Loading...
HomeMy WebLinkAbout20221617 Ver 2_DWR RAI_Nov2023 Supporting Docs_20231116E U U ❑ -6 0_ 0 U) M 6 N C O C N C � a� � II (UM O to c O E O O N > 0 U _O wcf) �U m � o C:) U CDz CO L� CO (D � N did 22.0 . / / x / / I / / qr 16 RIP Ar �- / I. WIL 07 / r # BLOCK F TOTAL: 7.89 AC DEVELOPABLE AREA 1.13 AC / BLOCK H TOTAL: 12.82 AC • +/ / / / ,� _ `\ DEVELOPABLE AREA 12.17 AC / BLOCK K TOTAL: 2.32 AC _ BAWDY CREEK - - '\ BLOCK L TOTAL: 3.36 AC LL DEVELOPABLE BLOCK A AREA 1.10 AC STREAM AND BUFFER BUFFER IMPACTS APPROVED BLOCK M TOTAL: 8.19 AC Al / / IMPACTS / UNDER SEPARATE PERMIT BLOCKN TOTAL: 27.97AC 3.79 AC / j� / 15 DEVELOPABLE AREA 12.19 AC WETLAND IMPACT APPROVED \ BLOCK O TOTAL: 62.00 AC o 19.00AC // // .. UNDER SEPARATE PERMIT \ DEVELOPABLE AREA 60.19AC z BLOCK P TOTAL: 51.50 AC O z DEVELOPABLE AREA 43.11 AC > >N UJ W ROADWAY COMMON AREA 16.67 AC z E_ / / 30'SETBACK TOTAL SITE AREA 307, 17 AC o I _ _ o o I \, �'\ TOTAL DEVELOPABLE AREA 212.37 AC 11.41 AC // - ------ 9 uy Zoo, MULTI -FAMILY - PROVIDE I \ CU TRACT NCE < / \ BLVD. I I ` 15.49 ACRES a / J - -- 0 0.843 ACRES OF - r 1 �, \ O o ' -_ �� I ° I \ N M � LC) CO � W BUFFER IMPACT. t -- F B a �I � s� =� PROr��� F I 62.00 AC a) CD , 339 LF OF STREAM ®®� �E e10 �, ( 1 13.17 AC / , �""� IL X I N SITE DEVELOPABLE AREAS CIO) ,I 000-0 Q - - - - BLOCK A TOTAL. 19.00 AC LLJ Z DEVELOPABLE AREA 17.35 AC - -JP LJJ w BLOCK A 1 TOTAL: 3.79 AC UJ Z z - F 1# z J BLOCK B TOTAL: 13.17 AC 4= - Q U z ui I I U U BLOCK C TOTAL: 54.46 AC DEVELOPABLE AREA 51.64 AC LLI - 3 � w tn BLOCK D TOTAL: 6.62 AC J BLOCK E TOTAL: 17.41 AC LL Q DEVELOPABLE AREA 13 49 AC I M PACTS . ^/V� i�� FUTURE 7.89 AC / OQ - �� \ DEVELOPMENT - ° D \ 202ACRE5 � I II II I a / 12.82 AC I 7/ ��/i �I BLOCK E STREAM AND / _ M / �� _wqa I. I / 3.62 AC C it M I I L I I BUFFER IMPACTS _ ' �i \� ,, 2 i II :::: i ,J WET POND C1 i II %(( r• 54.46Ac ( \\ LLLj Ir BUFFER IMPACTS I - 0 I MEMO 8D i SETBACK cz \\ verso - �Row)�5 - L 1 AI -_ -� AC 41 WET POND C2 51.50 AC 8 E BUFFER IMPACTS E sr \` X. wry G'�' I jGywgY 8.19AC (ro--- 8C �ow) _ co 8B-------- 2.32 AC 8A 13 o - \ -- / (6 X Gywq y',�, Row) 11 " 4, I � ; ------------ I i l L r i \ I � � I i THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. Wetland a Area (SF) permanent Impacts (SF) Permanent Impacts (AC) temp Impacts (SF) temp Impacts (AC) Obtained Jurisdictional Det. (yes/no) 1 (previously approved) 465,276 19,024 0.437 0 0.00 YES 1A 25,903 0.595 0 0.00 2 28,444 3,495 0.080 0 0.00 YES 3 687,436 33,407 0.767 0 0.00 YES 4 236,601 18,874 0.433 0 0.00 NO 15 25,855 1,163 0.027 0 0.00 YES 13 3,408 616 0.014 0 0.00 YES Subtotal Eastfield -Adventure 1,447,020 85,495 2.353 0 0.00 8A 23,022 16,891 0.388 0 0.00 YES 813 16,788 4,195 0.096 0 0.00 8C 5,341 5,341 0.123 0 0.00 8D 3,887 160 0.004 0 0.00 8E 272 0.006 0 0.00 8F 2,659 2,659 0.061 0 0.00 Subtotal Selma 51,697 29,518 0.678 0 0.00 Total 1,498,717 115,013 3.031 0 0.00 5 (non -Jurisdictional) 9,612 9,612 0.221 0 0.00 YES L 3.36 AC PROPOSED JURISDICTIONAL STREAM IMPACT TABLE DESCRIPTION LENGTH (LF) AREA (SF) AREA (AC) M PACT F 97 1,783 0.041 IMPACT G 202 5,805 0.133 OUTFALL Al 10 62 0.001 OUTFALL A2 10 35 0.001 OUTFALL C1 10 26 0.001 OUTFALL C2 10 24 0.001 OUTFALL E1 10 77 0.002 OUTFALL E2 10 112 0.003 OUTFALL E3 10 115 0.003 OUTFALL E4 10 107 0.002 BUFFER IMPACT ZONE 1 (SF) ZONE 2 (SF) TOTAL (SF) BLOCK A - BASIN (GRAD ING/REVEGETATION) O 9,270 9,270 BLOCK C - WET POND C1 OUTFALL 630 420 1,050 BLOCK C - WET POND C2 OUTFALL 600 400 1,000 BLOCK E - OUTFALLS AND ROAD 13,197 6,944 20,141 CROSSINGS BLOCK E - EXISTING IMPACTS (EXISTING ROAD) 7,700 8,873 16,573 TOTAL 22,127 25,907 48,034 _] SITE LEGEND BAWDY CREEK WETLANDS IMPACTED WETLANDS NORTH GRAPHIC SCALE 0 150 300 600 ( IN FEET) 1 inch = 300 ft. U J Z W CW G O O J J W W > > W W oo p WN w J =D LU 61� !!~^^ vJ p co Lf� O1 LL �^QzwWQz % 0 ` O N �./ / : I_ > LQ Q r UJ Q ♦�� v J W= W 0- Q OC/) UJ EX -MASTER WETLAND MAP Project Number:46118-0000 Drawing Scale: 1" = 300' Date Issued: NOV 2023 1200 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS B BE C E O O 0 a a a c U M '0 N O � N Q7 a) II m � � o o to C Q 0 ow -O Y N w Fn �@ �-a oCU O E oa Na M d CO C� o II N (� c� II LLO 0 L m a CLE 22.0 -,, r' 71>7 L — 171' L�\\��\ �ry���\� \ QQ VO I �Mo �� II r 171 PROPOSED BUFFER IMPACT TABLE SCRIPTION LEGEND AREA (SF) AREA (AC) )NE 2 BUFFER TU RAL I M PACT 6,944 0.159 )NE 1 BUFFER TU RAL I M PACT 13,197 0.303 EXISTING BUFFER IMPACT TABLE SCRIPTION LEGEND AREA (SF) AREA (AC) )NE 2 BUFFER TU RAL I M PACT 8,783 0.202 )NE 1 BUFFER TU RAL I M PACT 7,700 0.177 INSET A SCALE: 1" = 50' ITHE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. SWIM POND A2 INCFT R SCALE: 1" = 50' SITE MAP SCALE: 1" = 500' PROPOSED OUTFALL A2 TOP OF BANK (TYP. ) PROPOSED JURISDICTIONAL STREAM IMPACT TABLE DESCRIPTION LEGEND LENGTH (LF) AREA (SF) AREA (AC) IMPACT F 97 1,783 0.041 IMPACT G 202 5,805 0.133 OUTFALL Al 10 62 0.001 OUTFALL A2 10 35 0.001 OUTFALL E1 10 77 0.002 OUTFALL E2 10 112 0.003 OUTFALL E3 10 115 0.003 OUTFALL E4 10 107 0.002 I__LLL LL Q 0 W `� z Wa W W LLIzz � z W J Q > z� (� LLw W U W J J D LL Q O W of O > ~ W w O U 0 LL1 0- 0 Lu wN LL I 1 1 I I 1 1 O� N M I M CD rl- O Z O O O O O O O O 0 co N O U z z W W 0 O J J W W > > W W 00 0 WN IJJ J cn ~CO Lid LL 0L0 O N O LL` EDW Qz Qz aa>�a Q�_J LU W=u)o- Of oCn _J BLOCK E - STREAM IMPACT EXHIBIT NORTH Project Number:46118-0000 GRAPHIC SCALE Drawing Scale: 1"=50' Date Issued: NOV 2023 0 25 50 100 200 Index Number: -- Drawn By: SMP Checked By: ANS IN FEET) Project Manager: JS ( 1 inch = 50 ft. EX - 8A 3 a m x w F- U Q d Q w ry w Y U O J In am m N 0 3 0 c C N E 7 O O o� a Q a c In M '0 N C O O N_ Q7 a) II m � �o o C Q 0 ow -O Y N C N ccO— W (n �@ �-a oCU O E oQ N o_ U M a)7� 2 M d M C� o II N (D c� C� a) u LL 0 L m a ado_ 22.0 _E 170 160 170 RIP RAP APRONS TO BE INSTALLED UPSTREAM AND DOWNSTREAM OF CULVERT. EMBED RIP RAP TO MAINTAIN EXISTING CHANNEL INVERT w ,J 0 0+00 1+00 2+00 2+25 0+00 IMPACT F PROFILE PROFILE (B-B) HORIZONTAL SCALE: 1" — 50' VERTICAL SCALE: 1" = 10' •,� J 170 160 EXISTING GRADE 2.07% PROPOSED ROAD PROPOSED CULVERT EXISTING CHANNEL 0.21 % 0000 � C N CO � 0 ( s 0 � or` ti 0+00 IMPACT G PROFILE PROFILE (D-D) HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 10' 1+00 IMPACT F SECTION PROFILE (A -A) HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 10' • 170 160 0 2+00 N 1+00 PROPOSED ROAD -- — — -- EXISTING GRADE PROPOSED CULVERT RIP RAP APRONS TO BE INSTALLED UPSTREAM AND DOWNSTREAM OF CULVERT. EMBED RIP RAP TO MAINTAIN EXISTING CHANNEL INVERT C.0 — 0 I CO c N O r- 0 o M IMPACT G SECTION PROFILE (C-C) HORIZONTAL SCALE: 1 " = 50' VERTICAL SCALE: 1" = 10' ITHE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. 1 +00 1 +80 � ) IL Q � wzZ wOf W W LLIz(3 z z W Q J zU (� w W U ry W J J LL Q Of O w z O TC/) >I-_ ww O U 0 LL1 0- 0 Lu W N C7 00 Z O O O O O OCO Of� O 4) i co N O N U 1 L Z W W O O J J W W > > W W 00 0 WN w J cn ~ W LL 0` %oL0 O N O �Qz ED LLJ a Q�_J ai LU �Qz a W=� �Q oU) _J BLOCK E - STREAM IMPACT EXHIBIT Project Number:46118-0000 GRAPHIC SCALE Drawing Scale: AS SHOWN Date Issued: OCT 2023 0 25 50 100 200 Index Number: -- Drawn By: SMP Checked By: ANS IN FEET) Project Manager: JS ( 1 inch = 50 ft. EX-8B ROY COOPER Governor ELIZABETH S. BISER Secretary MARC itECKTENWALD Director Kevin Dougherty Eastfield Associates, LLC 101 S. Raiford St Selma, NC 27576 Project: Eastfield NORTH CAROLINA Environmental Quality November 13, 2023 Expiration of Acceptance: 5/13/2024 County: Johnston The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in - lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. Based on the information supplied by you in your request to use the DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin Impact Location 8-di it HUC Impact Type Impact Quantity Neuse 03020201 Riparian Wetland 3.56 Neuse 03020201 Warm Stream 267 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly.Williams@deq.nc.gov. Sincerely, FOR James. B Stanfill Deputy Director cc: Jeff Harbour, agent North Carolina Department of Environmental Quality I Division of Mitigation Services fk; C0.R[71 IRAAEQ 217 west Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652 do.t.—M EP7... a f `� 919.707.8976 WILD HOLDINOGs Neuse Stream and Wetland Credits Statement of Availability August 28, 2023 Eastfield Associates, LLC Attn: Kevin Dougherty 101 S. Radford Street Selma, NC 27576 RE: Availability of Stream and Riparian Wetland Credits for the "Eastfield Development" project Bank Name: Falling Creek Umbrella Mitigation Bank Bank Sites: McClenny Acres II Mitigation Site Bank Sponsor: Wildlands Holdings III, LLC USACE Action ID No.: SAW-2017-00552 Permittee: Eastfield Associates, LLC Riparian Wetland Credits Needed: 3.56 acres Riparian Wetland Credits Available: 1.01 acres Neuse 03020201 River Basin Dear Mr. Dougherty, Wildlands Holdings III, LLC, owned and operated by Wildlands Engineering, Inc., currently has sufficient stream and riparian wetland credits from the Falling Creek Umbrella Mitigation Bank: McClenny Acres II Mitigation Site to partially satisfy the stream and/or wetland mitigation requirements related to the above -mentioned project. The project is located within the Neuse River Basin of the service area (HUC 03020201) of the Bank. This letter is simply a statement of availability of credits as of the date written. It is neither a guarantee of future credit availability, nor a guarantee of credit pricing. Credits are sold on a first come, first serve basis at the Bank's price at the time an invoice is requested. Invoices reserve both the credits and the price for a period of 30 days. Credits and associated pricing may be reserved for up to 6 months with a signed reservation agreement and a 10% deposit. Final transfer of the credits will be made upon receipt of a copy of the US Army Corps of Engineers Compensatory Mitigation Responsibility Transfer Form approving the Stream and/or wetland mitigation purchase from the Bank and upon receipt of your payment to Wildlands Holdings III, LLC. We appreciate the opportunity to assist you with your mitigation requirements. Please contact me at (704) 332- 7754 x114 or cbrunick@wildlandseng.com if you have any questions or need any additional information. Wildlands Holdings III, LLC • Wildlands Engineering, Inc • 1430 South Mint Street, Suite 104, Charlotte, NC 28203 WILD HOLDINOGs Sincerely, Camden M. Brunick Wildlands Engineering, Inc. Mitigation Credit Sales cbrunick@wildlandseng.com 0: (704) 332-7754 ext. 114 M: (919) 219-6162 Cc: Mr. Chris Hopper, Regulatory Agent I USACE Mr. Robert Turnbull, Department Manager I Terracon Wildlands Holdings III, LLC • Wildlands Engineering, Inc • 1430 South Mint Street, Suite 104, Charlotte, NC 28203 G AT E WA YY C-46118-0006 On Call. On Time. On Target. November 2023 Eastfield Retail Block A-E 101 US Highway 70-A E Selma, North Carolina PREPARED FOR Eastfield Associates, LLC. 109 Zeta Drive Pittsburgh, PA N CA �RO SEAL = 056472 _ �vOs'�NGIN���' SUBMITTED BY Lindsay E. Appel The Gateway Engineers, Inc. 100 McMorris Road Pittsburgh, PA 15205 412.409.2313 PHONE 412.921.9960 FAX www.gatewavengineers.com ciubic(d)gatewayengineers.com REVIEWED BY Joshua M. Scanlon, P.E. TABLE OF CONTENTS Executive Summary 1 Methodology 1-2 Pre -Development Conditions 2 Post -Development Conditions 2 Stormwater Management Facilities 3-4 Storm Sewer System 5 Off -Site Discharge Analysis 5 Conclusion 5 TABLE OF APPENDICES USGS Location Map Appendix A Soils Survey Map Appendix B Pre and Post Drainage Area Maps Appendix C Hydraulic Calculations Appendix D Wet Pond Design Worksheets Appendix E Outlet Protection Calculations Appendix F Eastfield Retail Block C PCSM Report EXECUTIVE SUMMARY Eastfield Associates, LLC, is proposing to commercially develop a retail property located east of 1-95 and north of US Hwy. 70 in Johnston County, Selma, North Carolina. The site is largely flat, but all runoff from the site eventually drains east and west to Bawdy Swamp, a source to Bawdy Creek, which is within the Neuse River Basin. Per the Town of Selma zoning map, the site is zoned Interstate Business (IB). It does not fall within a FEMA designated flood zone. The total project acreage and disturbance for this project is 43.5 acres. Proposed work includes site grading, construction of retail buildings, stormwater management facilities, and associated amenities. Main access to the project site will be off of West Providence Boulevard. The site has been designed to meet both the Johnston County Stormwater Design Manual requirements and the DEMLR (Division of Energy, Mineral, and Land Resources) requirements in order to obtain an NPDES (National Pollutant Discharge Elimination System) Stormwater Construction General Permit from NC DEQ. Six (6) wet ponds with corresponding outlet structures are proposed to control the runoff rates from the site. This project will preserve the integrity of stream channels as well as maintain and protectthe physical, biological, and chemical qualities of the receiving stream. Proposed site design will maximize the protection of existing drainage features and vegetation by protecting the existing floodway. The Johnston County design criteria to be met includes but is not limited to attenuation of the 1-year, 2- year, 10-year, and 25-year storm events. Per the DEMLR requirements, treatment volume shall be provided for post -development runoff with a design storm depth of 1". The proposed wet ponds will provide a permanent pool and a temporary pool which meets the required design volume, as well as a forebay area and vegetated shelf. This report will demonstrate the methods used to compute the existing and proposed hydrographs, and how the proposed stormwater discharge from the site will not exceed the allowable thresholds. While meeting the requirements Johnston County and DEMLR are the basis of the stormwater management plan, best management practices shall also be used as a design guideline for the post -development aspect of the stormwater management process. METHODOLOGY The proposed site consists of two sub -drainage basins and two study point, Point of Interest 1 (POI-1) and Point of Interest 2 (POI-2). The area for the sub -basins is shown on the Pre -Development Drainage Area Map (PRE DA) in the appendices. Hydrologic calculations comparing the pre- to post -development runoff were performed utilizing the Soil Conservation Service's Technical Release 55 (TR-55) methodology. All surfaces were assumed to be in good condition for the hydrologic calculations. The routing of the post - developed hydrographs through the facilities were performed using the Modified Puls method. Rainfall data was taken from the Johnston County Stormwater Design Manual. Eastfield Retail Block C 1 PCSM Report These calculations were performed using Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2021. The 24 hour rainfall depths were obtained from the Johnston County Stormwater Design Manual. The soils present on the site were determined from the NRCS Soil Survey Mapping. All ground coverage was assumed to be in good condition. PRE -DEVELOPMENT CONDITIONS The existing site is primarily heavily wooded area, with some inclusions of impervious road. It drains to unnamed tributaries to Bawdy Creek. The site has been analyzed as two sub -basins draining to point of interest POI-1 and POI-2, POI-1 is located at the southwest corner of the site and POI-2 is located at the northeast corner of the site (Appendix C) Using the aforementioned TR-55 methodology, runoff curve numbers and times of concentration were computed for the drainage areas. Pre Sub -basin 1 consists of 28.5 acres which drains to the east to Block A stream and the Point of Interest POI-1. Pre Sub -basin 2 consists of 15.0 acres which drains to the west to the Block E stream and the Point of Interest POI-2. Using the rainfall data, curve numbers, and time of concentrations, a hydrograph was developed for each sub -basin. Peak discharges for the 1-, 2-, 10-, 25-, and 100-year storm frequencies were obtained: POI-1 DESIGN STORM PRE CONDITIONS PEAK RATE (CFS) 1-YEAR 14.62 2-YEAR 23.44 10-YEAR 53.62 25-YEAR 75.07 100-YEAR 113.41 POI-2 DESIGN STORM PRE CONDITIONS PEAK RATE (CFS) 1-YEAR 3.38 2-YEAR 6.68 10-YEAR 19.80 25-YEAR 29.83 100-YEAR 48.45 Eastfield Retail Block C 2 PCSM Report POST -DEVELOPMENT CONDITIONS In post -development most of the site will be graded to accommodate the retail buildings, parking, and associated appurtenances. The final design of the site has yet to be completed. An impervious cover of 90 percent was assumed for all developable areas. Six (6) stormwater management facilities and impervious parking areas/driveways will be installed for the proposed development. Based on the proposed layout, the land coverage in post -development was assumed to be either impervious (parking areas, access driveways, and building), or open space (for newly graded lawn and disturbed areas to be mowed). Under post -development conditions, the site will be divided into two sub -watersheds labeled, Total Post POI-1 (draining to wet ponds Al, E1, E2, E3, and E4, as well as the included Post POI-1 undetained area), and Total Post POI-2 (draining to wet pond A2, as well as the included Post POI-2 undetained area). Area detained by the stormwater management facilities will be collected by sheet flow and the proposed network of storm sewers and structures. Refer to the Post Development Drainage Map (POST DA) in the appendix C. STORMWATER MANAGEMENT FACILITI The proposed stormwater management facilities are composed of six (6) wet ponds with outlet control structures. Both ponds were designed with the Hydraulic Retention Time (HRT) method. DEMLR design standards for the wet ponds were met for each of the proposed ponds. Amain pool volume is designed based off the of the pond drainage area and runoff coefficients, and hydraulic retention time, and a temporary pool is then established above that which captures the design volume. A forebay of approximately 15 % of the total pond volume is included, as well as a vegetated shelf with a width of 6 feet and a slope of 6:1. The ponds are routed as wet, from the main pool elevation. Below are stage - storage tables and outlet structure characteristics for the proposed facilities. WET POND Al Stage -Storage Table Elevation (ft) Storage (cf) 164.00 0 165.00 78,442 166.00 160,088 167.00 244,992 *167.50 289,052 168.00 344,235 169.00 478,774 170.00 620,175 171.00 768,951 172.00 925,785 *Vegetated shelf 167-168 Outlet Structure Eastfield Retail Block C 3 PCSM Report (1) — 50' Wide Emergency Spillway @ 170.50 (1) — Overflow Weir (4' X 4' BOX) @ 169.50 (4) 12" Circular Orifice @ 168.05 (1) 4" Circular Orifice @ 167.50 (1) — 24" Outlet Pipe @ 167.50 WET POND A2 Stage -Storage Table Elevation (ft) Storage (cf) 165.00 0 166.00 61040 167.00 13,600 168.00 22,857 *169.00 33,946 170.00 47,531 171.00 64,028 172.00 82,832 173.00 103,552 174.00 126,243 *Vegetated shelf 169.5-170.5 Outlet Structure (1) — 60' Wide Emergency Spillway @ 172.50 (1) — Overflow Weir (4' X 4' BOX) @ 172.00 (1) 8" Circular Orifice @ 169.65 (1) — 18" Outlet Pipe @ 168.00 WET POND E1 Stage -Storage Table Elevation (ft) Storage (cf) 164.00 0 165.00 3,279 166.00 7,392 167.00 12,401 * 167.50 15,367 168.00 19,637 169.00 31,060 170.00 43,992 170.50 51,045 Eastfield Retail Block C 4 PCSM Report *Vegetated shelf 167-168 Outlet Structure (1) — 20' Wide Emergency Spillway @ 169.50 (1) — Overflow Weir (4' X 4' BOX) @ 169.00 (1) 12" X 6" Rectangular Weir @ 168 (1) 1" Circular Orifice @ 167.25 (1) —15" Outlet Pipe @ 167.20 WET POND E2 Stage -Storage Table Elevation (ft) Storage (cf) 163.00 0 164.00 539 165.00 1,422 166.00 2,718 167.00 4,493 *167.50 5,813 168.00 7,704 169.00 12,516 170.00 18,360 171.00 25,293 *Vegetated shelf 167-168 Outlet Structure (1) — 20' Wide Emergency Spillway @ 169.50 (1) — Overflow Weir (4' X 4' BOX) @ 169.00 (1) 6" Circular Orifice @ 168.10 (1) 0.5" Circular Orifice @ 167.50 (1) —15" Outlet Pipe @ 167.50 WET POND E3 Stage -Storage Table Elevation (ft) Storage (cf) 164.00 0 165.00 2,273 166.00 5,268 167.00 9,077 *167.50 11,618 168.00 14,928 169.00 22,825 Eastfield Retail Block C 5 PCSM Report 170.00 31,918 171.00 42,262 *Vegetated shelf 167-168 Outlet Structure (1) — 20' Wide Emergency Spillway @ 169.50 (1) — Overflow Weir (4' X 4' BOX) @ 169.00 (1) 1" Circular Orifice @ 167.50 (1) —15" Outlet Pipe @ 167.50 WET POND E4 Stage -Storage Table Elevation (ft) Storage (cf) 164.00 0 165.00 5,024 166.00 11,053 167.00 18,142 *167.50 22,574 168.00 28,045 169.00 40,534 170.00 54,449 171.00 69,848 *Vegetated shelf 167-168 Outlet Structure (1) — 20' Wide Emergency Spillway @ 169.50 (1) — Overflow Weir (4' X 4' BOX) @ 169.00 (1) 12" X 6" Rectangular Weir @ 168 (1) 1" Circular Orifice @ 167.25 (1) — 15" Outlet Pipe @ 167.20 Using the aforementioned outlet control structures and the available volume in the wet ponds, routing calculations have been performed to ensure the reduction of post -development flows to levels below those of the allowable pre -development conditions for the 1-year, 2-year, 10-year, and 25-year storm events for both POls. A minimum of 1' of freeboard is provided for the 100-year storm event. Staged orifices within the permanent outlet structures provide rate control and provide treatment of the design volume. Refer to appendix D for more detailed information. Eastfield Retail Block C 6 PCSM Report TOTAL POST P0I-1 Design Storm POST-1 Peak Rate (cfs) PRE-1 Peak Rate (cfs) Difference 1-YEAR 13.55 14.62 -1.07 2-YEAR 18.95 23.44 -4.49 10-YEAR 50.71 53.62 -2.91 25-YEAR 73.76 75.07 -1.31 100-YEAR 124.66 113.41 -11.25 TOTAL POST P0I-2 Design Storm POST-2 Peak Rate (cfs) PRE-2 Peak Rate (cfs) Difference 1-YEAR 3.15 3.38 -0.23 2-YEAR 3.98 6.68 -2.70 10-YEAR 18.04 19.80 -1.76 25-YEAR 42.60 29.83 12.77 100-YEAR 76.89 48.45 28.44 Treatment volume requirements are met for this site by providing the design volume (DV) in the temporary pool, between the normal pool outlet (first orifice) and the weir. Main pool and design volumes are provided in the table below (Appendix E): REQUIRED PROVIDED REQUIRED PROVIDED TOTAL DESIGN DESIGN MAIN POOL MAIN POOL PROVIDED WET POND VOLUME VOLUME VOLUME VOLUME POND DV (CF) (CF) VMP (CF) (CF) VOLUME (CF) Al 59,314 61,910 144,489 289,052 925,785 A2 17,143 21,443 41,760 42,377 126,035 E1 5,645 5,753 13,750 13,884 51,045 E2 2,287 2,372 5,571 5,813 25,293 E3 6,126 7,897 14,922 14,928 42,262 E4 7,369 8,130 17,951 19,915 69,848 Eastfield Retail Block C 7 PCSM Report STORM SEWER SYSTEM A storm sewer system will collect stormwater runoff from the impervious areas and convey it to the proposed stormwater management facilities, which will then discharge to Bawdy Swamp. All proposed storm sewers have been designed with a minimum diameter of 15" and a minimum slope of 0.2%. FF-SITE DISCHARGE ANALYSIS Per the Johnston County Stormwater Design Manual, attenuation is required for the 1-year storm. However, when a reduction in peak rates can be illustrated for the 10-year and 25-year storm events as well, then no downstream impact analyses is required. Consequently, peak rate reduction has been provided for the 1-year, 2-year, 10-year, and 25-year storm events. CONCLUSION From the calculations and report as submitted, the proposed project is consistent with the requirements of Johnston County and DEMLR. Peak rate reduction is provided for the 1-year, 2-year, 10-year, and 25- year storm events. Treatment volume shall be provided for post -development runoff with a design storm depth of 1". Two wet ponds have been utilized to provide rate and volume control. Please see the attached appendices for all maps and calculations. Eastfield Retail Block C 8 PCSM Report APPENDIX A gNOFA�h-lygOD DJT �I1ZIEV44 'QO o `�QO �� � Byp ... Selma \ — Memorial / DOG F \F FOOD DR yeP P r CA Cem— 3 5el(ma Memorial Gardens 96 301 = — ... w- — RDNER AI¢. w C.y'S 70 GRAHAM ST Croc 13 J ful0 Cry p Walls Cem AN D Alt BYP uVl 70 0 70 k . 150 �O - @ • %^ — — - o HOLLOMAN LN _ z EGORDON RD z W I ROwl nd 1, 1 v° Pond 70 �44 vy SITE LOCATION MAP - SELMA, NC NOT TO SCALE APPENDIX B 3 bo F 7459M 350 31' 24" N 1 35o 31' S" N 745920 746010 746100 746190 746280 746370 3 ro F Map Scale: 1:4,110 if printed on A landscape (11" x 8.5") sheet. Meters N 0 50 100 200 30D Feet 0 150 300 600 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: L TM Zone 17N WGS84 G}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Soil Map —Johnston County, North Carolina (PRE POI 1) 746010 746100 746190 746280 746370 746460 AffiM 746640 746460 746550 746640 3 a io 7467W 35' 31' 24" N 35' 31' 5" N 746730 3 a 10/25/2023 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons rwr Soil Map Unit Lines 0 Soil Map Unit Points Special Point Features Vo Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit .14 Gravelly Spot 0 Landfill Lava Flow Marsh or swamp + Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot 4 Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Soil Map —Johnston County, North Carolina (PRE POI 1) MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Other line placement. The maps do not show the small areas of .- Special Line Features contrasting soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL: rwr Interstate Highways Coordinate System: Web Mercator (EPSG:3857) US Routes Maps from the Web Soil Survey are based on the Web Mercator L Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Local Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Background . Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 28, Sep 13, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 24, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Johnston County, North Carolina PRE POI 1 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GoA Ra Goldsboro sandy loam, 0 to 2 percent slopes 7.0 15.1 24.6% 52.8% Rains sandy loam, 0 to 2 percent slopes Ud Udorthents, loamy 0.6 2.0% W Water 5.9 20.5% Totals for Area of Interest 28.5 100.0% USDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 3 bo F 7459M 35° 31' 24" N I Ami 746010 1 Hydrologic Soil Group —Johnston County, North Carolina (PRE POI 1) 746100 746190 746280 746370 746460 , IFi H/W;in rn eTW ,lid at t,hi,- l . y 350 31' S" Nmw 745920 746010 746100 746190 746280 746370 3 ro F Map Scale: 1:4,110 if printed on A landscape (11" x 8.5") sheet. N 0 50 100 200 30D Meters Feet 0 150 300 600 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 G}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 746550 746640 746460 746550 746640 3 a io 7467M 35' 31' 24" N 35' 31' 5" N 746730 3 a 10/25/2023 Page 1 of 4 Hydrologic Soil Group —Johnston County, North Carolina (PRE POI 1) MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:24,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map #%-0 Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 28, Sep 13, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 24, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UU� Natural Resources Web Soil Survey 10/25/2023 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Johnston County, North Carolina PRE POI 1 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI GoA Goldsboro sandy loam, 0 to 2 percent slopes B 7.0 24.6% Ra Rains sandy loam, 0 to 2 percent slopes A/D 15.1 52.8% Ud Udorthents, loamy C 0.6 2.0% W Water 5.9 20.5% Totals for Area of Interest 28.5 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. usDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Johnston County, North Carolina PRE POI 1 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher uSDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 Soil Map —Johnston County, North Carolina (PRE POI 2) 746520 746580 746640 746700 350 31' 29" N OP _te 35o 31' 13" N 6 746520 746580 746640 746700 3 Map Scale: 1:2,340 if printed on A portrait (8.5" x 11") sheet. Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 U}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 746760 746820 350 31' 29" N M 746760 746820 M 35' 31' 13" N 3 10/25/2023 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons rwr Soil Map Unit Lines 0 Soil Map Unit Points Special Point Features Vo Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit .14 Gravelly Spot 0 Landfill Lava Flow Marsh or swamp + Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot 4 Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Soil Map —Johnston County, North Carolina (PRE POI 2) MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Other line placement. The maps do not show the small areas of .- Special Line Features contrasting soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL: rwr Interstate Highways Coordinate System: Web Mercator (EPSG:3857) US Routes Maps from the Web Soil Survey are based on the Web Mercator L Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Local Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Background . Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 28, Sep 13, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 24, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Johnston County, North Carolina PRE POI 2 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GoA Gr Goldsboro sandy loam, 0 to 2 percent slopes 9.0 2.0 60.1 % 13.2% Grantham silt loam, 0 to 2 percent slopes Ra Rains sandy loam, 0 to 2 percent slopes 4.0 26.6% Totals for Area of Interest 15.0 100.0% usDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 Hydrologic Soil Group —Johnston County, North Carolina (PRE POI 2) 7465M 746580 746640 746700 350 31' 29" N / lip- 35o 31' 13" N 6 746520 746580 746640 746700 3 Map Scale: 1:2,340 if printed on A portrait (8.5" x 11") sheet. Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 U}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 746760 746820 350 31' 29" N M 746760 746820 M 35' 31' 13" N 3 10/25/2023 Page 1 of 4 Hydrologic Soil Group —Johnston County, North Carolina (PRE POI 2) MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:24,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map #%-0 Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 28, Sep 13, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 24, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UU� Natural Resources Web Soil Survey 10/25/2023 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Johnston County, North Carolina PRE POI 2 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI GoA Goldsboro sandy loam, 0 to 2 percent slopes B 9.0 60.1 % Gr Grantham silt loam, 0 to 2 percent slopes C/D 2.0 13.2% Ra Rains sandy loam, 0 to 2 percent slopes A/D 4.0 26.6% Totals for Area of Interest 15.0 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. usDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Johnston County, North Carolina PRE POI 2 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher uSDA Natural Resources Web Soil Survey 10/25/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 APPENDIX C a Q Q W Q W Q z 0 z 0 U D r J) z 0 0 w Cf a Q 0 w Ir a L v? 0 3 0 a� E U 0 0� 2 a m o c �? (1) co N � N Q� �co 2 0 oEn oho_ 22.0 LEGEND BIT BITUMINOUS CGCo COLUMBIA GAS COMPANY CONIC CONCRETE EGCo EQUITABLE GAS CO. (now PNGCO) TC TOP OF CURB VZPa VERIZON PENNSYLVANIA q G GUTTER BTCo BELL TELEPHONE CO. (now VZPa) TW TOP OF WALL APCo ALLEGHENY POWER COMPANY BW BOTTOM OF WALL WPPCo WEST PENN POWER COMPANY /// TS TOP OF SLOPE PPCo PENN POWER COMPANY / j / / // // BS BOTTOM OF SLOPE DLCo DUQUESNE LIGHT COMPANY SAN SANITARY PNGCo PEOPLES NATURAL GAS COMPANY ST STORM ALCOSAN ALLEGHENY COUNTY SANITARY AUTHORITY MH MANHOLE PWSA PITTSBURGH WATER AND SEWER AUTHORITY TOP TOP OF CASTING PAWC PENNSYLVANIA AMERICAN WATER COMPANY Know what's below. BOT BOTTOM DPW DEPARTMENT OF PUBLIC WORKS FL FLOW LINE PACT PITTSBURGH ALLEGHENY COUNTY THERMAL Call before you dig. CO CLEAN OUT RCP REINFORCED CONCRETE PIPE WV WATER VALVE CMP CORRUGATED METAL PIPE Serial No. A231231797-OOA WM WATER METER CPP CORRUGATED PLASTIC PIPE TIME O F CONCENTRATION WB WATER BOX TCP TERRA COTTA PIPE A231231853-OOA / / // / / / / s 1 �j 0 FH FIRE HYDRANT PVC POLYVINYL CHLORIDE PIPE A231231888-OOA /'' / /'// / /' ' ' \ / I ,j GV GAS VALVE VCP VITRIFIED CLAY PIPE /' ///' \ \ \ / � A231231935-OOA PATH POI-2 a \ GM GAS METER DIP DUCTILE IRON PIPE GMK GAS MARKER CIP CAST IRON PIPE A231232009-OOA EB ELECTRIC BOX SLCPP SMOOTH LINED CORRUGATED PLASTIC PIPE A231232049-OOA / / �� \ \ 7) EM ELECTRIC METER HOPE HIGH DENSITY POLYETHOLINE PIPE / / /� \ \ ` >4 TRANS TRANSFORMER —ETC— ELECTRIC TELEPHONE COMMUNICATIONS / / / / /// / % / / / / / 1 / i 76 \ — I GW GUY WIRE — G — GAS LINE / / / / /// / \ j / 8 \J VLT VAULT — W — WATER LINE LS LIGHT STANDARD — T — SUBSURFACE TELEPHONE LINE 171 \ J \\ YL YARD LIGHT — E — SUBSURFACE ELECTRIC LINE MB - MAILBOX — OH — - OVERHEAD WIRES POI-2 PM PARKING METER —CATV— CABLE TV DS DOOR SILL x 908.8 EXISTING SPOT ELEVATION GP GATE POST - - 908 - - EXISTING CONTOURS RAILROADFIR EXISTING INLET BOIL BOLLARD0 EXISTING MANHOLE WINWINDOW WELL - - - - EXISTING SEWER PIPE RD ROOF DRAIN ------ VP VENT PIPE 171 / / / / /// j / / /' ' / / TR TRAFFIC HC HANDICAP LH - LAMP HOLE 171 COMB COMBINATION SEWER / j / / /� j / ' ' ' ` / / \ v�O w/ -WITH NOTE //� \ /'�\ \ /" PRE DEVELOPMENT POI-2 \ X4$ THE UNDERGROUND UTILITIES SHOWN HEREON HAVE NOT BEEN PHYSICALLY LOCATEDDRAINAGE AREA: 15.0 ACRES'�BY THE SURVEYOR, HOWEVER, THE INFORMATION WAS OBTAINED FROM EXISTING PLANS /// // / / AND SURFACE FACILITIES. THE GATEWAY ENGINEERS, INC. MAKES NO GUARANTEE THAT \ THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, COMPOSITE C N . 64 EITHER IN SERVICE OR ABANDONED. THE GATEWAY ENGINEERS, INC. DOES NOT ' ' '/ WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION /'+ INDICATED ALTHOUGH THEY ARE SHOWN AS ACCURATELY AS POSSIBLE FROM THE / // // / / / / /� \ \ \ \ TC. 39.9 MINUTES INFORMATION AVAILABLE. ALL EXISTING SUBSURFACE UTILITY INFORMATION PRESENTED ON THE CONTRACT DRAWINGS IS CHARACTERIZED AS UTILITY QUALITY LEVEL C OR D PER "Cl/ASCE /j 38-02 - STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA" UNLESS SPECIFICALLY NOTED OTHERWISE. / / / // TIME OF CONCENTRATION \ \%\ %%''''' »; EXISTING PATH POI-1 / \/ / "° ON / �j ON POND / / / // / OHHn / I ON off No off / / "° ON ON /' // // / �70.� \� ON "o ON o / / // / / / // / 1 \\\ \ \ / — 163 — ON "0 NO ON ti / 9 / // / / / // / / / v v��A✓ i ON164 ON --i_ -- off "° off \l r / I 40 p I / I� I I /— —' y° � l I \ IIII I I /�� 11 ��i Imo/ I \ I I / / PRE DEVELOPMENT POI-1 \\ \ I 11 �4 °" DRAINAGE AREA: 28.5 ACRES I > ` 151 / l 170 ,; v 000-00 LL IO Q 0 LLJ ` Z LLJW W Luz0 z Z W J az > U LLJ W U LLJ J J LL Q O W Z O w MOMMMMMMM 011111111 ---- // /' 1, COMPOSITE C N : 7 2 I �✓ TC: 39.8 MINUTES co 177 \ —.173\ 169 013 4�l 71 OVO I �/ II / I / A ----- v4—\ III \ / \_ �wco 173--170 /' £ / / �� \ I / III /I /' �� \ — — l —i / / ' 170 1 III _ l / ��� / ' �� I 1 �- _ ,, v ��I _ �, (IIII r v W �I IIIII\ / 171 ---/ \j III` ���� _---__—_—_ J n IIII I �� I III�° \ I V v _ / II 69 171 — 11 III '69 1/ \ 1 I III/ `� \ =\ , < \ / \III �V\ / A l � / ^� > �� \ - — ►�J 16s - > 172_169=--_ co _ I ►I U \ / /' \\ �� / / ��/ —7 �� I III J J It IF NOW OR FORMERLY I \ \ I ) 0 ADINATH II ii \ I \ /\ \\ �\ \ \\\ -- r� // ^\ \\ ��� jllllll 6 I 169 I I II INCORPORATED 171 / 7 ( i / \ POI-1 PIDB211385, PG 0674 I \ li \ 171 \\\ \ \ \\\l \\ \ — I / IIIII I W yo I 0 / \ 1 \ \\ \ \\ r — I n / / � � v v \ '• I � � �� �'r--- �\V � I II � M// / i ii Ire \�\\ ir \ \ `N' III � -�\ w N—� \ \ — / /II ..,', \\ 1, \\\ \ \ I \ ,I III l I \ IIIII W > -169 /III III \ I J > W 8 / IIII III I \\ W Q o I cal J cn \`III+�I J( \ 1 D ` I \\A \\ -171\ (n Cfl W ti D o \ II \ \\\\ I LL / I z �170-� /'\ \\�\ �I`U 0WLLN U Q fmfrn fm — — — —= — — _ LJ W J W J 2 cn 0- Q EXISTING l CONDITIONS \vv�vvvv� �' Avvv -� �— I�, AV A \\ \ ���II �\ �\ < \ NORTH Project Number: 46118 0000 Drawing Scale: 1"=100' Date Issued: NOV 2023 \ \ \ \ I I J - ;-,•,- '1� 1 a \ GRAPHIC SCALE \\\ \\� \ \ . '.� . \ / \ \ \ \ fn� �•\l I Index Number: -- \ \ � � \ \\\ � . •i • . \ \ / ' \\ ��� �� o 50 100 200 400 Drawn By: SMP Checked By: ANS \ \ \\ \\ \\ \\\ ` _ =•-- �` ��I \ Project Manager: JS Ii • \✓�_\\ \ D`� \ \y I(I \_ o1( IN FEET) %� THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL ATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS IN D PURP S E I KfV J 1 inch = 100 ft. C060 E, R LICATI +,•REPR- DUCFI` R IS R%BUTION OF DATA CONTAIN D WIT I ICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. � 3 CL Q 2 c a� E U O -2 � M c (n M Q N � N C 4 m n� II r) q EuM 2 0 o� c n 0 0 ILE 22.0 r ) PCSM NOTES: PCSM LEGEND SHEET 702 /'' // //-„000 0 1. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE / / / / // I W Z FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES SOIL BOUNDARIES / / / a GOVERNING SAFETY AND HEALTH, INCLUDING THE FEDERAL / / / / �� I I I LLI CONSTRUCTION SAFETY ACT (PUBLIC LAW 91-54), FEDERAL / LJJ W REGISTER, CHAPTER XVII, PART 1926 OF TITLE 29 REGULATIONS, LIMITS OF DISTURBANCE / / / / // ^� Z OCCUPATIONAL SAFETY AND HEALTH REGULATIONS FOR / / - / / - (j / / I Z CONSTRUCTION, AND SUBSEQUENT PUBLICATIONS UPDATING THESE REGULATIONS. ® HC6O3PROPOSED STORM MANHOLE / / / / /� // / J 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE I r AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE 3 / / / CONSTRUCTED PRIOR TO THE SUBMISSION OF THE BID. SUBMISSION ® PROPOSED CLEANOUT z OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS C603 ///// 6 I POST POI-2 UNDETAINED v REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND / 1-1 / \ \— �j uJ CONSTRAINTS OF THE SITE. ® "C603PROPOSED INLET I / / / / \ / / I — �j,�0 DRAINAGE AREA: 0.7 I I I v • 3. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE / / I / �1 j ` I ACRES W LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE 6 COMPOSITE CN: 80 CONTRACTOR SHALL NOTIFY ONE CALL SYSTEMS, INC. THE PROPOSED HEADWALL/ END WALL / / —Imo/ \ \ I ,\ L ` LL LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE C603 I-,/ / 1-1\ \ \ I \ I Tc: 5.0 MINUTES cn APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE DETAINED AREAS / EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND J 01-2 1 � UNDERGROUND STRUCTURES. loll/ / / PLL 4. CONTRACTOR TO PROVIDE SHOP DRAWINGS ON ALL STORM SEWER UNDETAINED AREAS / / / / ��• \\, I \ Q MANHOLES, INLETS, AND DETENTION SYSTEMS. 5. AN AS -BUILT DRAWING OF NEW UTILITY SERVICES SHALL BE / / / PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER / UPON COMPLETION OF THE PROJECT. 6. ALL STORM PIPE SHALL BE HDPE, SMOOTH INTERIOR, CORRUGATED POLYETHYLENE PIPE UNLESS OTHERWISE NOTED. ALL STORM / SEWER CONSTRUCTION MATERIALS AND METHODS SHALL BE IN /' /' \ , 17, ACCORDANCE WITH DOT SPECIFICATIONS. ALL JOINTS SHALL BE • / / �( / ® WATERTIGHT. / / 7. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. / / / / /I • 8. THE CONTRACTOR SHALL ASSURE THAT THERE IS POSITIVE / / oll� DRAINAGE TO THE INLETS UPON PLACEMENT OF NEW PAVEMENT. Know What's below. G� / / / / / \_ 9. AN AS -BUILT DRAWING OF THE STORMWATER DETENTION FACILITY J / / / — 172�� \ PREPARED AND SEALED BY A PROFESSIONAL LAND SURVEYOR IS Call before you dig. ,/ \ \ \\ REQUIRED TO BE SUBMITTED TO THE PROJECT ENGINEER. / / / / Serial No. A231231797-OOA � / OOA -/ / / 1-1/ / T \ PROJECT AREAS A231231853 / / A231231888-OOA DISTURBED AREA - 43.5 ACRES A231231935-OOA / / - / / - �/ WET POND A2 \ A231232009-OOA A231232049-OOA / , / loe / / / 'IVOVio11> / / ` I 1 POST DEVELOPMENT A2 0 DRAINAGE AREA: 6.3 ACRES / \ \ I I I \ COMPOSITE CN: 94 0 Tc: 5.0 MINUTES UW Z // i.co oo, III h O / I / /Ho OH / / / T POND Al I I III I /Xi / SHEET 701 /loo, WE_ / "ol/ /-' / °ti POST DEVELOPMENT E1 / - / DRAINAGE AREA: 2.3 ACRES /j / _ \ z° 0 0 co 0 0 0 0 0 COMPOSITE CN: 93 � / , / — �i/\ / �/ �_ off _ \� Tc: 5.0 MINUTES / POST DEVELOPMENT Al \ HRH off \ ` I /� / DRAINAGE AREA: 24.4 ACRES _ > WET POND E1 I /'' / q Q \ H° / \ 4 r / I I , I I I I , \\ // - / - ♦ \ r iY COMPOSITE CN: 92 `� — — _ ' I /� p 4 \ OH °H° 16 \ I I _ - / / X 0 °y // / / / >r �r Tc: 20.0 MINUTES_ l000, °looll y /-1), \ ti "° I 1 I \ I I N° \ I 3/ / / / >r � ♦ ♦ ♦ « 5 I � � ,__ \ III / / �-/\ ` � �� �i I -7P,\\\\ ti /o' / \� I a` ` -- _ ?I\I WET POND E4 Ile Vt POST DEVELOPMENT E4 / DRAINAGE AREA: 2.8 ACRES / - COMPOSITE CN: 94 � G \ ,.� II— —�\ \ -171I Tc: 5.0 MINUTES 174_ _ I i 11v- 174 \ \ ` v <ft3�, / 170 / 171 171—/ 169 > \ 172 y � I I U _J l J I wI 171\ \ O p J J W \ \ v IIII III \ I UJ -169 ,1°� I > W I I I �. L1 0 0 O `170\ \\\\\ / \ \ \ I O w w g q {a 172 - 0 01� I— D _ —= = - j� J 11// `\ // \ \ \` \\ \I III I• •I 1 I r ' \ \ o \ \ \ / �j �'S \ \ -171 LLJ i i/�iji/ // \ \ \\\\\ \_ _ I III •I 1 I I / I D \ _ •�/ , 1 < \\\' \Q r0 �o 0 z 0 N ti O _�_� \ \\\\ \� IIII •IIIII / I �;�P ��o — } 0 z UJ LL z m fm � _= - — \�\\ \ \ \ \\ \ ` III\\ — I I — \ __\9 \ C a J W J \� \\\ \ \ \ \ \ �� 1 1 ® r�r, 25'REAR Y ' I W 0 p W \ �•+. : o _171 POST CONSTRUCTION ///U\ � \\ \ � � \ � \ � �\ � \ � � . �.:. - • ... \��n � o h \ STORMWATER MANAGEMENT PLAN V '\ � � / NORTH Project Number:46118-0000 Aviv ' l\\O�� .�\\ •� Drawing Scale: 1"-100' \�\�\ \ \\ \��\ • I I •,• L5!1 h Q GRAPHIC SCALE Date Issued: NOV 2023 '\�\ \� / \ \\ \ • • • • •1 I \ \ / / . o eo 100 zoo aoo Index Number: -- • n�••J�•• �� I Drawn By:SMP \ lJ / \ \ \ \ 1" • • r7p I Checked By: ANS \� �\ \ \�` \ . •1. • . • ' I • \NN h Manager: er: JS ' `` \"✓\�\\� \ \ \\\� \ \ •1 - I \ II — o� �( IN FEET) 1 9 ! \ 1 inch = 100 ft. THE GATEWAY ENGINEE IN . RE N'3'OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. D A CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURP ITS T R LICATIO • .f •�I t . • , OR R DISTRIBUTION OF DATA CONTAINED WITHIN STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. - \� 0 0 0 0 0 0 0 0 Tc: 5.0 MINUTES POST DEVELOPMENT E2 DRAINAGE AREA: 0.9 ACRES i,COMPOSITE CN: • /1 WET POND E2 POST POI-1 UNDETAINED F_ -. . �"• / i, J • -• :: J� yy• � I u II r - WET POND E3 T Q. POST DEVELOPMENT DRAINAGE AREA: 2.3 ACRES COMPOSITE CN: 94 Tc: 5.0 MINUTES •INOW OR FORM INCORPORATED Imagman ON f \• APPENDIX D Watershed Model Schematic 1 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 t� 13 17 eD V 20 14 22 Legend Hyd. Origin Description 1 SCS Runoff PRE POI-1 2 SCS Runoff PRE POI-2 3 SCS Runoff POST Al 4 Reservoir WET POND Al 5 SCS Runoff POST E1 6 Reservoir WET POND E1 7 SCS Runoff POST E2 8 Reservoir WET POND E2 9 SCS Runoff POST E3 10 Reservoir WET POND E3 11 SCS Runoff POST E4 12 Reservoir WET POND E4 13 SCS Runoff POST POI-1 UNDETAINED 23 14 Combine TOTAL POST POI-1 17 SCS Runoff POST A2 18 Reservoir WET POND A2 19 SCS Runoff POST POI-2 UNDETAINED 20 Combine TOTAL POST POI-2 22 Combine TOTAL PRE 23 Combine TOTAL POST Project: Block A-E.gpw Tuesday, 11 / 14 / 2023 Hydrograph Return Period Recce draflow Hydrographs Extension for Autodesk®Civil 3D® by Autodesk, Inc. v2021 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 14.62 23.44 ------- ------- 53.62 75.07 ------- 113.41 PRE POI-1 2 SCS Runoff ------ 3.384 6.683 ------- ------- 19.80 29.83 ------- 48.45 PRE POI-2 3 SCS Runoff ------ 59.08 74.93 ------- ------- 121.24 151.00 ------- 201.43 POST Al 4 Reservoir 3 3.016 4.489 ------- ------- 7.614 8.890 ------- 19.62 WET POND Al 5 SCS Runoff ------ 8.897 11.16 ------- ------- 17.72 21.93 ------- 29.08 POST E1 6 Reservoir 5 0.608 1.075 ------- ------- 5.092 8.228 ------- 19.56 WET POND E1 7 SCS Runoff ------ 3.481 4.366 ------- ------- 6.935 8.583 ------- 11.38 POST E2 8 Reservoir 7 0.358 0.575 ------- ------- 3.641 5.287 ------- 7.408 WET POND E2 9 SCS Runoff ------ 8.961 11.16 ------- ------- 17.54 21.64 ------- 28.60 POST E3 10 Reservoir 9 0.835 4.028 ------- ------- 11.76 17.82 ------- 25.42 WET POND E3 11 SCS Runoff ------ 11.15 13.89 ------- ------- 21.83 26.93 ------- 35.59 POST E4 12 Reservoir 11 0.660 1.202 ------- ------- 5.440 12.56 ------- 26.04 WET POND E4 13 SCS Runoff ------ 12.80 16.69 ------- ------- 28.16 35.55 ------- 48.07 POST POI-1 UNDETAINED 14 Combine 4, 6, 8, 13.55 18.95 ------- ------- 50.71 73.76 ------- 124.66 TOTAL POST POI-1 10, 12,13 17 SCS Runoff ------ 24.89 31.00 ------- ------- 48.73 60.12 ------- 79.45 POST A2 18 Reservoir 17 1.982 2.259 ------- ------- 16.53 38.86 ------- 70.19 WET POND A2 19 SCS Runoff ------ 1.479 2.063 ------- ------- 3.876 5.095 ------- 7.188 POST POI-2 UNDETAINED 20 Combine 18, 19 3.154 3.979 ------- ------- 18.04 42.60 ------- 76.89 TOTAL POST POI-2 22 Combine 1, 2, 17.97 30.10 ------- ------- 73.42 104.89 ------- 161.81 TOTAL PRE 23 Combine 14, 20, 16.70 22.86 ------- ------- 67.28 114.72 ------- 201.56 TOTAL POST Proj. file: Block A-E.gpw Tuesday, 11 / 14 / 2023 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 14.62 1 739 81,149 ------ ------ ------ PRE POI-1 2 SCS Runoff 3.384 1 741 24,575 ------ ------ ------ PRE POI-2 3 SCS Runoff 59.08 1 725 188,071 ------ ------ ------ POST Al 4 Reservoir 3.016 1 830 132,735 3 168.50 411,930 WET POND Al 5 SCS Runoff 8.897 1 717 19,078 ------ ------ ------ POST E1 6 Reservoir 0.608 1 753 14,516 5 168.49 25,232 WET POND E1 7 SCS Runoff 3.481 1 717 7,465 ------ ------ ------ POST E2 8 Reservoir 0.358 1 741 5,367 7 168.49 10,073 WET POND E2 9 SCS Runoff 8.961 1 717 19,469 ------ ------ ------ POST E3 10 Reservoir 0.835 1 744 10,782 9 169.06 23,406 WET POND E3 11 SCS Runoff 11.15 1 717 24,228 ------ ------ ------ POST E4 12 Reservoir 0.660 1 761 17,553 11 168.51 34,435 WET POND E4 13 SCS Runoff 12.80 1 717 26,360 ------ ------ ------ POST POI-1 UNDETAINED 14 Combine 13.55 1 718 207,313 4, 6, 8, ------ ------ TOTAL POST POI-1 10, 12, 13 17 SCS Runoff 24.89 1 717 54,079 ------ ------ ------ POST A2 18 Reservoir 1.982 1 749 52,992 17 171.37 71,064 WET POND A2 19 SCS Runoff 1.479 1 718 2,969 ------ ------ ------ POST POI-2 UNDETAINED 20 Combine 3.154 1 718 55,960 18, 19 ------ ------ TOTAL POST POI-2 22 Combine 17.97 1 740 105,724 1, 2, ------ ------ TOTAL PRE 23 Combine 16.70 1 718 263,274 14, 20, ------ ------ TOTAL POST Block A-E.gpw Return Period: 1 Year Tuesday, 11 / 14 / 2023 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PRE POI-1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 28.500 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.96 in Storm duration = 24 hrs . Composite (Area/CN) _ [(7.000 x 55) + (21.500 x 77)] / 28.500 Q (cfs) 15.00 12.00 .M 3.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-1 Hyd. No. 1 -- 1 Year Tuesday, 11 / 14 / 2023 = 14.62 cfs = 739 min = 81,149 cuft = 72* = 0 ft = 39.80 min = Type II = 484 Q (cfs) 15.00 12.00 M 3.00 i i i . I I I I I I I' ! 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PRE POI-1 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.59 0.00 0.00 Land slope (%) = 1.20 0.00 0.00 Travel Time (min) = 24.87 + 0.00 + 0.00 = 24.87 Shallow Concentrated Flow Flow length (ft) = 671.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 9.80 + 0.00 + 0.00 = 9.80 Channel Flow X sectional flow area (sqft) = 23.65 0.00 0.00 Wetted perimeter (ft) = 16.10 0.00 0.00 Channel slope (%) = 0.10 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =2.44 0.00 0.00 Flow length (ft) ({0})755.0 0.0 0.0 Travel Time (min) = 5.16 + 0.00 + 0.00 = 5.16 Total Travel Time, Tc.............................................................................. 39.80 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PRE POI-2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 15.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.96 in Storm duration = 24 hrs Composite (Area/CN) _ [(9.000 x 55) + (6.000 x 77)] / 15.000 PRE POI-2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Tuesday, 11 / 14 / 2023 = 3.384 cfs = 741 min = 24,575 cuft = 64* = 0 ft = 39.90 min = Type II = 484 Q (Cfs) Hyd. No. 2 -- 1 Year Q (Cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PRE POI-2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.59 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 26.75 + 0.00 + 0.00 = 26.75 Shallow Concentrated Flow Flow length (ft) = 856.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 12.50 + 0.00 + 0.00 = 12.50 Channel Flow X sectional flow area (sqft) = 23.65 0.00 0.00 Wetted perimeter (ft) = 16.10 0.00 0.00 Channel slope (%) = 0.30 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =4.22 0.00 0.00 Flow length (ft) ({0})151.0 0.0 0.0 Travel Time (min) = 0.60 + 0.00 + 0.00 = 0.60 Total Travel Time, Tc.............................................................................. 39.90 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 POST Al Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 24.400 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.96 in Storm duration = 24 hrs . Composite (Area/CN) _ [(16.800 x 98) + (7.600 x 80)] / 24.400 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 120 240 Hyd No. 3 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST Al Hyd. No. 3 -- 1 Year Tuesday, 11 / 14 / 2023 = 59.08 cfs = 725 min = 188,071 cuft = 92* = 0 ft = 20.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 -POST Al Max. Elevation Reservoir name = WET POND Al Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' — 0 300 Hyd No. 4 WET POND Al Hyd. No. 4 -- 1 Year Tuesday, 11 / 14 / 2023 = 3.016 cfs = 830 min = 132,735 cuft = 168.50 ft = 411,930 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 3 0 Total storage used = 411,930 cuft Pond Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Pond No. 1 - WET POND Al Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 164.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 164.00 76,854 0 0 1.00 165.00 80,030 78,442 78,442 2.00 166.00 83,261 81,646 160,088 3.00 167.00 86,547 84,904 244,992 3.50 167.50 89,694 44,060 289,052 4.00 168.00 131,039 55,183 344,235 5.00 169.00 138,039 134,539 478,774 6.00 170.00 144,762 141,401 620,175 7.00 171.00 152,791 148,777 768,951 8.00 172.00 160,876 156,834 925,785 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 24.00 4.00 12.00 0.00 Span (in) = 24.00 4.00 12.00 0.00 No. Barrels = 1 1 4 0 Invert El. (ft) = 167.50 167.50 168.05 0.00 Length (ft) = 958.00 0.00 0.00 0.00 Slope (%) = 0.10 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No Yes No Stage (ft) 8.00 6.00 4.00 2.00 0.00 ' ' 0.0 30.0 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 50.00 0.00 0.00 Crest El. (ft) = 169.50 170.50 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 60.0 90.0 120.0 150.0 180.0 210.0 240.0 Elev (ft) 172.00 170.00 168.00 166.00 1 164.00 270.0 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 5 POST E1 Hydrograph type = SCS Runoff Peak discharge = 8.897 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 19,078 cuft Drainage area = 2.300 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.600 x 98) + (0.700 x 80)] / 2.300 POST E1 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 WET POND E1 Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - POST E1 Max. Elevation Reservoir name = WET POND E1 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.25 ft Q (cfs) 10.00 M 4.00 2.00 WET POND E1 Hyd. No. 6 -- 1 Year Tuesday, 11 / 14 / 2023 = 0.608 cfs = 753 min = 14,516 cuft = 168.49 ft = 25,232 cuft Q (cfs) 10.00 4.00 2.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 6 Hyd No. 5 0 Total storage used = 25,232 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Pond No. 3 - WET POND E1 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 164.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 164.00 2,876 0 0 1.00 165.00 3,681 3,279 3,279 2.00 166.00 4,546 4,114 7,392 3.00 167.00 5,472 5,009 12,401 3.50 167.50 6,391 2,966 15,367 4.00 168.00 10,688 4,270 19,637 5.00 169.00 12,159 11,424 31,060 6.00 170.00 13,705 12,932 43,992 6.50 170.50 14,506 7,053 51,045 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.00 12.00 0.00 Span (in) = 15.00 1.00 6.00 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 167.20 167.25 168.00 0.00 Length (ft) = 78.00 0.00 0.00 0.00 Slope (%) = 0.13 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 6.00 Total Q Tuesday, 11 / 14 / 2023 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.00 20.00 0.00 0.00 Crest El. (ft) = 169.00 169.50 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 171.00 170.00 169.00 168.00 167.00 166.00 165.00 ' ' ' ' ' ' ' ' 164.00 12.00 18.00 24.00 30.00 36.00 42.00 48.00 54.00 60.00 Discharge (cfs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 7 POST E2 Hydrograph type = SCS Runoff Peak discharge = 3.481 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 7,465 cuft Drainage area = 0.900 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(0.650 x 98) + (0.250 x 80)] / 0.900 POST E2 Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 Li 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 8 WET POND E2 Hydrograph type = Reservoir Peak discharge = 0.358 cfs Storm frequency = 1 yrs Time to peak = 741 min Time interval = 1 min Hyd. volume = 5,367 cuft Inflow hyd. No. = 7 -POST E2 Max. Elevation = 168.49 ft Reservoir name = WET POND E2 Max. Storage = 10,073 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 4.00 3.00 2.00 1.00 WET POND E2 Hyd. No. 8 -- 1 Year 0.00 ' 1 1 1' 0 300 600 900 1200 1500 1800 2100 2400 2700 — Hyd No. 8 Hyd No. 7 0 Total storage used = 10,073 cuft Q (cfs) 4.00 3.00 2.00 1.00 1 0.00 3000 Time (min) Pond Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Pond No. 4 - WET POND E2 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 163.