Loading...
HomeMy WebLinkAbout20140338 Ver 1_Final Plan Set_20150825Maney Farm Mitigation Project Cape Fear River Basin HUC 03030002 Chatham County, North Carolina for NCDENR Division of Mitigation Services Title Sheet 0.1 Project Overview 0.2 General Notes and Symbols 0.3 Typical Sections 1.1-1.7 Stream Plan and Profile 2.1-2.15 Planting 3.1-3.5 Erosion and Sediment Control 4.1-4.4 Details 5.1-5.8 Fencing Plan 6.1-6.3 Vicinity Map Not to Scale BEFORE YOU DIG! IT'S THE LAW! CALL 1-800-632-4949N.C. ONE-CALL CENTER Sheet Index Project Directory Surveying: Turner Land Surveying, PLLC 3201 Glenridge Drive Raleigh, NC 27604 David S. Turner, PLS 919-875-1378 Engineering: Wildlands Engineering, Inc License No. F-0831 312 West Millbrook Road, Ste 225 Raleigh, NC 27609 Jeff Keaton, P.E. 919-851-9986 N Owner: NCDENR Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 Jeff Jurek 919-707-8976 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N PRELIMINARY PLANS ISSUED JULY 31, 2015 T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a Ti t l e S h e e t 00 5 - 0 2 1 4 4 RC P JK 0. 1 H W Y 8 7 E. Green s b o r o C h a p e l H i l l R d Cente r C h u r c h R d M o o n L i n d l e y R d Gr e e n h i l l R d L i n d l e y M i l l R d O l d S w i t c h b o a r d R d Castl e R o c k F a r m R d B e t h e l S o u t h F o r k R d Major Hil l R d H o l m a n M i l l R d SITE DH J Ju l y 3 1 , 2 0 1 5 Note: Total Disturbed Area = 9.5 Acres Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - O v e r v i e w . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a Pr o j e c t O v e r v i e w 00 5 - 0 2 1 4 4 RC P JK 0. 2 0'100'200'300' (HORIZONTAL) DH J Ju l y 3 1 , 2 0 1 5 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a Ge n e r a l N o t e s a n d S y m b o l s 00 5 - 0 2 1 4 4 RC P JK 0. 3 Existing Features Proposed Features Proposed Structures Erosion and Sediment Control Features Proposed Log Sill Proposed Root Wad Proposed Lunker Log Proposed Various Constructed Riffles Per Sheet 5.1 Proposed Brush Toe Proposed Sod Mats Proposed Channel Plug Existing Property Line Existing Thalweg Existing Major Contour Existing Minor Contour Existing Fence Line Existing Treeline Existing Tree Existing Power Pole Existing Wetlands Existing Rock Proposed Conservation Easement Proposed Fence Line Proposed Temporary Construction Easement Proposed Thalweg Alignment Proposed Bankfull Proposed Major Contour Proposed Minor Contour 10+00 100 100 CE CE X X Notes: DH J Ju l y 3 1 , 2 0 1 5 T TCE TCE Proposed Limits of Disturbance Proposed Silt Fence Proposed Silt Fence Stone Outlet Proposed Safety Fencing Proposed Temporary Crossing (Mud Mat) Proposed Temporary Access Road Proposed Construction Entrance Proposed Pump Around System SAF SAF LOD LOD [x][x] General Construction Notes for All Reaches 1.All erosion and sediment control practices shall comply with the North Carolina Erosion and Sediment Control Planning and Design Manual. 2.Contractor will install pump-around systems to divert flow while working in live, flowing channels. The Contractor shall operate and maintain the pump-around system 24 hours a day unless all disturbed areas within the pump-around work area can be stabilized by the end of the work day. Contractor shall not remove pump-around systems and advance to the next work area until the current work area is completed and stabilized. 3.No material from the off-line proposed stream channel excavation may be backfilled into the adjacent existing stream channel until the newly-constructed proposed stream section is completed, stabilized, and the stream flow has been diverted into it, not even if that section of old/ existing stream is being pumped. 4.In areas without a pump-around system, Contractor shall disturb only as much channel bank as can be stabilized with temporary seeding, mulch, and erosion control matting by the end of each work day. 5.When crossing an active section of new or old stream channel, a temporary stream crossing shall be installed according to the details and specifications. 6.All graded areas with slopes steeper than 3:1 will be stabilized within seven (7) working days. All other areas will be stabilized within 14 working days. 7.Locations for staging and stockpile areas and temporary stream crossings have been provided on the Plans. Additional or alternative staging and/or stockpile areas and stream crossings may be used by the Contractor provided that all practices comply with the North Carolina Erosion and Sediment Control Planning and Design Manual and that the areas are approved by the Engineer prior to implementation. 8.Various types of constructed riffles are specified on the plans. Contractor shall build the specific types of constructed riffles at locations shown on the Plans. Changes in constructed riffle type must be approved by the Engineer. 9.Contractor is to make every effort to avoid damaging or removing existing trees. 10.Under no circumstances will the Contractor exceed the limits of disturbance as shown on the Plans. Initial Site Preparation 1.Contact North Carolina ͞KŶĞ Ăůů͟ Center (1.800.632.4949) before any excavation. 2.Contact Land Quality (919-791-4200) before any work begins on the project and notify them of the start date. 3.Mobilize equipment and materials to the Site. 4.Identify and establish construction entrance, staging and stockpile areas, haul roads, silt fence, silt fence outlets, tree protection fencing, safety fencing, and temporary stream crossings as indicated on the Plans for work areas. Note: all construction traffic will enter the site from the construction entrance shown on Center Church Road. 5.All haul roads shall be monitored for sediment loss on a daily basis. In the event of sediment loss, silt fence or other acceptable sediment and erosion control practices shall be installed. 6.Set up temporary facilities, locate equipment within the staging area, and stockpile materials needed for the initial stages of construction within the stockpile area(s). 7.Install and maintain an onsite rain gauge and log book to record the rainfall amounts and dates. Complete the self-inspection as required by DENR permit. Channel Construction 8.Perform any necessary clearing and grubbing in phases as work progresses. Bank vegetation and vegetation immediately adjacent to live channels shall be left undisturbed as long as possible. Remove all non-native and invasive vegetation prior to beginning the channel construction. 9.Construction of all channels are to be done in the dry. Construction should generally progress from upstream to downstream to prevent sediment runoff from upstream construction affecting completed downstream reaches. Use a pump around as shown on the plans and discussed in the General Notes. 10.Where feasible, more than one offline section may be constructed concurrently. Offline sections shall be tied online sequentially from downstream to upstream. 11.As work progresses, remove and stockpile the top three inches of soil from the active grading area. Stockpiled topsoil shall be kept separate for onsite replacement prior to floodplain seeding. 12.Construct the proposed stream channel to the grade specified in the cross-sections and profile. Transfer coarse material from abandoned channel riffles to new channel riffles utilizing a pump-around when doing so. Grade the adjacent floodplain area according to grades shown on the plan. 13.Install in-stream structures (riffles, log vane, log drop, log J-hook, cover log, boulder sill, boulder j-hook with sill) and in-bank bioengineering such as brush toe and sod mats after channel grading is completed according to details and specifications. 14.Seed (with specified temporary and permanent seed mix) and straw mulch areas where the coir fiber matting is to be installed. 15.Install coir fiber matting according to plans and specifications. 16.Backfill abandoned channel sections with stockpiled soil according to the grades shown on the Plans. Non-native and invasive vegetation (e.g. privet, multiflora rose, and Japanese honeysuckle) shall be removed from the existing channel prior to backfilling. 17.Prepare floodplain for seeding by applying stockpiled topsoil to the floodplain between bankfull elevation and the grading limits, ripping, and raking/smoothing. Seed with specified temporary and permanent seed mix and mulch. Any areas within the conservation easement that have not been graded shall be treated according to the planting plan. 18.If at any time circumstances should arise where water has been turned into the new channel and additional work must be done on the floodplain, erosion control devices will be installed to protect the new channel from sedimentation. 19.Once all phases of channel and floodplain construction are complete, prepare the floodplain areas for planting per the specifications. 20.Install livestakes and herbaceous plugs along the stream banks according to the plans and specifications. Fencing Removal and Instatllation 21.Remove all existing fencing within the conservation easement as shown on the plans. 22.Install new fencing around conservation easement and access gates as shown on the plans. Construction Demobilization 24.Remove temporary stream crossings. 25.The Contractor shall ensure that the site is free of trash and leftover materials prior to demobilization of equipment from the site. 26.Complete the removal of any additional stockpiled material from the site. 27.All rock and other stockpiled materials must be removed from the limits of disturbance and conservation easement. All areas outside the conservation easement shall be returned to pre-project conditions or better. 28.Demobilize grading equipment from the site. 29.Seed, mulch, and stabilize staging areas, stockpile areas, haul roads, and construction entrances. Pasture seed mix is to be applied to areas of disturbance outside of the conservation easement. Remove all temporary fencing. Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k R e a c h 1 00 5 - 0 2 1 4 4 RC P JK 1. 