Loading...
HomeMy WebLinkAboutSW6231104_Application Form_20231115 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW- 1995 ❑ Coastal SW- 2008 0 Ph II - Post Construction (select all that apply) 0 Non-Coastal SW- HQW/ORW Waters 0 Universal Stormwater Management Plan 0 Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name- should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Tractor Supply Store -West End 2. Location of Project (street address): 4020 NC Hwy 73 City:West End County:Moore Zip:27376 3. Directions to project (from nearest major intersection): At the northeast corner of NC 73 and NC 211 4. Latitude:34.2414" ' " N Longitude:79.565° ' " W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is (check one): ['New ❑Modification ❑ Renewal w/Modification' 'Renewals with modifications also requires SWU-102-Renewal Application Form b.lf this application is being submitted as the result of a modification to an existing permit, list the existing permit number its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed' *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density EHigh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4.a.Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 5.86 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No Eves If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/Ir/rules-and-requlations III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Form SWU-101 Version Oct. 31,2013 Page 1 of/ Applicant/Organization: West End Development Group, LLC Signing Official & Title: Gavin Melia, Manager b.Contact information for person listed in item la above: Street Address: 120 Market Square-2—° Floor City: Pinehurst State:NC Zip: 28374 Mailing Address (if applicable): PO Box 3289 City:Pinehurst State:NC Zip: 28374 Phone: (910 ) 695-3694 cell: 910-724-6720 Fax: ( ) none Email: gavinAbaselinedevelopment.com c.Please check the appropriate box. The applicant listed above is: ❑ The property owner(Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) Developer* (Complete Contact Information, item 2a and 2b below.) 2.a.Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Southern Golf& Land, L.L.C. Signing Official & Title: Michael T. Phillips, Manager b.Contact information for person listed in item 2a above: Street Address: 215 Surry Circle Dr. N City: Pinehurst State:NC Zip:28374 Mailing Address (if applicable): same City: State: Zip: Phone: (910 ) 986-0401 Fax: ( ) Email:mikep6785Agmail.com 3.a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: NA Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( Email: 4. Local jurisdiction for building permits: Moore County Planning and Inspections Point of Contact: Ruth Pedersen, Planner Phone#: (910 ) 947-5010 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be piped from the parking areas into a single raw infiltration basin -dry detention. O Form SWU-l0l Version Oct. 31,2013 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Stormwater will be piped from the parking areas into a single rear infiltration basin-dry detention. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:6.14 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5)-Total Surface Water Area (6) =Total Project Area': 6.14 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/ Total Project Area)X 100 = 58.0 9. How many drainage areas does the project have? 1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ Receiving Stream Name Little River (Lower Little River) Stream Class * WS-III; HQW Stream Index Number* 18-23-(1) Total Drainage Area(sf) 285,000 On-site Drainage Area(sf) 237,300 Off-site Drainage Area (sf) 47,700 Proposed Impervious Area**(sf) 155,300 % Impervious Area**(total) 54.5% Impervious**Surface Area Drainage Area 1 Drainage Area_ Drainage Area Drainage Area_ On-site Buildings/Lots(sf) 22200 On-site Streets (sf) 84100 On-site Parking (sf) 28000 On-site Sidewalks (sf) Other on-site (sf) 28000 Future(sf) 5000 Off-site (sf) 16000 Existing BUA***(sf) Total (sf): 155,300 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications Form SWU-101 Version Oct.31,2013 Pageof/