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 163.00 383 0 0 1.00 164.00 694 539 539 2.00 165.00 1,072 883 1,422 3.00 166.00 1,520 1,296 2,718 4.00 167.00 2,030 1,775 4,493 4.50 167.50 3,253 1,321 5,813 5.00 168.00 4,311 1,891 7,704 6.00 169.00 5,313 4,812 12,516 7.00 170.00 6,374 5,844 18,360 8.00 171.00 7,492 6,933 25,293 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 0.50 6.00 0.00 Span (in) = 15.00 0.50 6.00 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 167.50 167.50 168.10 0.00 Length (ft) = 81.00 0.00 0.00 0.00 Slope (%) = 0.60 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 8.00 6.00 4.00 2.00 0.00 ' ' 0.0 10.0 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.00 20.00 0.00 0.00 Crest El. (ft) = 169.00 169.50 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 20.0 30.0 40.0 Stage / Discharge Elev (ft) 171.00 169.00 167.00 165.00 163.00 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Discharge (cfs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 9 POST E3 Hydrograph type = SCS Runoff Peak discharge = 8.961 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 19,469 cuft Drainage area = 2.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.750 x 98) + (0.500 x 80)] / 2.250 POST E3 Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 10 WET POND E3 Hydrograph type = Reservoir Peak discharge = 0.835 cfs Storm frequency = 1 yrs Time to peak = 744 min Time interval = 1 min Hyd. volume = 10,782 cuft Inflow hyd. No. = 9 - POST E3 Max. Elevation = 169.06 ft Reservoir name = WET POND E3 Max. Storage = 23,406 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft WET POND E3 Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 10 Hyd No. 9 0 Total storage used = 23,406 cuft Pond Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Pond No. 5 - WET POND E3 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 164.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 164.00 1,935 0 0 1.00 165.00 2,611 2,273 2,273 2.00 166.00 3,379 2,995 5,268 3.00 167.00 4,238 3,809 9,077 3.50 167.50 5,928 2,542 11,618 4.00 168.00 7,313 3,310 14,928 5.00 169.00 8,481 7,897 22,825 6.00 170.00 9,704 9,093 31,918 7.00 171.00 10,985 10,345 42,262 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.00 0.00 0.00 Span (in) = 15.00 1.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 167.50 167.50 0.00 0.00 Length (ft) = 76.00 0.00 0.00 0.00 Slope (%) = 0.66 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 8.00 6.00 4.00 2.00 0.00 1 0.0 Tuesday, 11 / 14 / 2023 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.00 20.00 0.00 0.00 Crest El. (ft) = 169.00 169.50 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 10.0 20.0 30.0 40.0 Total Q Stage / Discharge Elev (ft) 172.00 170.00 168.00 166.00 ' ' ' ' ' ' 164.00 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Discharge (cfs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 11 POST E4 Hydrograph type = SCS Runoff Peak discharge = 11.15 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 24,228 cuft Drainage area = 2.800 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(2.100 x 98) + (0.700 x 80)] / 2.800 POST E4 Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 12 WET POND E4 Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 11 -POST E4 Max. Elevation Reservoir name = WET POND E4 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.15 ft Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' 0 300 Hyd No. 12 WET POND E4 Hyd. No. 12 -- 1 Year Tuesday, 11 / 14 / 2023 = 0.660 cfs = 761 min = 17,553 cuft = 168.51 ft = 34,435 cuft Q (cfs) 12.00 10.00 4.00 2.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 11 0 Total storage used = 34,435 cuft Pond Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Pond No. 6 - WET POND E4 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 164.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 164.00 4,536 0 0 1.00 165.00 5,512 5,024 5,024 2.00 166.00 6,545 6,029 11,053 3.00 167.00 7,634 7,090 18,142 3.50 167.50 10,093 4,432 22,574 4.00 168.00 11,790 5,471 28,045 5.00 169.00 13,188 12,489 40,534 6.00 170.00 14,643 13,916 54,449 7.00 171.00 16,154 15,399 69,848 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.25 12.00 0.00 Span (in) = 15.00 1.25 6.00 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 167.20 167.20 168.00 0.00 Length (ft) = 81.00 0.00 0.00 0.00 Slope (%) = 0.10 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 8.00 6.00 4.00 2.00 0.00 1 0.0 Weir Structures Tuesday, 11 / 14 / 2023 [A] [B] [C] [D] Crest Len (ft) = 12.00 20.00 0.00 0.00 Crest El. (ft) = 169.00 169.50 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 10.0 20.0 30.0 40.0 Total Q Stage / Discharge Elev (ft) 172.00 170.00 168.00 166.00 ' ' ' ' ' ' 164.00 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Discharge (cfs) Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 13 POST POI-1 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 3.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.96 in Storm duration = 24 hrs . Composite (Area/CN) _ [(1.800 x 98) + (2.150 x 80)] / 3.950 Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST POI-1 UNDETAINED Hyd. No. 13 -- 1 Year Tuesday, 11 / 14 / 2023 = 12.80 cfs = 717 min = 26,360 cuft = 88* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 . 11 4.00 2.00 0.00 ' 1 1-' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 13 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 14 TOTAL POST POI-1 Hydrograph type = Combine Peak discharge = 13.55 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 207,313 cuft Inflow hyds. = 4, 6, 8, 10, 12, 13 Contrib. drain. area = 3.950 ac Q (cfs) 14.00 12.00 10.00 00 • 11 4.00 2.00 0.00 0 300 Hyd No. 14 .11 TOTAL POST POI-1 Hyd. No. 14 -- 1 Year Q (cfs) 14.00 12.00 10.00 11 . 11 4.00 2.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 10 Hyd No. 12 Hyd No. 13 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 17 POST A2 Hydrograph type = SCS Runoff Peak discharge = 24.89 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 54,079 cuft Drainage area = 6.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(4.900 x 98) + (1.350 x 80)] / 6.250 POST A2 Q (cfs) Hyd. No. 17 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 17 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 18 WET POND A2 Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 17 -POST A2 Reservoir name = WET POND A2 Storage Indication method used. Wet pond routing start elevation = 169.60 ft WET POND A2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, 11 / 14 / 2023 = 1.982 cfs = 749 min = 52,992 cuft = 171.37 ft = 71,064 cuft Q (cfs) Hyd. No. 18 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 18 Hyd No. 17 0 Total storage used = 71,064 cuft Pond Report 27 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Pond No. 2 - WET POND A2 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 165.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 165.00 5,333 0 0 1.00 166.00 6,746 6,040 6,040 2.00 167.00 8,375 7,561 13,600 3.00 168.00 10,139 9,257 22,857 4.00 169.00 12,038 11,089 33,946 5.00 170.00 15,132 13,585 47,531 6.00 171.00 17,862 16,497 64,028 7.00 172.00 19,747 18,805 82,832 8.00 173.00 21,692 20,720 103,552 9.00 174.00 23,691 22,692 126,243 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 8.00 Inactive 0.00 Crest Len (ft) = 16.00 60.00 0.00 0.00 Span (in) = 18.00 8.00 8.00 0.00 Crest El. (ft) = 172.00 172.50 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 168.00 169.65 171.50 0.00 Weir Type = 1 Broad --- --- Length (ft) = 75.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.70 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 6.00 4.00 2.00 0.00 ' ' 0.0 30.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 60.0 90.0 120.0 150.0 Elev (ft) 175.00 173.00 171.00 169.00 167.00 165.00 180.0 210.0 240.0 270.0 300.0 330.0 Discharge (cfs) Hydrograph Report W Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 19 POST POI-2 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.650 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.96 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST POI-2 UNDETAINED Hyd. No. 19 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 19 Tuesday, 11 / 14 / 2023 = 1.479 cfs = 718 min = 2,969 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 T-' 0.00 1080 1200 1320 1440 1560 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 20 TOTAL POST POI-2 Hydrograph type = Combine Peak discharge = 3.154 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 55,960 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 0.650 ac Q (cfs) 4.00 3.00 2.00 1.00 TOTAL POST POI-2 Hyd. No. 20 -- 1 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 180 360 540 720 900 1080 1260 1440 1620 1800 1980 Time (min) Hyd No. 20 — Hyd No. 18 Hyd No. 19 Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 22 TOTAL PRE Hydrograph type = Combine Peak discharge = 17.97 cfs Storm frequency = 1 yrs Time to peak = 740 min Time interval = 1 min Hyd. volume = 105,724 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 43.500 ac Q (cfs) 18.00 15.00 12.00 .IM 3.00 0.00 ' ' 0 120 240 Hyd No. 22 360 480 600 Hyd No. 1 TOTAL PRE Hyd. No. 22 -- 1 Year Q (cfs) 18.00 15.00 12.00 M 3.00 M ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 23 TOTALPOST Hydrograph type = Combine Peak discharge = 16.70 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 263,274 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac TOTAL POST Q (cfs) Hyd. No. 23 -- 1 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 23 Hyd No. 14 Hyd No. 20 Hydrograph Summary Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 23.44 1 738 122,097 ------ ------ ------ PRE POI-1 2 SCS Runoff 6.683 1 740 40,896 ------ ------ ------ PRE POI-2 3 SCS Runoff 74.93 1 725 241,178 ------ ------ ------ POST Al 4 Reservoir 4.489 1 809 184,558 3 168.74 443,970 WET POND Al 5 SCS Runoff 11.16 1 717 24,296 ------ ------ ------ POST E1 6 Reservoir 1.075 1 742 19,691 5 168.72 27,912 WET POND E1 7 SCS Runoff 4.366 1 717 9,507 ------ ------ ------ POST E2 8 Reservoir 0.575 1 730 7,402 7 168.71 11,132 WET POND E2 9 SCS Runoff 11.16 1 717 24,623 ------ ------ ------ POST E3 10 Reservoir 4.028 1 724 15,933 9 169.23 24,880 WET POND E3 11 SCS Runoff 13.89 1 717 30,642 ------ ------ ------ POST E4 12 Reservoir 1.202 1 746 23,900 11 168.78 37,751 WET POND E4 13 SCS Runoff 16.69 1 717 34,762 ------ ------ ------ POST POI-1 UNDETAINED 14 Combine 18.95 1 720 286,245 4, 6, 8, ------ ------ TOTAL POST POI-1 10, 12, 13 17 SCS Runoff 31.00 1 717 68,397 ------ ------ ------ POST A2 18 Reservoir 2.259 1 751 67,291 17 171.79 78,897 WET POND A2 19 SCS Runoff 2.063 1 718 4,156 ------ ------ ------ POST POI-2 UNDETAINED 20 Combine 3.979 1 718 71,447 18, 19 ------ ------ TOTAL POST POI-2 22 Combine 30.10 1 739 162,993 1, 2, ------ ------ TOTAL PRE 23 Combine 22.86 1 719 357,692 14, 20, ------ ------ TOTAL POST Block A-E.gpw Return Period: 2 Year Tuesday, 11 / 14 / 2023 Hydrograph Report 33 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PRE POI-1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 28.500 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.59 in Storm duration = 24 hrs . Composite (Area/CN) _ [(7.000 x 55) + (21.500 x 77)] / 28.500 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-1 Hyd. No. 1 -- 2 Year Tuesday, 11 / 14 / 2023 = 23.44 cfs = 738 min = 122,097 cuft = 72* = 0 ft = 39.80 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 i i i i I I I I I I 1 ` i 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PRE POI-2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 15.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.59 in Storm duration = 24 hrs . Composite (Area/CN) _ [(9.000 x 55) + (6.000 x 77)] / 15.000 Q (cfs) 7.00 .M 5.00 i 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-2 Hyd. No. 2 -- 2 Year Tuesday, 11 / 14 / 2023 = 6.683 cfs = 740 min = 40,896 cuft = 64* = 0 ft = 39.90 min = Type II = 484 Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1" ' ' ' ' ' ' % ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 3 POST Al Hydrograph type = SCS Runoff Peak discharge = 74.93 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 241,178 cuft Drainage area = 24.400 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(16.800 x 98) + (7.600 x 80)] / 24.400 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 POST Al Hyd. No. 3 -- 2 Year Milo Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge = 4.489 cfs Storm frequency = 2 yrs Time to peak = 809 min Time interval = 1 min Hyd. volume = 184,558 cuft Inflow hyd. No. = 3 - POST Al Max. Elevation = 168.74 ft Reservoir name = WET POND Al Max. Storage = 443,970 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft WET POND Al Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 91-1 IAM 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 0 Total storage used = 443,970 cuft 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 5 POST E1 Hydrograph type = SCS Runoff Peak discharge = 11.16 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 24,296 cuft Drainage area = 2.300 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.600 x 98) + (0.700 x 80)] / 2.300 POST E1 Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 6 WET POND E1 Hydrograph type = Reservoir Peak discharge = 1.075 cfs Storm frequency = 2 yrs Time to peak = 742 min Time interval = 1 min Hyd. volume = 19,691 cuft Inflow hyd. No. = 5 - POST E1 Max. Elevation = 168.72 ft Reservoir name = WET POND E1 Max. Storage = 27,912 cuft Storage Indication method used. Wet pond routing start elevation = 167.25 ft. WET POND E1 Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 6 Hyd No. 5 0 Total storage used = 27,912 cuft Time (min) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 7 POST E2 Hydrograph type = SCS Runoff Peak discharge = 4.366 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 9,507 cuft Drainage area = 0.900 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(0.650 x 98) + (0.250 x 80)] / 0.900 POST E2 Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0-1 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) Hydrograph Report 40 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 8 WET POND E2 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 7 - POST E2 Max. Elevation Reservoir name = WET POND E2 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.50 ft. WET POND E2 Q (cfs) Hyd. No. 8 -- 2 Year Tuesday, 11 / 14 / 2023 = 0.575 cfs = 730 min = 7,402 cuft = 168.71 ft = 11,132 cuft Q (cfs) 5.00 4.00 5.00 4.00 3.00 2.00 3.00 2.00 1.00 0.00 0 180 Hyd No. 360 540 720 900 1080 1260 1440 8 Hyd No. 7 0 Total storage used = 1.00 0.00 1620 1800 1980 Time (min) 11,132 cuft 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 9 POST E3 Hydrograph type = SCS Runoff Peak discharge = 11.16 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 24,623 cuft Drainage area = 2.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.750 x 98) + (0.500 x 80)] / 2.250 POST E3 Q (cfs) Hyd. No. 9 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 10 WET POND E3 Hydrograph type = Reservoir Peak discharge = 4.028 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 15,933 cuft Inflow hyd. No. = 9 - POST E3 Max. Elevation = 169.23 ft Reservoir name = WET POND E3 Max. Storage = 24,880 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft WET POND E3 Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hyd No. 9 0 Total storage used = 24,880 cuft 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 11 POST E4 Hydrograph type = SCS Runoff Peak discharge = 13.89 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 30,642 cuft Drainage area = 2.800 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(2.100 x 98) + (0.700 x 80)] / 2.800 POST E4 Q (cfs) Hyd. No. 11 -- 2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 12 WET POND E4 Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 11 -POST E4 Reservoir name = WET POND E4 Storage Indication method used. Wet pond routing start elevation = 167.15 ft Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WET POND E4 Tuesday, 11 / 14 / 2023 = 1.202 cfs = 746 min = 23,900 cuft = 168.78 ft = 37,751 cuft Q (cfs) Hyd. No. 12 -- 2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 12 Hyd No. 11 0 Total storage used = 37,751 cuft 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 13 POST POI-1 UNDETAINED Hydrograph type = SCS Runoff Peak discharge = 16.69 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 34,762 cuft Drainage area = 3.950 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.800 x 98) + (2.150 x 80)] / 3.950 Q (cfs) 18.00 15.00 12.00 .M 3.00 POST POI-1 UNDETAINED Hyd. No. 13 -- 2 Year Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 ' —r ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 13 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 14 TOTAL POST POI-1 Hydrograph type = Combine Peak discharge = 18.95 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 286,245 cuft Inflow hyds. = 4, 6, 8, 10, 12, 13 Contrib. drain. area = 3.950 ac TOTAL POST POI-1 Q (cfs) Hyd. No. 14 -- 2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 14 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 10 Hyd No. 12 Hyd No. 13 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 17 POST A2 Hydrograph type = SCS Runoff Peak discharge = 31.00 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 68,397 cuft Drainage area = 6.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(4.900 x 98) + (1.350 x 80)] / 6.250 POST A2 Q (cfs) Hyd. No. 17 -- 2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 17 Time (min) Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 18 WET POND A2 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 17 -POST A2 Max. Elevation Reservoir name = WET POND A2 Max. Storage Storage Indication method used. Wet pond routing start elevation = 169.60 ft. WET POND A2 Q (cfs) Hyd. No. 18 -- 2 Year Tuesday, 11 / 14 / 2023 = 2.259 cfs = 751 min = 67,291 cuft = 171.79 ft = 78,897 cuft Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 0.00 0 240 Hyd No. 18 5.00 0.00 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 17 0 Total storage used = 78,897 cuft Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 19 POST POI-2 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.650 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.59 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST POI-2 UNDETAINED Tuesday, 11 / 14 / 2023 = 2.063 cfs = 718 min = 4,156 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) Hyd. No. 19 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Time (min) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 20 TOTAL POST POI-2 Hydrograph type = Combine Peak discharge = 3.979 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 71,447 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 0.650 ac Q (cfs) 4.00 3.00 2.00 1.00 TOTAL POST POI-2 Hyd. No. 20 -- 2 Year 180 360 540 720 Hyd No. 20 — Hyd No. 18 900 1080 1260 Hyd No. 19 1440 1620 1800 Q (cfs) 4.00 3.00 2.00 1.00 ---* 0.00 1980 Time (min) Hydrograph Report 51 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 22 TOTAL PRE Hydrograph type = Combine Peak discharge = 30.10 cfs Storm frequency = 2 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 162,993 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 43.500 ac TOTAL PRE Q (cfs) Hyd. No. 22 -- 2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 k IX 5.00 1 1 1 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 22 Hyd No. 1 Hyd No. 2 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 23 TOTALPOST Hydrograph type = Combine Peak discharge = 22.86 cfs Storm frequency = 2 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 357,692 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0 300 Hyd No. 23 TOTAL POST Hyd. No. 23 -- 2 Year 600 900 1200 Hyd No. 14 1500 1800 2100 2400 Hyd No. 20 2700 Q (cfs) 24.00 20.00 16.00 12.00 4.00 1 0.00 3000 Time (min) Hydrograph Summary Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 53.62 1 738 262,975 ------ ------ ------ PRE POI-1 2 SCS Runoff 19.80 1 738 101,994 ------ ------ ------ PRE POI-2 3 SCS Runoff 121.24 1 724 400,324 ------ ------ ------ POST Al 4 Reservoir 7.614 1 800 340,243 3 169.48 547,291 WET POND Al 5 SCS Runoff 17.72 1 717 39,869 ------ ------ ------ POST E1 6 Reservoir 5.092 1 725 35,181 5 169.30 35,001 WET POND E1 7 SCS Runoff 6.935 1 717 15,601 ------ ------ ------ POST E2 8 Reservoir 3.641 1 722 13,484 7 169.18 13,544 WET POND E2 9 SCS Runoff 17.54 1 717 39,945 ------ ------ ------ POST E3 10 Reservoir 11.76 1 721 31,246 9 169.71 29,315 WET POND E3 11 SCS Runoff 21.83 1 717 49,709 ------ ------ ------ POST E4 12 Reservoir 5.440 1 725 42,846 11 169.43 46,562 WET POND E4 13 SCS Runoff 28.16 1 717 60,453 ------ ------ ------ POST POI-1 UNDETAINED 14 Combine 50.71 1 720 523,454 4, 6, 8, ------ ------ TOTAL POST POI-1 10, 12, 13 17 SCS Runoff 48.73 1 717 110,958 ------ ------ ------ POST A2 18 Reservoir 16.53 1 724 109,818 17 172.51 93,402 WET POND A2 19 SCS Runoff 3.876 1 717 7,981 ------ ------ ------ POST POI-2 UNDETAINED 20 Combine 18.04 1 722 117,800 18, 19 ------ ------ TOTAL POST POI-2 22 Combine 73.42 1 738 364,969 1, 2, ------ ------ TOTAL PRE 23 Combine 67.28 1 720 641,253 14, 20, ------ ------ TOTAL POST Block A-E.gpw Return Period: 10 Year Tuesday, 11 / 14 / 2023 Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PRE POI-1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 28.500 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.44 in Storm duration = 24 hrs . Composite (Area/CN) _ [(7.000 x 55) + (21.500 x 77)] / 28.500 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-1 Hyd. No. 1 -- 10 Year Tuesday, 11 / 14 / 2023 = 53.62 cfs = 738 min = 262,975 cuft = 72* = 0 ft = 39.80 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 i I I I I I I I_ i 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 55 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PRE POI-2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 15.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.44 in Storm duration = 24 hrs . Composite (Area/CN) _ [(9.000 x 55) + (6.000 x 77)] / 15.000 Q (cfs) 21.00 18.00 15.00 12.00 • m N. 11 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-2 Hyd. No. 2 -- 10 Year Tuesday, 11 / 14 / 2023 = 19.80 cfs = 738 min = 101,994 cuft = 64* = 0 ft = 39.90 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M . W 3.00 0.00 ' 1 1 1 1' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 56 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 POST Al Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 24.400 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs . Composite (Area/CN) _ [(16.800 x 98) + (7.600 x 80)] / 24.400 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST Al Hyd. No. 3 -- 10 Year Tuesday, 11 / 14 / 2023 = 121.24 cfs = 724 min = 400,324 cuft = 92* = 0 ft = 20.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' "— ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 57 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 3 -POST Al Reservoir name = WET POND Al Storage Indication method used. Wet pond routing start elevation = 167.50 ft WET POND Al Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, 11 / 14 / 2023 = 7.614 cfs = 800 min = 340,243 cuft = 169.48 ft = 547,291 cuft Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 0 Total storage used = 547,291 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 5 POST E1 Hydrograph type = SCS Runoff Peak discharge = 17.72 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 39,869 cuft Drainage area = 2.300 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.600 x 98) + (0.700 x 80)] / 2.300 POST E1 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) Hydrograph Report 59 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 WET POND E1 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - POST E1 Max. Elevation Reservoir name = WET POND E1 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.25 ft. WET POND E1 Q (cfs) Hyd. No. 6 -- 10 Year Tuesday, 11 / 14 / 2023 = 5.092 cfs = 725 min = 35,181 cuft = 169.30 ft = 35,001 cuft Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 0.00 0 180 Hyd No. 6 360 540 720 Hyd No. 5 T 900 1080 1260 0 Total storage used 3.00 0.00 1440 1620 1800 Time (min) = 35,001 cuft 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 7 POST E2 Hydrograph type = SCS Runoff Peak discharge = 6.935 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 15,601 cuft Drainage area = 0.900 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(0.650 x 98) + (0.250 x 80)] / 0.900 Q (cfs) 7.00 .M 5.00 i 3.00 2.00 1.00 POST E2 Hyd. No. 7 -- 10 Year 0.00 0 120 240 360 480 600 720 840 Hyd No. 7 Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 8 WET POND E2 Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 7 -POST E2 Reservoir name = WET POND E2 Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 7.00 AM 5.00 iM 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WET POND E2 Hyd. No. 8 -- 10 Year Tuesday, 11 / 14 / 2023 = 3.641 cfs = 722 min = 13,484 cuft = 169.18 ft = 13,544 cuft Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1�r ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 0 Total storage used = 13,544 cuft 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 9 POST E3 Hydrograph type = SCS Runoff Peak discharge = 17.54 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 39,945 cuft Drainage area = 2.