1 UT to South Fork Reach 1 - Riffle STA: 100+00 - 121+44 UT to South Fork Reach 1 - Shallow Pool STA: 100+00 - 121+44 Ty p i c a l S e c t i o n s UT to South Fork Reach 1 - Deep Pool STA: 100+00 - 121+44 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 9.50' 3.00'3.00'3.50' 1.00' 13.00' 3.20'6.40'3.40' 1.60' (MAX) PROPOSED GRADE 3:13:1 PROPOSED BANKFULL PROPOSED GRADE PROPOSED BANKFULL 2:1 4:1 13.00' 0.90'8.10'4.00' 1.80' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k R e a c h 2 00 5 - 0 2 1 4 4 RC P JK 1. 2 Ty p i c a l S e c t i o n s UT to South Fork Reach 2 - Riffle STA: 121+44 - 132+24 UT to South Fork Reach 2 - Shallow Pool STA: 121+44 - 132+24 UT to South Fork Reach 2 - Deep Pool STA: 121+44 - 132+24 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 12.10' 3.60'3.60'4.90' 1.20' 17.00' 3.60'7.20'6.20' 1.80' (MAX) PROPOSED GRADE 3:1 PROPOSED BANKFULL3:1 PROPOSED GRADE PROPOSED BANKFULL 2:14:1 17.00' 1.00'7.00' 2.00' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 9.00' 17.00' Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 1 C 00 5 - 0 2 1 4 4 RC P JK 1. 3 Ty p i c a l S e c t i o n s UT1C - Riffle STA: 200+00 - 202+51 UT1C - Shallow Pool STA: 200+00 - 202+51 UT1C - Deep Pool STA: 200+00 - 202+51 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 8.10' 2.35'2.35'3.40' 0.90' 10.80' 2.60'5.20'3.00' 1.30' (MAX) PROPOSED GRADE2.6:1 PROPOSED BANKFULL2.6:1 PROPOSED GRADE PROPOSED BANKFULL2:14:1 11.00' 0.80'3.00' 1.60' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 7.20' Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 2 00 5 - 0 2 1 4 4 RC P JK 1. 4 Ty p i c a l S e c t i o n s UT2 - Riffle STA: 304+45 - 305+58 UT2 - Shallow Pool STA: 304+25 - 305+58 UT2 - Deep Pool STA: 304+45 - 305+58 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 4.00' 1.00'1.00'2.00' 0.50' 5.60' 1.20'2.40'2.00' 0.60' (MAX) PROPOSED GRADE2:1 PROPOSED BANKFULL2:1 PROPOSED GRADE PROPOSED BANKFULL2:14:1 6.00' 0.35'3.15'2.50' 0.70' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 3 00 5 - 0 2 1 4 4 RC P JK 1. 5 Ty p i c a l S e c t i o n s UT3 - Riffle STA: 404+20 - 405+83 UT3 - Shallow Pool STA: 404+20 - 405+83 UT3 - Deep Pool STA: 404+20 - 405+83 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 4.00' 1.00'1.00'2.00' 0.50' 5.60' 1.20'2.40'2.00' 0.60' (MAX) PROPOSED GRADE2:1 PROPOSED BANKFULL2:1 PROPOSED GRADE PROPOSED BANKFULL2:14:1 6.00' 0.35'3.15'2.50' 0.70' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 4 00 5 - 0 2 1 4 4 RC P JK 1. 6 Ty p i c a l S e c t i o n s UT4 - Riffle STA: 502+11 - 503+50 UT4 - Shallow Pool STA: 501+11 - 503+50 UT4 - Deep Pool STA: 502+11 - 503+50 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 5.00' 1.25'1.25'2.50' 0.50' 7.00' 1.60'3.40'2.00' 0.80' (MAX) PROPOSED GRADE2.5:1 PROPOSED BANKFULL2.5: 1 PROPOSED GRADE PROPOSED BANKFULL 2:1 4.25:1 7.00' 0.55'4.45'2.00' 1.10' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - C o v e r N o t e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 5 00 5 - 0 2 1 4 4 RC P JK 1. 7 Ty p i c a l S e c t i o n s UT5 - Riffle STA: 600+00 - 606+77 UT5 - Shallow Pool STA: 600+00 - 606+77 UT5 - Deep Pool STA: 600+00 - 606+77 Notes: 1.) Typical sections are provided as reference for in channel grading only. 2.) Pool depth will vary per profile. 3.) All deep pools shall have bank revetments on outside of bend. 4.) Typical pool sections are shown as right meander bends only. The flatter side slope is on the inside of the meander bend and for left meander bends should be on the opposite side than shown on the typical sections. DH J Ju l y 3 1 , 2 0 1 5 7.20' 2.10'2.10'3.00' 0.80' 10.20' 2.40'4.80'3.00' 1.20' (MAX) PROPOSED GRADE 3:1 PROPOSED BANKFULL3:1 PROPOSED GRADE PROPOSED BANKFULL 2:14:1 10.00' 0.70'6.30'3.00' 1.40' (MAX) PROPOSED GRADE PROPOSED BANKFULL 0.5 : 1 4.5:1 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 1 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Reach 1 Typical Section 9.5' 1.0' 3.0'3.0'3.5' DH J Ju l y 3 1 , 2 0 1 5 565 570 575 580 565 570 575 580 100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+30 -0.8% -2.0% -2.1% -3.6 % -3.2% -2.5% -2.9% ST A = 1 0 0 + 0 0 . 0 0 EL E V = 5 7 4 . 8 0 ST A = 1 0 0 + 3 6 . 6 9 EL E V = 5 7 4 . 5 0 ST A = 1 0 0 + 5 0 . 1 8 EL E V = 5 7 4 . 0 0 STA = 100+54.67 ELEV = 574.00 ST A = 1 0 0 + 6 3 . 6 6 EL E V = 5 7 4 . 5 0 ST A = 1 0 0 + 8 3 . 8 5 EL E V = 5 7 4 . 1 0 ST A = 1 0 0 + 9 5 . 3 3 EL E V = 5 7 3 . 6 0 STA = 100+99.16 ELEV = 573.60 ST A = 1 0 1 + 0 6 . 8 1 EL E V = 5 7 4 . 1 0 ST A = 1 0 1 + 5 0 . 1 1 EL E V = 5 7 3 . 2 0 ST A = 1 0 1 + 6 4 . 9 7 EL E V = 5 7 2 . 5 0 STA = 101+69.92 ELEV = 572.50 ST A = 1 0 1 + 7 9 . 8 3 EL E V = 5 7 3 . 2 0 ST A = 1 0 2 + 1 3 . 2 0 EL E V = 5 7 2 . 0 0 ST A = 1 0 2 + 3 3 . 0 5 EL E V = 5 7 1 . 2 0 STA = 102+39.67 ELEV = 571.20 ST A = 1 0 2 + 5 2 . 9 0 EL E V = 5 7 2 . 0 0 ST A = 1 0 2 + 9 5 . 9 8 EL E V = 5 7 0 . 6 0 ST A = 1 0 3 + 0 7 . 7 3 EL E V = 5 6 9 . 9 0 STA = 103+11.65 ELEV = 569.90 ST A = 1 0 3 + 1 9 . 4 8 EL E V = 5 7 0 . 6 0 ST A = 1 0 3 + 6 3 . 3 6 EL E V = 5 6 9 . 5 0 ST A = 1 0 3 + 7 3 . 4 5 EL E V = 5 6 9 . 0 0 STA = 103+76.81 ELEV = 569.00 ST A = 1 0 3 + 8 3 . 5 4 EL E V = 5 6 9 . 5 0 ST A = 1 0 3 + 9 7 . 2 2 EL E V = 5 6 9 . 1 0 ST A = 1 0 4 + 1 1 . 7 4 EL E V = 5 6 8 . 4 0 STA = 104+16.57 ELEV = 568.40 ST A = 1 0 4 + 2 6 . 2 5 EL E V = 5 6 9 . 1 0 PROPOSED BANKFULL EXISTING GRADE PROPOSED GRADE X X X X X X X X X X X X X X X X X X X X C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E S A F SA F S A F S A F S A F WETLAND AREA B WETLAND AREA A WETLAND AREA C WETLAND AREA D STA: 100+00 BEGIN WORK UT TO SOUTH FORK STA: 102+84 UT TO SOUTH FORK STA: 202+60 UT1C CONFLUENCE SR 1 5 5 4 CE N T E R C H U R C H R O A D (6 0 ' R I G H T - O F - W A Y ) UT T O S O U T H FO R K U T 1 C CR- R R C R - W R CR-WR CR-WR C R - N M CR-NM C R - N M CR- N M CR-CR CR - N M CR-CR C R - R R CR-CR CR - C R 202+60 202+00 100 + 0 0 101+ 0 0 10 2 + 0 0 103+00 104+0 0 105+00 CR-CR WETLAND AREA U MAT C H L I N E - S T A 1 0 4 + 3 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 1 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 2 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Reach 1 Typical Section 9.5' 1.0' 3.0'3.0'3.5' DH J Ju l y 3 1 , 2 0 1 5 560 565 570 575 560 565 570 575 104+30 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+50 108+80 -3.2% -3.0% -2.0% -1.4% -1.6% -1.9% -2.1% -1.2% ST A = 1 0 4 + 5 0 . 9 2 EL E V = 5 6 8 . 3 0 ST A = 1 0 4 + 6 5 . 2 5 EL E V = 5 6 7 . 7 0 STA = 104+70.02 ELEV = 567.70 ST A = 1 0 4 + 7 9 . 5 8 EL E V = 5 6 8 . 3 0 ST A = 1 0 4 + 9 9 . 5 1 EL E V = 5 6 7 . 7 0 ST A = 1 0 5 + 1 1 . 8 4 EL E V = 5 6 7 . 1 0 STA = 105+15.95 ELEV = 567.10 ST A = 1 0 5 + 2 4 . 1 6 EL E V = 5 6 7 . 7 0 ST A = 1 0 5 + 6 4 . 6 8 EL E V = 5 6 6 . 9 0 ST A = 1 0 5 + 8 5 . 8 1 EL E V = 5 6 6 . 3 0 STA = 105+92.86 ELEV = 566.30 ST A = 1 0 6 + 0 6 . 9 4 EL E V = 5 6 6 . 9 0 ST A = 1 0 6 + 4 8 . 3 2 EL E V = 5 6 6 . 3 0 ST A = 1 0 6 + 6 2 . 0 0 EL E V = 5 6 5 . 6 0 STA = 106+66.55 ELEV = 565.60 ST A = 1 0 6 + 7 5 . 6 7 EL E V = 5 6 6 . 3 0 ST A = 1 0 7 + 1 9 . 4 1 EL E V = 5 6 5 . 6 0 ST A = 1 0 7 + 3 3 . 4 0 EL E V = 5 6 5 . 0 0 STA = 107+38.06 ELEV = 565.00 ST A = 1 0 7 + 4 7 . 3 9 EL E V = 5 6 5 . 6 0 ST A = 1 0 7 + 6 8 . 0 2 EL E V = 5 6 5 . 2 0 ST A = 1 0 7 + 7 9 . 5 5 EL E V = 5 6 4 . 5 0 STA = 107+83.40 ELEV = 564.50 ST A = 1 0 7 + 9 1 . 0 9 EL E V = 5 6 5 . 2 0 ST A = 1 0 8 + 1 4 . 7 5 EL E V = 5 6 4 . 7 0 STA = 108+21.27 ELEV = 564.20 STA = 108+23.44 ELEV = 564.20 ST A = 1 0 8 + 2 7 . 7 8 EL E V = 5 6 4 . 7 0 ST A = 1 0 8 + 6 9 . 5 4 EL E V = 5 6 4 . 2 0 PROPOSED GRADE EXISTING GRADE PROPOSED BANKFULL XXXXXXXXX X X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E CE CE CE CE CE CECECECECECECECECECECECECECECE CECECECECECE CE C E CE CE C E CE CE CE CE CE CE CE CE CE CE CE CE SAF SAF S A F SAF SAF SAF S A F SA F WETLAND AREA D WETLAND AREA G WETLAND AREA E WETLAND AREA F WETLAND AREA H 40' EASEMENT BREAK UT TO SOUTH FORK CR-N M CR- W R C R - W R CR - W R CR- N M CR - C R CR-CR C R - N M CR-C R 104+0 0 105+ 0 0 106+ 0 0 1 0 7 + 0 0 108+ 0 0 10 9 + 0 0 2 - 48" CMP CULVERTS LENGTH = 42.0' INV. UP = 585.3' INV. DOWN = 585.0' CREST EL. = 569.25 MA T C H L I N E - S T A 1 0 4 + 3 0 MA T C H L I N E - S T A 1 0 8 + 8 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 1 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 3 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Reach 1 Typical Section 9.5' 1.0' 3.0'3.0'3.5' DH J Ju l y 3 1 , 2 0 1 5 555 560 565 570 555 560 565 570 108+80 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 113+00 113+30 -2.4% -1.3% -1.2% -1.4% -1.5% -1.3% -2.2% -2.2% -1.8% ST A = 1 0 8 + 8 2 . 9 6 EL E V = 5 6 3 . 4 0 STA = 108+87.44 ELEV = 563.40 ST A = 1 0 8 + 9 6 . 3 8 EL E V = 5 6 4 . 2 0 ST A = 1 0 9 + 3 7 . 2 1 EL E V = 5 6 3 . 2 0 ST A = 1 0 9 + 5 5 . 5 7 EL E V = 5 6 2 . 5 0 STA = 109+61.69 ELEV = 562.50 ST A = 1 0 9 + 7 3 . 9 3 EL E V = 5 6 3 . 2 0 ST A = 1 1 0 + 0 5 . 4 4 EL E V = 5 6 2 . 8 0 ST A = 1 1 0 + 1 8 . 2 2 EL E V = 5 6 1 . 9 8 STA = 110+22.48 ELEV = 561.98 ST A = 1 1 0 + 3 1 . 0 0 EL E V = 5 6 2 . 8 0 ST A = 1 1 0 + 6 3 . 7 2 EL E V = 5 6 2 . 4 0 ST A = 1 1 0 + 7 9 . 2 9 EL E V = 5 6 1 . 8 0 STA = 110+84.48 ELEV = 561.80 ST A = 1 1 0 + 9 4 . 8 5 EL E V = 5 6 2 . 4 0 ST A = 1 1 1 + 1 6 . 8 2 EL E V = 5 6 2 . 1 0 ST A = 1 1 1 + 2 8 . 7 4 EL E V = 5 6 1 . 5 0 STA = 111+32.72 ELEV = 561.50 ST A = 1 1 1 + 4 0 . 6 7 EL E V = 5 6 2 . 1 0 ST A = 1 1 1 + 6 0 . 5 3 EL E V = 5 6 1 . 8 0 ST A = 1 1 1 + 6 9 . 6 1 EL E V = 5 6 1 . 2 0 STA = 111+72.64 ELEV = 561.20 ST A = 1 1 1 + 7 8 . 6 9 EL E V = 5 6 1 . 8 0 ST A = 1 1 1 + 9 3 . 5 5 EL E V = 5 6 1 . 6 0 ST A = 1 1 2 + 0 2 . 7 4 EL E V = 5 6 0 . 9 0 STA = 112+05.81 ELEV = 560.90 ST A = 1 1 2 + 1 1 . 9 3 EL E V = 5 6 1 . 6 0 ST A = 1 1 2 + 3 8 . 8 0 EL E V = 5 6 1 . 0 0 ST A = 1 1 2 + 4 7 . 9 4 EL E V = 5 6 0 . 4 0 STA = 112+50.99 ELEV = 560.40 ST A = 1 1 2 + 5 7 . 0 9 EL E V = 5 6 1 . 0 0 ST A = 1 1 2 + 8 4 . 7 8 EL E V = 5 6 0 . 4 0 ST A = 1 1 2 + 9 5 . 5 4 EL E V = 5 5 9 . 