Loading...
HomeMy WebLinkAbout20231357 Ver 1_USACE Correspondence_20231020Chandler, Rebecca D From: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil> Sent: Friday, October 20, 2023 4:37 PM To: george@americanlandconcepts.com; Laura.Rudolf@Williams.com Cc: Chandler, Rebecca D; Homer, Seren M Subject: [External] NWP-18 Provisional Verification for SAW-2023-01947 (Cardinal Pipeline ROW / Trib to Haw River / Challenge Dr and Lake Point Dr / Graham NC/ Alamance County) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. 22 This is a provisional notification that your proposed work may be authorized by the above -referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. As stated above, this is a provisional notification. This email does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a permit from the state (e.g., NCDWR) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. For NCDWR: Within 14 days, please notify me if the certification request does not contain the nine (9) components listed in Section 121.5(b) of the 2020 Clean Water Act Section 401 Certification Rule; otherwise, we will consider our receipt date (10/2/2023) as accurate. As specified in the 9/16/2022, Programmatic Agreement (PA) between the USACE and the NCDWR, the reasonable period of time (RPOT) for DWR to act on a Section 401 certification request is 120 days unless the RPOT is extended per the terms of this PA. As such, unless we receive an email request for an extension of the RPOT, the USACE will consider the Section 401 certification for this project to be waived on 1/30/2024. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Respectfully, Julia Julia Tillery (she/her) Regulatory Specialist, Raleigh Field Office CE-SAW-RG-R U.S. Army Corps of Engineers — Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919.440.1951 Email: julia.a.tillery@usace.army.mil From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Monday, October 2, 2023 10:13 AM To: george@americanlandconcepts.com Cc: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil> Subject: SAW-2023-01947 (Cardinal Pipeline ROW / Trib to Haw River / Challenge Dr and Lake Point Dr / Graham NC/ Alamance County) Good Morning, Your Pre -Construction Notification (PCN) NWP request has been received, assigned action ID SAW-2023-01947 and forwarded to Julia Tillery for further processing. Please refer to the action ID in all correspondence. Thank you, Josephine Schaffer From: laserfiche.ncdenr.gov@mccicloud.io <laserfiche.ncdenr.gov@mccicloud.io> Sent: Thursday, September 28, 2023 6:02 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Alamance - Non -DOT A new project has been received on 9/28/2023 5:59 PM for Cardinal Pipeline ROW @ Trib to Haw River. The link below will take you to the project folder. https://edocs.deg.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2979583;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.