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.750 x 98) + (0.500 x 80)] / 2.250 Q (cfs) 18.00 15.00 12.00 .M 3.00 POST E3 Hyd. No. 9 -- 10 Year 0.00 ' 0 120 240 360 480 600 720 840 Hyd No. 9 Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 960 1080 1200 Time (min) Hydrograph Report 63 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 10 WET POND E3 Hydrograph type = Reservoir Peak discharge = 11.76 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 31,246 cuft Inflow hyd. No. = 9 - POST E3 Max. Elevation = 169.71 ft Reservoir name = WET POND E3 Max. Storage = 29,315 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 18.00 15.00 12.00 .M 3.00 0.00 ' 0 120 240 Hyd No. 10 WET POND E3 Hyd. No. 10 -- 10 Year Q (cfs) 18.00 15.00 12.00 m 3.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 0 Total storage used = 29,315 cuft 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 11 POST E4 Hydrograph type = SCS Runoff Peak discharge = 21.83 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 49,709 cuft Drainage area = 2.800 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(2.100 x 98) + (0.700 x 80)] / 2.800 POST E4 Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) Hydrograph Report 65 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 12 WET POND E4 Hydrograph type = Reservoir Peak discharge = 5.440 cfs Storm frequency = 10 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 42,846 cuft Inflow hyd. No. = 11 -POST E4 Max. Elevation = 169.43 ft Reservoir name = WET POND E4 Max. Storage = 46,562 cuft Storage Indication method used. Wet pond routing start elevation = 167.15 ft WET POND E4 Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 Time (min) Hyd No. 12 Hyd No. 11 0 Total storage used = 46,562 cuft 66 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 13 POST POI-1 UNDETAINED Hydrograph type = SCS Runoff Peak discharge = 28.16 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 60,453 cuft Drainage area = 3.950 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.800 x 98) + (2.150 x 80)] / 3.950 POST POI-1 UNDETAINED Q (cfs) Hyd. No. 13 -- 10 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 13 Time (min) 67 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 14 TOTAL POST POI-1 Hydrograph type = Combine Peak discharge = 50.71 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 523,454 cuft Inflow hyds. = 4, 6, 8, 10, 12, 13 Contrib. drain. area = 3.950 ac TOTAL POST POI-1 Q (cfs) Hyd. No. 14 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 10.00 20.00 10.00 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Hyd No. 14 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 10 Hyd No. 12 — Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 17 POST A2 Hydrograph type = SCS Runoff Peak discharge = 48.73 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 110,958 cuft Drainage area = 6.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(4.900 x 98) + (1.350 x 80)] / 6.250 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 120 240 Hyd No. 17 POST A2 Hyd. No. 17 -- 10 Year 360 480 600 720 840 960 Q (cfs) 50.00 40.00 30.00 20.00 10.00 � — 0.00 1080 1200 Time (min) Hydrograph Report 69 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 18 WET POND A2 Hydrograph type = Reservoir Peak discharge = 16.53 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 109,818 cuft Inflow hyd. No. = 17 -POST A2 Max. Elevation = 172.51 ft Reservoir name = WET POND A2 Max. Storage = 93,402 cuft Storage Indication method used. Wet pond routing start elevation = 169.60 ft Q (cfs) 50.00 30.00 20.00 10.00 WET POND A2 Hyd. No. 18 -- 10 Year 180 360 540 720 Hyd No. 18 Hyd No. 17 900 1080 1260 1440 1620 0 Total storage used = 93,402 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 - '- 0.00 1800 Time (min) Hydrograph Report 70 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 19 POST POI-2 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.650 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 120 240 Hyd No. 19 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST POI-2 UNDETAINED Hyd. No. 19 -- 10 Year 360 480 600 720 840 960 Tuesday, 11 / 14 / 2023 = 3.876 cfs = 717 min = 7,981 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 20 TOTAL POST POI-2 Hydrograph type = Combine Peak discharge = 18.04 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 117,800 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 0.650 ac Q (cfs) 21.00 18.00 15.00 12.00 • m . 11 3.00 0.00 ' 0 180 Hyd No. 20 TOTAL POST POI-2 Hyd. No. 20 -- 10 Year 360 540 720 Hyd No. 18 Q (cfs) 21.00 18.00 15.00 12.00 M V. We 3.00 0.00 900 1080 1260 1440 1620 Time (min) Hyd No. 19 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 22 TOTAL PRE Hydrograph type = Combine Peak discharge = 73.42 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 1 min Hyd. volume = 364,969 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 43.500 ac Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 22 Hyd No. 1 Hyd No. 2 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 23 TOTALPOST Hydrograph type = Combine Peak discharge = 67.28 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 641,253 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac Q (cfs) 70.00 50.00 30.00 20.00 10.00 0.00 ' ' 0 240 Hyd No. 23 TOTAL POST Hyd. No. 23 -- 10 Year 480 720 960 Hyd No. 14 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 ' 0.00 1200 1440 1680 1920 2160 Time (min) Hyd No. 20 Hydrograph Summary Report 74 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 75.07 1 738 364,605 ------ ------ ------ PRE POI-1 2 SCS Runoff 29.83 1 738 148,663 ------ ------ ------ PRE POI-2 3 SCS Runoff 151.00 1 724 504,825 ------ ------ ------ POST Al 4 Reservoir 8.890 1 806 442,371 3 169.99 618,498 WET POND Al 5 SCS Runoff 21.93 1 717 50,067 ------ ------ ------ POST E1 6 Reservoir 8.228 1 724 45,346 5 169.62 39,047 WET POND E1 7 SCS Runoff 8.583 1 717 19,591 ------ ------ ------ POST E2 8 Reservoir 5.287 1 722 17,469 7 169.33 14,416 WET POND E2 9 SCS Runoff 21.64 1 717 49,955 ------ ------ ------ POST E3 10 Reservoir 17.82 1 720 41,252 9 169.85 30,570 WET POND E3 11 SCS Runoff 26.93 1 717 62,167 ------ ------ ------ POST E4 12 Reservoir 12.56 1 723 55,251 11 169.74 50,863 WET POND E4 13 SCS Runoff 35.55 1 717 77,543 ------ ------ ------ POST POI-1 UNDETAINED 14 Combine 73.76 1 720 679,232 4, 6, 8, ------ ------ TOTAL POST POI-1 10, 12, 13 17 SCS Runoff 60.12 1 717 138,765 ------ ------ ------ POST A2 18 Reservoir 38.86 1 722 137,609 17 172.77 98,756 WET POND A2 19 SCS Runoff 5.095 1 717 10,617 ------ ------ ------ POST POI-2 UNDETAINED 20 Combine 42.60 1 721 148,226 18, 19 ------ ------ TOTAL POST POI-2 22 Combine 104.89 1 738 513,267 1, 2, ------ ------ TOTAL PRE 23 Combine 114.72 1 721 827,459 14, 20, ------ ------ TOTAL POST Block A-E.gpw Return Period: 25 Year Tuesday, 11 / 14 / 2023 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 1 PRE POI-1 Hydrograph type = SCS Runoff Peak discharge = 75.07 cfs Storm frequency = 25 yrs Time to peak = 738 min Time interval = 1 min Hyd. volume = 364,605 cuft Drainage area = 28.500 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 39.80 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(7.000 x 55) + (21.500 x 77)] / 28.500 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 PRE POI-1 Hyd. No. 1 -- 25 Year Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PRE POI-2 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 15.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.64 in Storm duration = 24 hrs . Composite (Area/CN) _ [(9.000 x 55) + (6.000 x 77)] / 15.000 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' 0 120 240 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-2 Hyd. No. 2 -- 25 Year Tuesday, 11 / 14 / 2023 = 29.83 cfs = 738 min = 148,663 cuft = 64* = 0 ft = 39.90 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 i i I I I I I I I` i 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) 77 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 3 POST Al Hydrograph type = SCS Runoff Peak discharge = 151.00 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 504,825 cuft Drainage area = 24.400 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(16.800 x 98) + (7.600 x 80)] / 24.400 Q (cfs) 160.00 140.00 120.00 100.00 20.00 POST Al Hyd. No. 3 -- 25 Year Milo Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 3 -POST Al Reservoir name = WET POND Al Storage Indication method used. Wet pond routing start elevation = 167.50 ft Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, 11 / 14 / 2023 = 8.890 cfs = 806 min = 442,371 cuft = 169.99 ft = 618,498 cuft •1 11 •1 11 1 11 -� ---- -- • 1 1 1 1 11 -�------- • 1 1 1 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 0 Total storage used = 618,498 cuft 79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 5 POST E1 Hydrograph type = SCS Runoff Peak discharge = 21.93 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 50,067 cuft Drainage area = 2.300 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.600 x 98) + (0.700 x 80)] / 2.300 POST E1 Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) Hydrograph Report 80 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 WET POND E1 Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - POST E1 Max. Elevation Reservoir name = WET POND E1 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.25 ft Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 ' ' 0 180 Hyd No. 6 WET POND E1 Hyd. No. 6 -- 25 Year Tuesday, 11 / 14 / 2023 = 8.228 cfs = 724 min = 45,346 cuft = 169.62 ft = 39,047 cuft 360 540 720 900 1080 1260 1440 Hyd No. 5 0 Total storage used = 39,047 cuft Q (cfs) 24.00 20.00 16.00 12.00 4.00 -Emi- 0.00 1620 Time (min) 81 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 7 POST E2 Hydrograph type = SCS Runoff Peak discharge = 8.583 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 19,591 cuft Drainage area = 0.900 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(0.650 x 98) + (0.250 x 80)] / 0.900 POST E2 Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) Hydrograph Report 82 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 8 WET POND E2 Hydrograph type = Reservoir Peak discharge = 5.287 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 17,469 cuft Inflow hyd. No. = 7 - POST E2 Max. Elevation = 169.33 ft Reservoir name = WET POND E2 Max. Storage = 14,416 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft WET POND E2 Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 0 Total storage used = 14,416 cuft 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 9 POST E3 Hydrograph type = SCS Runoff Peak discharge = 21.64 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 49,955 cuft Drainage area = 2.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.750 x 98) + (0.500 x 80)] / 2.250 POST E3 Q (cfs) Hyd. No. 9 -- 25 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) Hydrograph Report 84 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 10 WET POND E3 Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 9 - POST E3 Max. Elevation Reservoir name = WET POND E3 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.50 ft. WET POND E3 Q (cfs) Hyd. No. 10 -- 25 Year 24.00 Tuesday, 11 / 14 / 2023 = 17.82 cfs = 720 min = 41,252 cuft = 169.85 ft = 30,570 cuft Q (cfs) 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 4.00 8.00 4.00 0.00 0 120 240 360 480 600 720 840 960 1080 Hyd No. 10 Hyd No. 9 0 Total storage used = 0.00 1200 1320 1440 Time (min) 30,570 cuft 85 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 11 POST E4 Hydrograph type = SCS Runoff Peak discharge = 26.93 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 62,167 cuft Drainage area = 2.800 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) _ [(2.100 x 98) + (0.700 x 80)] / 2.800 POST E4 Q (cfs) Hyd. No. 11 -- 25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) Hydrograph Report 86 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 12 WET POND E4 Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 11 - POST E4 Max. Elevation Reservoir name = WET POND E4 Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.15 ft. WET POND E4 Q (cfs) Hyd. No. 12 -- 25 Year 28.00 Tuesday, 11 / 14 / 2023 = 12.56 cfs = 723 min = 55,251 cuft = 169.74 ft = 50,863 cuft Q (cfs) 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0 180 Hyd No. 0.00 360 540 720 900 1080 1260 1440 1620 Time (min) 12 Hyd No. 11 0 Total storage used = 50,863 cuft 87 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 13 POST POI-1 UNDETAINED Hydrograph type = SCS Runoff Peak discharge = 35.55 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 77,543 cuft Drainage area = 3.950 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.800 x 98) + (2.150 x 80)] / 3.950 POST POI-1 UNDETAINED Q (cfs) Hyd. No. 13 -- 25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 LJ L 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 13 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 14 TOTAL POST POI-1 Hydrograph type = Combine Peak discharge = 73.76 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 679,232 cuft Inflow hyds. = 4, 6, 8, 10, 12, 13 Contrib. drain. area = 3.950 ac Q (cfs) TOTAL POST POI-1 Hyd. No. 14 -- 25 Year Q (cfs) 0 240 Hyd No. 14 480 720 960 1200 1440 1680 1920 2160 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 10 Hyd No. 12 Hyd No. 13 I Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 17 POST A2 Hydrograph type = SCS Runoff Peak discharge = 60.12 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 138,765 cuft Drainage area = 6.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(4.900 x 98) + (1.350 x 80)] / 6.250 POST A2 Q (cfs) Hyd. No. 17 -- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 17 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 18 WET POND A2 Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 17 -POST A2 Reservoir name = WET POND A2 Storage Indication method used. Wet pond routing start elevation = 169.60 ft WET POND A2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, 11 / 14 / 2023 = 38.86 cfs = 722 min = 137,609 cuft = 172.77 ft = 98.756 cuft Q (cfs) Hyd. No. 18 -- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 18 Hyd No. 17 0 Total storage used = 98,756 cuft Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 19 POST POI-2 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 0.650 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.64 in Storm duration = 24 hrs Q (cfs 6.00 5.00 4.00 3.00 2.00 1.00 Tuesday, 11 / 14 / 2023 Peak discharge = 5.095 cfs Time to peak = 717 min Hyd. volume = 10,617 cuft Curve number = 80 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 19 Time (min) Hydrograph Report 92 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 20 TOTAL POST POI-2 Hydrograph type = Combine Peak discharge = 42.60 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 148,226 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 0.650 ac TOTAL POST POI-2 Q (cfs) Hyd. No. 20 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 20 Hyd No. 18 Hyd No. 19 Hydrograph Report 93 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 22 TOTAL PRE Hydrograph type = Combine Peak discharge = 104.89 cfs Storm frequency = 25 yrs Time to peak = 738 min Time interval = 1 min Hyd. volume = 513,267 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 43.500 ac Q (cfs 120.00 100.00 F� 20.00 Q (cfs) 120.00 100.00 .1 11 40.00 20.00 rna 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hyd No. 2 I Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 23 TOTALPOST Hydrograph type = Combine Peak discharge = 114.72 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 827,459 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac TOTAL POST Q (cfs) Hyd. No. 23 -- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 Time (min) Hyd No. 23 Hyd No. 14 Hyd No. 20 Hydrograph Summary Report 95 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 113.41 1 737 548,815 ------ ------ ------ PRE POI-1 2 SCS Runoff 48.45 1 738 236,249 ------ ------ ------ PRE POI-2 3 SCS Runoff 201.43 1 724 684,403 ------ ------ ------ POST Al 4 Reservoir 19.62 1 765 619,018 3 170.66 718,857 WET POND Al 5 SCS Runoff 29.08 1 717 67,568 ------ ------ ------ POST E1 6 Reservoir 19.56 1 721 62,803 5 169.89 42,610 WET POND E1 7 SCS Runoff 11.38 1 717 26,440 ------ ------ ------ POST E2 8 Reservoir 7.408 1 721 24,310 7 169.58 15,905 WET POND E2 9 SCS Runoff 28.60 1 717 67,115 ------ ------ ------ POST E3 10 Reservoir 25.42 1 719 58,407 9 170.00 31,889 WET POND E3 11 SCS Runoff 35.59 1 717 83,521 ------ ------ ------ POST E4 12 Reservoir 26.04 1 721 76,538 11 170.01 54,660 WET POND E4 13 SCS Runoff 48.07 1 717 107,110 ------ ------ ------ POST POI-1 UNDETAINED 14 Combine 124.66 1 719 948,186 4, 6, 8, ------ ------ TOTAL POST POI-1 10, 12, 13 17 SCS Runoff 79.45 1 717 186,431 ------ ------ ------ POST A2 18 Reservoir 70.19 1 719 185,249 17 172.98 103,236 WET POND A2 19 SCS Runoff 7.188 1 717 15,268 ------ ------ ------ POST POI-2 UNDETAINED 20 Combine 76.89 1 719 200,517 18, 19 ------ ------ TOTAL POST POI-2 22 Combine 161.81 1 737 785,064 1, 2, ------ ------ TOTAL PRE 23 Combine 201.56 1 719 1,148,704 14, 20, ------ ------ TOTAL POST Block A-E.gpw Return Period: 100 Year Tuesday, 11 / 14 / 2023 Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PRE POI-1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 28.500 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.69 in Storm duration = 24 hrs . Composite (Area/CN) _ [(7.000 x 55) + (21.500 x 77)] / 28.500 Q (cfs) 120.00 100.00 20.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-1 Hyd. No. 1 -- 100 Year Tuesday, 11 / 14 / 2023 = 113.41 cfs = 737 min = 548,815 cuft = 72* = 0 ft = 39.80 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 I I I I I I I I t 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PRE POI-2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 15.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.69 in Storm duration = 24 hrs . Composite (Area/CN) _ [(9.000 x 55) + (6.000 x 77)] / 15.000 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 120 240 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI-2 Hyd. No. 2 -- 100 Year Tuesday, 11 / 14 / 2023 = 48.45 cfs = 738 min = 236,249 cuft = 64* = 0 ft = 39.90 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 i I I I I I I I` 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 POST Al Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 24.400 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.69 in Storm duration = 24 hrs . Composite (Area/CN) _ [(16.800 x 98) + (7.600 x 80)] / 24.400 Q (cfs) 210.00 180.00 150.00 120.00 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST Al Hyd. No. 3 -- 100 Year Tuesday, 11 / 14 / 2023 = 201.43 cfs = 724 min = 684,403 cuft = 92* = 0 ft = 20.00 min = Type II = 484 Q (cfs) 210.00 180.00 150.00 120.00 .1 1It 30.00 0.00 -'_T ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 -POST Al Max. Elevation Reservoir name = WET POND Al Max. Storage Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 210.00 180.00 150.00 120.00 F-TOWITIA 30.00 WET POND Al Hyd. No. 4 -- 100 Year Tuesday, 11 / 14 / 2023 = 19.62 cfs = 765 min = 619,018 cuft = 170.66 ft = 718,857 cuft Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' ' 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 0 Total storage used = 718,857 cuft 100 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 5 POST E1 Hydrograph type = SCS Runoff Peak discharge = 29.08 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 67,568 cuft Drainage area = 2.300 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.600 x 98) + (0.700 x 80)] / 2.300 POST E1 Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) Hydrograph Report 101 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 6 WET POND E1 Hydrograph type = Reservoir Peak discharge = 19.56 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 62,803 cuft Inflow hyd. No. = 5 - POST E1 Max. Elevation = 169.89 ft Reservoir name = WET POND E1 Max. Storage = 42,610 cuft Storage Indication method used. Wet pond routing start elevation = 167.25 ft WET POND E1 Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 5 0 Total storage used = 42,610 cuft 102 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 7 POST E2 Hydrograph type = SCS Runoff Peak discharge = 11.38 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 26,440 cuft Drainage area = 0.900 ac Curve number = 93* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(0.650 x 98) + (0.250 x 80)] / 0.900 POST E2 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) Hydrograph Report 103 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 8 WET POND E2 Hydrograph type = Reservoir Peak discharge = 7.408 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 24,310 cuft Inflow hyd. No. = 7 - POST E2 Max. Elevation = 169.58 ft Reservoir name = WET POND E2 Max. Storage = 15,905 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' 0 120 240 Hyd No. 8 WET POND E2 Hyd. No. 8 -- 100 Year Q (cfs) 12.00 10.00 4.00 2.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 0 Total storage used = 15,905 cuft 104 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 9 POST E3 Hydrograph type = SCS Runoff Peak discharge = 28.60 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 67,115 cuft Drainage area = 2.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.750 x 98) + (0.500 x 80)] / 2.250 POST E3 Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) Hydrograph Report 105 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 10 WET POND E3 Hydrograph type = Reservoir Peak discharge = 2 5.4 2 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 58,407 cuft Inflow hyd. No. = 9 - POST E3 Max. Elevation = 170.00 ft Reservoir name = WET POND E3 Max. Storage = 31,889 cuft Storage Indication method used. Wet pond routing start elevation = 167.50 ft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' 0 120 240 Hyd No. 10 WET POND E3 Hyd. No. 10 -- 100 Year 360 480 Hyd No. 9 .11 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 r ' 0.00 720 840 960 1080 1200 1320 Time (min) 0 Total storage used = 31,889 cuft 106 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 11 POST E4 Hydrograph type = SCS Runoff Peak discharge = 35.59 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 83,521 cuft Drainage area = 2.800 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(2.100 x 98) + (0.700 x 80)] / 2.800 POST E4 Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) Hydrograph Report 107 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 12 WET POND E4 Hydrograph type = Reservoir Peak discharge = 26.04 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 76,538 cuft Inflow hyd. No. = 11 - POST E4 Max. Elevation = 170.01 ft Reservoir name = WET POND E4 Max. Storage = 54,660 cuft Storage Indication method used. Wet pond routing start elevation = 167.15 ft WET POND E4 Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 — Hyd No. 11 0 Total storage used = 54,660 cuft 108 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 13 POST POI-1 UNDETAINED Hydrograph type = SCS Runoff Peak discharge = 48.07 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 107,110 cuft Drainage area = 3.950 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) _ [(1.800 x 98) + (2.150 x 80)] / 3.950 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 120 240 Hyd No. 13 POST POI-1 UNDETAINED Hyd. No. 13 -- 100 Year 360 480 600 720 840 960 Q (cfs) 50.00 40.00 30.00 20.00 10.00 � ' 0.00 1080 1200 Time (min) 109 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 14 TOTAL POST POI-1 Hydrograph type = Combine Peak discharge = 124.66 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 948,186 cuft Inflow hyds. = 4, 6, 8, 10, 12, 13 Contrib. drain. area = 3.950 ac TOTAL POST POI-1 Q (cfs) Hyd. No. 14 -- 100 Year Q (cfs) 140.00 140.00 120.00 100.00 120.00 100.00 80.00 60.00 80.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Hyd No. 14 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 10 Hyd No. 12 Hyd No. 13 110 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 17 POST A2 Hydrograph type = SCS Runoff Peak discharge = 79.45 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 186,431 cuft Drainage area = 6.250 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(4.900 x 98) + (1.350 x 80)] / 6.250 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 POST A2 Hyd. No. 17 -- 100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 17 Time (min) Hydrograph Report 111 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 18 WET POND A2 Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 17 -POST A2 Reservoir name = WET POND A2 Storage Indication method used. Wet pond routing start elevation = 169.60 ft Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, 11 / 14 / 2023 = 70.19 cfs = 719 min = 185,249 cuft = 172.98 ft = 103,236 cuft Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 777711= 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 0 Total storage used = 103,236 CA Hydrograph Report 112 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 19 POST POI-2 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.650 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.69 in Storm duration = 24 hrs Q (cfs) 8.00 4.00 2.00 0.00 ' 1' 0 120 240 Hyd No. 19 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST POI-2 UNDETAINED Hyd. No. 19 -- 100 Year Tuesday, 11 / 14 / 2023 = 7.188 cfs = 717 min = 15,268 cuft = 80 = 0 ft = 5.00 min = Type II = 484 360 480 600 720 840 960 1080 1200 Q (cfs) 8.00 4.00 2.00 — 0.00 1320 Time (min) 113 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 20 TOTAL POST POI-2 Hydrograph type = Combine Peak discharge = 76.89 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 200,517 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 0.650 ac Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 20 Hyd No. 18 Hyd No. 19 114 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 22 TOTAL PRE Hydrograph type = Combine Peak discharge = 161.81 cfs Storm frequency = 100 yrs Time to peak = 737 min Time interval = 1 min Hyd. volume = 785,064 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 43.500 ac TOTAL PRE Ell MIN oil ��� 115 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Hyd. No. 23 TOTALPOST Hydrograph type = Combine Peak discharge = 201.56 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 1,148,704 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac TOTAL POST Hydraflow Rainfall Report 116 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 39.4818 9.7000 0.8725 -------- 2 51.9984 10.6000 0.8893 -------- 3 0.0000 0.0000 0.0000 -------- 5 49.1179 9.4000 0.8228 -------- 10 47.0158 8.4000 0.7802 -------- 25 46.9359 7.7000 0.7416 -------- 50 43.1385 6.5000 0.6974 -------- 100 41.4250 5.8000 0.6640 -------- File name: Evans City IDF.IDF Intensity = B / (Tc + D)"E Tuesday, 11 / 14 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 3.78 2.93 2.41 2.05 1.79 1.59 1.43 1.31 1.20 1.11 1.04 0.97 2 4.52 3.53 2.91 2.48 2.17 1.93 1.74 1.59 1.46 1.35 1.26 1.18 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 5.47 4.28 3.55 3.04 2.67 2.39 2.17 1.98 1.83 1.70 1.60 1.50 10 6.21 4.85 4.02 3.45 3.04 2.73 2.48 2.28 2.11 1.97 1.85 1.74 25 7.13 5.57 4.63 4.00 3.53 3.18 2.90 2.67 2.48 2.32 2.18 2.06 50 7.85 6.11 5.08 4.39 3.89 3.51 3.21 2.96 2.76 2.59 2.44 2.31 100 8.53 6.63 5.52 4.79 4.25 3.85 3.53 3.27 3.05 2.87 2.71 2.57 Tc = time in minutes. Values may exceed 60. file name: G:\Proiects\18000\18047 MarkWest\-0148 Roval CS\Docs\Enaineerina\SWM\Hvdraflow\Forward TWD.DCD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.96 3.59 0.00 0.00 5.44 6.64 4.46 8.69 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents Block A-E.