8 0 STA = 112+99.13 ELEV = 559.80 ST A = 1 1 3 + 0 6 . 3 0 EL E V = 5 6 0 . 4 0 EXISTING GRADE PROPOSED GRADE PROPOSED BANKFULL XXX C E C E CE CECECECECECEC E C E C E C E CECECECECECECECECECECECECECECE C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE SA F SA F S A F SA F WETLAND AREA H WETLAND AREA L 40' EASEMENT BREAK STA: 110+03 UT TO SOUTH FORK STA: 300+74 UT2 CONFLUENCE STA: 112+34 UT TO SOUTH FORK STA: 401+63 UT3 CONFLUENCE UT T O SOU T H F O R K UT 2 U T 3 CR-RR CR-NM C R - W R CR - W R CR-N M CR-N M CR- N M CR-N M CR- N M CR - N M C R - C R CR- C R C R - C R C R - C R CR - C R 401+63 401+00 10 9 + 0 0 110 + 0 0 111 + 0 0 112+00 113+00 3 0 0 + 0 0 30 0 + 7 4 CR - N M C R - C R WETLAND AREA K ROCK PILE M A T C H L I N E - S T A 1 0 8 + 8 0 MA T C H L I N E - S T A 1 1 3 + 3 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 1 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 4 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Reach 1 Typical Section 9.5' 1.0' 3.0'3.0'3.5' DH J Ju l y 3 1 , 2 0 1 5 550 555 560 565 550 555 560 565 113+30 113+50 114+00 114+50 115+00 115+50 116+00 116+50 117+00 117+50 117+80 -2.6% -1.8% -3.4% -3.2% -2.9% -1.2% -2.5% -1.2% ST A = 1 1 3 + 4 9 . 8 1 EL E V = 5 5 9 . 6 0 ST A = 1 1 3 + 6 3 . 4 4 EL E V = 5 5 9 . 0 0 STA = 113+67.99 ELEV = 559.00 ST A = 1 1 3 + 7 7 . 0 8 EL E V = 5 5 9 . 6 0 ST A = 1 1 3 + 9 9 . 9 1 EL E V = 5 5 9 . 0 0 ST A = 1 1 4 + 1 0 . 1 3 EL E V = 5 5 8 . 5 0 STA = 114+13.53 ELEV = 558.50 ST A = 1 1 4 + 2 0 . 3 5 EL E V = 5 5 9 . 0 0 ST A = 1 1 4 + 4 7 . 8 0 EL E V = 5 5 8 . 5 0 ST A = 1 1 4 + 6 2 . 9 2 EL E V = 5 5 7 . 8 0 STA = 114+67.95 ELEV = 557.80 ST A = 1 1 4 + 7 8 . 0 3 EL E V = 5 5 8 . 5 0 ST A = 1 1 4 + 9 5 . 5 3 EL E V = 5 5 7 . 9 0 ST A = 1 1 5 + 1 2 . 2 5 EL E V = 5 5 7 . 1 0 STA = 115+17.82 ELEV = 557.10 ST A = 1 1 5 + 2 8 . 9 7 EL E V = 5 5 7 . 9 0 ST A = 1 1 5 + 5 1 . 1 5 EL E V = 5 5 7 . 2 0 ST A = 1 1 5 + 6 8 . 1 2 EL E V = 5 5 6 . 4 0 STA = 115+73.77 ELEV = 556.40 ST A = 1 1 5 + 8 5 . 0 9 EL E V = 5 5 7 . 2 0 ST A = 1 1 6 + 0 2 . 4 8 EL E V = 5 5 6 . 7 0 ST A = 1 1 6 + 1 8 . 7 8 EL E V = 5 5 6 . 0 0 STA = 116+24.21 ELEV = 556.00 ST A = 1 1 6 + 3 5 . 0 8 EL E V = 5 5 6 . 7 0 ST A = 1 1 6 + 5 9 . 6 2 EL E V = 5 5 6 . 4 0 ST A = 1 1 6 + 8 0 . 7 3 EL E V = 5 5 5 . 7 0 STA = 116+87.77 ELEV = 555.70 ST A = 1 1 7 + 0 1 . 8 4 EL E V = 5 5 6 . 4 0 ST A = 1 1 7 + 2 5 . 8 8 EL E V = 5 5 5 . 8 0 ST A = 1 1 7 + 4 0 . 5 7 EL E V = 5 5 5 . 1 0 STA = 117+45.47 ELEV = 555.10 ST A = 1 1 7 + 5 5 . 2 6 EL E V = 5 5 5 . 8 0 EXISTING GRADE PROPOSED GRADE PROPOSED BANKFULL XX X X X XXX X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECE C E CE CE CE CE CE CE CE CE CE SA F SA F WETLAND AREA L WETLAND AREA S WETLAND AREA R WETLAND AREA M S T A : 1 1 2 + 3 4 U T T O S O U T H F O R K UT TO SOUTH FORK CR - N M CR-RR C R - W R CR-W R C R - W R CR - N M C R - N M CR - W R CR- C R C R - C R CR- N M CR- N M 401+63 113+ 0 0 114 + 0 0 115+ 0 0 116 + 0 0 11 7 + 0 0 118+ 0 0 MAT C H L I N E - S T A 1 1 3 + 3 0 MAT C H L I N E - S T A 1 1 7 + 8 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 1 & 2 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 5 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Reach 1 12.10' 1.2' 3.6'3.6'4.9' Typical Section 9.5' 1.0' 3.0'3.0'3.5' Reach 2 DH J Ju l y 3 1 , 2 0 1 5 545 550 555 560 545 550 555 560 117+80 118+00 118+50 119+00 119+50 120+00 120+50 121+00 121+50 122+00 122+30 -2.2% -1.8% -1.9% -3.0% -2.2% -2.8% -2.0% -3.1% -1.9% ST A = 1 1 7 + 8 0 . 5 1 EL E V = 5 5 5 . 5 0 ST A = 1 1 7 + 9 7 . 2 7 EL E V = 5 5 4 . 9 0 STA = 118+02.85 ELEV = 554.90 ST A = 1 1 8 + 1 4 . 0 3 EL E V = 5 5 5 . 5 0 ST A = 1 1 8 + 2 7 . 5 7 EL E V = 5 5 5 . 2 0 ST A = 1 1 8 + 4 3 . 9 4 EL E V = 5 5 4 . 4 0 STA = 118+49.40 ELEV = 554.40 ST A = 1 1 8 + 6 0 . 3 1 EL E V = 5 5 5 . 2 0 ST A = 1 1 8 + 7 6 . 8 5 EL E V = 5 5 4 . 9 0 ST A = 1 1 8 + 8 9 . 3 5 EL E V = 5 5 4 . 3 0 STA = 118+93.51 ELEV = 554.30 ST A = 1 1 9 + 0 1 . 8 5 EL E V = 5 5 4 . 9 0 ST A = 1 1 9 + 1 7 . 7 5 EL E V = 5 5 4 . 6 0 STA = 119+25.17 ELEV = 554.00 STA = 119+27.65 ELEV = 554.00 ST A = 1 1 9 + 3 2 . 6 0 EL E V = 5 5 4 . 6 0 ST A = 1 1 9 + 4 2 . 4 5 EL E V = 5 5 4 . 3 0 STA = 119+56.36 ELEV = 553.50 ST A = 1 1 9 + 6 1 . 0 0 EL E V = 5 5 3 . 5 0 ST A = 1 1 9 + 7 0 . 2 8 EL E V = 5 5 4 . 3 0 ST A = 1 1 9 + 8 8 . 6 7 EL E V = 5 5 3 . 9 0 ST A = 1 2 0 + 0 6 . 8 8 EL E V = 5 5 3 . 3 0 STA = 120+12.95 ELEV = 553.30 ST A = 1 2 0 + 2 5 . 0 9 EL E V = 5 5 3 . 9 0 ST A = 1 2 0 + 4 3 . 1 7 EL E V = 5 5 3 . 4 0 ST A = 1 2 0 + 6 1 . 1 4 EL E V = 5 5 2 . 6 0 STA = 120+67.13 ELEV = 552.60 ST A = 1 2 0 + 7 9 . 1 1 EL E V = 5 5 3 . 4 0 ST A = 1 2 1 + 0 3 . 8 5 EL E V = 5 5 2 . 9 0 ST A = 1 2 1 + 2 4 . 1 6 EL E V = 5 5 2 . 1 0 STA = 121+30.93 ELEV = 552.10 ST A = 1 2 1 + 4 4 . 4 7 EL E V = 5 5 2 . 9 0 ST A = 1 2 1 + 6 9 . 9 9 EL E V = 5 5 2 . 1 0 ST A = 1 2 1 + 8 1 . 0 8 EL E V = 5 5 1 . 3 0 STA = 121+84.78 ELEV = 551.30 ST A = 1 2 1 + 9 2 . 1 7 EL E V = 5 5 2 . 1 0 ST A = 1 2 2 + 1 3 . 3 8 EL E V = 5 5 1 . 7 0 ST A = 1 2 2 + 2 6 . 0 4 EL E V = 5 5 1 . 1 0 EXISTING GRADE PROPOSED GRADE PROPOSED BANKFULL X X X X X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECE WETLAND AREA S WETLAND AREA R STA: 121+66 UT TO SOUTH FORK STA: 501+38 UT4 CONFLUENCE STA: 121+44 END UT TO SOUTH FORK REACH 1 BEGIN UT TO SOUTH FORK REACH 2 UT TO SOUTH UT TO SOUTH FORK CR-NM CR- R R C R - N M CR- W R CR - N M C R - W R CR-WR CR-W R C R - W R CR- N M C R - W R CR- N M C R - N M C R - C R C R - C R CR - W R 501+38 501 + 0 0 11 7 + 0 0 118+0 0 119+0 0 120+00 121 + 0 0 122+00 123+00 C R - C R MAT C H L I N E - S T A 1 1 7 + 8 0 MAT C H L I N E - S T A 1 2 2 + 3 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 2 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 6 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 12.10' 1.2' 3.6'3.6'4.9' Typical Section Reach 2 DH J Ju l y 3 1 , 2 0 1 5 545 550 555 560 545 550 555 560 122+30 122+50 123+00 123+50 124+00 124+50 125+00 125+50 126+00 126+50 126+80 -1.9% -2.2% -1.6% -1.7% -1.8% -1.3% -0.9% ST A = 1 2 2 + 3 0 . 2 7 EL E V = 5 5 1 . 1 0 ST A = 1 2 2 + 3 8 . 7 1 EL E V = 5 5 1 . 7 0 ST A = 1 2 2 + 6 5 . 2 1 EL E V = 5 5 1 . 2 0 ST A = 1 2 2 + 8 3 . 4 3 EL E V = 5 5 0 . 4 0 STA = 122+89.50 ELEV = 550.40 ST A = 1 2 3 + 0 1 . 6 4 EL E V = 5 5 1 . 2 0 ST A = 1 2 3 + 1 9 . 5 5 EL E V = 5 5 0 . 8 0 ST A = 1 2 3 + 3 7 . 3 7 EL E V = 5 5 0 . 2 0 STA = 123+43.31 ELEV = 550.20 ST A = 1 2 3 + 5 5 . 1 9 EL E V = 5 5 0 . 8 0 ST A = 1 2 3 + 9 3 . 1 4 EL E V = 5 5 0 . 2 0 ST A = 1 2 4 + 1 4 . 6 6 EL E V = 5 4 9 . 1 9 STA = 124+21.83 ELEV = 549.19 ST A = 1 2 4 + 3 6 . 1 7 EL E V = 5 5 0 . 2 0 ST A = 1 2 4 + 6 4 . 9 5 EL E V = 5 4 9 . 7 0 ST A = 1 2 4 + 8 0 . 3 4 EL E V = 5 4 9 . 1 0 STA = 124+85.47 ELEV = 549.10 ST A = 1 2 4 + 9 5 . 7 3 EL E V = 5 4 9 . 7 0 ST A = 1 2 5 + 2 4 . 1 4 EL E V = 5 4 9 . 2 0 ST A = 1 2 5 + 4 0 . 3 3 EL E V = 5 4 8 . 6 0 STA = 125+45.72 ELEV = 548.60 ST A = 1 2 5 + 5 6 . 5 1 EL E V = 5 4 9 . 2 0 ST A = 1 2 5 + 9 3 . 9 0 EL E V = 5 4 8 . 7 0 ST A = 1 2 6 + 0 9 . 1 5 EL E V = 5 4 7 . 8 0 STA = 126+14.24 ELEV = 547.80 ST A = 1 2 6 + 2 4 . 4 1 EL E V = 5 4 8 . 7 0 ST A = 1 2 6 + 6 7 . 9 8 EL E V = 5 4 8 . 3 0 EXISTING GRADE PROPOSED BANKFULLPROPOSED GRADE X XX X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECE CE CE SAF SAF SAF SAF SA F SA F SA F SAF SAF SAF SAF SAF WETLAND AREA O WETLAND AREA N WETLAND AREA P STA: 12 1 + 6 6 UT TO S O U T H F O R K STA: 50 1 + 3 8 UT4 CONFLU E N C E STA: 125+87 UT TO SOUTH FORK STA: 608+77 UT5 CONFLUENCE UT T O S O U T H FOR K UT 5 C R - N M CR-N M CR-N M CR- W R CR- W R CR- W R C R - W R CR-W R CR- N M CR-R R CR- N M C R - R R CR - C R 608+77 608 + 0 0 501+38 50 1 + 0 0 122+0 0 123+ 0 0 12 4 + 0 0 125 + 0 0 126 + 0 0 127 + 0 0 CR - C R C R - C R MA T C H L I N E - S T A 1 2 2 + 3 0 M A T C H L I N E - S T A 1 2 6 + 8 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT S F R e a c h 2 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 7 Sheet Index 2.1 2.2 2.3 2.4 2.5 2.6 2.7 12.10' 1.2' 3.6'3.6'4.9' Typical Section Reach 2 DH J Ju l y 3 1 , 2 0 1 5 540 545 550 555 540 545 550 555 126+80 127+00 127+50 128+00 128+50 129+00 129+50 130+00 130+50 131+00 131+50 132+00 132+24 -1.3% -2.0% -1.8% -1.1% -1.7% -3.1% -3.6% -3.2% -4.0 % 6.1%-1.6% ST A = 1 2 6 + 8 3 . 5 8 EL E V = 5 4 7 . 7 0 STA = 126+88.78 ELEV = 547.70 ST A = 1 2 6 + 9 9 . 1 7 EL E V = 5 4 8 . 3 0 ST A = 1 2 7 + 3 0 . 3 1 EL E V = 5 4 7 . 9 0 ST A = 1 2 7 + 4 7 . 2 0 EL E V = 5 4 7 . 3 0 STA = 127+52.84 ELEV = 547.30 ST A = 1 2 7 + 6 4 . 1 0 EL E V = 5 4 7 . 9 0 ST A = 1 2 7 + 7 9 . 1 3 EL E V = 5 4 7 . 6 0 ST A = 1 2 8 + 0 0 . 7 2 EL E V = 5 4 6 . 7 2 STA = 128+07.92 ELEV = 546.72 ST A = 1 2 8 + 2 2 . 3 2 EL E V = 5 4 7 . 6 0 ST A = 1 2 8 + 3 9 . 0 1 EL E V = 5 4 7 . 3 0 ST A = 1 2 8 + 5 7 . 0 8 EL E V = 5 4 6 . 5 0 STA = 128+63.10 ELEV = 546.50 ST A = 1 2 8 + 7 5 . 1 5 EL E V = 5 4 7 . 3 0 ST A = 1 2 9 + 1 9 . 0 4 EL E V = 5 4 6 . 8 0 ST A = 1 2 9 + 3 1 . 0 7 EL E V = 5 4 6 . 3 0 STA = 129+35.08 ELEV = 546.30 ST A = 1 2 9 + 4 3 . 1 0 EL E V = 5 4 6 . 8 0 ST A = 1 2 9 + 7 9 . 1 2 EL E V = 5 4 6 . 2 0 ST A = 1 2 9 + 9 3 . 8 8 EL E V = 5 4 5 . 5 0 STA = 129+98.80 ELEV = 545.50 ST A = 1 3 0 + 0 8 . 6 4 EL E V = 5 4 6 . 2 0 ST A = 1 3 0 + 3 4 . 1 1 EL E V = 5 4 5 . 4 0 ST A = 1 3 0 + 5 3 . 9 5 EL E V = 5 4 4 . 6 0 STA = 130+60.56 ELEV = 544.60 ST A = 1 3 0 + 7 3 . 7 9 EL E V = 5 4 5 . 4 0 ST A = 1 3 0 + 9 6 . 1 8 EL E V = 5 4 4 . 6 0 ST A = 1 3 1 + 1 4 . 4 6 EL E V = 5 4 3 . 8 0 STA = 131+20.55 ELEV = 543.80 ST A = 1 3 1 + 3 2 . 7 4 EL E V = 5 4 4 . 6 0 ST A = 1 3 1 + 5 1 . 7 4 EL E V = 5 4 4 . 0 0 ST A = 1 3 1 + 6 9 . 0 7 EL E V = 5 4 3 . 3 0 STA = 131+74.85 ELEV = 543.30 ST A = 1 3 1 + 8 6 . 4 1 EL E V = 5 4 4 . 