permit requirements for the project. Permit consultation is needed to resolve the situation to full compliance. Proiect Information Inspection Date: 08/21/2015 Project #: 34839.3.GVS4 Division #: 9 Project Type: Contract Project Length: 4.00 River Basin Location Description: Evaluator: TIP #: County: Engineer: Disturbed Acres: Phil Suggs U-2579B Forsyth Winston Salem Res. (Cragmore) Yadkin HQW Zone: NO Trout Zone: NO Winston Salem Northern Beltway Eastern section US 158 to Bus 421 and I 40 Proiect Evaluation Report Type: ❑ Routine ❑✓ PCN Length Section 0.1 Permitted Sites 12 and 3 ❑✓ ICA ❑ ICA Ex 1 st ❑ ICA Ex 2nd ❑CICA - SWO ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project of BMPs of BMPs of BMPs Implementation Evaluation 6 6 6 6 6 Grading Scale: 0- 6= Immediate Corrective Action Required, 7= Fair, 8= Good, 9= Very Good, 10 = Excellent ICA / PCN Comments: Please notify me when the training is completed with project personnel to assure all parties are aware of and following proper procedures for working in permitted areas. Remarks and Recommendations: This ICA report is being issued for unauthorized permitted site impacts on sites 3 and 12. Site 12 impacts occurred on Tuesday ,8/18, when the grading superintendent directed the operator to remove silt fence and orange safety fence delineating the permitted site, and to operate the equipment in the stream channel to clear and grub the site. No notification of the work was given to the NCDOT personnel. Upon discovery the work was stopped and all project work suspended by the Resident Engineer. A meeting was held with the following: Jeremy Guy, Resident Engineer Scott Wyrick, NCDOT lead inspector Amy Euliss, Div 9 DEO Dave Wanucha, DWR John Thomas, USACE 8/21/2015 5:14 PM Page 1 of 2 Raymond Foster, Dragados Roger McNeill, Dragados Phil Suggs, Roadside Environmental Unit Procedures were discussed and agreed to requiring the contractor to review his proposed work in the permitted sites with NCDOT personnel prior to beginning work. Neither Mr Foster nor Mr McNeill were involved in the work resulting in the impacts at site 12. The work suspension was lifted after this meeting and completion of urgent EC repairs and maintenance from NPDES inspections. Site 3 impacts occurred on Friday, 8/21, when the grading superintendent directed operators to remove a stream crossing without consultation with NCDOT personnel to review the work and appropriate BMPs. Upon discovery, the site was stabilized and work was again suspended. The site was stabilized sufficiently per review by Amy Euliss, Div 9 DEO. Corrective Action: The contractor shall hold a meet with the Resident a Engineer and NCDOT personnel and include all grading superintendents, foremen, equipment operators as well as all sub-contractors involved in earth moving activities and work in or around permitted sites. Grading superintendents and project managers will be required to review procedures for working in permitted sites with all parties involved. In short, no work shall take place in or around permitted sites without consulting appropriate NCDOT personnel and discussing work and appropriate BMPs and communicating that plan to the operators and inspectors. Adequate notification should be given on starting work. This meeting should take place by Wednesday, 8/25. Further unauthorized or accidental impacts to permitted sites and environmentally sensitive areas can result in action by the DWR and USACE for violation of permit conditions. 8/21/2015 5:14 PM Page 2 of 2