Loading...
HomeMy WebLinkAboutNCC204238_NOT Closeout Documents_20231114 ��--� Project The Perch — Briar Chapel SD West CI IA"I'IIA'1 COIIN"I"1' Chatham Permit# 2020-02687 CERTIFICATE OF Certificate of NCC204238 COMPLETION Coverage # Chatham County Inspection Date 10-31-2023 Watershed Protection Department Inspector Franky Sykes THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ❑x Final Inspection is Approved The project has been inspected by a Chatham County erosion control inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and the Chatham County Soil Erosion and Sedimentation Control Ordinance. ❑x Inspection Comments All temporary erosion control measures have been removed and permanent ground cover sufficient to restrain erosion has been established. ❑x Chatham County Land-Disturbing Permit(s) Closed The referenced permit(s) have been closed. ❑x Self-Inspections Erosion and sediment control self-inspections may cease for the above-referenced project. ❑x File an e-NOT (electronic Notice of Termination) or Modification Form with NCDEQ DEMLR If all land-disturbing activities by the Financially Responsible Party under the above- referenced permit are completed, and the Certificate of Coverage (from NCDEQ DEMLR) associated with the above-referenced project is not or will not be used to cover other projects then proceed to deq.nc.gov/ncg01 and file an e-NOT. Filing the e-NOT releases the Financially Responsible Party from coverage and requirements of the NPDES General Stormwater Permit for Construction Activities (NCG010000). If other projects are/will be covered under the associated Certificate of Coverage, then proceed to deq.nc.gov/ncg01 and complete a Modification Form. Erosion Control Final Inspection Form Rev.Nov 2020 Page 1 of 1