0 0 PROPOSED GRADE PROPOSED BANKFULL EXISTING GRADE X X X X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE WETLAND AREA Q STA: 132+24 END WORK UT TO SOUTH FORK UT TO S O U T H FORK CR- C R CR-WR CR- W R CR- C R C R - N M CR- W R C R - W R C R - N M CR-N M 127+ 0 0 128+00 12 9 + 0 0 13 0 + 0 0 131 + 0 0 132 + 0 0 132 + 2 4 MA T C H L I N E - S T A 1 2 6 + 8 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 1 C St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 8 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 Typical Section 8.1' 0.9' 2.35'2.35'3.4' DH J Ju l y 3 1 , 2 0 1 5 565 570 575 580 565 570 575 580 199+50 200+00 200+50 201+00 201+50 202+00 202+50 202+60 -2.1% -1.9% -1.9%-1.2%-1.7% -1.6% -0.6%-0.7%-0.7% ST A = 2 0 0 + 0 0 . 0 0 EL E V = 5 7 3 . 1 0 ST A = 2 0 0 + 1 9 . 0 0 EL E V = 5 7 2 . 7 0 STA = 200+22.39 ELEV = 572.30 STA = 200+25.78 ELEV = 572.30 ST A = 2 0 0 + 2 9 . 1 7 EL E V = 5 7 2 . 7 0 ST A = 2 0 0 + 4 4 . 8 8 EL E V = 5 7 2 . 4 0 STA = 200+50.75 ELEV = 572.00 STA = 200+56.62 ELEV = 572.00 ST A = 2 0 0 + 6 2 . 4 9 EL E V = 5 7 2 . 4 0 ST A = 2 0 0 + 7 8 . 6 2 EL E V = 5 7 2 . 1 0 STA = 200+83.55 ELEV = 571.60 STA = 200+88.47 ELEV = 571.60 ST A = 2 0 0 + 9 3 . 4 0 EL E V = 5 7 2 . 1 0 ST A = 2 0 1 + 0 1 . 7 4 EL E V = 5 7 2 . 0 0 STA = 201+07.02 ELEV = 571.70 STA = 201+12.30 ELEV = 571.70 ST A = 2 0 1 + 1 7 . 5 8 EL E V = 5 7 2 . 0 0 ST A = 2 0 1 + 3 4 . 8 6 EL E V = 5 7 1 . 7 0 STA = 201+39.20 ELEV = 571.10 STA = 201+43.54 ELEV = 571.10 ST A = 2 0 1 + 4 7 . 8 8 EL E V = 5 7 1 . 7 0 ST A = 2 0 1 + 7 2 . 5 7 EL E V = 5 7 1 . 3 0 STA = 201+78.85 ELEV = 571.00 STA = 201+85.14 ELEV = 571.00 ST A = 2 0 1 + 9 1 . 4 2 EL E V = 5 7 1 . 3 0 ST A = 2 0 2 + 0 8 . 5 0 EL E V = 5 7 1 . 2 0 STA = 202+11.63 ELEV = 570.90 STA = 202+14.76 ELEV = 570.90 ST A = 2 0 2 + 1 7 . 8 9 EL E V = 5 7 1 . 2 0 ST A = 2 0 2 + 3 2 . 4 7 EL E V = 5 7 1 . 1 0 STA = 202+37.32 ELEV = 570.80 STA = 202+42.18 ELEV = 570.80 ST A = 2 0 2 + 4 7 . 0 3 EL E V = 5 7 1 . 1 0 STA = 202+60.40 ELEV = 571.00 EXISTING GRADE PROPOSED BANKFULL PROPOSED GRADE X X X X X X X X X X X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE STA: 102+84 UT TO SOUTH FORK STA: 202+60 UT1C CONFLUENCE STA: 200+00 BEGIN WORK UT1C WETLAND AREA B CR- W R CR- N M UT TO S O U T H FORK UT1C SR 1 5 5 4 CE N T E R C H U R C H R O A D (60 ' R I G H T - O F - W A Y ) C R - R R CR- W R CR- W R C R - W R CR-NM CR- N M CR-NM CR-NM CR-RR CR - C R CR-CR 202+60 19 8 + 9 8 19 9 + 0 0 200+00 201 + 0 0 202 + 0 0 10 1 + 0 0 102+0 0 10 3 + 0 0 ROCK PILE CR - C R WETLAND AREA U ROCK PILE 0'20'40'60' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 2 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 9 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 DH J Ju l y 3 1 , 2 0 1 5 X X CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECE C E CE C E CE C E CE C E CE C E CE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E STA: 295+15 BEGIN ENHANCEMENT II UT2 WETLAND AREA J WETLAND AREA I UT2 STA: 30 0 + 0 0 END EN H A N C E M E N T I I BEGIN E N H A N C E M E N T I UT2 CR-NM 295 + 1 5 29 6 + 0 0 29 7 + 0 0 298+00 299 + 0 0 300+00 M A T C H L I N E - S T A 2 9 9 + 5 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 2 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 0 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 Typical Section 4.0' 0.5' 1.0'1.0'2.0' DH J Ju l y 3 1 , 2 0 1 5 555 560 565 570 555 560 565 570 299+00 299+50 300+00 300+50 300+74 -0.9%-2.0%-1.2% ST A = 3 0 0 + 0 0 . 0 0 EL E V = 5 6 3 . 3 0 ST A = 3 0 0 + 1 0 . 5 8 EL E V = 5 6 3 . 2 0 STA = 300+17.98 ELEV = 562.90 STA = 300+25.39 ELEV = 562.90 ST A = 3 0 0 + 3 2 . 7 9 EL E V = 5 6 3 . 2 0 ST A = 3 0 0 + 4 2 . 8 9 EL E V = 5 6 3 . 0 0 STA = 300+47.77 ELEV = 562.70 STA = 300+52.66 ELEV = 562.70 ST A = 3 0 0 + 5 7 . 5 4 EL E V = 5 6 3 . 0 0 ST A = 3 0 0 + 7 3 . 8 5 EL E V = 5 6 2 . 8 0 EXISTING GRADE PROPOSED BANKFULL PROPOSED GRADE X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE SAF S A F STA: 110+03 UT TO SOUTH FORK STA: 300+74 UT2 CONFLUENCE WETLAND AREA H STA: 300+00 END ENHANCEMENT II BEGIN ENHANCEMENT I U T T O S O U T H F O R K UT 2 CR-WR C R - N M C R - N M CR- N M CR - N M CR-C R 109 + 0 0 1 1 0 + 0 0 1 1 1 + 0 0 299+ 0 0 300+00 30 0 + 7 4 CR - N M ROCK PILE M A T C H L I N E - S T A 2 9 9 + 5 0 0'20'40'60' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 3 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 1 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 DH J Ju l y 3 1 , 2 0 1 5 CECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE S A F SA F SA F STA: 395+79 BEGIN ENHANCEMENT II UT3 WETLAND AREA K STA: 400+00 END ENHANCEMENT I I BEGIN ENHANCEMEN T I UT3 UT3 CR-NM 3 9 5 + 7 9 3 9 6 + 0 0 397+00 398+00 399+00 400+00 MA T C H L I N E - S T A 0 + 0 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 3 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 2 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 Typical Section 4.0' 0.5' 1.0'1.0'2.0' DH J Ju l y 3 1 , 2 0 1 5 555 560 565 570 555 560 565 570 400+00 400+50 401+00 401+50 401+63 -2.1% -3.2% -3.4% -2.0% -3.5% -3.5% STA = 400+00.00 ELEV = 563.80 ST A = 4 0 0 + 1 4 . 1 9 EL E V = 5 6 3 . 5 0 STA = 400+16.36 ELEV = 563.30 STA = 400+18.53 ELEV = 563.30 STA = 400+20.70 ELEV = 563.50 ST A = 4 0 0 + 3 3 . 2 2 EL E V = 5 6 3 . 1 0 STA = 400+37.98 ELEV = 562.85 STA = 400+42.74 ELEV = 562.85 ST A = 4 0 0 + 4 7 . 5 0 EL E V = 5 6 3 . 1 0 ST A = 4 0 0 + 6 5 . 0 6 EL E V = 5 6 2 . 5 0 STA = 400+72.07 ELEV = 562.10 STA = 400+79.08 ELEV = 562.10 ST A = 4 0 0 + 8 6 . 0 9 EL E V = 5 6 2 . 5 0 ST A = 4 0 1 + 0 0 . 8 7 EL E V = 5 6 2 . 2 0 STA = 401+06.50 ELEV = 561.90 STA = 401+12.13 ELEV = 561.90 ST A = 4 0 1 + 1 7 . 7 5 EL E V = 5 6 2 . 2 0 ST A = 4 0 1 + 3 4 . 8 1 EL E V = 5 6 1 . 6 0 STA = 401+39.28 ELEV = 561.20 STA = 401+43.75 ELEV = 561.20 ST A = 4 0 1 + 4 8 . 2 2 EL E V = 5 6 1 . 6 0 STA = 401+62.60 ELEV = 561.10 EXISTING GRADE PROPOSED GRADE PROPOSED BANKFULL CE CE CECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE S A F SA F SA F S A F S A F STA: 112+34 UT TO SOUTH FORK STA: 401+63 UT3 CONFLUENCE WETLAND AREA L STA: 400+00 END ENHANCEMENT II BEGIN ENHANCEMENT I WETLAND AREA K S O U T H F O R K UT3 CR - R R CR- N M CR-NM CR-WR CR - N M CR-N M CR- C R CR-CR CR-CR CR- C R 401+63 400+00 401 + 0 0 11 2 + 0 0 113 + 0 0 UT T O S O U T H FO R K CR-CR MA T C H L I N E - S T A 0 + 0 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 4 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 3 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 Typical Section 5.0' 0.5' 1.25'1.25'2.5' DH J Ju l y 3 1 , 2 0 1 5 545 550 555 560 545 550 555 560 497+87 498+00 498+50 499+00 499+50 500+00 500+50 501+00 501+38 -2.1%-1.4%-1.1%-1.1%-1.4% ST A = 5 0 0 + 0 0 . 0 0 EL E V = 5 5 3 . 2 0 STA = 500+04.84 ELEV = 553.10 STA = 500+08.51 ELEV = 552.74 STA = 500+12.19 ELEV = 552.74 ST A = 5 0 0 + 1 5 . 8 6 EL E V = 5 5 3 . 1 0 ST A = 5 0 0 + 3 0 . 4 9 EL E V = 5 5 2 . 9 0 STA = 500+35.15 ELEV = 552.57 STA = 500+39.80 ELEV = 552.57 ST A = 5 0 0 + 4 4 . 4 6 EL E V = 5 5 2 . 9 0 ST A = 5 0 0 + 6 2 . 5 0 EL E V = 5 5 2 . 7 0 STA = 500+69.17 ELEV = 552.35 STA = 500+75.83 ELEV = 552.35 ST A = 5 0 0 + 8 2 . 5 0 EL E V = 5 5 2 . 7 0 ST A = 5 0 1 + 0 0 . 6 4 EL E V = 5 5 2 . 5 0 STA = 501+06.17 ELEV = 552.11 STA = 501+11.71 ELEV = 552.11 ST A = 5 0 1 + 1 7 . 2 4 EL E V = 5 5 2 . 5 0 ST A = 5 0 1 + 3 8 . 2 0 EL E V = 5 5 2 . 2 0 EXISTING GRADE PROPOSED BANKFULL PROPOSED GRADE CE CE CE CE CECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E STA: 121+66 UT TO SOUTH FORK STA: 501+38 UT4 CONFLUENCE STA: 121+44 END UT TO SOUTH FORK REACH 1 BEGIN UT TO SOUTH FORK REACH 2 STA: 497+87 BEGIN ENHANCEMENT II UT4 STA: 500+00 END ENHANCEMENT II BEGIN ENHANCEMENT I UT4 C R - N M CR-N M CR- R R CR- N M CR-W R C R - W R CR-N M CR- W R CR- N M CR-C R 501+38 497+87 498+00 499+00 500+ 0 0 501 + 0 0 121 + 0 0 1 2 2 + 0 0 1 2 3 + 0 0 CR-CR 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 5 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 4 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 Typical Section 7.2' 0.8' 2.1'2.1'3' DH J Ju l y 3 1 , 2 0 1 5 548 550 555 560 565 548 550 555 560 565 602+00 602+50 603+00 603+50 604+00 604+50 605+00 605+50 606+00 606+30 -1.7% -1.6% -1.3% -2.2% -3.2% -3.3% -3.5% -2.2% -2.7% -1.3% -3.8 % ST A = 6 0 2 + 0 0 . 0 0 EL E V = 5 5 6 . 5 0 STA = 602+06.00 ELEV = 556.40 STA = 602+11.64 ELEV = 556.01 STA = 602+17.28 ELEV = 556.01 ST A = 6 0 2 + 2 2 . 9 2 EL E V = 5 5 6 . 4 0 ST A = 6 0 2 + 4 8 . 5 6 EL E V = 5 5 6 . 0 0 STA = 602+54.36 ELEV = 555.67 STA = 602+60.15 ELEV = 555.67 ST A = 6 0 2 + 6 5 . 9 5 EL E V = 5 5 6 . 0 0 ST A = 6 0 2 + 8 9 . 1 4 EL E V = 5 5 5 . 7 0 STA = 602+96.04 ELEV = 555.32 STA = 603+02.94 ELEV = 555.32 ST A = 6 0 3 + 0 9 . 8 4 EL E V = 5 5 5 . 7 0 ST A = 6 0 3 + 3 2 . 8 5 EL E V = 5 5 5 . 2 0 STA = 603+42.70 ELEV = 554.77 STA = 603+52.55 ELEV = 554.77 ST A = 6 0 3 + 6 2 . 3 9 EL E V = 5 5 5 . 2 0 ST A = 6 0 3 + 8 4 . 2 3 EL E V = 5 5 4 . 5 0 ST A = 6 0 3 + 9 3 . 0 6 EL E V = 5 5 4 . 0 0 STA = 604+01.88 ELEV = 554.00 ST A = 6 0 4 + 1 0 . 7 0 EL E V = 5 5 4 . 5 0 ST A = 6 0 4 + 2 5 . 8 9 EL E V = 5 5 4 . 0 0 STA = 604+32.60 ELEV = 553.60 STA = 604+39.31 ELEV = 553.60 ST A = 6 0 4 + 4 6 . 0 2 EL E V = 5 5 4 . 0 0 ST A = 6 0 4 + 5 4 . 5 5 EL E V = 5 5 3 . 7 0 STA = 604+60.86 ELEV = 553.35 STA = 604+67.17 ELEV = 553.35 ST A = 6 0 4 + 7 3 . 4 8 EL E V = 5 5 3 . 7 0 ST A = 6 0 4 + 9 5 . 9 7 EL E V = 5 5 3 . 2 0 STA = 605+03.56 ELEV = 552.60 STA = 605+11.16 ELEV = 552.60 ST A = 6 0 5 + 1 8 . 7 6 EL E V = 5 5 3 . 2 0 ST A = 6 0 5 + 4 0 . 9 8 EL E V = 5 5 2 . 6 0 STA = 605+45.82 ELEV = 552.28 STA = 605+50.66 ELEV = 552.28 ST A = 6 0 5 + 5 5 . 5 0 EL E V = 5 5 2 . 6 0 ST A = 6 0 5 + 7 8 . 1 6 EL E V = 5 5 2 . 3 0 STA = 605+84.11 ELEV = 551.84 STA = 605+90.06 ELEV = 551.84 ST A = 6 0 5 + 9 6 . 0 1 EL E V = 5 5 2 . 3 0 ST A = 6 0 6 + 0 9 . 3 1 EL E V = 5 5 1 . 8 0 STA = 606+15.39 ELEV = 551.46 STA = 606+21.47 ELEV = 551.46 ST A = 6 0 6 + 2 7 . 5 4 EL E V = 5 5 1 . 8 0 PROPOSED GRADEEXISTING GRADE PROPOSED BANKFULL X X X X X X X X X X X X X X X X X X X XCE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE STA: 602+00 BEGIN WORK UT5 WETLAND AREA T UT5 CR- R R C R - W R C R - R R CR - W R CR- W R CR - N M CR-N M CR-N M C R - N M CR-NM CR-C R C R - N M CR - C R CR - N M CR - N M 602+00 603+00 604+00 60 5 + 0 0 60 6 + 0 0 607+00 MA T C H L I N E - S T A 6 0 6 + 3 0 0'20'40'60' (HORIZONTAL) 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P r o f i l e s . