Loading...
HomeMy WebLinkAbout20231561 Ver 1_5914.4 _Pisgah Church_PCN_10.27.23_20231113Preliminary ORM Data Entry Fields for New Actions ACTION ID #: SAW- Begin Date (Date Received): Prepare file folder Assign Action ID Number in ORM 1. Project Name [PCN Form A2a]: 2. Work Type: Private Institutional Government Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: 4. Property Owner / Applicant [PCN Form A3 or A4]: 5. Agent / Consultant [PNC Form A5 – or ORM Consultant ID Number]: 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location – Coordinates, Street Address, and/or Location Description [PCN Form B1b]: 8. Project Location – Tax Parcel ID [PCN Form B1a]: 9. Project Location – County [PCN Form A2b]: 10. Project Location – Nearest Municipality or Town [PCN Form A2c]: 11. Project Information – Nearest Waterbody [PCN Form B2a]: 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form B2c]: Authorization: Section 10 Section 404 Section 10 and 404 Regulatory Action Type: Standard Permit Pre-Application Request Nationwide Permit # Unauthorized Activity Regional General Permit # Compliance Jurisdictional Determination Request No Permit Required Revised 20150602 Page 1 of 13 PCN Form – Version 1.3 December 10, 2008 Version Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NWP 29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: Pisgah Church Road 2b. County: Guilford 2c. Nearest municipality / town: Greesboro 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: RAK LLC 3b. Deed Book and Page No. multiple, see attached pacel cards in JD Request package 3c. Responsible Party (for LLC if applicable): Mr. Phil Kleinman 3d. Street address: 1801 Carlisle Street 3e. City, state, zip: Greensboro, NC 27408 3f. Telephone no.: 336-580-6401 3g. Fax no.: 3h. Email address: pk@premiersoresinc.com Page 2 of 13 PCN Form – Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Bradley Luckey 5b. Business name (if applicable): Pilot Environmental, Inc. 5c. Street address: PO Box 128 5d. City, state, zip: Kernersville, NC 27285 5e. Telephone no.: 336.708.4997 5f. Fax no.: 5g. Email address: bluckey@pilotenviro.com Page 3 of 13 PCN Form – Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7866690508, 7866691720, 7866693634, 7866695656, 7866686730, 7866691367, 7866693483, 7866695486, 7866694209, 7866696301, 7866685917, 7866681947, 7866589877, 7866681737, and 7866589526 1b. Site coordinates (in decimal degrees): Latitude: 36.13571 Longitude: - 79.79171 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 25 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Jeanette/Richland Lake 2b. Water Quality Classification of nearest receiving water: WS-III, NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The southwestern portion of the site is currently developed with a school. A gasoline station is located on the southeastern portion of the site. Residences are located on the eastern portion of the site. The remainder of the site contains fields and wooded land. The site is located in a commercial/residential portion of Greensboro, Guilford County, North Carolina. 3b. List the total estimated acreage of all existing wetlands on the property: Wetland=0.658 Ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Stream=1,330 3d. Explain the purpose of the proposed project: The purpose of the project is to develop the site with an apartment complex and commercial outparcel. 3e. Describe the overall project in detail, including the type of equipment to be used: The purpose of the project is to develop the site with apartments and commercial outparcel as a storage unit facility. In order to provide access and develop the site with an apartment complex, it is necessary to impact wetlands. Clearing and grading the site is necessary. Graders, haulers, excavators and other heavy equipment will be used during site construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: SAW-2020-01186 Yes No Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): David Brame/MichaelBrame Agency/Consultant Company: Pilot Enviromental, Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. JD pending Page 4 of 13 PCN Form – Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. Impacts to streams/wetlands, outside of those proposed in this application, are not anticipated as a result of the proposed project. Page 5 of 13 PCN Form – Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction Page 6 of 13 PCN Form – Version 1.3 December 10, 2008 Version 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 2f. Area of impact (acres) W1 P T Fill Bottomland Hardwoods Yes No Corps DWQ 0.038 W2 P T Fill Bottomland Hardwoods Yes No Corps DWQ 0.001 W3 P T Fill Bottomland Hardwoods Yes No Corps DWQ 0.011 W4 P T Fill Bottomland Hardwoods Yes No Corps DWQ 0.014 W5 P T Yes No Corps DWQ W6 P T Yes No Corps DWQ 2g. Total wetland impacts 0.064 2h. Comments: Wetland Impact 1 will permanently impact 0.038 acres (1,670 SF) of wetlands with fill. Wetland Impact 2 will permanently impact 0.001 acres (62SF) of wetlands with fill. Wetland Impact 3 will permanently impact 0.011 acres (498 SF) of wetlands with fill. Wetland Impact 4 will permanently impact 0.014 acres (621 SF) of wetlands with fill. Temporary impacts to wetlands are not proposed. Mitigation for unavoidable net loss of wetlands is not proposed. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P T Road Fill/Rip- Rap/Dewatering Unnamed PER INT Corps DWQ 5 61/18/10 S2 P T PER INT Corps DWQ S3 P T PER INT Corps DWQ S4 P T PER INT Corps DWQ S5 P T PER INT Corps DWQ S6 P T PER INT Corps DWQ 3h. Total stream and tributary impacts 61/18/10 3i. Comments: Stream Impact 1 will permanently impact 61 linear feet (305 SF) of stream from culvert/wall fill, permanently impact 18 linear feet (90 SF) of stream from keyed in rip-rap fill and temporarily impact 10 linear feet (50 SF) of stream from dewatering. Temporary impacts will be restored to similar pre-construction grade and stabilized with natural biodegradable matting and herbaceous seed mix. Mitigation is not proposed for the net loss of stream from culvert or sideslope fill. Page 7 of 13 PCN Form – Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number – Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 P T O2 P T O3 P T O4 P T 4f. Total open water impacts 4g. Comments: Open water impacts are not proposed. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Other: Jordan Catawba Randleman 6b. Buffer impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P T Yes No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 6i. Comments: City of GSO will issued buffer authorization certification prior to impacts occuring. Page 8 of 13 PCN Form – Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The site has been designed to avoid impacts to streams and wetlands. The proposed stream impact was selected in a location that the stream is relatively straight with few meanders and does not contain significant amounts of wetlands. Stream Crossing 1 has been designed to utilize rip-rap that will be keyed into existing stream grade, thus not resulting in a net loss of aquatic function to the stream. The applicant has designed utilities to be located within the proposed road crossing footprint, thus reducing temporary impacts to streams. The remaining 1,241 linear feet of stream channel and 0.594 acres of wetlands are being avoided. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The clearing limits will be staked and silt fence or other BMPs will be used. A temporary coffer dam will be installed. During construction, water will be pumped around the construction footprint. Appropriate stream bank protection will be provided in the channel during construction and all excess excavated material will be immediately removed from the crossing area and stockpiled in upland locations. Upon completion of the culvert installation, the temporary sand bag coffer dams will be removed and flow will be diverted through the culvert. Following installation of the culvert, areas of temporary stream impact will be restored to similar pre-construction grade. The stream banks will be matted with biodegradable materials and seeded/live staked with native species. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: warm cool cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 9 of 13 PCN Form – Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 10 of 13 PCN Form – Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 38.4 % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? Certified Local Government DWQ Stormwater Program DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? Greensboro 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Page 11 of 13 PCN Form – Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: A NEPA or SEPA is not required as part of this project. Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Impacts from wastewater generation are not proposed. Page 12 of 13 PCN Form – Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The IPaC report for the site identifies Schweinitz’s sunflower and small whorled pogonia as federally protected species that could be proximate to the project area. The project area contains a mature hardwood/pine forest estimated to be at least 40 years in age. Mid and understory vegetation is densely vegetated. Suitable habitat for Schweinitz's sunflower or small whorled pogonia are not located within the proposed project area. Therefore, we have made a determination of no effect for these species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Based on our knowledge of the site, the site is not located in or near an area designated as essential fish habitat. Best management practices will prevent sediment from entering down-gradient waterbodies which may contain fish. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? We reviewed the SHPO Map (http://gis.ncdcr.gov/hpoweb/) to identify historic and/or archaeological resources of the site. The map does not identify eligible for listing or listed properties on or near the project area. A copy of the map is included as an attachment. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA NHFL (Drawing 4, Verification Package) Bradley S. Luckey, PWS Applicant/Agent's Printed Name _______________________________ Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) 10.27.23 Date WETLANDS IMPACT AREA EXISTING WETLANDS FLARED END SECTIONFES CI CURB INLET GRATE INLETGI YARD INLETYI STORM DRAINAGE PIPE SANITARY MANHOLE STORM MANHOLE SSMH SDMH WATER MAIN CB CATCH BASIN SEAL C 14984 H ENGI SEFO E N A RAO LI REEN L A N OIS N RO P A H C T R R BURT L S P Y JR. , . 2 PISGA H C H U R C H R O A D N O R T H C H U R C H S T R E E T DIXON STREET PAX S T R E E T October 27, 2023 United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: Project Code: 2024-0010238 Project Name: Pisgah Church Road Subject:List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area  contains suitable habitat for any of the federally-listed species on this species list, the proposed action has the potential to adversely affect those species.  