Loading...
HomeMy WebLinkAbout20001195 Ver 15_Emails_20150824Burdette, Jennifer a From: Benton, Charles <charles.benton @aecom.com> Sent: Monday, August 24, 2015 5:10 PM To: Johnson, Alan; Amschler, Crystal C SAW (Crystal.C.Amschler @usace.army.mil) Cc: Burdette, Jennifer a; Petterson, Chris Subject: RE: Charlotte Douglas tower Hi Alan, I could meet you at the site next week with the project engineer.Crystal Amschler has been to the site already and may not need to see it again. I understand that her office will be ready to issue the 404 Individual Permit in a few weeks. I'm not sure what happened to your review copy, but we did submit the agent authorization form and the letter from the DMR for acceptance for mitigation. I will send these to you in a separate email along with the overview maps that were submitted with the application. Also included in the package was all the DWQ Stream ID forms from our delineation. The proposed project would impact 709 linear feet of intermittent stream. We understand that this project would have a significant impact to an intermittent stream and will require an Individual WQC. The application package we've submitted (600+ pages) attempts to thoroughly document how the project site was selected through several analysis, including a NEPA EA. In addition, the proposed site (Alternative Site 2) was then evaluated further in detail to reduce impacts. However, constraints, as document in the permit application, including potential buried waste in the vicinity and overhead utility lines, restricted the configuration of this site. I look forward to hearing from you to arrange a site visit and meeting with you in the field. amm Charlie Benton, PWS Senior Project Manager I Senior Environmental Scientist D 1- 919 -461 -1435 C 1- 919 -946 -3122 charles.benton(o)aecom.com From: Johnson, Alan [alan.johnson @ncdenr.gov] Sent: Monday, August 24, 2015 4:17 PM To: Benton, Charles; Amschler, Crystal C SAW ( Crystal.0 .Amschler(abusace.armv.mil) Cc: Burdette, Jennifer a Subject: Charlotte Douglas tower I have the project in house. I would like to go take a look. It may be advised that Crystal and I go at the same time. It seems the project is right on top of every channel at the site. I received the project overlay, but it is blown up so that it is only of the actual site (within the boundary itself), not in relation to the general area. It would be good to see the data in relation to Hangar Road, Yorkmont Road, and West Blvd. A cursory review of the layout would indicate that without changing the location of the tower itself, reconfiguration might would avoid some of the proposed impacts. Again I haven't been to the site and it wasn't specified if the "streams" shown on the impact sheet were ephemeral, intermittent or perennial. Also, a quick check of the application failed to show an agent authorization form or application to the DMR for acceptance for mitigation. At the moment I am pretty much "open" for September. Thanks Alan Johnson Alan O]ohnson— Senior Environmental Specialist N[ Dept. ofEnvironment & Natural Resources UNCOEN0 Division nf Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.