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 5 St r e a m P l a n a n d P r o f i l e 00 5 - 0 2 1 4 4 RC P JK 2. 1 5 Sheet Index 2.8 2.9 2.10 2.11 2.12 2.13 2.15 2.14 Typical Section 7.2' 0.8' 2.1'2.1'3' DH J Ju l y 3 1 , 2 0 1 5 548 550 555 560 606+30 545 550 555 560 545 550 555 560 606+30 606+50 607+00 607+50 608+00 608+50 608+77 STA = 606+21.47 ELEV = 551.46 ST A = 6 0 6 + 2 7 . 5 4 EL E V = 5 5 1 . 8 0 -2.7% -2.0% -1.4% -1.8% -2.7% -2.7% -3.1% ST A = 6 0 6 + 3 8 . 5 1 EL E V = 5 5 1 . 5 0 STA = 606+45.76 ELEV = 550.90 STA = 606+53.02 ELEV = 550.90 ST A = 6 0 6 + 6 0 . 2 8 EL E V = 5 5 1 . 5 0 ST A = 6 0 6 + 8 4 . 8 9 EL E V = 5 5 1 . 0 0 STA = 606+92.35 ELEV = 550.65 STA = 606+99.80 ELEV = 550.65 ST A = 6 0 7 + 0 7 . 2 6 EL E V = 5 5 1 . 0 0 ST A = 6 0 7 + 2 9 . 0 0 EL E V = 5 5 0 . 7 0 STA = 607+35.95 ELEV = 550.32 STA = 607+42.89 ELEV = 550.32 ST A = 6 0 7 + 4 9 . 8 4 EL E V = 5 5 0 . 7 0 ST A = 6 0 7 + 6 6 . 1 3 EL E V = 5 5 0 . 4 0 STA = 607+74.30 ELEV = 549.70 STA = 607+82.47 ELEV = 549.70 ST A = 6 0 7 + 9 0 . 6 3 EL E V = 5 5 0 . 4 0 ST A = 6 0 8 + 0 9 . 0 4 EL E V = 5 4 9 . 9 0 STA = 608+15.38 ELEV = 549.59 STA = 608+21.72 ELEV = 549.59 ST A = 6 0 8 + 2 8 . 0 6 EL E V = 5 4 9 . 9 0 ST A = 6 0 8 + 3 9 . 3 0 EL E V = 5 4 9 . 6 0 STA = 608+43.36 ELEV = 549.23 STA = 608+47.43 ELEV = 549.23 ST A = 6 0 8 + 5 1 . 4 9 EL E V = 5 4 9 . 6 0 ST A = 6 0 8 + 7 7 . 4 0 EL E V = 5 4 8 . 8 0 EXISTING GRADE PROPOSED GRADE PROPOSED BANKFULL X X X X X X X X X X CE CE CECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE SA F SA F S A F S A F SAF SAF SAF S A F S A F WETLAND AREA T WETLAND AREA N UT5 STA: 125+87 UT TO SOUTH FORK STA: 608+77 UT5 CONFLUENCE UT T O SO U T H F O R K WETLAND AREA P UT5 CR-R R C R - W R CR- W R CR - W R CR- N M CR-NM C R - N M CR- W R CR- W R CR - N M C R - N M CR - C R CR- N M 608+77 6 0 5 + 0 0 606 + 0 0 607+00 6 0 8 + 0 0 125 + 0 0 1 2 6 + 0 0 1 2 7 + 0 0 CR-CR MA T C H L I N E - S T A 6 0 6 + 3 0 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P l a n t i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a Pl a n t i n g L i s t 00 5 - 0 2 1 4 4 RC P JK 3. 1 ZONE 1 - STREAM BANK PLANTING ZONE ZONE 2 - BUFFER PLANTING ZONE ZONE 3 - SUPPLEMENTAL MID-STORY/SHRUB PLANTING ZONE *Juncus effusus only to be used in channels within 100' of confluence with UT to South Fork Cane Creek. Permanent Riparian Seeding Pure Live Seed (20 lbs/ acre) Approved Date Species Name Common Name Stratum Density (lbs/acre) All Year Panicum rigidulum Redtop Panicgrass Herb 1.5 All Year Agrostis hyemalis Winter Bentgrass Herb 4.0 All Year Chasmanthium latifolium River Oats Herb 2.0 All Year Rudbeckia hirta Blackeyed Susan Herb 1.0 All Year Coreopsis lanceolata Lanceleaf Coreopsis Herb 1.0 All Year Carex vulpinoidea Fox Sedge Herb 3.0 All Year Panicum clandestinum Deertongue Herb 3.5 All Year Elymus virginicus Virginia Wild Rye Herb 2.0 All Year Asclepias syrica Common Milkweed Herb 0.2 All Year Baptisia australis Blue False Indigo Herb 0.2 All Year Gaillardia pulchella Annual Gaillardia Herb 1.0 All Year Echinacea purpurea Pale Purple Coneflower Herb 0.6 Permanent Seeding Outside Easement Approved Date Species Name Common Name Stratum Density (lbs/acre) All Year Festuca arundinacea Tall Fescue Herb 40 Temporary Seeding Pure Live Seed Approved Date Species Name Common Name Stratum Density (lbs/acre) Aug 15 - May 1 Secale cereale Rye Grain Herb 140 May 1 - Aug 15 Setaria italica German Millet Herb 50 DH J Ju l y 3 1 , 2 0 1 5 Streambank Planting Zone Live Stakes Species Common Name Max Spacing Indiv. Spacing Min. Size Stratum % of Stems Cornus ammomum Silky Dogwood 8 ft.2-8 ft.Ϭ͘ϱ͟Ͳϭ͘ϱ͟ĐĂů͘Shrub 35% Salix sericea Silky Willow 8 ft.2-8 ft.Ϭ͘ϱ͟Ͳϭ͘ϱ͟ĐĂů͘Shrub 35% Salix nigra Black Willow 8 ft.2-8 ft.Ϭ͘ϱ͟Ͳϭ͘ϱ͟ĐĂů͘Shrub 15% Physocarpos opulifolius Ninebark 8 ft.2-8 ft.Ϭ͘ϱ͟Ͳϭ͘ϱ͟ĐĂů͘Shrub 15% Herbaceous Plugs *Juncus effusus Common Rush 5 ft.3-5 ft.ϭ͘Ϭ͟ͲϮ͘Ϭ͟ plug Herb 40% Carex alata Broadwing Sedge 5 ft.3-5 ft.ϭ͘Ϭ͟ͲϮ͘Ϭ͟ plug Herb 40% Panicum virgatum Switchgrass 5 ft.3-5 ft.ϭ͘Ϭ͟ͲϮ͘Ϭ͟ plug Herb 20% Buffer Planting Zone Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum % of Stems Fraxinus pennsylvanica Green Ash 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 20% Platanus occidentalis Sycamore 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 20% Betula nigra River Birch 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 15% Quercus phellos Willow Oak 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 10% Liriodendron tulipifera Tulip Poplar 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 10% Alnus serrulata Tag Alder 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 8% Quercus palustris Pin Oak 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Canopy 5% Carpinus caroliniana American Hornbeam 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Mid-Story 4% Viburnum prunifolium Blackhaw Viburnum 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 2% Calycanthus floridus Sweetshrub 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 2% Callicarpa americana American Beautyberry 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 2% Symphoricarpos orbiculatus Coralberry 12 ft.6-12 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 2% Supplemental Mid-Story / Shrub Planting Zone Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum % of Stems Carpinus caroliniana American Hornbeam 24 ft.12-24 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Mid-Story 40% Callicarpa americana American Beautyberry 24 ft.12-24 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 15% Calycanthus floridus Sweetshrub 24 ft.12-24 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 15% Viburnum prunifolium Blackhaw Viburnum 24 ft.12-24 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 10% Symphoricarpos orbiculatus Coralberry 24 ft.12-24 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Shrub 10% Aesculus pavia Red Buckeye 25 ft.12-24 ft.Ϭ͘Ϯϱ͟Ͳϭ͘Ϭ͟Mid-Story 10% 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P l a n t i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k & U T 1 Pl a n t i n g 00 5 - 0 2 1 4 4 RC P JK 3. 2 DH J Ju l y 3 1 , 2 0 1 5 Sheet Index 3.3 3.2 3.4 3.5 C E C E C E C E C E C E C E CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECE X X X X X X X X X X X X X X X X X X X X X X XXX X X X X X CE CE CE CE CE CE CECE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECE C E C E C E C E C E C E C E CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E CE CE CE CE CE CE CE CE 202+60 199+0 0 200+00 2 0 1 + 0 0 202+00 300+74 2 9 9 + 0 0 30 0 + 0 0 UT1 C UT TO S O U T H F O R K UT2 U T 3 40'EASEMENT BREAK S R 1 5 5 4 C E N T E R C H U R C H R O A D ( 6 0 ' R I G H T - O F - W A Y ) 395+ 7 9 396 + 0 0 3 9 7 + 0 0 39 8 + 0 0 3 9 9 + 0 0 40 0 + 0 0 10 0 + 0 0 101 + 0 0 102+00 103+00 104+00 105+00 106+00 1 0 7 + 0 0 10 8 + 0 0 1 0 9 + 0 0 110+0 0 111+0 0 112+00 STA: 100+00 BEGIN WORK UT TO SOUTH FORK STA: 102+84 UT TO SOUTH FORK STA: 202+60 UT1C CONFLUENCE STA: 110+03 UT TO SOUTH FORK STA: 300+74 UT2 CONFLUENCE M A T C H L I N E - S T A 1 1 1 + 1 0 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P l a n t i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k , U T 3 , & U T 4 Pl a n t i n g 00 5 - 0 2 1 4 4 RC P JK 3. 3 DH J Ju l y 3 1 , 2 0 1 5 Sheet Index 3.3 3.2 3.4 3.5 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P l a n t i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k & U T 5 Pl a n t i n g 00 5 - 0 2 1 4 4 RC P JK 3. 4 DH J Ju l y 3 1 , 2 0 1 5 Sheet Index 3.3 3.2 3.4 3.5 CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE X X X X X X X X X X X X X X X XXXXXXX X X X X X X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE U T 5 UT TO SOUTH FORK 132 + 2 4 123+0 0 1 2 4 + 0 0 1 2 5 + 0 0 126+ 0 0 127 + 0 0 128+00 12 9 + 0 0 130 + 0 0 131 + 0 0 132 + 0 0 60 2 + 0 0 60 3 + 0 0 60 4 + 0 0 605 + 0 0 6 0 6 + 0 0 60 7 + 0 0 608+0 0 60 8 + 7 7 STA: 132+24 END WORK UT TO SOUTH FORK STA: 125+87 UT TO SOUTH FORK STA: 608+77 UT5 CONFLUENCE MA T C H L I N E - S T A 1 2 2 + 4 0 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - P l a n t i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT 2 Pl a n t i n g 00 5 - 0 2 1 4 4 RC P JK 3. 5 DH J Ju l y 3 1 , 2 0 1 5 Sheet Index 3.3 3.2 3.4 3.5 CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE 295 + 1 5 2 9 6 + 0 0 297+ 0 0 29 8 + 0 0 2 9 9 + 0 0 STA: 112+34 UT TO SOUTH FORK STA: 401+63 UT3 CONFLUENCE UT2 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - E S C . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a Ov e r v i e w Er o s i o n a n d S e d i m e n t C o n t r o l 00 5 - 0 2 1 4 4 RC P DH J JK 4. 1 Ju l y 3 1 , 2 0 1 5 N Erosion Control Maintence Contact: Jeff Keaton, PE 312 West Millbrook Rd., Suite 225 Raleigh, NC 27609 919-851-9986 Total Disturbed Area = 9.5 Acres 0'150'300'450' (HORIZONTAL) Erosion and Sediment Control Features T Proposed Limits of Disturbance Proposed Silt Fence Proposed Silt Fence Stone Outlet Proposed Safety Fencing Proposed Temporary Crossing (Mud Mat) Proposed Temporary Access Road Proposed Construction Entrance Proposed Pump Around System SAF SAF LOD LOD [x][x] Temporary Seeding Pure Live Seed Approved Date Species Name Common Name Stratum Density (lbs/acre) Aug 15 - May 1 Secale cereale Rye Grain Herb 140 May 1 - Aug 15 Setaria italica German Millet Herb 50 CE CE CE CE CECE CE C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE C E C E CE CE CE CE CE CE C E CECECECEC E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CECECE CE CE C E C E C E C E C E C E C E C E C E C E CE C E CECE C E CE CE CE C E C E C E C E CE / L O D CE / L O D LOD LOD LO D LO D LO D LO D LO D L O D LO D L O D L O D L O D LOD L O D L O D L O D L O D LOD LO D L O D LO D LO D L O D L O D LO D L O D LOD LOD LOD LOD CE/ L O D C E / L O D LODLOD LOD L O D L O D L O D L O D L O D L O D L O D L O D L O D LOD SHEET 4.4 SHEET 4.3 SHEET 4.2 T T T T T T UT2 UT4 UT3 SR1 5 5 4 CEN T E R C H U R C H R O A D (60 ' R I G H T - O F - W A Y ) UT5 U T T O S O U T H F O R K U T T O S O U T H F O R K U T T O S O U T H F O R K U T 1 C T CONSTRUCTION ENTRANCE LAT: 35.83 LONG: -79.34 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - E S C . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k & U T 1 Er o s i o n a n d S e d i m e n t C o n t r o l 00 5 - 0 2 1 4 4 RC P DH J JK 4. 2 Ju l y 3 1 , 2 0 1 5 Sheet Index 4.3 4.2 4.4 Erosion and Sediment Control Features T SAF SAF LOD LOD [x][x] Proposed Limits of Disturbance Proposed Silt Fence Proposed Silt Fence Stone Outlet Proposed Safety Fencing Proposed Temporary Crossing (Mud Mat) Proposed Temporary Access Road Proposed Construction Entrance Proposed Pump Around System X X X X X X X X X X X X X X X X X XXXXX X X X X X X X [x] [x] [ x ] [ x ] SAF SAF SAF SAF SAF [x] CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E CECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE/LOD CE/LOD CE/LODCE/LOD CE/LOD CE/LOD CE/LOD CE/ L O D CE/ L O D LO D LOD LO D LO D LO D LO D LO D LO D L O D LOD LOD LOD LO D LO D L O D L O D L O D L O D L O D LOD LO D LOD LOD LOD LOD LOD LOD LOD LOD L O D LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LO D LOD C E / L O D C E / L O D C E / L O D C E / L O D C E / L O D C E / L O D C E / L O D CE/LOD CE/LOD CE/LOD LOD LO D LOD LOD SAF SAF SAF SAF SAF STA: 100+00 BEGIN WORK UT TO SOUTH FORK UT TO SOUTH FORK UT1C UT TO SOUTH FORK S R 1 5 5 4 C E N T E R C H U R C H R O A D ( 6 0 ' R I G H T - O F - W A Y ) PROPOSED CROSSING 2-36" 100+00 10 1 + 0 0 102+00 103 + 0 0 104+00 105+ 0 0 106+ 0 0 1 0 7 + 0 0 108+ 0 0 10 9 + 0 0 202+60 198+98 199 + 0 0 200+00 2 0 1 + 0 0 202+ 0 0 295 + 1 5 29 6 + 0 0 297 + 0 0 STA: 102+84 UT TO SOUTH FORK STA: 202+60 UT1C CONFLUENCE STA: 200+00 BEGIN WORK UT1C PROPOSED CONSTRUCTION ENTRANCE PRO P O S E D S T O C K P I L E ARE A ( T Y P ) P R O P O S E D S T A G I N G A R E A PROPOSED TEMPORARY ACCESS ROAD PROPOSED SILT FENCE (TYP) T PROPOSED TEMPORARY CROSSING (TYP) T PROPOSED TEMPORARY CROSSING (TYP) PROPOSED STO C K P I L E AREA (TYP) WETLAND AREA A WETLAND AREA B WETLAND AREA C WETLAND AREA D WETLAND AREA E WETLAND AREA F WETLAND AREA G WETLAND AREA H WE T L A N D AR E A J UP L A N D AR E A U 2 WETLAND AREA U WETLAND AREA E PROPOSED SILT FENCE (TYP) PROPOSED SAFETY FENCE (TYP) PROPOSED SAFETY FENCE (TYP) PROPOSED SILT FENCE (TYP)MA T C H L I N E - S T A 1 0 9 + 2 0 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - E S C . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k , U T 2 , & U T 3 Er o s i o n a n d S e d i m e n t C o n t r o l 00 5 - 0 2 1 4 4 RC P DH J JK 4. 3 Ju l y 3 1 , 2 0 1 5 Sheet Index 4.3 4.2 4.4 Erosion and Sediment Control Features T SAF SAF LOD LOD [x][x] Proposed Limits of Disturbance Proposed Silt Fence Proposed Silt Fence Stone Outlet Proposed Safety Fencing Proposed Temporary Crossing (Mud Mat) Proposed Temporary Access Road Proposed Construction Entrance Proposed Pump Around System X XX XXXXXX X X X X [x] [x] SAF SAF SAF C E C E C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CECECECECECECE C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECE LO D LOD LO D LO D LOD LOD LOD LOD LOD LOD L O D LOD LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD CE/LOD CE/LOD LODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD SAF SAF SAF [x] [x] UT TO SOUTH FORK U T 2 U T 3 UT TO SOUTH F O R K 4 0 1 + 6 3 3 9 8 + 0 0 3 9 9 + 0 0 400+00 401+00 108+0 0 10 9 + 0 0 110 + 0 0 111 + 0 0 112+00 113+00 114 + 0 0 115 + 0 0 116 + 0 0 11 7 + 0 0 118+ 0 0 119+ 0 0 120+00 121 + 0 0 300+74 2 9 9 + 0 0 30 0 + 0 0 STA: 110+03 UT TO SOUTH FORK STA: 300+74 UT2 CONFLUENCE STA: 112+34 UT TO SOUTH FORK STA: 401+63 UT3 CONFLUENCE STA: 304+45 END ENHANCEMENT II BEGIN ENHANCEMENT I STA: 404+20 END ENHANCEMENT II BEGIN ENHANCEMENT I U T 3 PROPOSED STOCKPILE AREA (TYP) PROPOSED TEMPORARY ACCESS ROAD PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE (TYP) T T T PROPOSED TEMPORARY CROSSING (TYP) WETLAND AREA H WETLAND AREA K WETLAND AREA L WETLAND AREA M WETLAND AREA S WETLAND AREA R PROPO S E D STOCK P I L E A R E A (TYP) PROPOSED SAFETY FENCE (TYP) PROPOSED SAFETY FENCE (TYP) PROPOSED SILT FENCE (TYP) M A T C H L I N E - S T A 1 0 9 + 2 0 MA T C H L I N E - S T A 1 2 0 + 6 5 0'40'80'120' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - E S C . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k , U T 4 , & U T 5 Er o s i o n a n d S e d i m e n t C o n t r o l 00 5 - 0 2 1 4 4 RC P DH J JK 4. 4 Ju l y 3 1 , 2 0 1 5 Sheet Index 4.3 4.2 4.4 Erosion and Sediment Control Features T SAF SAF LOD LOD [x][x] Proposed Limits of Disturbance Proposed Silt Fence Proposed Silt Fence Stone Outlet Proposed Safety Fencing Proposed Temporary Crossing (Mud Mat) Proposed Temporary Access Road Proposed Construction Entrance Proposed Pump Around System X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX [x ] [ x ] [ x ] SAF SAF SA F SAF SAF S A F CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E CE C E C E C E CE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE LOD LOD LO D LO D L O D L O D L O D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LOD LOD LOD LO D LOD LOD LODLOD LOD LODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D CE/LOD CE / L O D LO D LO D L O D L O D LO D LO D LO D LO D L O D L O D L O D LO D LO D LOD LOD L O D LODLODLOD LOD LOD LODLODLOD SAF SAF SA F SAF SAF S A F [x] [x] [x ] [x] STA: 132+24 END WORK UT TO SOUTH FORK UT TO SOUTH F O R K UT TO SOUTH FORK UT TO SOUT H F O R K 5 0 0 + 0 0 501 + 0 0 5 0 1 + 3 8 132+24 120+00 121 + 0 0 122+00 123+0 0 1 2 4 + 0 0 12 5 + 0 0 126+ 0 0 127 + 0 0 128+00 129 + 0 0 130+ 0 0 131 + 0 0 132 + 0 0 608+77 602+00 603+00 60 4 + 0 0 605 + 0 0 60 6 + 0 0 60 7 + 0 0 608+ 0 0 STA: 121+66 UT TO SOUTH FORK STA: 501+38 UT4 CONFLUENCE STA: 600+00 BEGIN WORK UT5 STA: 125+87 UT TO SOUTH FORK STA: 608+77 UT5 CONFLUENCE STA: 121+44 END UT TO SOUTH FORK REACH 1 BEGIN UT TO SOUTH FORK REACH 2 STA: 502+11 END ENHANCEMENT II BEGIN ENHANCEMENT I UT 5 PROPOSED LIMITS OF DISTURBANCE PROPOSED TEMPORARY ACCESS ROAD PROPOSED STOCKPILE AREA (TYP) PROPOSED SILT FENCE (TYP) T T PROPOSED TEMPORARY CROSSING (TYP) PROPOSED TEMPORARY CROSSING (TYP) UT 4 T WETLAND AREA O WETLAND AREA N WETLAND AREA T WETLAND AREA P WETLAND AREA Q PROPOSED STOCKPILE AREA (TYP) PROPOSED SAFETY FENCE (TYP) PROPOSED SILT FENCE (TYP) MA T C H L I N E - S T A 1 2 0 + 6 5 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK 5. 1 T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Chunky Riffle Not to Scale Woody Riffle Not to Scale 1 5.1 Constructed Riffle Not to Scale FLOW TOE OF SLOPE (TYP) RI F F L E B O T T O M WI D T H P E R TY P I C A L S E C T I O N S Plan View A A' SEE PROFILE FOR LENGTH OF RIFFLE B B' HEAD OF RIFFLE Profile A-A' TOP OF BANK (TYP) Section B-B' TOP OF BANK (TYP) HEAD OF RIFFLE ELEVATION POINT PER PROFILE TAIL OF RIFFLE ELEVATION POINT PER PROFILE 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL RIFFLE INVERT PER PROFILE 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL Section A-A' MICRO POOL HABITAT BEHIND LARGER WOODY DEBRIS 3" TO 6" DIAMETER WOODY DEBRIS WORKED INTO RIFFLE SUBSTRATE Plan View FLOW TOE OF SLOPE (TYP) RI F F L E B O T T O M WI D T H P E R TY P I C A L S E C T I O N S A SEE PROFILE FOR LENGTH OF RIFFLE B' B TOP OF BANK (TYP) RIFFLE MICRO POOL HABITAT BEHIND LARGER WOODY DEBRIS A' TOE OF SLOPE TOP OF BANK 3" TO 6" BRUSHY MATERIAL WORKED INTO ROCKY SUBSTRATE LOG EXPOSED 1" TO 3" ABOVE FINISHED RIFFLE ELEVATION Section B-B' 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL TOE OF SLOPE (TYP) TOP OF BANK (TYP) CLASS 1 STONE OR SALVAGED ONSITE BOULDERS MIN 0.5'x1'x1.5' LENGTH VARIES PER PLAN CLASS 1 STONE OR SALVAGED ONSITE BOULDERS MIN 0.5'x1'x1.5' Section A-A' Plan View TOP OF BANK (TYP) Section B-B' A A' B B' CLASS 1 STONE OR SALVAGED ONSITE BOULDERS MIN 0.5'x1'x1.5' 3" MAX TAIL OF RIFFLE ELEVATION POINT PER PROFILE HEAD OF RIFFLE ELEVATION POINT PER PROFILE 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL RIFFLE INVERT PER PROFILE3" MAX 2 5.1 4 5.1 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s 3 5.1 Rock and Roll Riffle Not to Scale Plan View Profile View A-A' 2% - 4% 1/ 2 T O 2 / 3 BA N K F U L L NOTE: 1.LOGS WITHOUT ROOT MASS MAY BE USED ONLY IF APPROVED BY THE PROJECT ENGINEER. 2.BOULDER MATERIAL CAN BE SUBSTITUTED IN PLACE OF ANGLED LOGS WITH APPROVAL OF ENGINEER. Log Section B-B' TOP OF BANK BURY INTO BANK 3' MIN. (TYP) BANKFULL 12" DIAMETER OR GREATER (TYP) POOL WIDTH PER TYPICAL SECTION FL O W ϱϱΣdKϲϱΣ (TYP) B' B 0. 5 ' M A X . NORMAL WATER SURFACE TOP OF BANK 5' MIN. (TYP)NONWOVEN FILTER FABRIC THALWEG FLOW 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL FL O W TOE OF SLOPE A' CR-WRCR-NM CR-RR CR-CR DH J Ju l y 3 1 , 2 0 1 5 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N Log Sill Not to Scale FLO W ROOT WAD Plan View TO P O F B A N K ( T Y P ) ROOT WAD INSTALLATION: 1.EXCAVATE A TRENCH A MINIMUM OF TWO TIMES THE WIDTH OF THE TRUNK AND DEEP ENOUGH SUCH THAT 1 3 OF THE ROOTMASS IS BELOW THE CHANNEL BOTTOM AND THAT A FOOTER LOG CAN BE PLACED. 2.PLACE ROOT WAD IN TRENCH, BACKFILL, AND COMPACT. Root Wad Not to Scale BANKFULL BENCH INSTALL ROOT WAD SUCH THAT 1/3 OF THE ROOT WAD MASS IS BURIED BELOW THE CHANNEL BOTTOM (TYP)Section A-A' TO P O F S L O P E ( T Y P ) A A' EROSION CONTROL MATTING 8"-10" BERM 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 3 5.2 4 5.2 Section A - A' TOP OF BANK (TYP) TOE OF SLOPE (TYP) A A' Profile View Plan View Section A - A' STREAMBED FILTER FABRIC EXTEND FILTER FABRIC 5' MIN. UPSTREAMFLOW SILL ELEVATION PER PROFILE (TYP) EMBED LOG 3' (MIN.) SILL ELEVATION PER PROFILE (TYP) HEADER LOG FOOTER LOG SILL ELEVATION PER PROFILE EXCAVATED SCOUR POOL 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL Lunker Log Not to Scale COVER LOG Section A-A' FOOTER LOG BURIED 6" BELOW MAX POOL DEPTH FLO W COVER LOG Plan View TO P O F B A N K ( T Y P ) TO E O F S L O P E ( T Y P ) A A' 2 : 1 1' FOOTER LOG 5' M I N . TRANSPLANT/ BRUSH TOE Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s 2 5.2 TOP OF BANK TRANSPLANTED SOD AND ROOTMASS TOP OF BANK TOE OF SLOPE NOTES: 1.PREPARE THE BANK WHERE THE SOD MAT WILL BE TRANSPLANTED BY RAKING & FERTILIZING. 