If suitable habitat is present, surveys  should be conducted to determine the species’ presence or absence within the project area. The  use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys.   New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 10/27/2023   2    species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws.gov/sites/default/files/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project-related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts, see https://www.fws.gov/program/migratory-bird-permit/what- we-do. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project-related stressors or minimize the exposure of birds and their resources to the project-related stressors. For more information on avian stressors and recommended conservation measures, see https://www.fws.gov/library/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation- migratory-birds. 10/27/2023   3    ▪ ▪ ▪ ▪ We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): Official Species List USFWS National Wildlife Refuges and Fish Hatcheries Bald & Golden Eagles Migratory Birds OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 10/27/2023   4    PROJECT SUMMARY Project Code:2024-0010238 Project Name:Pisgah Church Road Project Type:Residential Construction Project Description:Residential Development Project Location: The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@36.1353004,-79.79116810679766,14z Counties:Guilford County, North Carolina 10/27/2023   5    1. ENDANGERED SPECIES ACT SPECIES There is a total of 4 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. MAMMALS NAME STATUS Tricolored Bat Perimyotis subflavus No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/10515 Proposed Endangered INSECTS NAME STATUS Monarch Butterfly Danaus plexippus No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/9743 Candidate FLOWERING PLANTS NAME STATUS Schweinitz's Sunflower Helianthus schweinitzii No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/3849 Endangered Small Whorled Pogonia Isotria medeoloides Population: No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/1890 Threatened 1 10/27/2023   6    1. 2. 3. CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HAVE EFFECTS ON ALL ABOVE LISTED SPECIES. USFWS NATIONAL WILDLIFE REFUGE LANDS AND FISH HATCHERIES Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA. BALD & GOLDEN EAGLES Bald and golden eagles are protected under the Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act . Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats , should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. The Bald and Golden Eagle Protection Act of 1940. The Migratory Birds Treaty Act of 1918. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) There are bald and/or golden eagles in your project area. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON Bald Eagle Haliaeetus leucocephalus This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https://ecos.fws.gov/ecp/species/1626 Breeds Sep 1 to Jul 31 1 2 3 10/27/2023   7    ▪ ▪ ▪ ▪  no data survey effort breeding season probability of presence PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read the supplemental information and specifically the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence () Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season () Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. Survey Effort () Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data () A week is marked as having no data if there were no survey events for that week. SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eagle Non-BCC Vulnerable Additional information can be found using the following links: Eagle Managment https://www.fws.gov/program/eagle-management Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoiding-and-minimizing-incidental-take-migratory-birds Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.pdf Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/ media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- project-action 10/27/2023   8    1. 2. 3. MIGRATORY BIRDS Certain birds are protected under the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act . Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. The Migratory Birds Treaty Act of 1918. The Bald and Golden Eagle Protection Act of 1940. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON Bald Eagle Haliaeetus leucocephalus This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https://ecos.fws.gov/ecp/species/1626 Breeds Sep 1 to Jul 31 Black-billed Cuckoo Coccyzus erythropthalmus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9399 Breeds May 15 to Oct 10 Cerulean Warbler Dendroica cerulea This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/2974 Breeds Apr 28 to Jul 20 Chimney Swift Chaetura pelagica This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9406 Breeds Mar 15 to Aug 25 Kentucky Warbler Oporornis formosus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9443 Breeds Apr 20 to Aug 20 1 2 3 10/27/2023   9    NAME BREEDING SEASON Prairie Warbler Dendroica discolor This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9513 Breeds May 1 to Jul 31 Prothonotary Warbler Protonotaria citrea This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9439 Breeds Apr 1 to Jul 31 Red-headed Woodpecker Melanerpes erythrocephalus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9398 Breeds May 10 to Sep 10 Rusty Blackbird Euphagus carolinus This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9478 Breeds elsewhere Wood Thrush Hylocichla mustelina This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/9431 Breeds May 10 to Aug 31 PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read the supplemental information and specifically the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence () Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season () Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. Survey Effort () Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data () A week is marked as having no data if there were no survey events for that week. 10/27/2023   10    ▪ ▪ ▪  no data survey effort breeding season probability of presence SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eagle Non-BCC Vulnerable Black-billed Cuckoo BCC Rangewide (CON) Cerulean Warbler BCC Rangewide (CON) Chimney Swift BCC Rangewide (CON) Kentucky Warbler BCC Rangewide (CON) Prairie Warbler BCC Rangewide (CON) Prothonotary Warbler BCC Rangewide (CON) Red-headed Woodpecker BCC Rangewide (CON) Rusty Blackbird BCC - BCR Wood Thrush BCC Rangewide (CON) Additional information can be found using the following links: Eagle Management https://www.fws.gov/program/eagle-management Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoiding-and-minimizing-incidental-take-migratory-birds Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.pdf 10/27/2023   11    ▪Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/ media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- project-action 10/27/2023   12    IPAC USER CONTACT INFORMATION Agency:Private Entity Name:Bradley Luckey Address:743 Park Lawn Court City:Kernersville State:NC Zip:27285 Email bluckey@pilotenviro.com Phone:3367084997 LEAD AGENCY CONTACT INFORMATION Lead Agency:Army Corps of Engineers LEGEND Site Boundary Drawing 1 USGS Topographic Map Lake Brandt and Greensboro, NC Quadrangles Scale: 1” = 2,000’ USGS Topographic Map Pisgah Church Road Approximate 25-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 Drawing 2 USDA Web Soil Survey of Guilford County, NC Scale: 1” = 200' LEGEND Site Boundary Web Soil Map Pisgah Church Road Approximate 25-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 Drawing 2A USDA Published Soil Survey of Guilford County, NC Published 1977, Sheets 15 and 16 Not to Scale Published Soil Map Pisgah Church Road Approximate 25-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 LEGEND Site Boundary Drawing 3 USFWS NWI Wetlands Mapper Scale: 1” = 400' LEGEND Site Boundary Freshwater Emergent Freshwater Forested/Shrub Estuarine and Marine Deepwater Estuarine and Marine Freshwater Pond Lake Riverine Other NWI Map Pisgah Church Road Approximate 25-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 LEGEND Site Boundary Drawing 4 National Flood Hazard Layer From FEMA Web Map Service Scale: 1” = 800' FEMA FIRM Pisgah Church Road Approximate 25-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 WG DP-1 FLAG NUMBERS/INFORMATION WETLAND FLAGS = STREAM FLAGS = Wetland Flags = 76 Stream Flags = Flagged at origins and intersections; surveyor locate Drawing 5 2020 Satellite Imagery from ESRI and Pilot GPS Data Scale: 1” = 200' Date: 7.8.21 Wetland Map Pisgah Church Road Approximate 24.9-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 TRACT A: THE LOCATIONS OF FEATURES SHOWN WERE VERIFIED BY MR. DAVID BAILEY WITH THE USACE AND MS. SUE HOMEWOOD WITH THE NCDEQ-DWR ON AUGUST 5, 2020. DELINEATION CONDUCTED BY PILOT PERSONNEL 6/30/20. TRACT B: THE FEATURES DEPICTED HAVE NOT BEEN VERIFIED BY THE USACE AND ARE SUBJECT TO CHANGE. DELINEATION CONDUCTED BY PILOT PERSONNEL 6/30/21. THIS MAP INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. LEGEND Site Boundary Pond Intermittent Stream Perennial Stream Wetland Data Point Flag Number/Feature ID DP-1 WA 1-5 USACE PJD Area WG DP-2 USACE AJD Area WG DP-1 FLAG NUMBERS/INFORMATION WETLAND FLAGS = STREAM FLAGS = Wetland Flags = 76 Stream Flags = Flagged at origins and intersections; surveyor locate Drawing 5 2020 Satellite Imagery from ESRI and Pilot GPS Data Scale: 1” = 200' Date: 7.8.21 Wetland Map Pisgah Church Road Approximate 0.10-Acre Tract Greensboro, Guilford County, NC Pilot Project 5914.1 TRACT A: THE LOCATIONS OF FEATURES SHOWN WERE VERIFIED BY MR. DAVID BAILEY WITH THE USACE AND MS. SUE HOMEWOOD WITH THE NCDEQ-DWR ON AUGUST 5, 2020. DELINEATION CONDUCTED BY PILOT PERSONNEL 6/30/20. TRACT B: THE FEATURES DEPICTED HAVE NOT BEEN VERIFIED BY THE USACE AND ARE SUBJECT TO CHANGE. DELINEATION CONDUCTED BY PILOT PERSONNEL 6/30/21. THIS MAP INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. LEGEND Site Boundary Pond Intermittent Stream Perennial Stream Wetland Data Point Flag Number/Feature ID DP-1 WA 1-5 WG DP-2 USACE PJD Area USACE AJD Area From:Heather LaGamba To:"401PreFile@ncdenr.gov" Subject:Pre-File Notice - Pisgah Church Road (5914.4) Date:Wednesday, October 11, 2023 4:18:26 PM We would like to submit a Pre-filing Notice for the following project: Project Name: Pisgah Church Road (5914.4) Project Owner: Premier Stores, Inc. Project Owner’s Address: 7609 Business Park Drive, Greensboro, North Carolina 27409 Project County: Guilford Type of project/Approval Sought: 401 WQC, Pre-Application Request Meeting Declined Thank you and have a wonderful day! Sincerely, Heather LaGamba 336.345.9536 (c) 336.310.4527 (o) P.O. Box 128 Kernersville, NC 27285 www.pilotenviro.com hlagamba@pilotenviro.com