HomeMy WebLinkAboutNCC200467_NOT Closeout Documents_20231113 FINAL INSPECTION REPORT
Town of Huntersville- Land Development
105 Gilead Rd, Ste 300, Huntersville NC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCGO1 COC# NCC200467
Project Name Ardmore at Bryton
Financially Responsible Owner(FRO) Ardmore at Bryton, LLC bwhite@ardmoreresidential.com
FRO Address 1400 W. Northwood St. Greensvoro, NC 27408
Project Location 12450 Bryton Ridge Pkwy
River Basin/Watershed Cane Creek (Clarke Creek Watershed)
EC Final Inspection Date 10/3/2023 Start Time 9:30 AM Time 9:45 AM
Inspector Name Anne Loftin/Veronika Galitsky
Others Present none
Weather Conditions Sunny Soil Conditions Workable
Onsite Contact Made Yes Name Stewart Barry
Title/Company Whitewood Construction
Report Sent Yes See dispatch list at bottom of report
Erosion/Sediment measures removed? Yes
Site Permanently Stabilized? Yes
Comment
BMP's Installed Per Approved Plan? Yes
As-Built BMP Project# 452209
Yes underground detention and surface san filter
FINAL INSPECTION COMMENTS
10/3/23 inspection notes: Project is completed,stable and the erosion measures removed. Punch list from pre-final inspection appears
to have been addressed. BMP as-built surveys approved in EPM 452209 on 10/25/23. Applicant given BMP declaration (PC019)and
reminded of ongoing maintenance and owner's annual compliance inspections as well as ownership transfer notification (in the PC019).
DISPATCH LIST
FRO: bwhite@ardmoreresidential.com; Andrew Belford (abelford@whitewoodconstruction.com); Bruce Ashworth
<Bruce.Ashworth@waynebrothers.com>; Mike Fitzsimmons<Mike.Fitzsimmons@waynebrothers.com>; Stewart Berry
<Sberry@whitewoodconstruction.com>; ngonzalez@whitewoodconstruction.com; Nolan Franz<nfranz@hagen-eng.com>
1 of 1
Report Date: 10/25/2023