2.EXCAVATE TRANSPLANT SOD MATS WITH A WIDE BUCKET AND AS MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE. 3.PLACE TRANSPLANT ON THE BANK TO BE STABILIZED. 4.SECURE WITH SOD STAPLES. 5.FILL IN ANY HOLES AROUND THE TRANSPLANT AND COMPACT. 6.ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED. 7.PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT THEY TOUCH. 8.INSTALL EROSION CONTROL MATTING ABOVE TRANSPLANTED SOD MATS. Section View Riffle Installation Plan View Transplanted Sod Mats Not to Scale FLOW TRANSPLANTED SOD AND ROOTMASS 1 5.2 DH J Ju l y 3 1 , 2 0 1 5 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s Live Staking & Juncus Plugs Not to Scale TOP OF BANK LIVE STAKE (TYP) SEE PLAN VIEW FOR SPACING EROSION CONTROL MATTING (SEE DETAIL) Plan View - Small Streams 2' T O 3 ' L I V E S T A K E TA P E R E D A T B O T T O M 1/2" TO 2" DIAMETER Live Stake Detail NOTE: 1.LIVE STAKES TO BE PLANTED IN AREAS AS SHOWN ON PLANS AND DIRECTED BY THE ENGINEER. TOE OF SLOPE JUNCUS PLUG (TYP) 6' - 8' SPACING FOR LIVE STAKES 3' - 5' SPACING FOR JUNCUS PLUGS 3' OUTSIDE TOP OF BANK TOE OF SLOPE Plan View - Large Streams 6' - 8' SPACING FOR LIVE STAKES 3' - 5' SPACING FOR JUNCUS PLUGS 2 - 3' SPACING FOR LIVE STAKES TOP OF BANK TOE OF SLOPE Section View - Large Streams TOP OF BANK EROSION CONTROL MATTING (SEE DETAIL) TOE OF SLOPE JUNCUS PLUG (TYP) Section View - Small Streams LIVE STAKE (TYP) SEE PLAN VIEW FOR SPACING 3' 2 5.3 Bare Root Planting Not to Scale 1 2 3 4 5 6 INSERT THE DIBBLE, OR SHOVEL, STRAIGHT DOWN INTO THE SOIL TO THE FULL DEPTH OF THE BLADE AND PULL BACK ON THE HANDLE TO OPEN THE PLANTING HOLE. (DO NOT ROCK THE SHOVEL BACK AND FORTH AS THIS CAUSES SOIL IN THE PLANTING HOLE TO BE COMPACTED, INHIBITING ROOT GROWTH. REMOVE THE DIBBLE, OR SHOVEL, AND PUSH THE SEEDLING ROOTS DEEP INTO THE PLANTING HOLE. PULL THE SEEDLING BACK UP TO THE CORRECT PLANTING DEPTH (THE ROOT COLLAR SHOULD BE 1 TO 3 INCHES BELOW THE SOIL SURFACE). GENTLY SHAKE THE SEEDLING TO ALLOW THE ROOTS TO STRAIGHTEN OUT. DO NOT TWIST OR SPIN THE SEEDLING OR LEAVE THE ROOTS J-ROOTED. INSERT THE DIBBLE, OR SHOVEL, SEVERAL INCHES IN FRONT OF THE SEEDLING AND PUSH THE BLADE HALFWAY INTO THE SOIL. TWIST AND PUSH THE HANDLE FORWARD TO CLOSE THE TOP OF THE SLIT TO HOLD THE SEEDLING IN PLACE. PUSH THE DIBBLE, OR SHOVEL, DOWN TO THE FULL DEPTH OF THE BLADE. PULL BACK ON THE HANDLE TO CLOSE THE BOTTOM OF THE PLANTING HOLD. THEN PUSH FORWARD TO CLOSE THE TOP, ELIMINATING AIR POCKETS AROUND THE ROOT. REMOVE THE DIBBLE, OR SHOVEL, AND CLOSE AND FIRM UP THE OPENING WITH YOUR HEEL. BE CAREFUL TO AVOID DAMAGING THE SEEDLING. NOTES: 1.ALL SOILS WITHIN THE BUFFER PLANTING AREA SHALL BE DISKED, AS REQUIRED, PRIOR TO PLANTING. 2.ALL PLANTS SHALL BE PROPERLY HANDLED PRIOR TO INSTALLATION TO INSURE SURVIVAL. DIBBLE BAR PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS-SECTION, AND SHALL BE 12 INCHES LONG, 4 INCHES WIDE AND 1 INCH THICK AT CENTER. ROOTING PRUNING ALL ROOTS SHALL BE PRUNED TO AN APPORIATE LENGTH TO PREVENT J-ROOTING. RESTORED CHANNEL BANKFULL BUFFER WIDTH VARIES SPACING PER PLANTING PLAN Section View 12 " - 1 8 " SEED AND PLAN AS PER BUFFER RESTORATION SHEET COMPACTED FILL TO BE COMPOSED OF SOIL AND FREE OF DEBRIS AND BRUSH. OLD CHANNEL TO BE ABANDONED. Ephemeral Pool Not to Scale 3 5.3 4 5.3 DH J Ju l y 3 1 , 2 0 1 5 Erosion Control Matting Not to Scale Section View STAKE (TYP) EROSION CONTROL MATTING (TYP) Plan View ANCHOR TRENCH ON 1' CENTERS TOP OF BANK TOE OF SLOPE TOE OF SLOPE Typical Stake TOP OF BANK SECURE MATTING IN 6" DEEP TRENCH 6' MIN. OVERLAP IN DOWNSTREAM DIRECTION AT MAT ENDS 11" 1" .6" 1.25" 0.4" NOTE: 1.PER SPECIFICATIONS, ALL EROSION CONTROL MATTING SHALL BE COMPOSED OF NATURAL FIBERS. 2.USE 2" X 2" X 18" STAKES AT TOP AND TOE OF SLOPE 1 5.3 18 " 2"2" Typical Top & Bottom Stake 2" DRIVE GALVANIZED 16D NAIL THROUGH STAKE 2" FROM TOP ANCHOR OVERLAP ON 1' CENTERS ANCHORS ON 3' CENTERS ANCHORS ON 1' CENTERS Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s Brush Toe - Tributaries Not to Scale 2 5.4 FLOW A A' Plan View EROSION CONTROL MATTING TOP O F B A N K ( T Y P ) TOE O F S L O P E ( T Y P ) TOE O F S L O P E ( T Y P ) TOP O F B A N K ( T Y P ) DENSELY PACKED WOODY DEBRIS BRUSH MATERIAL TO BE INSTALLED FLUSH WITH BANK TOP OF BANK (BANKFULL) Section A-A' DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL EROSION CONTROL MATTING BACKFILL TOE OF SLOPE 3' NATIVE SOILELEV. 6" BELOW POOL DEPTH ELEV. 6" ABOVE DOWNSTREAM RIFFLE INVERT Brush Toe - UT to South Fork Not to Scale 1 5.4 NOTES: 1.OVEREXCAVATE 3' OUTSIDE OF TOP OF BANK (BANKFULL). 2.INSTALL BASE LOGS PARALLEL TO FLOW AT TOE OF SLOPE. DIAMETER 6"-12". 3.INSTALL BASE LOGS PERPENDICULAR TO FLOW AT INTERVALS ALONG BANK, Z^d/E'KEdKWK&WZ>>>^>K'^͘^>K'^^,>>ϲΗͲϭϮ͟/DdZ͘ 4.INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON-SITE AND SOIL TO FILL ANY VOID SPACE. LIGHTLY COMPACT BRUSH/WOODY DEBRIS LAYER. 5.BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS INSTALLED POINTING SLIGHTLY UPSTREAM. 6.INSTALL FILTER FABRIC OVER BRUSH/WOODY DEBRIS. 7.INSTALL EARTH BACKFILL OVER BRUSH/WOODY LAYER ACCORDING TO TYPICAL SECTION DIMENSIONS. 8.SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. NOTES: 1.OVEREXCAVATE 3' OUTSIDE OF TOP OF BANK (BANKFULL). 2.INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON-SITE AND SOIL TO FILL ANY VOID SPACE. LIGHTLY COMPACT BRUSH/WOODY DEBRIS LAYER. 3.BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS INSTALLED POINTING SLIGHTLY UPSTREAM. 4.INSTALL FILTER FABRIC OVER BRUSH/WOODY DEBRIS. 5.INSTALL EARTH BACKFILL OVER BRUSH/WOODY LAYER ACCORDING TO TYPICAL SECTION DIMENSIONS. 6.SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. FILTER FABRIC Plan View TOP OF BANK (BANKFULL) Section A-A' BASE LOG 4"-6" DIAMETER DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL EROSION CONTROL MATTING BACKFILL DENSELY PACK BRUSH, WOODY DEBRIS AND SOIL IN BETWEEN BASE LOGS BASE LOGS PERPENDICULAR TO FLOW TOE OF SLOPE 2' MIN 3' BRUSH MATERIAL TO BE INSTALLED FLUSH WITH BANK FLOW A A' EROSION CONTROL MATTING TOP O F B A N K ( T Y P ) TOE O F S L O P E ( T Y P ) TOE O F S L O P E ( T Y P ) TOP O F B A N K ( T Y P ) BASE LOGS PARALLEL TO FLOW BACKFILL NATIVE SOIL BASE LOG 6-12" DIAMETER ELEV. 6" BELOW POOL DEPTH ELEV. 1' ABOVE DOWNSTREAM RIFFLE INVERT FILTER FABRIC WIDTH PER TYPICAL SECTIONS 6" WIDTH PER TYPICAL SECTIONS 6" DH J Ju l y 3 1 , 2 0 1 5 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s Permanent Culvert Crossing on UT to South Fork Not to Scale 1 5.5 DH J Ju l y 3 1 , 2 0 1 5 Cross Section View Plan View ROAD CREST 20'VARIESVARIES 6" MIN. BEDDING, #57 STONE 4.00'4.00' 2'2' CREST EL. 565.25'TOP 3" ABC STONE BACKFILL, PLACED IN LIFTS OF 4" TO 6", BORROW EXCAVATION SELECTED BY ENGINEER. NATIVE SOIL BACKFILL 50/50 MIX CLASS A AND CLASS B RIP RAP PER GRADES SHOWN ON PLANS. #57 STONE TO SPRINGLINE EMBED CULVERT 6" BACKFILL WITH 50/50 MIX CLASS A/B RIP RAP MATERIAL. EXISTING CHANNEL GRADE 1 FT 50/50 MIX CLASS A AND CLASS B RIP RAP PER GRADES SHOWN ON PLANS. 48" CMP INV. EL: 564.20' U/S INV. EL: 563.70' D/S 50 1 1 12 TIE INTO EXISTING GRADE AT ELEVATION 568.56' TIE INTO EXISTING GRADE AT ELEVATION 565.92 6"MIN C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE SA F 10 8 + 0 0 INLET STATION 108+61 OUTLET STATION 109+19 ROAD TOP WIDTH = 16.0' 2-48" CMP CULVERTS MAX 2(H):1(V) SIDE SLOPE FROM ROAD CREST TO CULVERT INVERT. SIDE SLOPE TO BE FACED WITH 50/50 MIX CLASS A AND CLASS B RIPRAP. MAX 2(H):1(V) SIDE SLOPE FROM ROAD CREST TO CULVERT INVERT. SIDE SLOPE TO BE FACED WITH 50/50 MIX CLASS A AND CLASS B RIPRAP. Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s WATER DIVERSION CHANNEL MUD MATS SUPPORT LOG ϭϮΗTD/E͘ FILTER FABRIC CLASS B STONENOTE: 1.CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. 2.MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 3.INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 4.MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL. 5.STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 6.CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED. Y X' DIM Temporary Stream Crossing - Mud Mat Not to Scale 1 5.6 DH J Ju l y 3 1 , 2 0 1 5 8" 4" Temporary Silt Fence Not to Scale NOTES: 1.USE WIRE A MINIUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINES OF WIRES WITH 12" STAY SPACING. 2.USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRES AS DIRECTED BY THE ENGINEER. 3.PROVIDE 5' STEEL POST OF THE SELF-FASTENER ANGLE STEEL TYPE. ANGLE STEEL TYPE. WIRE TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. MIDDLE AND VERTICAL WIRES SHALL BE 12 12 GAGE MIN. 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) FILTER FABRIC EXISTING GROUND FILTER FABRIC COMPACTED FILL ST E E L P O S T 2' - 0 " D E P T H EXTEND FABRIC INTO TRENCH 2 5.6 Silt Fence Stone Outlet Not to Scale Front View Cross Section View NOTES: 1. STRUCTURAL STONE SHALL BE (CLASS "B") STONE FOR EROSION CONTROL PURPOSES. 2. SEDIMENT CONTROL STONE SHALL BE NO. 5 OR NO. 57 STONE. 2' SILT FENCE 3' MAX. 1' - 6" MIN. 1' - 6" MIN. STRUCTURAL STONE 2:1 SEDIMENT CONTROL STONE2:1 FLOW 2' Top View SILT FENCE SILT FENCE POST 3 5.6 6' MAX. WITH WIRE ORANGE SAFTY FENCE "T" OR "U" POST DRIVEN MINIMUM OF 18" INTO GROUND ATTACH SAFETY FENCE TO METAL POSTS USING METAL WIRE TIES 4' M I N . 18 " M I N . Safety Fence Not to Scale 4 5.6 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s 5 0 ' 12 ' PU B L I C R O A D CLASS A STONE 8" MIN. DEPTH NOTES: 1.PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. 5.LOCATE CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6.MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY. 7.ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED IMMEDIATELY. 8.USE CLASS A STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. 9.PLACE FILTER FABRIC BENEATH STONE. Construction Entrance Not to Scale 3 5.7 Barbed Wire Fence NCDOT Detail No. 866.04 Not to Scale 4 5.7 A B C 8" 12" 21" 4" 12" 13" 3" 15" 11" 12" 8" 10" 6" 3"3"3" 8" 8" 2 3 4 5 6 7NUMBER OF BARBED WIRE STRANDS STRAND SPACING BRACE POSTS LINE POSTS HORIZONTAL BRACE LENGTH EXPOSED EMBEDMENT LENGTH EXPOSED EMBEDMENT H1 H2 H3 H4 H5 H6 6' - 0" 3' - 5" 2' - 7" 6' - 0" 3' - 5" 2' - 7" 6' - 0" 3' - 5" 2' - 7" 6' - 0" 3' - 5" 2' - 7" 8" - 0" 4' - 11" 3' - 1" 8" - 0" 4' - 11" 3' - 1" 8" - 0" 4' - 11" 3' - 1" 8" - 0" 4' - 11" 3' - 1" 7' - 6" 4' - 11" 2' - 7" 7' - 6" 4' - 11" 2' - 7" 7' - 6" 4' - 11" 2' - 7" 7' - 6" 4' - 11" 2' - 7" 8' - 0"8' - 0"8' - 0"8' - 0"8' - 0"8' - 0" BARBED WIRE FENCE CHART ALTERNATE TYPES OF STAPLES USE ONE #9 STAPLE OR TWO #16 STAPLES AT EACH POINT OF ATTACHMENT. CORNER BRACE h^t,EKZEZE'>/^ϭϱΣKZ'ZdZ END OR GATE BRACES LINE BRACES (MAXIMUM SPACING 330') 1 1 2" MIN 5" x 5" WOOD BRACE POSTS 4"x4" HORIZONTAL TOP BRACE 4 POINT BARBED WIRE SEE CHART FOR STRANDS AND SPACING #9 WIRE TWISTED GROUND LINE 8' - 0" MIN 8' - 0" MIN H3 H2 H1 8' - 0 " M I N 8' - 0" M I N GROU N D LINE #9 W I R E TWIS T E D H3 H2 H1 4"x4" HORIZONTAL TOP BRACE 4 POINT BARBED WIRE SEE CHART FOR STRANDS AND SPACING 5" x 5" WOOD BRACE POSTS 5" x 5" CORNER WOOD BRACE POST H3 H2 H1 H6 H5 H4 8' - 0" MIN14' - 0" TYPICAL SPACING ALL LINE POSTS 4"x4" HORIZONTAL TOP BRACE 4"x4" HORIZONTAL LINE POST 4 POINT BARBED WIRE SEE CHART FOR STRANDS AND SPACING 5" x 5" WOOD BRACE POSTS GROUND LINE #9 WIRE TWISTED DH J Ju l y 3 1 , 2 0 1 5 IMPERVIOUS DIKE (SEE INSET "B") INTAKE HOSE PUMP DISCHARGE HOSE IMPERVIOUS DIKE (SEE INSET "B") 10' X 5' STABILIZED OUTLET USING CLASS B RIPRAP AND NCDOT TYPE 2 FILTER FABRIC. (SEE INSET "C") INTAKE HOSE DEWATERING PUMP DISCHARGE HOSE DEWATERING BAG (SEE INSET "A") SAND BAG (24" X 12" X 6") OR STONE. IMPERVIOUS SHEETING FLOW FLEXIBLE DISCHARGE HOSE FROM PUMP AROUND PUMP HELD IN PLACE WITH SAND BAGS AS NEEDED. 10' MIN. STABILIZED OUTLET USING CLASS B RIPRAP TRENCHED INTO EXISTING GROUND A MINIMUM OF 6". SIZE AND LOCATION TO BE DETERMINED IN THE FIELD BY THE ENGINEER. FILTER FABRIC Inset "C" Stabilized Outlet Plan View Inset "B" Impervious Dike EXISTING TERRAIN DEWATERING BAG STREAM BED FILTER FABRIC 8" of CLASS B RIPRAP 15' to 20' NOTE: 1.PROVIDE STABILIZED OUTLET TO STREAMBED. 10 ' 15' BAG PLACED ON AGGREGATED OR STRAW. HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS. SEWN IN SPOUT HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE. FLEXIBLE DISCHARGE HOSE WATER FLOW FROM PUMP Inset "A" Dewatering Bag A C T I V E W O R K A R E A DEWATERING BAG Pump Around System Not to Scale 1 5.7 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N 00 5 - 0 2 1 4 4 RC P JK T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - D e t a i l s . d w g Ma r c h 7 , 2 0 1 2 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a De t a i l s REMOVE ALL BRUSH AND DEBRIS FROM INSIDE DRIPLINE. 6' WOODEN OR METAL "T" POSTS SHALL BE USED AS STANDARDS. SAFETY FENCE SHALL BE ATTACHED TO STANDARDS TO FORM BARRIER. Section View RADIUS OF TREE PROTECTION BARRIER PER PLANS. NOTES: 1.ALL TREE PROTECTION BARRIERS SHALL BE REMOVED PRIOR TO CONTRACTOR DEMOBILIZATION. 2.SEE PLANS FOR LOCATION OF ALL TREE PROTECTION BARRIERS. Plan View 3' M I N . 3' 3' Channel Plug Not to Scale Section A-A' Plan View EROSION CONTROL MAT 1 1 COMPACTED SELECT MATERIAL CHANNEL BACKFILL SIDE SLOPE PER TYPICAL SECTION P R O P O S E D C H A N N E L A A' BOULDER TOE PROTECTION AS DIRECTED BY ENGINEER FLOW ABANDONED CHANNEL Tree Protection Not to Scale 1 5.8 2 5.8 2" Tube Steel Gate Not to Scale Detail of Gate Post Anchor Access Gate Hinge Assembly GATE POST GATE POST2" PAINTED TUBE STEEL GATE GROUND LINE 4' or 12' 3' MIN 18" MIN 5" GATE POST ANCHOR 5 8" CURVED TO FIT DIAMETER OF FRAME CURVED TO FIT DIAMETER OF BOLT HING Hinge Clamp (2 Required) Bolt Hinge (2 Required) GENERAL NOTES: ALL POSTS AND BRACES MAY BE EITHER ROUND OR SQUARE AT THE OPTION OF THE CONTRACTOR, PROVIDED THE SAME TYPE IS USED THROUGHOUT THE PROJECT. DIMENSIONS SHOWN ARE THE DIAMETER OF ROUND OR EDGE DIMENSIONS OF SQUARE POSTS AND BRACES. ERECT LINE BRACES BETWEEN END, CORNER OR GATE POSTS. PLACE LINE BRACES AT INTERVALS NOT TO EXCEED 300' AN AT THE END OF THE BARBED WIRE ROLL. THE 300' INTERVAL MAY BE REDUCED BY THE ENGINEER ON CURVES WHERE THE DEGREE OF CURVATURE IS GREATER THAN 3 DEGREES. NOTCH BRACE POSTS 1" MINIMUM FOR HORIZONTAL BRACES. PLACE TWO GALVANIZED 12d OR THREE GALVANIZED 10d NAILS AT EACH END OF ALL BRACES. PLACE THE BRACE WIRE AROUND THE POST. DRAW ALL BRACE WIRE TAUT BY TWISTING BETWEEN EACH POST. INSTALL THE FENCE FACING THE PROPERTY OWNER EXCEPT THAT ON ,KZ/KEd>hZs^'ZdZd,Ed,Z'Z^;ϯΣͿ/E^d>> THE FENCE TO PULL AGAINST ALL POSTS. SEE NCDOT STD. 866.02 FOR FENCING AT DITCH CROSSINGS, BREAKS IN GRADES AND R/W BREAKS. USE LATCH DEVICE APPROVED BY THE ENGINEER. HINGE ASSEMBLY AS SHOWN IS SUGGESTED. SUBSTITUTION MAY BE SUBJECT TO APPROVAL BY THE ENGINEER. USED 2" PAINTED STEEL PIPE FOR GATE FRAME EXCEPT AS SHOWN HERE. ANY COMBINATION OF GATE AND FENCE TYPE MEETING THE APPROVAL OF THE ENGINEER IS ACCEPTABLE AND IS NOT LIMITED TO THE EXAMPLES SHOWN HEREON. USE CLASS "B" CONCRETE AT GATE POSTS OR WHERE REQUIRED BY SOIL CONDITIONS. CONCRETE MAY ALSO BE USED IN LIEU OF SETTING POSTS TO THEIR MAXIMUM DEPTH. 3 5.8 DH J Ju l y 3 1 , 2 0 1 5 0'60'120'240' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - F e n c i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k , U T 1 C , & U T 2 Fe n c i n g P l a n 00 5 - 0 2 1 4 4 RC P DH J JK 6. 1 Ju l y 3 1 , 2 0 1 5 Sheet Index 6.3 6.2 6.1 X X X X X X X X X X X X X X X X X X X X X X X X X CECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E CE C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE C E C E C E CE C E CE C E CE CE CE CE CE CE CE CE C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE SAF SAF 39 5 + 7 9 39 6 + 0 0 39 7 + 0 0 3 9 8 + 0 0 3 9 9 + 0 0 4 0 0 + 0 0 401+00 4 0 1 + 6 3 1 0 0 + 0 0 10 1 + 0 0 102+0 0 10 3 + 0 0 104+ 0 0 105 + 0 0 106 + 0 0 107 + 0 0 108+00 109 + 0 0 110 + 0 0 111 + 0 0 112+0 0 113+00 11 4 + 0 0 198 + 9 8 199 + 0 0 200+00 20 1 + 0 0 202 + 0 0 202 + 6 0 29 5 + 1 5 296 + 0 0 29 7 + 0 0 2 9 8 + 0 0 29 9 + 0 0 3 0 0 + 0 0 30 0 + 7 4 TIE PROPOSED FENCE TO EXISTING FENCE LINE INSTALL 5 STRAND BARBED WIRE FENCE 12" OUTSIDE EASEMENT PER DETAIL (TYP) TIE PROPOSED FENCE TO EXISTING FENCE LINE INSTALL 5 S T R A N D BARBED WIR E F E N C E 12" OUTSIDE E A S E M E N T PER DETAIL ( T Y P ) UT TO SOUTH F O R K UT1C UT TO SOUTH FO R K UT TO SOUTH F O R K U T 3 SR 1 5 5 4 CE N T E R C H U R C H R O A D (6 0 ' R I G H T - O F - W A Y ) UT 2 REMOVE EXISTING FENCE WITHIN EASEMENT ONLY INSTALL 12' STEEL TUBE GATE (TYP)REMOVE EXISTING FENCE REMOVE EXISTING FENCE INSTALL 4' STEEL TUBE GATE (TYP) INSTALL 4' STEEL TUBE GATE (TYP) INSTALL 12' STEEL TUBE GATE (TYP) INSTALL 12' STEEL TUBE GATE (TYP) INSTALL 12' STEEL TUBE GATE (TYP) REMOVE EXISTING FENCE INSTALL 5 STRAND BARED WIRE FENCE TO EXISTING FARM ROAD M A T C H L I N E - S T A 1 1 0 + 8 0 0'60'120'240' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - F e n c i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k , U T 3 , & U T 4 Fe n c i n g P l a n 00 5 - 0 2 1 4 4 RC P DH J JK 6. 2 Ju l y 3 1 , 2 0 1 5 Sheet Index 6.3 6.2 6.1 X XXXXXX X XCECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECE C E C E C E C E C E C E C E CE CE CE CE CE C E C E C E C E C E C E C E CECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE SAF 395 + 7 9 39 6 + 0 0 397+00 3 9 8 + 0 0 3 9 9 + 0 0 4 0 0 + 0 0 401+00 4 0 1 + 6 3 49 7 + 8 7 49 8 + 0 0 49 9 + 0 0 5 0 0 + 0 0 501 + 0 0 5 0 1 + 3 8 110 + 0 0 111 + 0 0 112+00 113+00 114 + 0 0 115 + 0 0 116 + 0 0 11 7 + 0 0 118+ 0 0 119+ 0 0 120+ 0 0 121 + 0 0 122+00 123+0 0 295 + 1 5 29 6 + 0 0 297 + 0 0 2 9 8 + 0 0 2 9 9 + 0 0 3 0 0 + 0 0 30 0 + 7 4 INSTALL 5 STRAND BARBED WIRE FENCE 12" OUTSIDE EASEMENT PER DETAIL (TYP) UT TO SOUTH FORK U T 3 UT TO SOUTH F O R K UT 2 UT4 INSTALL 12' STEEL TUBE GATE (TYP) REMOVE EXISING FENCE REMOVE EXISTING FENCE WITHIN EASEMENT ONLY REMOVE EXISTING FENCE WITHIN EASEMENT ONLY INSTALL 5 STRAND BARBED WIRE FENCE TO EXISTING FARM ROAD MA T C H L I N E - S T A 1 1 0 + 8 0 MA T C H L I N E - S T A 1 2 2 + 4 0 0'60'120'240' (HORIZONTAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : 31 2 W e s t M i l l b r o o k R o a d , S t e 2 2 5 Ra l e i g h , N C 2 7 6 0 9 Te l : 9 1 9 . 8 5 1 . 9 9 8 6 Fa x : 9 1 9 . 8 5 1 . 9 9 8 6 Fi r m L i c e n s e N o . F - 0 8 3 1 Da t e : Re v i s i o n s : PRE L I M I N A R Y DO N O T US E F O R CO N S T R U C T I O N T: \ A C T I V E P R O J E C T S ( N C ) \ 0 0 5 - 0 2 1 4 4 M a n e y F a r m \ C a d d \ P l a n s \ 0 2 1 4 4 - F e n c i n g . d w g Ju l y 3 1 , 2 0 1 5 Ma n e y F a r m M i t i g a t i o n P r o j e c t Ch a t h a m C o u n t r y , N o r t h C a r o l i n a UT t o S o u t h F o r k , U T 4 , a n d U T 5 Fe n c i n g P l a n 00 5 - 0 2 1 4 4 RC P DH J JK 6. 3 Ju l y 3 1 , 2 0 1 5 Sheet Index 6.3 6.2 6.1 X X X X X X X X X X X XXXXX X X X X X X X X X X CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CECECECE CE CE CE CE CE SAF SA F SAF SAF 49 7 + 8 7 49 8 + 0 0 49 9 + 0 0 5 0 0 + 0 0 501 + 0 0 5 0 1 + 3 8 121 + 0 0 122+00 123+0 0 1 2 4 + 0 0 1 2 5 + 0 0 126+ 0 0 127 + 0 0 128+00 12 9 + 0 0 130 + 0 0 131 + 0 0 132 + 0 0 132 + 2 4 60 2 + 0 0 60 3 + 0 0 60 4 + 0 0 605 + 0 0 6 0 6 + 0 0 60 7 + 0 0 608+0 0 60 8 + 7 7 INSTALL 5 STRAND BARBED WIRE FENCE 12" OUTSIDE EASEMENT PER DETAIL (TYP) TIE PROPOSED FENCE TO EXISTING FENCE LINE UT TOSOUTH F O R K UT TO SOUT H F O R K UT 5 UT4 INSTALL 4' STEEL TUBE GATE (TYP) REMOVE EXISTING FENCE WITHIN EASEMENT ONLY REMOVE EXISTING FENCE WITHIN EASEMENT ONLY INSTALL 12' STEEL TUBE GATE (TYP) REMOVE EXISTING FENCE WITHIN EASEMENT ONLY MA T C H L I N E - S T A 1 2 2 + 4 0