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 11 / 14 / 2023 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE POI-1............................................................................ 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, PRE POI-2............................................................................ 6 TR-55 Tc Worksheet........................................................................................................... 7 Hydrograph No. 3, SCS Runoff, POST Al ............................................................................... 8 Hydrograph No. 4, Reservoir, WET POND Al ......................................................................... 9 Pond Report - WET POND Al ........................................................................................... 10 Hydrograph No. 5, SCS Runoff, POST E1............................................................................. 11 Hydrograph No. 6, Reservoir, WET POND E1....................................................................... 12 Pond Report - WET POND E1........................................................................................... 13 Hydrograph No. 7, SCS Runoff, POST E2............................................................................. 14 Hydrograph No. 8, Reservoir, WET POND E2....................................................................... 15 Pond Report - WET POND E2........................................................................................... Hydrograph No. 9, SCS Runoff, POST E3............................................................................. Hydrograph No. 10, Reservoir, WET POND E3..................................................................... Pond Report - WET POND E3........................................................................................... Hydrograph No. 11, SCS Runoff, POST E4........................................................................... Hydrograph No. 12, Reservoir, WET POND E4..................................................................... Pond Report - WET POND E4........................................................................................... Hydrograph No. 13, SCS Runoff, POST POI-1 UNDETAINED.............................................. Hydrograph No. 14, Combine, TOTAL POST POI-1.............................................................. Hydrograph No. 17, SCS Runoff, POST A2........................................................................... Hydrograph No. 18, Reservoir, WET POND A2..................................................................... Pond Report - WET POND A2........................................................................................... Hydrograph No. 19, SCS Runoff, POST POI-2 UNDETAINED.............................................. Hydrograph No. 20, Combine, TOTAL POST POI-2............................................................. Hydrograph No. 22, Combine, TOTAL PRE.......................................................................... Hydrograph No. 23, Combine, TOTAL POST......................................................................... 31 2 - Year 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 SummaryReport....................................................................................................................... 32 HydrographReports................................................................................................................. 33 Hydrograph No. 1, SCS Runoff, PRE POI-1.......................................................................... 33 Hydrograph No. 2, SCS Runoff, PRE POI-2.......................................................................... 34 Hydrograph No. 3, SCS Runoff, POST Al ............................................................................. 35 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 36 Hydrograph No. 5, SCS Runoff, POST E1............................................................................. 37 Hydrograph No. 6, Reservoir, WET POND E1....................................................................... 38 Hydrograph No. 7, SCS Runoff, POST E2............................................................................. 39 Hydrograph No. 8, Reservoir, WET POND E2....................................................................... 40 Hydrograph No. 9, SCS Runoff, POST E3............................................................................. 41 Contents continued... Block A-E.gpw Hydrograph No. 10, Reservoir, WET POND E3..................................................................... 42 Hydrograph No. 11, SCS Runoff, POST E4........................................................................... 43 Hydrograph No. 12, Reservoir, WET POND E4..................................................................... 44 Hydrograph No. 13, SCS Runoff, POST POI-1 UNDETAINED.............................................. 45 Hydrograph No. 14, Combine, TOTAL POST POI-1.............................................................. 46 Hydrograph No. 17, SCS Runoff, POST A2........................................................................... 47 Hydrograph No. 18, Reservoir, WET POND A2..................................................................... 48 Hydrograph No. 19, SCS Runoff, POST POI-2 UNDETAINED.............................................. 49 Hydrograph No. 20, Combine, TOTAL POST POI-2............................................................. 50 Hydrograph No. 22, Combine, TOTAL PRE.......................................................................... 51 Hydrograph No. 23, Combine, TOTAL POST......................................................................... 52 10 -Year SummaryReport....................................................................................................................... 53 HydrographReports................................................................................................................. 54 Hydrograph No. 1, SCS Runoff, PRE POI-1.......................................................................... 54 Hydrograph No. 2, SCS Runoff, PRE POI-2.......................................................................... 55 Hydrograph No. 3, SCS Runoff, POST Al ............................................................................. 56 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 57 Hydrograph No. 5, SCS Runoff, POST E1............................................................................. 58 Hydrograph No. 6, Reservoir, WET POND E1....................................................................... 59 Hydrograph No. 7, SCS Runoff, POST E2............................................................................. 60 Hydrograph No. 8, Reservoir, WET POND E2....................................................................... 61 Hydrograph No. 9, SCS Runoff, POST E3............................................................................. 62 Hydrograph No. 10, Reservoir, WET POND E3..................................................................... 63 Hydrograph No. 11, SCS Runoff, POST E4........................................................................... 64 Hydrograph No. 12, Reservoir, WET POND E4..................................................................... 65 Hydrograph No. 13, SCS Runoff, POST POI-1 UNDETAINED.............................................. 66 Hydrograph No. 14, Combine, TOTAL POST POI-1.............................................................. 67 Hydrograph No. 17, SCS Runoff, POST A2........................................................................... 68 Hydrograph No. 18, Reservoir, WET POND A2.................................................................... 69 Hydrograph No. 19, SCS Runoff, POST POI-2 UNDETAINED.............................................. 70 Hydrograph No. 20, Combine, TOTAL POST POI-2............................................................. 71 Hydrograph No. 22, Combine, TOTAL PRE.......................................................................... 72 Hydrograph No. 23, Combine, TOTAL POST......................................................................... 73 25 - Year SummaryReport....................................................................................................................... 74 HydrographReports................................................................................................................. 75 Hydrograph No. 1, SCS Runoff, PRE POI-1.......................................................................... 75 Hydrograph No. 2, SCS Runoff, PRE POI-2.......................................................................... 76 Hydrograph No. 3, SCS Runoff, POST Al ............................................................................. 77 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 78 Hydrograph No. 5, SCS Runoff, POST E1............................................................................. 79 Hydrograph No. 6, Reservoir, WET POND E1....................................................................... 80 Hydrograph No. 7, SCS Runoff, POST E2............................................................................. 81 Hydrograph No. 8, Reservoir, WET POND E2....................................................................... 82 Hydrograph No. 9, SCS Runoff, POST E3............................................................................. 83 Hydrograph No. 10, Reservoir, WET POND E3..................................................................... 84 Hydrograph No. 11, SCS Runoff, POST E4........................................................................... 85 Contents continued... Block A-E.gpw Hydrograph No. 12, Reservoir, WET POND E4..................................................................... 86 Hydrograph No. 13, SCS Runoff, POST POI-1 UNDETAINED.............................................. 87 Hydrograph No. 14, Combine, TOTAL POST POI-1.............................................................. 88 Hydrograph No. 17, SCS Runoff, POST A2........................................................................... 89 Hydrograph No. 18, Reservoir, WET POND A2..................................................................... 90 Hydrograph No. 19, SCS Runoff, POST POI-2 UNDETAINED.............................................. 91 Hydrograph No. 20, Combine, TOTAL POST POI-2............................................................. 92 Hydrograph No. 22, Combine, TOTAL PRE.......................................................................... 93 Hydrograph No. 23, Combine, TOTAL POST......................................................................... 94 100 - Year SummaryReport....................................................................................................................... 95 HydrographReports................................................................................................................. 96 Hydrograph No. 1, SCS Runoff, PRE POI-1.......................................................................... 96 Hydrograph No. 2, SCS Runoff, PRE POI-2.......................................................................... 97 Hydrograph No. 3, SCS Runoff, POST Al ............................................................................. 98 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 99 Hydrograph No. 5, SCS Runoff, POST E1........................................................................... 100 Hydrograph No. 6, Reservoir, WET POND E1..................................................................... 101 Hydrograph No. 7, SCS Runoff, POST E2........................................................................... 102 Hydrograph No. 8, Reservoir, WET POND E2..................................................................... 103 Hydrograph No. 9, SCS Runoff, POST E3........................................................................... 104 Hydrograph No. 10, Reservoir, WET POND E3................................................................... 105 Hydrograph No. 11, SCS Runoff, POST E4......................................................................... 106 Hydrograph No. 12, Reservoir, WET POND E4................................................................... 107 Hydrograph No. 13, SCS Runoff, POST POI-1 UNDETAINED............................................ 108 Hydrograph No. 14, Combine, TOTAL POST POI-1............................................................ 109 Hydrograph No. 17, SCS Runoff, POST A2......................................................................... 110 Hydrograph No. 18, Reservoir, WET POND A2................................................................... 111 Hydrograph No. 19, SCS Runoff, POST POI-2 UNDETAINED............................................ 112 Hydrograph No. 20, Combine, TOTAL POST POI-2........................................................... 113 Hydrograph No. 22, Combine, TOTAL PRE........................................................................ 114 Hydrograph No. 23, Combine, TOTAL POST...................................................................... 115 OFReport................................................................................................................ 116 APPENDIX E Pond Al Designed by: RME Checked by: Project Name : Eastfield Retail Block A Last Revised Date : 10/26/2023 Runoff Coefficent Rv = 0.05+0.9*la a = 0.69 Impervious fraction (unitless) Rv = 0.67 Runoff Coefficient (unitless) Dv (design volume) = 3630*Rd*Rv*A=Dv Rd = 1 (design storm depth in inches) A = 24.4 (drainage area in acres) Rv = 0.67 runoff coefficient Dv = 59,314j Design Volume (cubic feet) Equation 1: Main Pool Volume Vmp = 0.87 * (HRT/Ts) * DV HRT = 14 Required Hydraulic Retention Time (14 days) Ts = 5 Average time between storm events (5 days) DV = 59,314 Design Volume (ft^3) Vmp = 144,489 Main Pool volume (ft^3) 61,910 Provided 289,052 Provided Temporary Pool Dewatering Time (Design Volume) Orifice Equation for Outlet Flow Q = Cd * A * (2*g*Ho)^0.5 Q-2 Day Orifice Diameter (in) 4 Q-5 Day Cd= 0.6 A= 0.087 SF g= 32.2 FPS Ho= 0.55 Flow Rate Provided Q= 0.311618262 Total Volume= 925785 Days to Dewater 2.20 Volume @ 1' Freeboard = Enter values if this color. Rv = 0.05+0.9*la Rv = Runoff Coefficient (unitless) la = Impervious Fraction (unitless) Impervious Area = 16.8 (AC) 0.3433 0.1373 203,804 768951 Provided JIIT11ple ivietrioi} liar munoii VOlurrie Rv = 0.05 + 0.9: In Where. R•1 = Runoff coefficient (unitless) IA Impervious fraction (unitless) DV - 3630' RD " Rv* A Where: DV = Design valume (cu ft) RE, = Design storm depth (in) A = Drainage area (ac) A couple of notes on the variables in the Simpla Mel had: . The runoff coefficient, Rv, is She runoff depth in inches divided by the rainfall depth 3n inches. . The impervious fractian, IA. is the impervious portion of drainage area in acres divided by the drainage area in acres . The design volume, DV, is the volume of runoff that wusL be controlled for the design Storm. . The design storm depth, Rb, is 1.5" in Can slal Counties and A.0" elsewhere. In SA waters. the DV is The difference between runoff volume pre- versus post -development far the tiJ-year storm. • The drainage area. A, must include all of tha surfaces that drain to the SC ragardless of whether they are on -site or off -site. Equation 1. Main Pool Volume, Vain VMP = 0.87 * HRT * DV s Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool valume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) Ts Average time between storm events (5 days) DV = Design volume (cubic feet) Pond A2 Designed by: RME Checked by: Project Name : Eastfield Retail Block A Last Revised Date : 10/26/2023 Runoff Coefficent Rv = 0.05+0.9*la la = 0.78 Impervious fraction (unitless) Rv = 0.76 Runoff Coefficient (unitless) Dv (design volume) = 3630*Rd*Rv*A=Dv Rd = 1 (design storm depth in inches) A = 6.25 (drainage area in acres) Rv = 0.76 runoff coefficient Dv = 17,143 Design Volume (cubic feet) Equation 1: Main Pool Volume Vmp = 0.87 * (HRT/Ts) * DV HRT = 14 Required Hydraulic Retention Time (14 days) Ts = 5 Average time between storm events (5 days) DV = 17,143 Design Volume (ftA3) Vmp = 41,7601 Main Pool volume (ftA3) 21,443 Provided 42,377 Provided Temporary Pool Dewatering Time (Design Volume) Orifice Equation for Outlet Flow Q = Cd * A * (2*g*Ho)A0.5 Q-2 Day Orifice Diameter (in) 8 Q-5 Day Cd= 0.6 A= 0.349 SF g= 32.2 FPS Ho= 2.35 Flow Rate Provided Q= 2.576531631 Total Volume= 126035 Days to Dewater 0.08 Volume @ V Freeboard = Enter values if this color. Rv = 0.05+0.9*la Rv = Runoff Coefficient (unitless) la = Impervious Fraction (unitless) Impervious Area = 4.9 (AC) 0.0992 0.0397 58,902 103344 Provided oirril metnota ror munoTT volume Rv = 0.05 + 0.9 ; IA Where: Rv m Runoff coefficient (unitless) IA m 1mperviousfractbon (unitless) DV 3630 ' REP* Ru " A Where: DV = Design volume (cu Ft) Rp Design storm depth (in) A = Drains" area (ac) A couple of notes on the variables in the Simply Method: + The runoff coefficient Rv, is the runoff depth in inches divided by the rainfall depth in inches. The impervious fraction, fA is the impervious portion of drainage area in acres divided by the drainage area in acres The design volume, DV, is the volume of runoff that must be eon trolled for the design Storm_ • The design storm depth, Rb, is 1. 5' in Coastal Counties and 1.0" elsewhere_ In SA waters, tha DV is the difference between runoff volume pre- versus post-lavelopment far the 10-year storm. The drainage area, A, must include all et tha surfaces that drain to the SC regardless of whether they are on -site or off -site. Equation 9: Main Pool Volume, Vmp VMP = 0.87 * HRT * DV s Where: 0.87 = Factor to adjust for the volume in the forebay Vk1p Main pool volume, not including the forebay (cubic feet] HRT Required hydraulic residence time (14 days) Ts Average time between storm events (5 days) DV = Design volume (cubic feet) Pond E1 Designed by: RME Checked by: Project Name : Eastfield Retail Block E Last Revised Date : 10/26/2023 Runoff Coefficent Rv = 0.05+0.9*la a = 0.70 Impervious fraction (unitless) Rv = 0.68 Runoff Coefficient (unitless) Dv (design volume) = 3630*Rd*Rv*A=Dv Rd = 1 (design storm depth in inches) A = 2.3 (drainage area in acres) Rv = 0.68 runoff coefficient Dv = 5,645 j Design Volume (cubic feet) Equation 1: Main Pool Volume Vmp = 0.87 * (HRT/Ts) * DV HRT = 14 Required Hydraulic Retention Time (14 days) Ts = 5 Average time between storm events (5 days) DV = 5,645 Design Volume (ft^3) Vmp = 13,7501 Main Pool volume (ft^3) 5,753 Provided 13,884 Provided Temporary Pool Dewatering Time (Design Volume) Orifice Equation for Outlet Flow Q = Cd * A * (2*g*Ho)^0.5 Q-2 Day Orifice Diameter (in) 1 Q-5 Day Cd= 0.6 A= 0.005 SF g= 32.2 FPS Ho= 0.75 Flow Rate Provided Q= 0.022743233 Total Volume= 51045 Days to Dewater 2.87 Volume @ 1' Freeboard = Enter values if this color. Rv = 0.05+0.9*la Rv = Runoff Coefficient (unitless) la = Impervious Fraction (unitless) Impervious Area = 1.6 (AC) 0.0327 0.0131 19,395 43992 Provided JIIT11ple ivietriou liar munoii VOlurrie Rv = 0.05 + 0.9: In Where. R•1 = Runoff coefficient (unitless) IA Impervious fraction (unitless) DV - 3630' RD " Rv* A Where: DV = Design valume (cu ft) RE, = Design storm depth (in) A = Drainage area (ac) A couple of notes on the variables in the Simpla Mel had: . The runoff coefficient, Rv, is She runoff depth in inches divided by the rainfall depth 3n inches. . The impervious fractian, IA. is the impervious portion of drainage area in acres divided by the drainage area in acres . The design volume, DV, is the volume of runoff that wusL be controlled for the design Storm. . The design storm depth, Rb, is 1.5" in Can slal Counties and A.0" elsewhere. In SA waters. the DV is The difference between runoff volume pre- versus post -development far the tiJ-year storm. • The drainage area. A, must include all of tha surfaces that drain to the SC ragardless of whether they are on -site or off -site. Equation 1. Main Pool Volume, Vain VMP = 0.87 * HRT * DV s Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool valume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) Ts Average time between storm events (5 days) DV = Design volume (cubic feet) Pond E2 Designed by: RME Checked by: Project Name : Eastfield Retail Block E Last Revised Date : 10/26/2023 Runoff Coefficent Rv = 0.05+0.9*la a = 0.72 Impervious fraction (unitless) Rv = 0.70 Runoff Coefficient (unitless) Dv (design volume) = 3630*Rd*Rv*A=Dv Rd = 1 (design storm depth in inches) A = 0.9 (drainage area in acres) Rv = 0.70 runoff coefficient Dv = 2,287 j Design Volume (cubic feet) Equation 1: Main Pool Volume Vmp = 0.87 * (HRT/Ts) * DV HRT = 14 Required Hydraulic Retention Time (14 days) Ts = 5 Average time between storm events (5 days) DV = 2,287 Design Volume (ft^3) Vmp = 5,571 Main Pool volume (ft^3) 2,372 Provided 5,813 Provided Temporary Pool Dewatering Time (Design Volume) Orifice Equation for Outlet Flow Q = Cd * A * (2*g*Ho)^0.5 Q-2 Day Orifice Diameter (in) 0.5 Q-5 Day Cd= 0.6 A= 0.001 SF g= 32.2 FPS Ho= 1.1 Flow Rate Provided Q= 0.006885856 Total Volume= 25293 Days to Dewater 3.84 Volume @ 1' Freeboard = Enter values if this color. Rv = 0.05+0.9*la Rv = Runoff Coefficient (unitless) la = Impervious Fraction (unitless) Impervious Area = 0.65 (AC) 0.0132 0.0053 7,858 18360 Provided JIIT11ple ivietrioi} liar munoii VOlurrie Rv = 0.05 + 0.9: In Where. R•1 = Runoff coefficient (unitless) IA Impervious fraction (unitless) DV - 3630' RD " Rv* A Where: DV = Design valume (cu ft) RE, = Design storm depth (in) A = Drainage area (ac) A couple of notes on the variables in the Simpla Mel had: . The runoff coefficient, Rv, is She runoff depth in inches divided by the rainfall depth 3n inches. . The impervious fractian, IA. is the impervious portion of drainage area in acres divided by the drainage area in acres . The design volume, DV, is the volume of runoff that wusL be controlled for the design Storm. . The design storm depth, Rb, is 1.5" in Can slal Counties and A.0" elsewhere. In SA waters. the DV is The difference between runoff volume pre- versus post -development far the tiJ-year storm. • The drainage area. A, must include all of tha surfaces that drain to the SC ragardless of whether they are on -site or off -site. Equation 1. Main Pool Volume, Vain VMP = 0.87 * HRT * DV s Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool valume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) Ts Average time between storm events (5 days) DV = Design volume (cubic feet) Pond E3 Designed by: RME Checked by: Project Name : Eastfield Retail Block E Last Revised Date : 10/26/2023 Runoff Coefficent Rv = 0.05+0.9*la a = 0.78 Impervious fraction (unitless) Rv = 0.75 Runoff Coefficient (unitless) Dv (design volume) = 3630*Rd*Rv*A=Dv Rd = 1 (design storm depth in inches) A = 2.25 (drainage area in acres) Rv = 0.75 runoff coefficient Dv = 6,1261 Design Volume (cubic feet) Equation 1: Main Pool Volume Vmp = 0.87 * (HRT/Ts) * DV HRT = 14 Required Hydraulic Retention Time (14 days) Ts = 5 Average time between storm events (5 days) DV = 6,126 Design Volume (ft^3) Vmp = 14,9221 Main Pool volume (ft^3) 7,897 Provided 14,928 Provided Temporary Pool Dewatering Time (Design Volume) Orifice Equation for Outlet Flow Q = Cd * A * (2*g*Ho)^0.5 Q-2 Day Orifice Diameter (in) 1 Q-5 Day Cd= 0.6 A= 0.005 SF g= 32.2 FPS Ho= 1.1 Flow Rate Provided Q= 0.027543423 Total Volume= 42262 Days to Dewater 2.57 Volume @ 1' Freeboard = Enter values if this color. Rv = 0.05+0.9*la Rv = Runoff Coefficient (unitless) la = Impervious Fraction (unitless) Impervious Area = 1.75 (AC) 0.0354 0.0142 21,048 31918 Provided JIIT11ple ivietriou liar mufli]ff VOlurrie Rv = 0.05 + 0.9: In Where. R•1 = Runoff coefficient (unitless) IA Impervious fraction (unitless) DV - 3630' RD " Rv* A Where: DV = Design valume (cu ft) RE, = Design storm depth (in) A = Drainage area (ac) A couple of notes on the variables in the Simply Mel had: . The runoff coefficient, Rv, is She runoff depth in inches divided by the rainfall depth 3n inches. . The impervious fractian, IA. is the impervious portion of drainage area in acres divided by the drainage area in acres . The design volume, DV, is the volume of runoff that wust be controlled for the design Storm. . The design storm depth, Rb, is 1.5" in Can slal Counties and A.0" elsewhere. In SA waters. the DV is The difference between runoff volume pre- versus post -development far the tiJ-year storm. • The drainage area. A, must include all of tha surfaces that drain to the SC ragardless of whether they are on -site or off -site. Equation 1. Main Pool Volume, Vain VMP = 0.87 * HRT * DV s Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool volume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) Ts Average time between storm events (5 days) DV = Design volume (cubic feet) Pond E4 Designed by: RME Checked by: Project Name : Eastfield Retail Block E Last Revised Date : 10/26/2023 Runoff Coefficent Rv = 0.05+0.9*la a = 0.75 Impervious fraction (unitless) Rv = 0.73 Runoff Coefficient (unitless) Dv (design volume) = 3630*Rd*Rv*A=Dv Rd = 1 (design storm depth in inches) A = 2.8 (drainage area in acres) Rv = 0.73 runoff coefficient Dv = 7,3691 Design Volume (cubic feet) Equation 1: Main Pool Volume Vmp = 0.87 * (HRT/Ts) * DV HRT = 14 Required Hydraulic Retention Time (14 days) Ts = 5 Average time between storm events (5 days) DV = 7,369 Design Volume (ft^3) Vmp = 17,951 Main Pool volume (ft^3) 8,130 Provided 19,915 Provided Temporary Pool Dewatering Time (Design Volume) Orifice Equation for Outlet Flow Q = Cd * A * (2*g*Ho)^0.5 Q-2 Day Orifice Diameter (in) 1.25 Q-5 Day Cd= 0.6 A= 0.009 SF g= 32.2 FPS Ho= 1.1 Flow Rate Provided Q= 0.043036599 Total Volume= 69848 Days to Dewater 1.98 Volume @ 1' Freeboard = Enter values if this color. Rv = 0.05+0.9*la Rv = Runoff Coefficient (unitless) la = Impervious Fraction (unitless) Impervious Area = 2.1 (AC) 0.0426 0.0171 25,320 54449 Provided JIIT11ple ivietriou liar mufli]ff VOlurrie Rv = 0.05 + 0.9: In Where. R•1 = Runoff coefficient (unitless) IA Impervious fraction (unitless) DV - 3630' RD " Rv* A Where: DV = Design valume (cu ft) RE, = Design storm depth (in) A = Drainage area (ac) A couple of notes on the variables in the Simply Mel had: . The runoff coefficient, Rv, is She runoff depth in inches divided by the rainfall depth 3n inches. . The impervious fractian, IA. is the impervious portion of drainage area in acres divided by the drainage area in acres . The design volume, DV, is the volume of runoff that wust be controlled for the design Storm. . The design storm depth, Rb, is 1.5" in Can slal Counties and 1.0" elsewhere. In SA waters. the DV is The difference between runoff volume pre- versus post -development far the tiJ-year storm. • The drainage area. A, must include all of tha surfaces that drain to the SC ragardless of whether they are on -site or off -site. Equation 1. Main Pool Volume, Vain VMP = 0.87 * HRT * DV s Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool volume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) Ts Average time between storm events (5 days) DV = Design volume (cubic feet) APPENDIX F User Input Data Calculated Value Reference Data Designed By: JMH Date: Checked By: RME Date: Company: The Gateway Engineers, Inc. Project Name: Eastfield Crossing, Overall Project No.: 46118-0000 Site Location (City/Town) Selma Culvert Id. Apron Al Total Drainage Area (acres) Step 1. Determine the tail -water depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailwater depth is less than half the outlet pipe diameter: it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto NVide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations Shoe- otherwise. Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) RZ11! 6 Min TW (Fig. 8.06a) 7.614 2.42 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine duo riprap size and minimum apron length (L)_ The d. size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1 Minimum apron length, La A) 8 Apron width at pipe outlet (ft.) 6 Apron shape Trapezoid Apron width at outlet end (ft.) 10 Step 4. D: ternllAe the nla%lima n stone diculleter- rl,.,x = 1.5 x d5, Minimum TW Max Stone Diameter, dmax (ft.) 1.5 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d f`13 ,: Minimum TW 2.25 0 2 Maximum TW 0 Maximum TW 0 Step 6. Fit the rlprap apron to the site by making it level for the nunimiuu length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of rlprap where protection of the channel side slopes is necessary (Appendix 8.05)_ 'Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. see page 8.06.8. User Input Data Calculated Value Reference Data Designed By: JMH Date: Checked By: RME Date: Company: The Gateway Engineers, Inc. Project Name: Eastfield Crossing, Overall Project No.: 46118-0000 Site Location (City/Town) Selma Culvert Id. Apron A2 Total Drainage Area (acres) Step 1. Determine the tail -water depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailwater depth is less than half the outlet pipe diameter: it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto NVide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations Shoe- otherwise. Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 18 6 Min TW (Fig. 8.06a) 16.53 9.35 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine duo riprap size and minimum apron length (L)_ The d. size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1 Minimum apron length, La A) 10 Apron width at pipe outlet (ft.) 4.5 Apron shape Trapezoid Apron width at outlet end (ft.) 11.5 Step 4. D: ternllAe the nla%lnlum stone diauneter_ rl,.,x = 1.5 x d5, Minimum TW Max Stone Diameter, dmax (ft.) 1.5 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d f`13 ,: Minimum TW 2.25 4.5 1.5 Maximum TW 0 Maximum TW 0 Step 6. Fit the riprap apron to the site by making it level for the nunimiuu length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (Appendix 8.05)_ 'Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. see page 8.06.8. User Input Data Calculated Value Reference Data Designed By: JMH Date: Checked By: RME Date: Company: The Gateway Engineers, Inc. Project Name: Eastfield Crossing, Overall Project No.: 46118-0000 Site Location (City/Town) Selma Culvert Id. Apron E1 Total Drainage Area (acres) Step 1. Determine the tail -water depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailwater depth is less than half the outlet pipe diameter: it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto NVide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations Shoe- otherwise. Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 15 6 Min TW (Fig. 8.06a) 5.09 4.15 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine duo riprap size and minimum apron length (L)_ The d. size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1 Minimum apron length, La A) 9 Apron width at pipe outlet (ft.) 3.75 Apron shape Trapezoid Apron width at outlet end (ft.) 10.25 Step 4. D: ternllAe the nla%lima n stone dlallleter- rl,.,x = 1.5 x d5, Minimum TW Max Stone Diameter, dmax (ft.) 1.5 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d f`13 ,: Minimum TW 2.25 3.75 1.25 Maximum TW 0 Maximum TW 0 Step 6. Fit the rlprap apron to the site by making it level for the nunimiuu length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of rlprap where protection of the channel side slopes is necessary (Appendix 3.05)_ 'Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. see page 8.06.8. User Input Data Calculated Value Reference Data Designed By: JMH Date: Checked By: RME Date: Company: The Gateway Engineers, Inc. Project Name: Eastfield Crossing, Overall Project No.: 46118-0000 Site Location (City/Town) Selma Culvert Id. Apron A2 Total Drainage Area (acres) Step 1. Determine the tail -water depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailwater depth is less than half the outlet pipe diameter: it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto NVide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations Shoe- otherwise. Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 15 6 Min TW (Fig. 8.06a) 5.09 4.15 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine duo riprap size and minimum apron length (L)_ The d. size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1 Minimum apron length, La A) 9 Apron width at pipe outlet (ft.) 3.75 Apron shape Trapezoid Apron width at outlet end (ft.) 10.25 Step 4. D: ternllAe the nla%lima n stone dlallleter- rl,.,x = 1.5 x d5, Minimum TW Max Stone Diameter, dmax (ft.) 1.5 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d f`13 ,: Minimum TW 2.25 3.75 1.25 Maximum TW 0 Maximum TW 0 Step 6. Fit the rlprap apron to the site by making it level for the nunimiuu length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of rlprap where protection of the channel side slopes is necessary (Appendix 3.05)_ 'Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. see page 8.06.8. User Input Data Calculated Value Reference Data Designed By: JMH Date: Checked By: RME Date: Company: The Gateway Engineers, Inc. Project Name: Eastfield Crossing, Overall Project No.: 46118-0000 Site Location (City/Town) Selma Culvert Id. Apron E2 Total Drainage Area (acres) Step 1. Determine the tail -water depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailwater depth is less than half the outlet pipe diameter: it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto NVide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations Shoe- otherwise. Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 15 6 Min TW (Fig. 8.06a) 3.64 2.97 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine duo riprap size and minimum apron length (L)_ The d. size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1 Minimum apron length, La A) 6 Apron width at pipe outlet (ft.) 3.75 Apron shape Trapezoid Apron width at outlet end (ft.) 7.25 Step 4. D: ternllAe the nla%lima n stone dlallleter- rl,.,x = 1.5 x d5, Minimum TW Max Stone Diameter, dmax (ft.) 1.5 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d f`13 ,: Minimum TW 2.25 3.75 1.25 Maximum TW 0 Maximum TW 0 Step 6. Fit the rlprap apron to the site by making it level for the nunimiuu length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of rlprap where protection of the channel side slopes is necessary (Appendix 3.05)_ 'Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. see page 8.06.8. User Input Data Calculated Value Reference Data Designed By: JMH Date: Checked By: RME Date: Company: The Gateway Engineers, Inc. Project Name: Eastfield Crossing, Overall Project No.: 46118-0000 Site Location (City/Town) Selma Culvert Id. Apron E4 Total Drainage Area (acres) Step 1. Determine the tail -water depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailwater depth is less than half the outlet pipe diameter: it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto NVide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations Shoe- otherwise. Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 15 6 Min TW (Fig. 8.06a) 5.44 4.43 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine duo riprap size and minimum apron length (L)_ The d. size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1 Minimum apron length, La A) 8 Apron width at pipe outlet (ft.) 3.75 Apron shape Trapezoid Apron width at outlet end (ft.) 9.25 Step 4. D: ternllAe the nla%lima n stone dlallleter- rl,.,x = 1.5 x d5, Minimum TW Max Stone Diameter, dmax (ft.) 1.5 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d f`13 ,: Minimum TW 2.25 3.75 1.25 Maximum TW 0 Maximum TW 0 Step 6. Fit the rlprap apron to the site by making it level for the nunimiuu length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of rlprap where protection of the channel side slopes is necessary (Appendix 3.05)_ 'Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. see page 8.06.8. Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<0.5 diameter) I u l I q}I11e J liin luiili ■ 1/ � ,���+���}� �����IIII�II IIII �� 1 I � +■�■:.� • ■■ .lull II 1I1111111111111NI1111i f 1,���/// ��{��I, , IIII illllill„1 9�l�� ■■ �_.��--. " „R� ����������������� I ���/F 1 gill Ni.�rll f 111111111111111 r11i IIII IIIlII III 1 Illll kllll lll_II111 V.1 1 Ilrlll MI III �� Illllfllllll II PIII 1 I+I N111 1 ,illl 1111111 II Elili� 1 Ili I II dlll III 1 . � �� _ Illllfulllull lllll��I�I I����" � �� a 111111111111p IIIII F I 11 � k. 1 1 � , fl 11 11 111 Curves may not he extrapolated. Figure 8.06a Oasign of outlet protection protection from around pipe flowing full, minimurn taitwater condition 110.5 diameter). Rev. 1193 L06J Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) 3t7,u F I Outlet Do + o.4La 120 P.P.�- ele► PI) L La 11D } - SDe + 100 J 90 aD 70 i b ' n 60 J�� .•. �. ..rye � � t A�50 _ - p . 40 a 3 30 l✓ - h t0:...,. ,� a s b 'a a m n i Z Y a 15 i 15 1 b � v_loll d 3 5 10 20 So 100 2D0 500 Discharge (ttallsec) Curves may nol to extrapolated. Figure 0.0$b Dosign of outlet protection from a round pipe flowing full, maxwmum tailwatar cond-tion (T„ a 0 5 dameter). 8.06.4 Rev.1"j W W W lL.l 0 U 0 O 0 U E L) U -07- �00 � M U N 6 O � N (o Co Q � (1) 2 U) m ❑ E o in 0 0375; � U 7 (D O ID O 19 V d 'D O U L!i N O � d M N 1) 0 II N N LO co � u iT o o IL& 22.0 EASTFIELD DEVELOPMENT - BLOCK A AND E PRELIM INARYSTORMWATER MANAGEMENT PLANS HIGHWAY 70-A SELMA, NC PREPARED FOR: ADVENTURE DEVELOPMENT, LLC 101 S RAI FORD ST SUITE 200 SELMA, NC 27576 • qBF? 5•�T 2 5A, j FO �O<o -I .. _. - �'- LIZZIE M/ZByp p 70 q�F Selma DOG �F WOOD ,�F CAM Q _ Memorial / Oq SAP Sel�ma�Memorial Gardens 96\ 301 f `. ERaO L� W = RD/yER AVE- S� 70 SQo��oC� - GRAHAM ST Croc Cry- •. p Walls Cem - �... ur fQ1O B J pR -�. _ • . �• ppP� — W BLANCHE ST EXD Alt Byp - 70 0 70 x — C� 3 150 �—.. ✓ — HOLLOMAN LN = _ E GORDON RD � W I ROU)IQ 1(d � Pond o SITE LOCATION MAP - SELMA, NC NOT TO SCALE Know what's below. Call before you dig. Serial No. A231231797-OOA A231231853-OOA A231231888-OOA A231231935-OOA A231232009-OOA A231232049-OOA ITHE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. SHEETINDEX NO. TITLE C000 COVER SHEET C060 EXISTING CONDITIONS C700 POST CONSTRUCTION STORMWATER MANAGEMENT PLAN C701 POST CONSTRUCTION STORMWATER MANAGEMENT PLAN C702 POST CONSTRUCTION STORMWATER MANAGEMENT PLAN C710 POST CONSTRUCTION STORMWATER MANAGEMENT DETAILS C711 POST CONSTRUCTION STORMWATER MANAGEMENT DETAILS PP101 WET POND PLANTING PLAN PP102 WET POND PLANTING PLAN \\\"\11111�///// CA SEAL = 056472 _ �v0 •'�NGINE��'•• � 0 O U LLI 0-1 O U) NW 0. �00000=0 ot d d d d d d d .1 W Z U U O J J m z z W W O O J J W w > > W W 00 0 LLI N W 0 0� ::) J D „J W 0 ''~^^ VJ 0 O Ln N % ` O }U Z pw W LLU Z woo Q=2 w0�� Q LU=�a_QoU) COVER SHEET Project Number:46118-0000 Drawing Scale: N.T.S. Date Issued: JULY 2023 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS C000 Q Q W o' Q W Q z of 0 z 0 0 7) U) z O 0 W Q W Of N O 0 N E 0 >a -o w w w W_ 00 v N aN v2 a �Lo .o d co N E � n LL 06 M L 76 w2 oho_ 22.0 LEGEND BIT BITUMINOUS CGCo COLUMBIA GAS COMPANY CONC CONCRETE EGCo EQUITABLE GAS CO. (now PNGCO) TIC TOP OF CURB VZPa VERIZON PENNSYLVANIA q G GUTTER BTCo BELL TELEPHONE CO. (now VZPa) TW TOP OF WALL APCo ALLEGHENY POWER COMPANY BW BOTTOM OF WALL WPPCo WEST PENN POWER COMPANY TS TOP OF SLOPE PPCo PENN POWER COMPANY BS BOTTOM OF SLOPE DLCo DUQUESNE LIGHT COMPANY SAN SANITARY PNGCo PEOPLES NATURAL GAS COMPANY ST STORM ALCOSAN ALLEGHENY COUNTY SANITARY AUTHORITY MH MANHOLE PWSA PITTSBURGH WATER AND SEWER AUTHORITY TOP TOP OF CASTING PAWC PENNSYLVANIA AMERICAN WATER COMPANY Know what's below. BOT BOTTOM DPW DEPARTMENT OF PUBLIC WORKS FL FLOW LINE PACT PITTSBURGH ALLEGHENY COUNTY THERMAL Call before you dig. CO CLEAN OUT RCP REINFORCED CONCRETE PIPE WV WATER VALVE CMP CORRUGATED METAL PIPE Serial No. A231231797-OOA WM WATER METER CPP CORRUGATED PLASTIC PIPE TIME O F CONCENTRATION WB WATER BOX TCP TERRA COTTA PIPE A231231853-OOA / / // / / / / s 1 �j 0 FH FIRE HYDRANT PVC POLYVINYL CHLORIDE PIPE A231231888-OOA /'' / /'// / /' ' ' \ / I ,j GV GAS VALVE VCP VITRIFIED CLAY PIPE /' ///' \ \ \ / � A231231935-OOA PATH POI-2 N \ GM GAS METER DIP DUCTILE IRON PIPE GMK GAS MARKER CIP CAST IRON PIPE A231232009-OOA EB ELECTRIC BOX SLCPP SMOOTH LINED CORRUGATED PLASTIC PIPE A231232049-OOA / / �� \ \ 7) EM ELECTRIC METER HOPE HIGH DENSITY POLYETHOLINE PIPE / / /� \ \ ` >4 TRANS TRANSFORMER —ETC— ELECTRIC TELEPHONE COMMUNICATIONS / / / / /// / % / / / / / 1 / i 76 \ — I GW GUY WIRE — G — GAS LINE / / / / /// / j / 8 \J VLT VAULT — W — WATER LINE LS LIGHT STANDARD — T — SUBSURFACE TELEPHONE LINE 171 J \\ YL YARD LIGHT — E — SUBSURFACE ELECTRIC LINE MB - MAILBOX — OH — - OVERHEAD WIRES POI-2 PM PARKING METER —CATV— CABLE TV DS DOOR SILL x 908.8 EXISTING SPOT ELEVATION GP GATE POST — — 908 — — EXISTING CONTOURS RAILROADFIR EXISTING INLET BOIL BOLLARD0 EXISTING MANHOLE WINWINDOW WELL — — — — EXISTING SEWER PIPE RD ROOF DRAIN ------ VP VENT PIPE 171 / / / / /// j / / /' ' / / TR TRAFFIC HC HANDICAP LH - LAMP HOLE 171 COMB COMBINATION SEWER / j / / /� j / ' ' ' ` / / \ v�O w/ -WITH NOTE PRE DEVELOPMENT POI-2 \ X4$ THE UNDERGROUND UTILITIES SHOWN HEREON HAVE NOT BEEN PHYSICALLY LOCATED DRAINAGE AREA: 15.0 ACRES BY THE SURVEYOR, HOWEVER, THE INFORMATION WAS OBTAINED FROM EXISTING PLANS /// // / / AND SURFACE FACILITIES. THE GATEWAY ENGINEERS, INC. MAKES NO GUARANTEE THAT \ THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, COMPOSITE C N . 64 EITHER IN SERVICE OR ABANDONED. THE GATEWAY ENGINEERS, INC. DOES NOT ' ' '/ WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION /'+ INDICATED ALTHOUGH THEY ARE SHOWN AS ACCURATELY AS POSSIBLE FROM THE TC. 39.9 MINUTES INFORMATION AVAILABLE. P / / / / /// / j / / / / �\ ~ \ \ I I \ ALL EXISTING SUBSURFACE UTILITY INFORMATION PRESENTED ON THE CONTRACT DRAWINGS IS CHARACTERIZED AS UTILITY QUALITY LEVEL C OR D PER "Cl/ASCE — 38-02 - STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING �'` SUBSURFACE UTILITY DATA" UNLESS SPECIFICALLY NOTED OTHERWISE. / ' /' / ' / / ' /'/ TIME OF CONCENTRATION /�' %%''%%�'' � »;>'_�� � EXISTING PATH POI-1 / // / / "o OH '\ ,/� off � �� " > � � )— POND OHHn / I off "o °H off No off / Ho / ��\� OH 7 0. 163 — OH "0 OH/ ti / 9 / // / / / // / / / v v��A✓ i OH164 OH off off r / I 40 / I� l I \ IIII I I J IV/ ___ PRE DEVELOPMENT POI-1 DRAINAGE AREA: 28.5 ACRES I > ` 151 / l 170 v 000-00 LL Q 0 LLJ z W LLJ W z LUZ 0 W J a zU �W U LLJ tz LLJ LL �A CAR J LL Q \�11\llllll//// i SEAL 056472 _ /vOs•FiyGINe �0 �7 O u1 Z O w MOMMMMMMM 011111111 COMPOSITE C N : 7 2 \// \ \I�ip� — —�73 ' / I \✓ J' do = TC: 39.8 MINUTES 6-�� co I No I 177 _( .A73\ I� I' /' / /\JIB N\ 170— "' l� 16s // i/ i/ /// / /// � � `•. •, \ / � , � � I �^. G \ -1 71 � / i i' % / / '•� � ` � I I I I I //I ( Q/ r j � l I \ \ - , _ _O � 1 / / � ' • / / / \ \��,> < / I� 69 ( I I 174— N/ 174 \_ J 170 0 — / / _ i l ) \10 ��/I /' \ w / 3 171 �� 69 171 '69 1/ 1 I III/ , /�°/// V / � �/ _ I I � II / I — ��\ • / � \ \ l ��I� /v '---7 rI � / / � I III�pO /� _ / A� � �'� Q A.►�J / / \\ \ \ \ / \ — I III 169- 172=169= _ —77 \ /I �I I —171- \ I �vll' /—�/ \p� / / \� O U / '° _ A III _IF J NOW OR FORMERLY < ,� • ` � I � � \ I I ) ` o ADINATH 17 // �\ \\ f � jllllll <1 I 169 I INCORPORATED /IF I I \ / \\\\\ 171 \ \ \\� ,l rJ / \ \ /III IIII I I✓ / / POI-1 PIDB263854 PG 0674 I \ li II / 0 \ 171 \\\ \ \ \\\l \\ \ — I / IIIII I W 0 / IIIIIIL — I n / / � •171, I ` � \\� � I I III � �\ `l -�\\\\IIIh� O / \ \ \ "\\ \ I I WL/ °" � � \ \ �` — \ \ i / '` � ! � I \\� 11 � '\ I '\ III III l I ' J W % r > Ill '/ IIII \\ , �6�' I II w Q I I\ l\ \ o f\ Rl 0 w„„ 170 Q�I',� -172 — � \\�\\�/ / � II` Ill _-- �y\\ " 11 '� ° I \\ \ �� _J1/ \ \ �` \ ` \I III I I ( \\ � I D � I 1. \ � \ / � � �j �I \\\\N \\ � -171- � � \\ =IIII IIII I z M LL17o ,U U , ° fm _ 69fm f— 69 Q Q C� O W2LU (n aQ i EXISTING l CONDITIONS NORTH Project Number: 46118 0000 Drawing Scale: 1 "=100' Date Issued: NOV 2023 \ GRAPHIC SCALE \\ \\� \ \ . '.� . \ / \ \ \ \ fn� �•\I I Index Number: -- \\Z o 50 100 200 400 Drawn By:SMP Checked By: ANS \ \ \\ \\ \\ \\\ ` _ =•-. �` ��I \ Project Manager: JS Ii ` % \✓�_�\ \ D`� \ \y I(I \_ o1( IN FEET) %� THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL ATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTEN D PURP S E F- J 1 inch = 100 ft. C060 R E, R LICATI +,-REPR- DUCFI` R IS R%BUTION OF DATA CONTAIN D WIT I ICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. � c a� E 0 -0 d �o c Lri m N N �p � N (o c a3 I� U) M❑ o� cot ILI& 22.0 r ) PCSM NOTES: PCSM LEGEND SHEET 702 /'' // //-„000 0 1. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE / / / / // I W Z FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES SOIL BOUNDARIES / / / a GOVERNING SAFETY AND HEALTH, INCLUDING THE FEDERAL / / / / �� I I I LLI CONSTRUCTION SAFETY ACT (PUBLIC LAW 91-54), FEDERAL / LJJ W REGISTER, CHAPTER XVII, PART 1926 OF TITLE 29 REGULATIONS, LIMITS OF DISTURBANCE / / / / // ^� Z OCCUPATIONAL SAFETY AND HEALTH REGULATIONS FOR / / - / / - (j / / I Z CONSTRUCTION, AND SUBSEQUENT PUBLICATIONS UPDATING THESE REGULATIONS. ® HC6O3PROPOSED STORM MANHOLE / / / / /� // / J 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE I r AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE "C603 / / / CONSTRUCTED PRIOR TO THE SUBMISSION OF THE BID. SUBMISSION ® PROPOSED CLEANOUT OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS / / / / /</ / \ 1 j6 I POST POI-2 UNDETAINED L v REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND / / / \ \- �j uJ CONSTRAINTS OF THE SITE. ® "C603PROPOSED INLET I / / / / \ / / I - �j,�0 DRAINAGE AREA: 0.7 I I I v • 3. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE / / I / \� j ` I ACRES W LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE 6 COMPOSITE CN: 80 CONTRACTOR SHALL NOTIFY ONE CALL SYSTEMS, INC. THE PROPOSED HEADWALL/ END WALL / / -Imo/ \ \ I ,\ L ` LL LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE C603 I-,/ / 1-1\ \ \ I \ I Tc: 5.0 MINUTES cn APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE DETAINED AREAS / EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND J 01-2 1 � UNDERGROUND STRUCTURES. loll/ / / PLL 4. CONTRACTOR TO PROVIDE SHOP DRAWINGS ON ALL STORM SEWER UNDETAINED AREAS / / / / \\, I \ Q MANHOLES, INLETS, AND DETENTION SYSTEMS. 5. AN AS -BUILT DRAWING OF NEW UTILITY SERVICES SHALL BE / / / PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER / / �:' \. ��� CA rig UPON COMPLETION OF THE PROJECT. / / ��� .... 0. .••�ssi 6. ALL STORM PIPE SHALL BE HDPE, SMOOTH INTERIOR, CORRUGATED / , / / I \ •' OF O,y • 9 POLYETHYLENE PIPE UNLESS OTHERWISE NOTED. ALL STORM SEWER CONSTRUCTION MATERIALS AND METHODS SHALL BE IN ® / / / \ , 1 = SEAL 056472 / ACCORDANCE WITH DOT SPECIFICATIONS. ALL JOINTS SHALL BE • - / - - \ �� / J - _ WATERTIGHT. / j \ - 7. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS / V �J -' � /' /I CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. 17 1 IN I ��%� Off,' .NGINE�• 8. THE CONTRACTOR SHALL ASSURE THAT THERE IS POSITIVE / / / / /• \ O DRAINAGE TO THE INLETS UPON PLACEMENT OF NEW PAVEMENT. KNOW what's below. / / / / \_ 9. AN AS -BUILT DRAWING OF THE STORMWATER DETENTION FACILITY / / - 172 \ PREPARED AND SEALED BY A PROFESSIONAL LAND SURVEYOR IS Call before VOU dig. REQUIRED TO BE SUBMITTED TO THE PROJECT ENGINEER. + / \ Serial No. A231231797-OOA / � / / / - � A231231853-OOA / / i" / PROJECT AREAS / / / \ A231231888-OOA DISTURBED AREA - 43.5 ACRES A23123 009-OOA / / - / / - �/ WET POND A2 \ A23123209-OOA A231232049-OOA / 10, / / 000, / "IVOVio / / ` I II POST DEVELOPMENT A2 / DRAINAGE AREA: 6.3 ACRES / , / \ \ I I I \ COMPOSITE CN: 94 0 Tc: 5.0 MINUTES U / �/ / I W / _ / Z // // i. III h> O / I 1[// T / off T POND Al I I III I /Xi / SHEET 701 / / WE_ 100, 10, \.I I I / /-' .01 °ti POST DEVELOPMENT E1 / - / / - r \\ ' DRAINAGE AREA: 2.3 ACRES /j / I � \ \<<^ �. z° 0 0 0 0 0 0 0 0 COMPOSITE CN: 93 �i/� / �/ �_ off _ \v Tc:/'0 MIN T� 1-1POST DEVELOPMENT Al \ Ham,, H° °H / DRAINAGE AREA: 24.4 ACRES _ > I I — I / —\\ 2 WET POND E1 I /'' / q Q \ H° / \ 4 r / I I , I I I I , \\ //- /- ♦ \ r iY COMPOSITE CN: 92 `� — — _ ' I /� p4 \ °H° 16 \ — I I / / o oy // / / / >r �r Tc: 20.0 MINUTES_ °y "° I 1 I \ I I /// // �� ° of `� � � ® �'�\� • � � •�;:. ) r — � I III 1 / I I \ N° \ I � 3 yam" h° °ti / / / >r� ♦ ♦ ♦ « 5 I \ � ,__ \ III / / �/\` ��� Ole 1-73 oe �i I 173 / ?I _ �\ WET POND E4 `�_ __169, fr POST DEVELOPMENT E4 / DRAINAGE AREA: 2.8 ACRES -171\ COMPOSITE CN: 94 \ Tc: 5.0 MINUTES \ loo,�A ' / � / 174-\ \ \ I I / / ft3� , / V/I �\ 11 �l� \ ° LU / 171 --� !j II� \ ��_= J �i / �� // � � �%`'\ � I \ IIIII 69- 171—/ _ < III / \ \ 169 > �171 y � I I VIP _J \III J J l 111111 / J I WI 171\ \ I G 0 \ 1 I IJ 0 J W �A \ vv IIIII III \ I W -169 IIII III \I —' / ,llb I > W W 0 0 o O \\ �� W w 172- D _ �_ -� �_ j,J �// `\ // \ \ \` \\ \I III I• I I r ' \ \ //ly\ \ J// \ \ \ / // ?s 0 \ \ -171 \ W U O i i/�ij/ // \ \ \ \\\\\ \\ I III •I I I I / I 1 D \ _ •I ' / \ 1 < \\\' \ \N \ \ LL Q L(� LL o LL Z O N __ _�_ \ \\ \�\ llll•IIII I \9 L pro 1 —}Z OWLLz fm fm fm \ \� \ \\\\ \\ II\\ - I I �� CO a _ 25 REAR Y W LL LLI _(0 0-Q U) \ _ l \\ \\ \ \�•+. POST CONSTRUCTION \ \ — N l �V� °c h STORMWATER \ \ _ - \ � \ MANAGEMENT PLAN / NORTH Project Number:46118-0000 \ \ 1 '' l\ ��0�� �.�\\ •h Drawing Scale: 1"-100' �' \�\�\ \ \\ \�� \ • I I •,• L �!1 —_ r�o_ a h Q GRAPHIC SCALE Date Issued: NOV 2023 \\\\ \\ / // .`•�.': \ \I` � o eo goo zoo aoo Index Number:-- - ♦ \�\ O \ \\\� ��—---\` • •J••• �� �Il Drawn By:SMP n ! \� \\\ \ \\� - �, lJ � �•�.•.•.�.•.•.• � •l"•• � � �� h Checked By:ANS ' \ \ \ \ . •I. �� �. Project Manager: JS ' `` \"✓\\\\� \ \ \\�� \ \ •I - I \ II IN FEET) 1 9 1 inch = 100 ft. THE GATEWAY ENGINEE IN . RE N'3'OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. D A CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOS ITS T R _ICATIO • .f •but;. • , OR R DISTRIBUTION OF DATA CONTAINED WITHIN STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. - \� 0 0 0 0 0 0 0 0 Tc: 5.0 MINUTES POST DEVELOPMENT E2 110 DRAINAGE AREA: 0.9 ACRES i,COMPOSITE CN: • /1 'V WET POND E2 POST POI-1 UNDETAINED F_ �• J� yy• � I u II r - F WET -• Q. -• •- COMPOSITE CN: 94 Tc: 5.0 MINUTES NOW 0 R FORMERLY ADINATH INCORPORATED DRAINAGE AREA: 2.3 ACRES 0 INK, i � • =� A ._ � l Ili � `f� a tom' � � � ��\� " �� • eJ 0) 3 d Q a w rr Q w Q z ❑ z 0 U Z) U) z 0 U F- 0 CL c (D a 0 G �w a) U) m 2 cot � U 0 o(D v� o_ .o d N 0) CD N WL a� iL oU @ � o Duo_ 22.0 PCSM NOTES: PCSM LEGEND 1. