HomeMy WebLinkAbout20100752 Ver 3_Blowing Rock Acute Care Access Road and US 321 Projects_20150818 Carpenter,Kristi From:Slaughter, Johnathan H Sent:Tuesday, August 18, 2015 9:15 AM To:Wanucha, Dave Subject:FW: Blowing Rock Acute Care Access Road and US 321 Projects Dave, I’ve been in Tennessee so getting caught up on emails now. See below. I spoke with the District Engineer and he said that the issues have been addressed now. From: Eller, Douglas W Sent: Wednesday, August 12, 2015 7:40 AM To: Slaughter, Johnathan H <hslaughter@ncdot.gov>; Trivette, Neil <ntrivette@ncdot.gov>; Souther, Zachary S <zssouther@ncdot.gov> Cc: Beaver, G Trent <tbeaver@ncdot.gov>; Treadaway, Edward D <edtreadaway@ncdot.gov>; Henley, Travis J <tjhenley1@ncdot.gov> Subject: Blowing Rock Acute Care Access Road and US 321 Projects Just wanted to let everyone know that Monday afternoon these two projects were hit with an extremely strong intense thunderstorm. Both projects received over 3” of rain in less than 1 hour and then rained again later Monday night. And then light sporadic rain yesterday a.m. Each project received the typical damaged during this type of event, stopped up slope drains, slope washes, basins filling up, silt fence overtopping. Hospital job was mainly the two areas that we’ve been fighting from the beginning at the bottom where everything ends up. Yesterday everyone went into cleanup/repair mode but things were still extremely wet. Efforts will continue today. Thanks doug Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1