Loading...
HomeMy WebLinkAbout20230797 Ver 1_RPOT Request_20231117From: Snider, Holley To: Mickey Suaa; Hair, Sarah E SAW Cc: Rogers, Richard E; Pietraj, Michael; Goss, Stephanie; Harrison, James A; Behm, Pamela; Boyd, Jacob B Subject: West Carteret County Boat Launch (DWR Project#20230797 & USACE SAW#2019-02188) Date: Friday, November 17, 2023 12:07:00 PM Attachments: 20230797 Ver 1 Other Aaency Correspondence 20230929.pdf Good afternoon Liz and Mickey, DWR received the CAMA major permit application for the West Carteret County Boat Launch in accordance with 15A NCAC 02H .0502 (b) on 6/5/2023 which started the 60-day State review clock, additional information was requested on 8/3/23 (attached), a partial response to the DWR RFAI was received on 9/1/23. The DWR RFAI requested additional information on the model used to conduct the flushing analysis, including a flushing modeling plan be provided to DWR for approval. DWR Basin Planning and Branch staff have reviewed the information and cannot approve the model that was provided. DWR has requested a meeting with the applicant and consultant to discuss the flushing model requirements and concerns listed in the attached email. Once a flushing model has been provided that can be approved by DWR, the model will need to be run, the results analyzed and reports reviewed by DWR Basin and Planning Branch staff. DWR's request for additional information referenced Division of Marine Fisheries (DMF) memorandum dated 6/21/2023 which outlined concerns, suggestions and requested additional clarification and information on the project. A response to the DMF memo was received on October 16, 2023. A technical discussion was held on October 27, 2023 with the state resource agencies to discuss the response to the DMF and DWR RFAls and outstanding resource concerns. Specific concerns were raised regarding the proposed mitigation plan including private ownership of the proposed mitigation site and lack of authority to conduct the mitigation as proposed. Based on the information above, DWR is requesting an extension to the federal reasonable period of time to the review the project. DWR requested and was granted an extension to the federal reasonable period of time for review to December 1, 2023. However, Per state rule 15A NCAC 02H .0507 (a) the 60 day State clock for DWR to take action does not restart until DWR receives all of the information requested. Given the flushing model has not been approved, modeling has not been conducted and reports not reviewed, combined with unresolved resource agency concerns, DWR is requesting an extension to federal reasonable period of time to review the project be extended to April 1, 2024. 1 thank you in advance for your consideration and feel free to call or email me if you have any questions. Sincerely, Holley Snider - Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 *please note my email address has changed holley.snider6Ddeq.nc.gov* D_E P9pM1ne1N al E�nIT19a�11 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties