HomeMy WebLinkAboutNCG050286_CEI_20230927 ' diu.STATE q,
ROY COOPER o$�
Governor Pt -
ELIZABETH S.BISER ,.,•
Secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
November 1, 2023
Cascades Moulded Pulp
Attn: Jaime Mendoza, Plant Manager
P.O. Box 609
Rockingham, NC 28380
Subject: COMPLIANCE EVALUATION INSPECTION
NPDES Stormwater General Permit NCG050000
Cascades Moulded Pulp, Certificate of Coverage NCGO50286
Richmond County
Dear Mr. Mendoza:
On September 27, 2023, a site inspection was conducted for the Cascades Moulded Pulp facility located
at 112 Cascades Way, Rockingham, Richmond County, North Carolina. A copy of the Compliance
Inspection Report is enclosed for your review. Your time and assistance was greatly appreciated. The site
visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit
NCGO50000 under Certificate of Coverage NCG050286. Permit coverage authorizes the discharge of
stormwater from the facility to receiving waters designated as Falling Creek(Hinson Lake,Great Falls Pond),
a class C waters in the Yadkin- Pee Dee River Basin.
As a result of the inspection, the facility was found to be compliant with the conditions of the NCG050000
permit. Please refer to the enclosed Compliance Inspection Report for additional comments and
observations made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to$25,000 per day for each violation. If you or your staff have any questions,
comments, or needs assistance with understanding any aspect of your permit, please contact myself at
(910) 433-3384 or via e-mail at melissa.iovner0deo.nc.aov Kelly Jonas may also be contacted at (910)
433-3389 or via e-mail at kellv.ionasna.dec.nc.aov
Sincerely,
,L,*/ /
Melissa Joyner
Environmental Senior Specialist
DEMLR
Enclosure: Compliance Inspection Report
ec: DEMLR NPDES Stormwater Permit Laserfiche File
cc: FRO—DEMLR, Stormwater Files
�-1,, North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
D_E QJ� Fayetteville Regional Office 1 225 Green Street.Suite 7141 Fayetteville,North Carolina 28301
910.433.3300
Compliance Inspection Report
Permit:NCG050286 Effective: 06/01/23 Expiration: 05/31/28 Owner: Cascades Moulded Pulp
SOC: Effective: Expiration: Facility: Cascades Moulded Pulp
County: Richmond 112 Cascades Way
Region: Fayetteville
Rockingham NC 28380
Contact Person:Paul Landry Title: Plant Manager Phone: 910-997-2775
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Corporate Responsible Official Jaime Mendoza 910-997-2775
On-site representative Jaime Mendoza 910-997-2775
Related Permits:
Inspection Date: 09/27/2023 Entry Time 12:30PM Exit Time: 02:10PM
Primary Inspector:Melissa A Joyner" '°ye16( v' �' `/�"� Phone:
Secondary Inspector(s): 1 /
Kelly Jonas K
Reason for Inspection: Routine 1\ Inspection Type: Compliance Evaluation
Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
permit: NCGO50286 Owner-Facility:Cascades Moulded Pulp
Inspection Date: 09/27/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Melissa Joyner and Kelly Jonas met with Jamie Mendoza, Plant Manager of the Cascades Moulded Pulp facility. The
Stormwater Pollution Prevention Plan (SWPPP)was reviewed and appeared to be mostly in accordance with the conditions
of NPDES General Permit NCG050000. Since Mr. Mendoza is the new Plant Manager a Permit Contact Update Request
Form will need to be completed and submitted on-line. The Site Map should be updated by including a north arrow,
topography, labeling for the drains, a delineation of each drainage area of the outfalls and a table of impervious percentage
for each drainage area.The Spill Response Team data should be updated. The facility did not have solvents, therefore this
information must be certified in the SWPPP. Documentation of annual employee training will need to be included in the
SWPPP. The facility inspections will need to be conducted on a quarterly basis per conditions of the new General Permit
NCG050000 (effective June 1, 2023). Analytical and Qualitativie Monitoring will also need to be conducted on a quarterly
basis. Discharge Monitoring Reports (DMR's)will need to uploaded electronically within 30 days of conducting Analytical
Monitoring. To register for eDMR(electronic Discharge Monitoring Reports) please go to the following link:
https://www.deq.ne.gov/abouttdivisions/energy-mineral-and-land-resources/stormwater/stormwater-program/
npdes-ind ustrial-program/stormwater-electronic-discharge-monitoring-reports-edmr
The facility grounds were inspected and appeared orderly.All Above Ground Storage Tanks are located inside of the facility.
An on-site rain gauge will need to be installed. Ph will need to be recorded with a calibrated Ph meter within 15 minutes of
collecting the water sample.
Page 2 of 3
Permit: NCGO50286 Owner-Facility:Cascades Moulded Pulp
Inspection Date: 09/27/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑
#Does the Plan include a General Location(USGS)map? 0 ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ 0 ❑
#Does the Plan include a BMP summary? 0 ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑
#Does the facility provide and document Employee Training? ❑ 0 ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
#Is the Plan reviewed and updated annually? ❑ M ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment:
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ 0
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑
Comment: NPDES General Permit NCG050000 became effective June 1 2023 The facility is still within
the grace period for compliance.
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ M ❑ ❑
#Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
#If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ ❑
Comment:
Page 3 of 3