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES SOIL BOUNDARIES GOVERNING SAFETY AND HEALTH, INCLUDING THE FEDERAL I CONSTRUCTION SAFETY ACT (PUBLIC LAW 91-54), FEDERAL REGISTER, CHAPTER XVII, PART 1926 OF TITLE 29 REGULATIONS, LIMITS OF DISTURBANCE OCCUPATIONAL SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION, AND SUBSEQUENT PUBLICATIONS UPDATING THESE REGULATIONS. ® HC6O3 PROPOSED STORM MANHOLE 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIOR TO THE SUBMISSION OF THE BID. SUBMISSION (D PROPOSED PROPOSED CLEANOUT OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS C603 REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND CONSTRAINTS OF THE SITE. ® 7 PROPOSED INLET 3. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE C603 LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFY ONE CALL SYSTEMS, INC. THE C603 PROPOSED HEADWALL/ ENDWALL LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE DETAINED AREAS EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES. 4. CONTRACTOR TO PROVIDE SHOP DRAWINGS ON ALL STORM SEWER UNDETAINED AREAS MH 2 LMH 3 83.20 LF OF 24" SLCPP @ 0.08% MANHOLES, INLETS, AND DETENTION SYSTEMS. °y 5. AN AS -BUILT DRAWING OF NEW UTILITY SERVICES SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OF THE PROJECT. IZI POST DEVELOPMENT Al 6. ALL STORM PIPE SHALL BE HDPE, SMOOTH INTERIOR, CORRUGATED / / /�jGQrDRAINAGE AREA: 24.4 ACRES L —POLYETHYLENE PIPE UNLESS OTHERWISE NOTED. ALL STORM/ 2�COMPOSITE CN: 92SEWER CONSTRUCTION MATERIALS AND METHODS SHALL BE INQ� ACCORDANCE WITH DOT SPECIFICATIONS. ALL JOINTS SHALL BE / /CJ� �%p� p3�F Tc: 20.0 MINUTES WATERTIGHT. 00 7. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. 8. THE CONTRACTOR SHALL ASSURE THAT THERE IS POSITIVE Know what's below. DRAINAGE TO THE INLETS UPON PLACEMENT OF NEW PAVEMENT. 9. AN AS -BUILT DRAWING OF THE STORMWATER DETENTION FACILITY Call before you dig. PREPARED AND SEALED BY A PROFESSIONAL LAND SURVEYOR IS Serial No. A231231797-OOA REQUIRED TO BE SUBMITTED TO THE PROJECT ENGINEER. A231231853-OOA / / o / \\ PA231231888.00A PROJECT AREAS MH 1 A231231935 OOA A231232009-OOA / /' / / \\ /� �p°I° POST DEVELOPMENT E1 DISTURBED AREA = 43.5 ACRES A231232049-OOA /' / / \\ Co ° / / / / / / \\ � r DRAINAGE AREA: 2.3 ACRES COMPOSITE CN: 93 Tc: 5.0 MINUTES oy / / / z — �P ,5�10 � EW Al Ile 73.99 LF OF 15" / // OS E1 I /// /� SLCPP@0.14% WET POND E1 / / O t 1 ® ® ®// ♦, \ I /� �J WET POND Al FOREBAY i / — , � EMERGENCY SPILLWAi / \r I ♦, I / f. / I I '' h � ) / \'EW El FOREBAY EW E4 / 1-1 /' / / / \� ` I �T FROM TOf� OF o / EMERGENCY SPILLWAY OS E4 75.80 LF OF 15" \\ l / / // / / / �' �o ^oh SLCPP @ 0.13% \\ / / 1 �r ♦ WET POND E4 looe 1-1 loo, BAY %' I loo,\ <— ��! � 177 J / MIN s� loll / loll / / // // \ II \ ` ` // /� 174—JI POST DEVEL // /// / \�\�,� DRAIINAGEAREO /PMENT 9 A:0ACRES ` / �_./ �--- -- \_ —/J �y`a COMPOSITE CN: 93 . / r 169 l I \ N_ / / r— I \ \ Tc: 5.0 MINUTES / / \\ /\\ ` % / POST POI-1 UNDETAINED A / / ��-- 1�1 / r o FOREBAY � / � / \ ` / \ \ Z DRAINAGE AREA: EMERGENCY SPILLWAY F /\/ / COMPOSITE CN: gg 0 ACRES �y \ X TC: 5.0 MINUTES \\ /--171 \ d \ 1 v m WET POND E2 // / / i \ \ I 1 / ) ✓ \ \\ \' LG � i / � I I I \ I \ I I n1 / / 17 / /�:✓ 111 a� � POST DEVELOPMENT E4 1 \ / DRAINAGE AREA: 2.8 ACRES .�� 1/ 1 \ COMPOSITE CN: 94 \ Tc: 5.0 MINUTES / I \\I\ \\ ° r I I OSE2 SLCPP @ o 67 r° / \'\I // / / ✓ J EW E2 w / rj ^cob 70.63 LF OF 15" I I I / ° 0.71% OS E3 ,� I�� I� % RIP RAP APRON (TYP.) ` 11 I II CIA/ Cq `'' ' LL a 0 WZ W LU W LU UJ z w J a zu �W w U tz LLJ J J LL Q " CARo<�'r'; _\ �O�oFEss/O 9'y9 SEAL 056472 _ Z �v0 '�NGIN���' MOMMOMMOM 011111111 / \ L % I , I i I // / / \ I 1 �1llr \ — \ \ °OQ000000 , U-1 r P FOREBAY WET POND E3 EMERGENCY SPILLWAY POST DEVELOPMENT E3 ,�/ / / / � / I ✓ \ / I I C I I � _ _ _ = U DRAINAGE AREA: 2.3 ACRES l I COMPOSITE CN: 94 Tc: 5.0 MINUTES \I / EV fV \ II / I Ev / o ( F I I ° '7 NOW OR FORMERLY .I ADINATH I I I I I \ I INCORPORATED DH / \ L D HO % \ PIDB263854-334-04674 II \ I I II off /IIII / II E,oa E`1,_ \ \ - P0I-1 / I I II I 0 I NOW OR FORMERLY I I PROPERTIES OF JOH SON,LLC I I I V PIN:261414-34-2420 II / I I I w Y DB 5882, PG 242 \ I I I Q I i ON \ M \ \ / / / I c0 z OH I �— / \� Z W `1 \ W II p p J J W W > > W \ / W Do \ WN w 0 0� :/) I-_ W LL LL Q O (0 14.) N % ` O �QZ o WLLZ woo <Cai<Q G w Q W=00- oU) POST CONSTRUCTION STORMWATER NORTH MANAGEMENT PLAN ISJ Project Number:46118-0000 Drawing Scale:1"=50' v Date Issued: NOV 2023 fm 0 25 50 100 200 Index Number: -- GRAPHIC SCALE I I Drawn By:SMP Checked B ANS _— — 0/y I ti I I W W Project Manager: JS rU�_,�TACONT&LUF� °H—\�Ta�\�(�/A), v v (IN FEET) A�//i� ___/II1 inch = 50 ft.C%O1 THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATPc THIN THE PLANS. DATA CONTAINED WITHIN NLY TO BE USE R I INTE D POSY ITS TH U E, E ATIO RObUCTION� EDiST IBU�IIS STRICTLY PROHIBITED AND S1�87EC� TALF`AL ACTION. I 0) 3 a Q W W W Q z ❑ z O H U U) z 0 U F- O d C a: E U d -o `m o c Lri U N 6 O � N cot co� Co E Q) o� 03 co U 7 N 0 �2 a 0o Lp C� d N I) N E� Jv n LL m o a_a 22.0 PCSM NOTES: PCSM LEGEND 1. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES SOIL BOUNDARIES GOVERNING SAFETY AND HEALTH, INCLUDING THE FEDERAL CONSTRUCTION SAFETY ACT (PUBLIC LAW 91-54), FEDERAL n n / / / / / l / I REGISTER, CHAPTER XVII, PART 1926 OF TITLE 29 REGULATIONS, LIMITS OF DISTURBANCE / OCCUPATIONAL SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION, AND SUBSEQUENT PUBLICATIONS UPDATING THESE REGULATIONS. HC6O3 PROPOSED STORM MANHOLE / / ® 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE / / / AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE 3 / /✓ / / CONSTRUCTED PRIOR TO THE SUBMISSION OF THE BID. SUBMISSION (D PROPOSED CLEANOUT OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS C603 / / / / I REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND 7 CONSTRAINTS OF THE SITE. ® C603 PROPOSED INLET / / / / 3. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE / LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE g / CONTRACTOR SHALL NOTIFY ONE CALL SYSTEMS, INC. THE PROPOSED HEADWALL/ ENDWALL LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE C603 / / APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE / / RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE DETAINED AREAS / / / EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND / / / / / / / J UNDERGROUND STRUCTURES. / / 4. CONTRACTOR TO PROVIDE SHOP DRAWINGS ON ALL STORM SEWER UNDETAINED AREAS / / / / MANHOLES, INLETS, AND DETENTION SYSTEMS. / 5. AN AS -BUILT DRAWING OF NEW UTILITY SERVICES SHALL BE / / / / PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER / / _ / UPON COMPLETION OF THE PROJECT. , / 1-,/ 1-1 6. ALL STORM PIPE SHALL BE HDPE, SMOOTH INTERIOR, CORRUGATED POLYETHYLENE PIPE UNLESS OTHERWISE NOTED. ALL STORM , / / / SEWER CONSTRUCTION MATERIALS AND METHODS SHALL BE IN ® I / / ACCORDANCE WITH DOT SPECIFICATIONS. ALL JOINTS SHALL BE / / / / �� ✓ II — — — '; WATERTIGHT. / 7. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS / / CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. / / / 1-1/ loll/ \ \\ I / — — — �� \ 8. THE CONTRACTOR SHALL ASSURE THAT THERE IS POSITIVE Know what's below. /// DRAINAGE TO THE INLETS UPON PLACEMENT OF NEW PAVEMENT. Ile/ / / 9. AN AS -BUILT DRAWING OF THE STORMWATER DETENTION FACILITY Call before you dig. / / / PREPARED AND SEALED BY A PROFESSIONAL LAND SURVEYOR IS Serial No. A231231797-OOA / / / / / / \ \ \ �\ �r I / REQUIRED TO BE SUBMITTED TO THE PROJECT ENGINEER. / �� \ ;2 \ 15.7 A231231853-OOA / / / / / \ \ PROJECT AREAS A231231888-OOA / / A231231935-OOA / / / / / / ,rn> \ \� DISTURBED AREA = 43.5 ACRES A231232009-OOA A231232049-OOA / / / / / 171\\ //-4 \�\\ \ \ S � Py G�/ / / / FOREBAY loe / // / / . 171 // _ \ / /----172 EMERGENCY SPILLWAY / / �6a �°� �9s WET POND A2 /// /// �66 ��Gs°ram o�?�9 FOREBAY s / / �p oD p lo,6> 2 9 u p pC, 92,' 9 F csoC 90A << / / / �p� p pT //// �y ioo loe 1-1 / / / / / / / / / / / \ POST DEVELOPMENT A2 / / / / ` — _ _ / DRAINAGE AREA: 6.3 ACRES / / 1 �1 II COMPOSITE MINN: 4 / Ah Tc: / I I 1 \ / ,d \ / Dc / I-, / I � � OS Al — OH - - H°WET POND Al — OH — LMH 3 83.20 LF OF 24" SLCPP @ 0.08% 71 POST DEVELOPMENT Al DRAINAGE AREA: 24.4 ACRES n %Y1 COMPOSITE CN: 92 Tc: 20.0 MINUTES I I THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHI IS FOREBAY ONLY TO BE USED FOR ITS URPOSE BY ITS RES�BLE � V THE USE, REPLICATION, REPRODUCTION, 0/REDISTRIBUTION 'l-000< I I I I I / POST DEVELOPMENT Al — DRAINAGE AREA: 24.4 ACRES COMPOSITE CN: 92 Tc: 20.0 MINUTES -� q �— q4 qq / / I I I I / I / I I I 1 11 A CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. I OH /\7 EW A2- 71.07 LF OF 18" SLCPP @ 2.81 % OS A2 POST POI-2 UNDETAINED DRAINAGE AREA: 0.7 ACRES COMPOSITE CN: 80 Tc: 5.0 MINUTES RIP RAP APRON (TYP.) POI-2 �l \ NOW OR FORMERLY JOEL L. WILLIAMS PIN:261411-56-5355 DB 1891, PG 160 N/F JOEL L WILLIAMS PIN:261411-56-5355 DB 1891, PG 160 I _ I NO OH - 1 0 H0 OH\\ I I \ OH Ho OH �\ _ H° I OH Ho OH OH Ho / OH \ \ HO \ \ off \I - - / H \ 0 0y ti° 0ti \ 0ti IIII I I 0y\ / Oti \ � � IIII \ I �I II 1 /► IIII 1 / / IIIII 1 1 / II II \ � / IIII / NORTH II II 3 J11I GRAPHIC SCALE / IIIII / 0 25 50 100 200 IN FEET) — — 1 inch = 50 ft. IIII C WZ W LLJ W Z UJ z 0 W J a z� �WLU U a LL J J LL Q CA/�O�/ �O .OF�SS/6 SEAL 056472 _ � OS,'•.. GINS..• � � .... 0 LLI z 0 W W Z Q U O U � J I— L Z W W � 0- O O J IJI W W > w W 0 00 \ � WN W W 0 J u� ~ Ill LQ L 0 U)� ti N z O }U LL p w LL U — Z �� a Lu ai Z �Q Q�_J w0�_J w=� �Q �U) POST CONSTRUCTION STORMWATER MANAGEMENT PLAN Project Number:46118-0000 Drawing Scale: 1 "=50' Date Issued: NOV 2023 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS C702 U) J H w 0 z U) Q m co U a w Q U O J m a) N N 0 3 0 10(L 'D oo -0r to N -a o c N m �n Co N a) (0 Co E o in 0 E a 0 > �w CID Q 00:� :ca (0U 75t N 'o o� v2 a "o a. co N Ln E7 c � n FL o6M 0 L 76 w2 a:a 22.0 BASKET INLET FRAME AND GRATE TO BE REMOVE PLATES AND 10, SECURED WITH STAINLESS STEEL BOLTS. INSTALL ORIFICE TRASH ANTI -SEEP COLLARS SEE DETAIL 9/ C403 FOR SIZE STREAM 77.53 L.F. OF 15" WT JT HPPE SLCPP AT 0.13% RACKS (TYP.) TOP OF EMBANKMENT EL. 171.00 /----------- / \ EMERGENCY SPILLWAY CREST EL. 169.50 TOP OF EMBANKMENT EL. 172.00 100-YEAR EL. 170.66 5' - 25-YEAR EL. 169.99 FOREBAY CREST SPILLWAY EL. 167.50 llllll=l 10-YEAR EL. 169.48 . 2-YEAR EL. 16874 IIIIIIIIIIy iI1=III-III III 1-YEAR EL. 168.50 p - 1 IIIIIIIIII � ,IIIIIIIIIIIIIIII I IIIIIIIIIIII REMOVE I11=111=11 3 CLEAN OUT STAKE EL. 164 o "" . "" . "" . "" REMOVE 3� CLEAN OUT STAKE 0 0 0 0 0 0 0 CLASS B �3 RIP -RAP BASKET INLET FRAME AND GRATE TO BE REMOVE PLATES AND 10, SECURED WITH STAINLESS STEEL BOLTS. INSTALL ORIFICE TRASH 167.50Z ONE (1) 4" ORIFICE 2. REMOVE ALL AUUUMULA I EU SEUIMEN I FKUIVI I HE FUKEBAY AND BASIN. DO NOT COMPACT BASIN BOTTOM. 3. REMOVE TEMPORARY OUTLET CONTROL STRUCTURE AND SEAL OPENING IN PERMANENT OUTLET CONTROL STRUCTURE. 4. UNBLOCK ORIFICES ON THE OUTLET CONTROL STRUCTURE. 5. BASIN CORE TO BE CONSTRUCTED WITH ON -SITE CLAY MATERIAL. BASKET INLET FRAME AND GRATE TO BE REMOVE PLATES AND SECURED WITH STAINLESS STEEL BOLTS. INSTALL ORIFICE TRASH TOP OF EMBANKMENT EL. 174.00 RACKS (TYP.) IIII1 I=1 I I=1 =1 111 111 I E L. 172.00 1=1 1=1 1=1 -I -� I I-III-IIII I_ 3 1=1I1=1 11 I- 100-YEAR EL. 172.98 1-IIIIIII IIIIIIIIII _ - - 25-YEAR EL. 172.77 5 I1= FOREBAY CREST SPILLWAY EL. 169.00 1=1 �-Ii II II iII� IIIII - II II� III1II 'II 1II,gill 10-YEAR EL. 172.51 zill-Ill- 37 EL. 165.0 0REMOVE CLEANOUT STAKE TOP OF EMBANKMENT EL. 170.50 3 1� 100-YEAR EL. 169.89 25-YEAR EL. 169.62 7 FOREBAY CREST SPILLWAY EL. 167.50 =1 10-YEAR EL. 169.30 IIII-IIII 2-YEAR EL. 168.72 1=1 1=1 1=1 $� 11 III -III -III- 1-YEAR EL. 168.49 i 1=1I 1=1I 1=1 I I p � 1-1 I I -I 111 1I =1 =1 a I - IIII-III =I I III =1 (IIIIIIIIII REMOVE 3 =I = = 1=1I CLEAN OUT STAKE EL. 164.00 TOP OF EMBANKMENT EL. 171.00 3 1� 100-YEAR EL. 169.58 25-YEAR EL. 169.33 FOREBAY CREST SPILLWAY EL. 167.50 -1111111 10-YEAR EL. 169.18 �IIIIIIIIII� 2-YEAR EL. 168.71 71 11 l 11 l 11 l 11 l 11 1 1 1-YEAR EL. 168.49 p �-III IIIIII II=1I1= I- ' -III=III-III= 111-1I1=1I REMOVE �IIII( II III 3 CLEAN OUT STAKE CLASS B RIP -RAP III-1 I I- I I- I I I-1 11=1 I I- I I I I -III -I I III-III-III-1 I I -I I GEOTEXTILE 5' CLASS B RIP -RAP 5' 3 �1 REMOVE CLEAN OUT STAKE EL. 165.00 0 o - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - I I1=1I1=1I1=1I1=1I1=1I1=1I1=1I I I1=1I1= 1- :I I1=1I1=1I1=1I1=1I1=1I1=1I I_I I _I I1=1I1=1I1=1I II I1=1I1=1I I- I I1=1I1=1I1=1I1=1I I=1 I I=1 I =1 I I=1 I IIIIIIIIIIIIIIII-II I IIII I III III -II I III -II I III -II I III -II I III III-IIII -II I IIII I III -II I IIII I I 2' TI=III=III=III=III=III = =IIII III=11 1=1 =1 1=1 III =1 1=1 1=1 IIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII I EL II III III_III-III=IIIIII=III-III=III=III-III-III-III-1 -III-III-1III-III=III-III . 168.00 SEDIMENT STORAGE ZONE L. 163.0011=III �� III=III=11 111=III= 3 -III 111 111 111 111 I II 111 I �-� [I � I I I=1 11 I 1=1 11=1 11=1 11=1 11= NOTES: 6" AASHTO #57 AGGREGATE 1. DEWATER USING PUMPED WATER FILTER BAG. 2. REMOVE ALL ACCUMULATED SEDIMENT FROM THE FOREBAY AND BASIN. DO NOT COMPACT BASIN BOTTOM. 3. REMOVE TEMPORARY OUTLET CONTROL STRUCTURE AND SEAL OPENING IN PERMANENT OUTLET CONTROL STRUCTURE. 4. UNBLOCK ORIFICES ON THE OUTLET CONTROL STRUCTURE. 5. BASIN CORE TO BE CONSTRUCTED WITH ON -SITE CLAY MATERIAL. BASKET INLET FRAME AND GRATE TO BE SECURED WITH STAINLESS STEEL BOLTS REMOVE 168.00 CLEAN OUT STAKE �n 3 -EL. �1 167.25 / REMOVE PLATES AND INSTALL ORIFICE TRASH RACKS (TYP.) EL. 169.00 3 _ a 1�-IIIIII 11-III= I= I 1=1 11 111 1 12" X611 (WEIR 1 F1 STRUCTURE 263.83 L.F. OF 24" WT JT HPPE SLCPP AT 0.10% III-III-III-III-1 I1 I1 I1 I1 I1 I1 I1 I1 4' 10' TOP OF EMBANKMENT EL. 174.00 /----------- / IN, / \ FMFRGFNCY SPII I WAY CRFST FI _ 172_50 ANTI -SEEP COLLARS SEE DETAIL 9/ C403 FOR SIZE STREAM 73.03 L.F. OF 18" WT JT HPPE SLCPP AT 2.67% 4' 10, TOP OF EMBANKMENT EL. 170.50 / \ FMFRGFNCY SPII I WAY CRFST FI _ 169.50 CORE 4' 2. KEIVIUVE ALL AC. UUMULA I EU SEUIMEN I FKUIVI I HE FUKEBAY AND BASIN. DO NOT COMPACT BASIN BOTTOM. 3. REMOVE TEMPORARY OUTLET CONTROL STRUCTURE AND SEAL OPENING IN PERMANENT OUTLET CONTROL STRUCTURE. 4. UNBLOCK ORIFICES ON THE OUTLET CONTROL STRUCTURE. 5. BASIN CORE TO BE CONSTRUCTED WITH ON -SITE CLAY MATERIAL. REMOVE 3 0 o �o CLEAN OUT STAKE CLASS B �Q 1 RIP -RAP �� yc l 2. REMOVE ALL ACCUMULATED SEDIMENT FROM THE FOREBAY AND BASIN. DO NOT COMPACT BASIN BOTTOM. 3. REMOVE TEMPORARY OUTLET CONTROL STRUCTURE AND SEAL OPENING IN PERMANENT OUTLET CONTROL STRUCTURE. 4. UNBLOCK ORIFICES ON THE OUTLET CONTROL STRUCTURE. 5. BASIN CORE TO BE CONSTRUCTED WITH ON -SITE CLAY MATERIAL. THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. 4' ANTI -SEEP COLLARS SEE DETAIL 9/ C403 FOR SIZE STREAM 77.58 L.F. OF 15" WT JT HPPE SLCPP AT 0.64% 1A WET POND Al CROSS SECTION C710 1B WET POND A2 CROSS SECTION C710 1C WET POND E1 CROSS SECTION C710 1D WET POND E2 CROSS SECTION C710 `'' ' a000 0 W? LIJ Ji w w UJZ z z UJ LU z� �WU > a Lu c.n LL LL Q CA � •'FEssio •.'L ; Z_ •�0 ti9• .'9 SEAL 056472 _ �v0sGINel; Nv0 �. 0 O W Z O W W Q Z U O U J 1 7� L Z UJ W ^� I..L 0 O J WIJI W % W W 00 Q LU N W J W � LL !U p 67 O N )LL % ` O rr�nn Q z Q LLJ Q> z Q _J wQ Cl)_J W 2 U) D_ Q LU o U) POST CONSTRUCTION STORMWATER MANAGEMENT DETAILS Project Number:46118-0000 Drawing Scale: N.T.S. Date Issued: JULY 2023 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS C710 a E o 7C3 a P co C N N -6 O c N co ,n m n n m ❑ E o o > o aka 22.0 TOP OF EMBANKMENT EL. 171.00 YEAR EL. 170.00 V 25-YEAR EL. 169.85 � 5' FOREBAY CREST SPILLWAY EL. 167.50 BASKET INLET FRAME AND GRATE TO BE REMOVE PLATES AND 10, SECURED WITH STAINLESS STEEL BOLTS. INSTALL ORIFICE TRASH RACKS (TYP.) TOP OF EMBANKMENT EL. 171.00 EMERGENCY SPILLWAY CREST EL. 169.50 EL. 169.00 3 1F-,, 10-YEAR EL. 169.71 7 J1 A Qo 0 o I=III111-III- 2-YEAR EL. 169.23 ������� REMOVE II IIIIIIIIIII III- -- I -IIIIIIIII�IIIIII�IIIIIIIIII-IIIIII- 1�CLEAN OUT STAKE II III IIIIIIIII1III_1 -, 1-YEAR EL. 169.06 3 '- 1 1� IIIIIIIIIII II II� - o� o o o 0 0 3 EL. IIIIIIII II III -I REMOVE CLASS B 1 (IIIIII 3 CLEAN OUT STAKE RIP -RAP 167.50� 0 ONE (1) 1.0" ORIFICE II=1II IIIII III X=11I III- EL. o 0 0 0 0 0 ���� o 0 0 0 0 4' X 4' BOX III: III - III III -III- 164.00 ���� ��� EL. 164.00 IIII I I IIII I I-1 I I1 I I1 IIII I I IIII I I IIII I I IIII I I IIII I I1 I I1 I I-1 I I-1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I IIII I I1 I I I I1 I I1 I I-1 I IIIII I I1 I I1 I I1 I I1 I I1 1I ------------ =1 I I-1 I I-1 I I-1 I I1 I I1 IIII I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I-1 I I-1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I I I1 I I1 I I-1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 I I1 11 IIII 1 11 I I1 I I1 11-1 11-1 1 11 I I 1 11 11 11 1 11 1 11 1 11 i I1 1 11 1 11 1 11 1 11 1 11 11-1 1 11 I I1 1 11 1 11 1 11 I'1' I1 1 11 1 11 I =1I-1I-1I-1I I- _ =1 1=III=III=1=1=1I=1I-1=1I-1I-1I-1I-1I-1I-1I-1-1-1-1=1=1I=1I 1=1I=1I-1I--1I-1I-1I-1-1-1-1-1IIII -III III III -III II III I I1 11I 2' IIIIIIIIIIII=III III III= III=III IIII III -III III=III =III III=III III=III =III IIIIII=III I I I I=III I I=11 III=III III=III III III=III III -I III=III III I I III=III III :III III III=III I I11 III= GEOTEXTILE III= III=III IIII III=III III=III =III 1I1=III III=III =III III1I1=III EL. 167.50 II III I=III II=1�111=III III=III, 11111;111111111=,IIIIIIII I�IIIII�IIIIIIIIIII�IIIIIIIII_�IIIII�IIIIIIIIIIIIIII;IIII=III a - SEDIMENT STORAGE ZONE EL. 162.00 I11I d III III=III IIIIII 3' III -I 1=1 I I I=1 11=1 IIT I-1 III-1-1=1=111-1 1= IIIIII I IIII IIIII IIIIIII�II II11II II1IIIII II NOTES: 6" AASHTO #57 AGGREGATE 1. DEWATER USING PUMPED WATER FILTER BAG. 2. REMOVE ALL ACCUMULATED SEDIMENT FROM THE FOREBAY AND BASIN. DO NOT COMPACT BASIN BOTTOM. 3. REMOVE TEMPORARY OUTLET CONTROL STRUCTURE AND SEAL OPENING IN PERMANENT OUTLET CONTROL STRUCTURE. 4. UNBLOCK ORIFICES ON THE OUTLET CONTROL STRUCTURE. 5. BASIN CORE TO BE CONSTRUCTED WITH ON -SITE CLAY MATERIAL. TOP OF EMBANKMENT EL. 171.00 100-YEAR EL. 170.01y 25-YEAR EL. 169.74 FOREBAY CREST SPILLWAY EL. 167.50 5' IIIIIIII 10-YEAR EL. 169.43 III II II II 2-YEAR EL. 168.78 II -III _ 1-YEAR EL. 168.51 p L-IIIII-IIIIIIIIIIIII I ' IIIIIIIIIII III II=- 11-I REMOVE =III II II II I. 3 CLEAN OUT STAKE -IIIII1IIIIIIIIIIIIII 1 EL. II IIIIIIIII IIIII -III 164.00 3 11, CLASS B RIP -RAP ANTI -SEEP COLLARS SEE DETAIL 9/ C403 FOR SIZE CORE STREAM 71.58 L.F. OF 15" WT JT HPPE SLCPP AT 0.70 0 �o 11 IIII IIII 1 II 11I 11 11 11 IIII =1 I I I I I I I I I � I I I -I 11=1 I I I I II I I I I I=1 I I I I I=1 I I III -I 11=1 I I_I 11=1 I _-_- I-1 I IIIII I11 I I I-1I I-1I I 4'� BASKET INLET FRAME AND GRATE TO BE REMOVE PLATES AND 10, SECURED WITH STAINLESS STEEL BOLTS. INSTALL ORIFICE TRASH RACKS (TYP.) TOP OF EMBANKMENT EL. 171.00 / FMFR(=,FN('Y SPII I WAY (:RF.T FI 1RA g;n EL. 169.00 11 1I iI II II II I"' "' - III III III 3 III III 1 11 l l l l l l l 111 8, _ I 11' 1111111-I 4a 1�I' III=1 L illlllll II EL. IIIIIIIIII ANTI -SEEP COLLARS SEE a �I I I I I II I III I I '=I ( REMOVE 168.00 „III _I III=III- DETAIL 9/ C403 FOR SIZE CLEAN OUT STAKE 121I X16 WEIR 1 1 =IIIIIIIIIII - III11 1 71 3 l 1 167.20zz EL. 164.00 i ONE (1) 1.25" ORIFICE ,--4'X4'BOX f CORE STREAM =1 1=1-III III -III III -III III- -L/ -L/ 1 I 1 -III=III-IIIIIIIIIIII-III- o - ,_ IIII - I I III III IIII=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I I I I_I I II I =1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I III=1 I -1 I I=1 I I=1 I I=1 I I I I-1 I I=1 I I-1 I I1 I I-1 I I-1 I I1 I I1 I I=1 I I=1 I I=1 I I1 11-1 I I I 18 - 2' -� I I=III=III=III=III=1 I I III -1 11= I=1 I I=1 I I=1 I I=1 I I1 I I=1 I I=1 I I1 I I I-1 I I I I I-1 I I=1 I I=1 I I=1 I I1 I I1 I I=1 I I1 I I I II=1I -III=1II_III=III III=III_IIIIII=III=III-IIIIIIIII=III IIII. II III= - - o GEOTEXTILE -111 . 1====11II II=III=11I1 11I-11I-III I-III=III=III=III=III=III=11I11I 12 80.69 L.F. OF 15 WT JT HPPE SLCPP AT 0.62 /a I-III=11I-11I-11I-111 I-III=IIIIII11I-11I-11I-III11I-11I-11I-11I-11I III-111 EL. 167.20 SEDIMENT STORAGE ZONE ELI 1162.00 IIIIII111111 a =III II -III=-'= 3' =_ _ 1 ' 11=11 III II III III=III III-III=III-III=III-III=III III=III III=III - I I III=1 I I III -II I IIII I I111 I I -I I III- 1 11 � I1 I I III=1 I III III -II I I I I=1 I I I I I=1 I I I I I=1 I I I I I=1 I I III III -III I I I=1 I IIII =1I III -III -III 1 KEYWAY11 I1=1I I1=4' IIIII =1I III I1=1I =1I I1=1I I1=1I I1=1I II I � I -I -I -I I I I I I -I I I_I 11 11 fir III I I ' 11 11 I I -I III IIII�II IIIII I IIIII I I 111 I IIII III III III 111 11115111 111 NOTES: 6" AASHTO #57 AGGREGATE 1. DEWATER USING PUMPED WATER FILTER BAG. 4 2. REMOVE ALL ACCUMULATED SEDIMENT FROM THE FOREBAY AND BASIN. DO NOT COMPACT BASIN BOTTOM. 3. REMOVE TEMPORARY OUTLET CONTROL STRUCTURE AND SEAL OPENING IN PERMANENT OUTLET CONTROL STRUCTURE. 4. UNBLOCK ORIFICES ON THE OUTLET CONTROL STRUCTURE. 5. BASIN CORE TO BE CONSTRUCTED WITH ON -SITE CLAY MATERIAL. ORIGINAL GROUND SECTION A -A RIPRAP APRON APRON APRON OUTLET PIPE DIA SIZE LENGTH INITIAL TERMINAL NO. Pd d 50 Al WIDTH WIDTH (IN) Aiw Atw (FT) (FT) (FT) (FT) RIPRAP APRON Al 24 1 8 6 10 RIPRAP APRON A 18 1 10 4.5 11.50 RIPRAP APRON E1 15 1 9 3.75 10.25 RIPRAP APRON E2 15 1 9 3.75 10.25 RIPRAP APRON E3 15 1 6 3.75 7.25 RIPRAP APRON E4 15 1 8 3.75 9.25 NOTES. ALL APRONS SHALL BE CONSTRUCTED TO THE DIMENSIONS SHOWN. TERMINAL WIDTHS SHALL BE ADJUSTED AS NECESSARY TO MATCH RECEIVING CHANNELS. ALL APRONS SHALL BE INSPECTED AT LEAST WEEKLY AND AFTER EACH RUNOFF EVENT. DISPLACED RIPRAP WITHIN THE APRON SHALL BE REPLACED IMMEDIATELY. EXTEND RIPRAP ON BACK SIDE OF APRON TO AT LEAST 1/2 DEPTH OF PIPE ON BOTH SIDES TO PREVENT SCOUR AROUND THE PIPE. 2 RIPRAP APRON AT PIPE OUTLET - C711 N.T.S. THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. %J Ll./ I L/\ I ILL 3 BASIN ACCESS ROAD TYPICAL SECTIONLU C711 19 4 STONE FOREBAY TO C711 BASIN EMBANKMENT T\ A 1E WET POND E3 CROSS SECTION C711 1F WET POND E4 CROSS SECTION C711 O/A„ _J , r0 F( - 1 1-- FOR ANCHOR BOLTS OUTLET STRUCTURE PIPE SCREEN NO. 2 REBAR a_ a J d_a a d �. d a 4 6" ORIFICES 12" ORIFICES HEIGHT ............... 12 INCHES HEIGHT ............... 24 INCHES LENGTH ............... 12 INCHES LENGTH ............... 24 INCHES OPENINGS ............. 3 INCH OPENINGS ............. 4 INCH FOR MAXIMUM FREE DRAINAGE AREA WITH OPENINGS SIZED TO PREVENT CLOGGING. 5 ORIFICE REBAR TRASH RACK C711 -N.T.S. CIO-) a � W? W Li Li w UJzoz Lu a zu �W LU U rz w c.n L� Q �NCARO SEAL 056472 0 �O , 1 1 �9G� I I I r) ry O U LLI ry Z O U) W ry 011111111 LLI Q z U O U J J i z z LLI IFICE LLI O O J J LLI LU LLI LU 0 00 Q N LLI W 0 0� ::) LU~(0 LL p LO 0 ` N 0 � O Q z U) Q LLJ z Q % Q W Q Cl) UJ=Q= (n av) POST CONSTRUCTION STORMWATER MANAGEMENT DETAILS Project Number:46118-0000 Drawing Scale: N.T.S. Date Issued: JULY 2023 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS C711 3 z Q IL CD z z Q IL 0 0 d 0- (1) 2 w m ❑ E o o in 0 o2 IL& 22.0 VEGETATED SHELF BELOW PERMANENT POOL VEGETATED SHELF PLANT, AS SPECIFIED MULCH LAYER AS SPECIFIED PLANTING SOIL MIX AS SPECIFIED FINISH GRADE VEGETATED SHELF ZONE PERMANENT POOL ELEVATION 0 0 CULTIVATE SOIL IN ENTIRE PLANTING AREA TO A DEPTH OF 12" UNCOMPACTED SUBGRADE 'LANTING NOTES: LIGHTLY TAMP SOIL AROUND PLANTS TO REMOVE ANY AIR POCKETS. VEGETATED BENCH SOILS TO BE TESTED IN AT WIDISTANT LOCATIONS ALONG BENCH PRIOR TO 1CUREMENT. SOILS TO BE TESTED FOR pH, FRIENT LEVELS, SECONDARY AND MICRONUTRIENT )IL TEXTURE CLASS AND ORGANIC MATTER CONTENT. A FIELD SOIL MOISTURE TEST (HAND FEEL AND SOIL APPEARANCE TEST) SHALL BE PERFORMED AS WELL. TESTER SHALL DIG AN 18" DEEP HOLE AT LOWEST POINT OF BENCH IN 5 EQUIDISTANT LOCATIONS AND NOTE IF GROUNDWATER IS ENCOUNTERED. NOTES AND PHOTOGRAPHS SHALL BE SENT TO THE ENGINEER PRIOR TO PLANT PROCUREMENT. PLANT SPECIES ADJUSTMENTS MAY BE MADE DEPENDING ON SOIL TESTING. VEGETATED SHELF PLANT, AS SPECIFIED FINISH GRADE PERMANENT POOL ELEVATION VEGETATED SHELF ZONE AQUATIC SOIL MIX SOIL COMPOSITION / PRODUCT SELECTION TO BE COORDINATED WITH AQUATIC PLANT GROWER AND ENGINEER BEFORE AQUATIC SOIL PROCUREMENT AND VEGETATED SHELF PLANTING. UNCOMPACTED SUBGRADE TOTE: VET POND VEGETATED BENCH SOILS TO IE TESTED WET POND C-1 VEGETATED TENCH SOILS TO BE TESTED IN AT LEAST 5 OCATIONS ALONG BENCH PRIOR TO PLANT 'ROCUREMENT. SOILS TO BE TESTED FOR pH, MACRONUTRIENT LEVELS, SECONDARY AND MICRONUTRIENT LEVELS, SOIL TEXTURE CLASS AND ORGANIC MATTER CONTENT. 