Loading...
HomeMy WebLinkAboutNCS000482_30 Day Response_20220907 Monroe City of 300 W Crowell Street, Monroe, NC 28112 Stormwater monroenc.org 704-282-4500 • PO Box 69,Monroe,NC 28111 August 22, 2022 RECEIVED AUG 2 5 2A91 DEQ- DEMLR Stormwater Program DENR-LAND QUALITY Attn:12Isaiah Reed STORMWQTERPERPAMING 512 N Salisbury Street 1612 Mail Service Center Raleigh, NC 27699- 1612 RE: 2022 Annual Report (NCS000482) Dear Isaiah, We are submitting this letter in response to an email from Jeanette Powell dated June 16, 2021, regarding MS4 Annual Reporting new guidelines. On May 24, 2022,staff from the North Carolina Department of Environmental Quality (DEQ) conducted a compliance audit of the City of Monroe's National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit. During that audit,the following minimum control measures were evaluated: • Program Implementation, Documentation & Assessment • Public Education & Outreach • Public Involvement & Participation • Illicit Discharge Detection & Elimination • Pollution Prevention and Good Housekeeping for Municipal Operations On June 6, 2022, North Carolina DEQ issued a Notice of Violation (NOV-2022-PC-0287) to the City of Monroe.The following actions were required: 1. Respond in writing within thirty (30) calendar days from the date of receipt of the notice to acknowledge the requirements and the intent to comply. Letter emailed June 16,2022 2. Adopt a Council Resolution within sixty (60) calendar days from the date of receipt of the notice. The resolution must declare support for a compliant Stormwater management program. Council Resolution adopted on July 12,2022 3. Submit documentation for review and comment within one hundred twenty (120) calendar days from the date of receipt of the letter: a. The Illicit Discharge Detection & Elimination Program Plan Due October 14,2022 b. The MS4 Operation & Maintenance Program Plan Due October 14, 2022 c. The Municipal SCM Operation & Maintenance Program Plan Due October 14, 2022 d. Self-evaluate the permit components that were not reviewed by DEQ for compliance. / Due October 14, 2022 RECEIVED E® e. A Draft Stormwater Management Plan (SWMP) Due October 14, 2022 4. Respond to public comments on the Draft SWMP and submit a final SWMP for DEQ apprro�vpI tan�dZQ2 final permit issuance. Pending Draft SWMP submittal and feedback. LAND QUALITY SECTION ASI-Ir i1.!_E DEQ-DEMLR Stormwater Program August 22, 2022 Page 2 This letter contains a brief summary of the current status of the audit and NOV to satisfy the 2022 Annual Self-Assessment Requirement. If there are any additional questions or concerns at this time,you can contact me at (704) 282-4535. ncerely, UkWAVA')o Deanna Gambino Stormwater Compliance Coordinator City of Monroe RECEIVED SEP b 7 20 LAN])QUALily SECTION