HomeMy WebLinkAboutNCC204517_Annual Fee NOD Letter (2023 Fee)_20231116 ROY COOPER _
ELIZABETH S.BISER
Serrrrary
WILLIAM E.TOBY VINSON,JR NOR•H CAROLINA
rnrenm Drrtrrpr Environmental Quality
11/16/2023
DEPCOM Power Inc
Attn:Anthony Perrino
9185 E Pima Center Parkway,Suite 100
Scottsdale,Arizona 85258
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC204517-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 10/1/2023 and was due on 11/1/2023.The annual fee applies to the following construction site:
Bay Tree Solar, LLC
1700 George Long Rd, Harrells, NC
Bladen County
Certificate of Coverage No. NCC204517
NC Reference No. NCG01-2020-4517
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
0-11 Q North Carolina Department of 1—irmmental Quality I Division o1 Energy.Mineral and lend Re—ea
_ SR N-th Salisbury Street I Ib12 Mail Seri—Center Ralrgh,North Carolina Z7699 1612
w n..��....w�
V 919.702.9200