HomeMy WebLinkAbout260007_Routine Inspection_20231113Type of Visit: AQF Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: "Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: //Q/ 3 ,p Arrival Time: /� ��9/r1 Departure Time: D ; UD . County: rr� eegion:
Farm Name: ,/�c�(�Gay A/e o 6L11 Owner Email:
Owner Name: A % Phone:
Mailing Address:
Physical Address:
Facility Contact: I Title:
OnsiteRepresentative: /I
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Phone:
Integrator:
Certification Number: '2_ U07 %
Certification Number:
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
❑ Yes AIo ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes ❑ No
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes 'j2'No ❑ NA ❑ NE
❑ Yes CgNo ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: - Q Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑ No
❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in): C2
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes -ErNo
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes .rNo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes Q"No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes ETNo
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes 25'No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes ETNo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes JEJ Ro
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ
those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
❑ Yes ffNo ❑ NA ❑ NE
❑ Yes [3'No ❑ NA ❑ NE
❑ Yes k3-No ❑ NA ❑ NE
17. Does the facility lack adequate acreage for land application?
❑ Yes MNo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes Fq-No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes �No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes .®'Clo
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes PNo
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather
Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
[j Yes z.E]"No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes e'iQo
❑ NA
❑ NE
Page 2 of
511212020 Continued
Facility Number: -
Date of Inspection: <�
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes La No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes L2No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
❑NA ❑NE
❑ NA ❑ NE
❑ Yes
P�No
❑ NA
❑ NE
❑ Yes
[3`�o
❑ NA
❑ NE
❑ Yes
❑'&o
❑ NA
❑ NE
❑YesIo ❑NA ❑NE
❑ Yes AE:r o ❑ NA ❑ NE
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ,❑'No
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E!fNo
34. Does the facility require a follow-up visit by the same agency? [—]Yes E3�/No
i
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
❑NA ❑NE
❑NA ❑NE
❑ NA ❑ NE
❑NA ❑NE
Phone:
Date:
Page 3 of 3 511212020