0 1 WET POND VEGETATED SHELF PP101 PLANTING DETAILS 100.00' SEGMENT. REPEAT SIMILAR PLANTING ARRANGEMENT FOR ENTIRE SHELF PLANTING (12) Chasmanthium latifolium 24" O.C. (50) Panicum virgatum 'Heavy Metal' 24" O.C. (12)Juncus effusus 24" O.C. (26) Muhlenbergia capillaris 24" O.C. (12) Chasmanthium latifolium 24" O.C. (12)Juncus effusus 24" O.C. 100.00' SEGMENT, REPEAT SIMILAR PLANTING ARRANGEMENT FOR ENTIRE SHELF PLANTING e (26) Muhlenbergia capillaris 24" O.C. 24" O.C. 24" O.C. 24" O.C. ITHE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. LANDSCAPE NOTES: BEFORE PLANTING, SOILS SHALL BE SUFFICIENTLY FERTILE TO SUPPORT PLANT GROWTH. A SOIL ANALYSIS SHALL BE CONDUCTED BEFORE PLANTING. PLANTING SHOULD BE DONE IN THE SPRING OR AUTUM, WITH SPRING (THIS IS LATE MARCH THROUGH JUNE) PREFERABLE DUE TO WETTER CONDITIONS AND THE POTENTIALLY HIGHER WATER LEVEL WITHIN THE POND. IF VEGETATION IS PLANTED IN THE AUTUMN (SEPTEMBER THROUGH NOVEMBER) OR DURING A DROUGHT, IRRIGATION MAY BE REQUIRED TO AID IN ESTABLISHMENT. IN ANY CASE, ALL PLANTS WILL REQUIRE THOROUGH WATERING - WHETHER FROM RAIN, POND WATER, OR ARTIFICIAL IRRIGATION - FOR THREE TO FOUR WEEKS FOLLOWING INSTALLATION. IN ADDITION, BE CAREFUL NOT TO OVER -TOP (COMPLETELY SUBMERGE) HERBACEOUS SPECIES AND GRASSES BEFORE ROOTS HAVE ESTABLISHED IN THE SUBSTRATE. EVEN WETLAND SPECIES CAN "DROWN" IF SUBJECTED TO COMPLETE SUBMERGING DURING THE INITIAL TWO TO THREE WEEKS FOLLOWING INSTALLATION. HOWEVER, TOTAL SUBMERGENCE IS NOT AN ISSUE FOR ESTABLISHED PLANTS AND DURING THE DORMANT SEASON (FROM LATE AUTUMN TO EARLY SPRING). AREAS ADJACENT TO WET PONDS, INCLUDING NORTH M GRAPHIC SCALE 0 25 50 100 200 ( IN FEET) 1 inch = 50 ft. a IL � 0 5iwzz w� w w LUZ z z �w J a z� (� w w U ry w v7 J J D IL Q CARO s SEAL = 056472 _ �v0s'�NGINe��' O U LLI 0-1 O U) W ry M00000=0M 2 M 2H.H.H.H.1 W 0 Z U O U J 1 L Z W W n� O O J J W W > > W W 0 0 0 WN W 0 J „J ~(0 W LL 0` % 0 O Ln N O }U Z p W W LLU Z rn W ai W Q Q O�Q W=(� 0-Q �cn LU WET POND PLANTING I PLAN Project Number:46118-0000 Drawing Scale: 1 "=50' Date Issued: NOV 2023 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS PP101 c a� E U -o d `m rn -6 M C � U N 6 0 � N co m zt 0- (1) 2 w a3 ❑ E o o in 0 o2 VEGETATED SHELF BELOW PERMANENT POOL VEGETATED SHELF PLANT, AS SPECIFIED MULCH LAYER AS SPECIFIED PLANTING SOIL MIX AS SPECIFIED FINISH GRADE VEGETATED SHELF ZONE PERMANENT POOL ELEVATION 0 0 CULTIVATE SOIL IN ENTIRE PLANTING AREA TO A DEPTH OF 12" UNCOMPACTED SUBGRADE 'LANTING NOTES: LIGHTLY TAMP SOIL AROUND PLANTS TO REMOVE ANY AIR POCKETS. VEGETATED BENCH SOILS TO BE TESTED IN AT WIDISTANT LOCATIONS ALONG BENCH PRIOR TO 1CUREMENT. SOILS TO BE TESTED FOR pH, FRIENT LEVELS, SECONDARY AND MICRONUTRIENT )IL TEXTURE CLASS AND ORGANIC MATTER CONTENT. A FIELD SOIL MOISTURE TEST (HAND FEEL AND SOIL APPEARANCE TEST) SHALL BE PERFORMED AS WELL. TESTER SHALL DIG AN 18" DEEP HOLE AT LOWEST POINT OF BENCH IN 5 EQUIDISTANT LOCATIONS AND NOTE IF GROUNDWATER IS ENCOUNTERED. NOTES AND PHOTOGRAPHS SHALL BE SENT TO THE ENGINEER PRIOR TO PLANT PROCUREMENT. PLANT SPECIES ADJUSTMENTS MAY BE MADE DEPENDING ON SOIL TESTING. VEGETATED SHELF PLANT, AS SPECIFIED FINISH GRADE PERMANENT POOL ELEVATION VEGETATED SHELF ZONE AQUATIC SOIL MIX SOIL COMPOSITION / PRODUCT SELECTION TO BE COORDINATED WITH AQUATIC PLANT GROWER AND ENGINEER BEFORE AQUATIC SOIL PROCUREMENT AND VEGETATED SHELF PLANTING. UNCOMPACTED SUBGRADE TOTE: VET POND VEGETATED BENCH SOILS TO IE TESTED WET POND C-1 VEGETATED TENCH SOILS TO BE TESTED IN AT LEAST 5 OCATIONS ALONG BENCH PRIOR TO PLANT 'ROCUREMENT. SOILS TO BE TESTED FOR pH, MACRONUTRIENT LEVELS, SECONDARY AND MICRONUTRIENT LEVELS, SOIL TEXTURE CLASS AND ORGANIC MATTER CONTENT. 1 WET POND VEGETATED SHELF PP102 PLANTING DETAILS 100.00' SEGMENT. REPEAT SIMILAR PLANTING ARRANGEMENT FOR ENTIRE SHELF PLANTING (12) Chasmanthium latifolium 24" O.C. (50) Panicum virgatum 'Heavy Metal' 24" O.C. (12)Juncus effusus 24" O.C. (26) Muhlenbergia capillaris 24" O.C. (12) Chasmanthium latifolium 24" O.C. (12)Juncus effusus 24" O.C. 100.00' SEGMENT, REPEAT SIMILAR PLANTING ARRANGEMENT FOR ENTIRE SHELF PLANTING (26) Muhlenbergia capillaris 24" O.C. 24" O.C. 24" O.C. 24" O.C. LANDSCAPE NOTES: BEFORE PLANTING, SOILS SHALL BE SUFFICIENTLY FERTILE TO SUPPORT PLANT GROWTH. A SOIL ANALYSIS SHALL BE CONDUCTED BEFORE PLANTING. PLANTING SHOULD BE DONE IN THE SPRING OR AUTUM, WITH SPRING (THIS IS LATE MARCH THROUGH JUNE) PREFERABLE DUE TO WETTER CONDITIONS AND THE POTENTIALLY HIGHER WATER LEVEL WITHIN THE POND. IF VEGETATION IS PLANTED IN THE AUTUMN (SEPTEMBER THROUGH NOVEMBER) OR DURING A DROUGHT, IRRIGATION MAY BE REQUIRED TO AID IN ESTABLISHMENT. IN ANY CASE, ALL PLANTS WILL REQUIRE THOROUGH WATERING - WHETHER FROM RAIN, POND WATER, OR ARTIFICIAL IRRIGATION - FOR THREE TO FOUR WEEKS FOLLOWING INSTALLATION. IN ADDITION, BE CAREFUL NOT TO OVER -TOP (COMPLETELY SUBMERGE) HERBACEOUS SPECIES AND GRASSES BEFORE ROOTS HAVE ESTABLISHED IN THE SUBSTRATE. EVEN WETLAND SPECIES CAN "DROWN" IF SUBJECTED TO COMPLETE SUBMERGING DURING THE INITIAL TWO TO THREE WEEKS FOLLOWING INSTALLATION. HOWEVER, TOTAL SUBMERGENCE IS NOT AN ISSUE FOR ESTABLISHED PLANTS AND DURING THE DORMANT SEASON (FROM LATE AUTUMN TO EARLY SPRING). GRAPHIC SCALE 0 25 50 100 200 ( IN FEET) 1 inch = 50 ft. � �/ ry aIo L 0 wzz w� w w LUzz � z �w J a zu (� w w U ry w v7 J J H Q CAR SEAL = 056472 _ O �v0 '�NGINE��' � i O U LLI 0-1 O U) W ry M88888 = 8 = W 0 Z CU O U J 1 L Z W W n2 O O J J W W > > W W 0 0 0 WN W 0 ~(0 W LL 0` % 0 O Ln N O }U Z p W W LLU Z ai W Q Q �Q W=(� 0-Q �cn LU WET POND PLANTING PLAN Project Number:46118-0000 Drawing Scale: 1 "=50' Date Issued: NOV 2023 Index Number: -- Drawn By: SMP Checked By: ANS Project Manager: JS P P 102 IL& 22.0 ITHE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. SUPPLEMENT-EZ COVER PAGE FORMS LOADED :OJECT INFORMATION 1 jProject Name Eastfield Crossing, Block C 2 1 Proiect Area (ac) 117.7 3 lCoastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? High 6 Does this protect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 50 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 8 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: 28 Organization: 29 Street address: 30 City, State, Zip: 31 Phone number(s): 32 1 Email: Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of Designer DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 8 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM Wet Pond Al Wet Pond A2 Wet Pond C1 Wet Pond C2 5 Total drainage area (sq ft) 4229863 1063051 272250 1698840 836352 6 Onsite drainage area (sq ft 3933607 1063051 272250 1406355 832581 7 Offsite drainage area (sq ft) 296256 292485 3771 8 Total BUA in project (sq ft 3465264.025 823865 sf 210994 sf 978264 sf 1173630 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 399010 399010 sf 10permitting) New BUA not on subdivided lots (subject to sf 3066254.025 823865 sf 210994 sf 978264 sf 774620 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) 1646086 sf 637831 sf 163350 sf 341876 sf 287407 sf Sidewalk (sq ft 169467.1 106305 sf 27225 sf Roof (sq ft) 459459.55 53153 sf 13613 sf 374726 sf Roadway s ft 317653.775 26576 sf 6806 sf 261662 sf 13625 sf Future (sq ft) 473588 sf Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on Isubdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 82% 78% 78% 58% 140% 19 Design storm (inches) 1 in tin 1 in tin 1 in 20 Design volume of SCM cu ft 304243 cf 61910 cf 21443 cf 132873 cf 63865 cf 21 Calculation method for design volume Simple Method Simple Method Simple Method Simple Method Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 8 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 5 6 7 8 4 Type of SCM Wet Pond E1 Wet Pond E2 Wet Pond E3 Wet Pond E4 5 Total drainage area (sq ft) 4229863 100188 39204 98010 121968 6 Onsite drainage area (sq ft 3933607 100188 39204 98010 121968 7 Offsite drainage area (sq ft) 296256 8 Total BUA in project (sq ft 3465264.025 77646 sf 30383 sf 75958 sf 94525 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 399010 10permitting) New BUA not on subdivided lots (subject to sf 3066254.025 77646 sf 30383 sf 75958 sf 94525 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) 1646086 sf 60113 sf 23522 sf 58806 sf 73181 sf Sidewalk (sq ft 169467.1 10019 sf 3920 sf 9801 sf 12197 sf Roof (sq ft) 459459.55 5009 sf 1960 sf 4901 sf 6098 sf Roadway s ft 317653.775 2505 sf 980 sf 2450 sf 3049 sf Future (sq ft) Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on Isubdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 82% 78% 78% 78% 78% 19 Design storm (inches) 1 in 1 in 1 in 1 in 1 in 20 Design volume of SCM cu ft 304243 cf 5753 cf 2372 cf 7897 cf 8130 cf 21 Calculation method for design volume Simple Method Simple Method Simple Method Simple Method Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): WET POND 1 I Drainaae area nL Al 1 A2 1 C1 1 C2 1 E1 31 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) Pump (preferred) Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes Yes Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A N/A N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes Yes Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes Yes Yes Yes WET POND Mnc FROM n2H _1a53 18 Sizing method used HRT HRT HRT HRT HRT 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 163.50 164.50 161.00 162.00 1635.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 164.00 165.00 161.50 162.50 164.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 167.00 169.50 165.00 165.50 167.00 23 Elevation of the permanent pool (fmsl) 167.50 169.65 164.50 1166.75 167.25 24 Elevation of the top of the vegetated shelf (fmsl) 168.00 170.50 166.00 166.50 168.00 25 Elevation of the temporary pool (fmsl) 168.05 171.00 165.50 168.00 168.00 26 Surface area of the main permanent pool (square feet) 89694 13905 129349 48195 6391 27 Volume of the main permanent pool (cubic feet) 289052 cf 42377 cf 363619 cf 148003 cf 13884 cf 28 Average depth of the main pool (feet) 3.00 ft 4.00 ft 2.81 ft 3.07 ft 2.17 ft 29 Average depth equation used Equation 2 Equation 2 Equation 2 Equation 2 Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 43358 cf 6357 cf 82981 cf 162314 cf 2083 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes Yes Yes Yes 34 Clean -out depth for forebay (inches) 6 in 6 in 6 in 6 in 6 in 351 Design volume of SCM (cu ft) 61910 cf 21443 cf 132873 cf 63865 cf 5753 cf 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice Orifice Orifice 37 If orifice, orifice diameter (inches) 4 in 8 in 4 in 3 in 1 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.2 0.08 3.35 2.74 2.87 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes Yes Yes Yes 42 Are berms or baffles provided to improve the flow path? No No No No No 43 Depth of forebay at entrance (inches) 42 in 48 in 48 in 42 in 42 in 44 Depth of forebay at exit (inches) 42 in 48 in 48 in 42 in 42 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes Yes Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 6 ft 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes Yes Yes 53 Species of turf that will be used on the dam and embankment Clean Crop Seed Clean Crop Seed Clean Crop Seed Clean Crop Seed Clean Crop Seed 54 Hasa planting plan been provided for the vegetated shelf? Yes Yes Yes Yes Yes IITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet Dond(s): Wet Pond 4 10:23 AM 11/15/2023 WET POND 1 I Drainaae area nL E2 1 E3 1 E4 31 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes Yes WET POND Mnc FROM n2H _1a53 18 Sizing method used HRT HRT HRT 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 162.50 163.50 163.50 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 163.00 164.00 164.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 167.00 167.00 167.00 23 Elevation of the permanent pool (fmsl) 167.50 167.50 167.25 24 Elevation of the top of the vegetated shelf (fmsl) 168.00 168.00 168.00 25 Elevation of the temporary pool (fmsl) 168.10 169.00 168.00 26 Surface area of the main permanent pool (square feet) 3253 7313 10093 27 Volume of the main permanent pool (cubic feet) 5813 cf 14928 cf 19915 cf 28 Average depth of the main pool (feet) 1.79 ft 2.04 ft 1.97 ft 29 Average depth equation used Equation 2 Equation 2 Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 872 cf 2239 cf 2987 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes Yes 34 Clean -out depth for forebay (inches) 6 in 6 in 6 in 35 Design volume of SCM (cu ft) 2372 cf 7897 cf 8130 cf 361 Is the outlet an orifice or a weir? Orifice Orifice Orifice 37 If orifice, orifice diameter (inches) 1 in 1 in 1 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 3.84 2.57 1.98 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes Yes 42 Are berms or baffles provided to improve the flow path? No No No 43 Depth of forebay at entrance (inches) 54 in 42 in 42 in 44 Depth of forebay at exit (inches) 54 in 42 in 42 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes 53 Species of turf that will be used on the dam and embankment Clean Crop Seed Clean Crop Seed Clean Crop Seed 54 Hasa planting plan been provided for the vegetated shelf? Yes Yes Yes IITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet Dond(s): Wet Pond 5 10:23 AM 11/15/2023 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Eastfield Development 2. Location of Project (street address): US Highway 70A / Providence Blvd. City:Selma County:Johnston Zip:27576 3. Directions to project (from nearest major intersection): Traveling from Selma, take US Highway 70A, turn left at Providence Blvd, entrance is 2,1001f to the right. 4. Latitude:35° 31' 11.06" N Longitude:78° 16' 42.99" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, DRW #20221617 and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 43.5+71.8 ac of Disturbed Area ❑NPDES Industrial Stormwater E404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Eastfield Crossing / Providence Blvd. - Sect. 404 - ID SAW-2018-00045- 3/3/2022; Erosion Ctrl: Eastfield Retail Block - TOHNS-2022-006 - 4/8/2022, Eastfield Crossing - Eastfield Bus Park Spec Bldg#1- JOHNS-2021-011 - 12/28/2022, Eastfield Retail Block C: JOHNS-2022-059 - 7/3/2023 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: Eastfield Associates, LLC Signing Official & Title:Kevin Dougherty - Manager b. Contact information for person listed in item 1a above: Street Address:101 South Raiford Street City:Selma State:NC Zip:27576-3154 Mailing Address (if applicable): City: State: Zip: Phone: (919 ) 965-5661 Fax: ( ) Email:kmd@adventuredev.com Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): State: Zip: City: State: Zip: Phone: ( ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: Point of Contact: Phone #: ( ) Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff will be collected via an underground storm system which discharges to wetponds with forebays (Eastfield Retail Block A/E). Runoff will be collected via an underground storm system and surface channels which discharge to wetponds with forebays(Eastfield Retail Block C). 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Neuse 4. Total Property Area: 40.3+71.8 acres River basin. 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 5.88 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:117.70 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHVO line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 70.1 9. How many drainage areas does the project have?6 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 Basin Information Drainage Area Al Drainage Area A2 Drainage Area C1 Drainage Area C2 Receiving Stream Name Bawdy Creek Bawdy Creek Bawdy Creek Bawdy Creek Stream Class * QNSW QNSW QNSW QNSW Stream Index Number * 27-50-1 27-50-1 27-50-1 27-50-1 Total Drainage Area (sf) 1,063,051 272,250 1,698,840 836,352 On -site Drainage Area (so 1,063,051 272,250 1,406,355 832,581 Off -site Drainage Area (sf) 0 0 292,485 3,771 Proposed Impervious Area** (sf) 823,865 210,994 1,528,956 752,717 % Impervious Area** total 78.0 78.0 90 90 Impervious— Surface Area Drainage Area Al Drainage Area A2 Drainage Area C1 Drainage Area C2 On -site Buildings/Lots (so 53,153 13,613 374,726 0 On -site Streets (sf) 26,576 6,806 261,662 13,625 On -site Parking (sf) 637,831 163,350 341,876 287,407 On -site Sidewalks (so 106,305 27,225 0 0 Other on -site (so Future (sf) 0 473,588 Off -site (sf) Existing BUA*** (so Total (so: 1 823,865 1 210,994 1 978,264 1 301,032 * Stream Class and Index Number can be determined at: http.aortal.ncdenr.org web/wc)[ps/csu/classi ications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Protects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCA C 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:/ /portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. Form SWU-101 Version Oct. 31, 2013 Page 4 of 7 Basin Information Drainage Area E1 Drainage Area E2 Drainage Area E3 Drainage Area E4 Receiving Stream Name Bawdy Creek Bawdy Creek Bawdy Creek Bawdy Creek Stream Class * QNSW QNSW QNSW QNSW Stream Index Number * 27-50-1 27-50-1 27-50-1 27-50-1 Total Drainage Area (sf) 100,188 39,204 98,010 121,968 On -site Drainage Area (so 100,188 39,204 98,010 121,968 Off -site Drainage Area (so 0 0 0 0 Proposed Impervious Area** (sf) 77,646 30,383 75,958 94,525 % Impervious Area** (total) 78.0 78.0 78.0 78.0 Impervious- Surface Area Drainage Area E1 Drainage Area E2 Drainage Area E3 Drainage Area E4 On -site Buildings/Lots (sf) 5,009 1,960 4,901 6,098 On -site Streets (sf) 2,505 980 2,450 3,049 On -site Parking (sf) 60,113 23,522 58,806 73,181 On -site Sidewalks (so 10,019 3,920 9,801 12,197 Other on -site (so Future (sf) Off -site (sf) Existing BUA*** (so Total (so: 77,646 30,383 75,958 94,525 * Stream Class and Index Number can be determined at: http.aortal.ncdenr.or web/wcl[ps/csu/classi cations Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 G AT E WAS( C-46118-0000 On Call. On Time. On Target. November 2023 Eastfield Development US Highway 70-A Selma, North Carolina PREPARED FOR Eastfield Associates, LLC. 101 S Raiiford Street, Suite 200 Selma, NC 27576 SUBMITTED BY Ryan M. Enoch The Gateway Engineers, Inc. 100 McMorris Road Pittsburgh, PA 15205 412.409.2313 PHONE 412.921.9960 FAX www.gatewaVengineers.com renoch(c-)gatewayengineers.com REVIEWED BY Daniel S. Deiseroth, P.E. TABLE OF CONTENTS PROJECT SUMMARY QUALITATIVE CUMULATIVE IMPACT ANALYSIS CONCLUSION APPENDIX SITE LOCATION MAP Eastfield Development Cumulative Impact Analysis 1-3 PROJECT SUMMARY Adventure Development is proposing to construct infrastructure for the Eastfield mixed -use development located southeast of the interchange of Interstate 95 and US Highway 70 in Selma, Johnston County, North Carolina. The project consists of road construction consistent with the Town of Selma's transportation plan, utility installation, and site grading for future commercial, residential, and industrial uses. The proposed development goals have been oriented based on input received from the Johnston County Economic Development Commission. The total Eastfield site is approximately 307 acres, of which 212 acres is developable. The project area consists of a mixed hardwood community, agricultural fields, existing utility easements, and existing rural residential and commercial buildings. The project area is owned by the applicant. The project parcels are currently zoned as Industrial, Interstate Business, High Density Residential, or Low Density Residential by the Town of Selma. The purpose of this project is to construct necessary infrastructure for a mixed -use development within a strategic location in Selma, North Carolina to meet the market needs of the community for commercial and industrial facilities. The applicant's goal was to assemble enough land to address the voids in the community, increase the tax base of Selma while minimizing environmental impacts. The proposed work to improve and modernize the US 70 / 70A intersection is based on NCDOT studies indicating that the existing intersection does not meet current traffic needs and safety standards. The project is located within the Neuse River Basin and drains to Bawdy Swamp and unnamed tributaries to Mocassin Creek, a source of Bawdy Creek. A Best Usage Classification (BUC) of C;NSW has been assigned to both water bodies. Multiple wetlands associated with Bawdy Swamp and Mocassin Creek were identified onsite that have been determined to be subject to Section 404 jurisdiction. To accomplish the goals of the project approximately 3.03 acres of wetland impacts and 379 linear feet of stream impacts are proposed to construct the required road improvements and associated infrastructure for the development. Because of these impacts the applicant is submitting an Individual Permit Request for impacts to wetlands and waters of the US (DWR# 20221617 v2 / USACE# SAW-2017- 00326) QUALITATIVE CUMULATIVE IMPACT ANALYSIS Per Section III of the NCDEQ 2004 Cumulative Impact Policy, private developments are unlikely to cause cumulative impacts unless they are 1) relatively large, 2) involve commercial development, and 3) occur in otherwise relatively undeveloped landscapes with an impact on regional growth patterns. Based on these characteristics the DWR has determined that a qualitative Cumulative Impact Analysis is required for the Eastfield Development. The following analysis provides considerations of the Qualitative Indirect and Cumulative Impacts to downstream water quality resources from the Eastfield Development. NC DWQ Cumulative Impact Policy, Version 2.1, dated April 10,2004, Question 1a. Is growth likely to be induced by the project? The purpose of this project is to meet the existing market needs of the Selma community, not induce growth. The Eastfield Development is relatively large and includes commercial development. While the existing site parcels are relatively undeveloped, the area is zoned Interstate Business and is located within the 1-95 corridor just two miles from downtown Selma and 30 miles from Raleigh. It is reasonable to expect continual development in this area over time, regardless of Eastfield. Therefore, it is unlikely that the Eastfield Development will impact the current regional growth patterns. NC DWQ Cumulative Impact Policy, Version 2.1, dated April 10,2004, Question 1b. Are existing uses of the water likely to be impacted? The project site drains to Bawdy Swamp and unnamed tributaries to Mocassin Creek, a source of Bawdy Creek. The receiving waters have been classified as Class C Nutrient Sensitive Waters (C;NSW). The project is not located within a watershed classified as Water Supply (WSW), High Quality (HQW), or Outstanding Resource (ORW). Johnston County's Stormwater Management Ordinance is applicable to Eastfield, and future projects, and establishes minimum criteria to control and minimize quantitative and qualitative impacts of stormwater runoff from development within the county, a nutrient management program for new development in accordance with 15A NCAC 2B .0235 Neuse River Basin - Nutrient Sensitive Waters Management Strategy: Basinwide Stormwater Requirements and to establish regulations to provide additional protection within the environmentally sensitive area district (ES). The anticipated direct impacts to water quality will be mitigated by the construction of Wet Ponds throughout the site to provide stormwater management and protect water quality downstream. The Wet Ponds have been designed in accordance with NCDEQ's Stormwater Design Manual incorporating features such as forebays, vegetative shelves, multi -stage outlet structures, and rip rap outlet protection. Additional water quality protection will be provided through Erosion and Sediment Control measures provided during construction. Water quality impacts will also be minimized by the protection and preservation of the existing riparian buffers to maintain the natural nutrient removal functions. The Neuse River Basin buffer protection rules require a 50-foot buffer measured from top of bank on each side of the stream. NC DWQ Cumulative Impact Policy, Version 2.1, dated April 10,2004, Question 1c. Are additional regulatory measures needed? The site is located within the Neuse River Basin in Johnston County. In December of 1997, the Environmental Management Commission adopted rules to reduce the amount of nitrogen delivered to the Neuse River Basin from point and nonpoint sources by a minimum of 30 percent of the 1995-loading rate. Wastewater treatment plants and industrial plants are considered point source discharges. Point source discharges are regulated under the National Pollution Discharge Elimination System (NPDES) administered through the NC Department of Environment and Natural Resources Division of Water Quality. Non -point source discharges originate from rainfall or snow melt flowing across lawns, streets, 2 parking lots, agricultural fields, forests, industrial sites, construction sites, etc. In May 1998, the Johnston County Board of Commissioners adopted the Johnston County Stormwater Management Ordinance. The intent of the ordinance was to protect streams from the secondary impacts of development. Later in 1998, the Environmental Management Commission adopted the Neuse River Basin — Nutrient Sensitive Waters Management Strategy: Basin -wide Stormwater Requirements (Neuse Rules). In those rules, Johnston County was identified as one of the 15 local governments required to adopt a Stormwater program specifically addressing nitrogen reduction. The EMC approved the revised Johnston County program in December 2000 with an effective date of March 9, 2001. The Eastfield Development stormwater management plan has been designed in accordance with the Johnston County Stormwater Design Manual, dated January 2008. This manual details the requirements on impervious area limits, hydrology and hydraulic calculations, nitrogen reduction, stormwater BMPs, stream buffers, certifications, inspections, and maintenance. CONCLUSION The Eastfield Development will support the existing needs of the surrounding community and improve the economic condition of Johnston County. Although cumulative and indirect impacts could result from the project, these impacts would be minimal assuming adherence to the existing state and county stormwater and erosion and sediment control regulations, therefore , cumulative and indirect impacts are not expected to cause a violation of downstream water quality standards in association with the Eastfield Development. All phases of the project's development, from initial planning, to operation and maintenance of completed facilities, will all adhere to the local, State, and federal water quality management standards and goals. The Eastfield project is not anticipated to result in any detrimental impacts to onsite or downstream water quality because of the stringent application of and adherence to all required water quality treatment protocols. 3 APPENDIX A r c: k -11 L:AKj L NA w L-k-.: Person' Udl.a F.ap& CourFW. Granville Nn, 11- am PI w M County L RF H �wlarr cwl Eulinqionrq Fropidin FWISI-.�ke County I DLwham Orange }'"'I e P.Ickdrs C "Z 0 4LwFtyD u rtha Hash F Jj c Court County Wilson Ralei u nty ii it HA. 1- 1 ston EASTFIELD DEVELOPMENT Fort Bixgg Mwhr4 Fw*wrvonni, fin. �rr�oltlr. CIirlon —r%o— Neuse River --%-- Tributaries C3 N eus e River Basin 61 N eus e River Basin C ou rrti es 1p N eus e River Cut -Off, Goldsboro Pitt County C, N...... d Greme )Idsborol.!,: county Grifton Wayne . lfin�';ton AGO, 19 County Seven Springs�Z Craven County Lenoir County 0,9., Trenton Jones Pollock n A J.7cF.SS'IT+i Ile 7: mnp Lbic, Im KY WV \A TN — NC Sc GA P. o-np Lq` l N-J,,na)WildbrO RV 30 1-ja E. vp r3j 9 ew B ern pa CI;r o' County Ile Y� . E