Loading...
HomeMy WebLinkAboutNCDOT-CSX Directional Bore - Permit Drawing9 9 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 22 2 2 2 3 2 33 3 3 11 11 1 1 10 10 8 8 8 8 8 9 9 9 9 9 9 77 7 7 7 6 6 6 6 6 6 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 55 5 5 2 2 2 3 3 22 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 22 2 2 2 2 2 2 2 2 2 2 2 22 22 2 2 2 2 2 2 2 222 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 9 9 9 1 0 10 1 0 10 1 0 1 0 11 1 1 11 1 1 11 1 1 12 1 2 12 1 2 1 2 1 2 1 3 1 3 1 3 13 1 3 13 1 3 1 3 14 1 4 14 14 14 14 14 1 4 15 15 15 15 1 5 1 5 15 3 3 4 5 with the CSX Transportation. provided for in agreements used for any purpose not fidential; and shall not be and shall be held con- of the CSX Transportation shall remain the property mation furnished herewith ifications, and/or infor- all plans, drawings, spec- Information confidential JACKSONVILLE, FLORIDA DESIGN & CONSTRUCTION ENGINEERING DEPARTMENT DESIGNED BY APPROVED BY DRAWN BY CHECKED BY DATE SUB BY APPDATEREVDESCRIPTION DRAWING NO. REVISION SHEET NO. SCALE CONTRACT NO. P H Y S I C A L E N T I T Y C O N T R A C T D E S I G N A T O R I T E M L I N E C O S T E L E ME N T N U MB E R P R O J E C T WO R K E L E M E N T CSX TRANSPORTATION, INC. AS SHOWN M. WILSON M. WILSON B. ELIAS M. BELL VAL. SEC. 17 0 9 / 14 / 2 0 2 3 1: 2 1: 2 3 P M R : \ P r o j e c t s \ 2 3 8 8 - C S X \ 2 0 3 4 - N C W ilm in g t o n - C u r v e R e a lig n m e n t \ 0 0 0 _ C A D D \ 0 0 2 _ S H E E T S \ E r o s io n C o n t r o l\ 2 3 8 8 2 0 2 8 - S H T - E C 1 4 . d g n PEMBROKE, NC WILMINGTON, NC RR EAST RR WEST WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA ZONE: FLORENCESUB: WILMINGTON PROPOSED WILMINGTON CURVE REALIGNMENT LEVEL 3 V08138 V.11,N.C./11 NOT FOR CONSTRUCTION LJA Rail, LLC 3600 W Sam Houston Parkway S Phone 713.953.5200 Suite 600 Fax 713.953.5026 Houston, Texas 77042 FRN - F-1386JULY 14, 2023 PLAN ELEVATION 90% - NOT FOR CONSTRUCTION EC-14 MAIN EXISTING C A P E F E A R R I V E R BRIDGE SE 361.10 NAVASSA EROSION CONTROL PLAN SHEET SHALL COORDINATE WITH CSXT FOR MOUNTING LOCATIONS. OF HDPE CONDUIT SHALL BE EXPOSED AND THE CONTRACTOR SHALL TERMINATE TO GROUND BOXES ON EACH SIDE. NO SECTION FOR ROUTING AND INSTALLATION. ELECTRICAL HDPE CONDUITS CONTRACTOR SHALL COORDINATE WITH CSXT SIGNALS DEPARTMENT CONDUITS AND BOXES SHOWN AS CONCEPTUAL ONLY. AND A NEW FIBER OPTICS LINK ACROSS THE CHANNEL. HDPE METHOD TO CARRY THE NEW POWER FEEDER CONDUCTORS INSTALLED BY THE HORIZONTAL DIRECTIONAL DRILL (HDD) 1. NEW HDPE CONDUITS SHALL BE FURNISHED AND NOTES: - NO DREDGING FOR BARGES. - NO PIERS ADDED THAT ARE POURED IN PLACE. - NO PERMANENT WETLAND IMPACTS. - NO PERMANENT ACCESS ROADS, PLATFORMS, OR FILL. 3. THE FOLLOWING SHALL NOT BE ALLOWED: BE VERIFIED BY THE CONTRACTOR BASED ON FIELD CONDITIONS. AVOID CONFLICT. ROUTING IS DIAGRAMMATIC IN NATURE AND SHALL UNDERGROUND UTILITIES EXIST IN THE PROPOSED HDD ROUTE TO FOUNDATIONS. CONTRACTOR SHALL ALSO VERIFY IF ANY AVOID POTENTIAL CONFLICTS WITH EXISTING STRUCTURES AND THEIR - CONTRACTOR TO VERIFY THE LOCATION OF FENDER PILES TO SHALL BE NO LESS THAN 6' UNDER THE RIVER BOTTOM. US ARMY CORP OF ENGINEERS, BUT AT MINIMUM, BORE - CONTRACTOR TO COORDINATE BURIAL DEPTH WITH THE RIGHT-OF-WAY. - ALL WORK SHALL BE PERFORMED WITHIN THE CSXT 2. THE NEW SYSTEM SHALL BE INSTALLED AS FOLLOWS: EVER IS MORE STRINGENT. TIMES THE DIAMETER OF THE DRILLING ROD, WHICH RECOMMENDATION FOR BENDING OR A MINIMUM 1200 - CONTRACTOR TO FOLLOW DUCT MANUFACTURER'S - ANY TEMPORARY PILING SHALL BE REMOVED. 2. (CONTINUED) OR SUBMIT THEIR OWN, EQUIVALENT PLAN FOR REVIEW PRIOR TO WORK. - CONTRACTOR MUST ADHERE TO CSXT'S FRACTION MITIGATION PLAN - FRAC-OUT MITIGATION PLAN. - SCALABLE PLAN VIEW AND ELEVATION WITH THE ABOVE ITEMS. - ANY DEVIATIONS FROM PLANS. - BORING ENTRY/EXIT POINTS. - TOTAL PERMANENT IMPACTS. - LOCATION OF RIG AND SPOILS. - LOCATION OF STAGING/LAYDOWN AREAS. - LOCATIONS OF TEMPORARY TIMBER MATS. - DEPTH OF DUCT BELOW RIVER 4. CONTRACTOR SHALL INCLUDE THE FOLLOWING IN THEIR BID: ENTRY PIT LOCATION PROPOSED HDD JUNCTION BOX 4' x 4' GROUND INSTALLATION DETAILS) (SEE NOTES FOR NEW HDPE CONDUITS INSTALLATION DETAILS) (SEE NOTES FOR NEW HDPE CONDUITS LEGEND: CSX RIGHT-OF-WAY ADJACENT PROPERTY LINES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING FLOW LINE LIMITS OF DISTURBANCE GRADING LIMIT FILL WETLAND AREA TEMPORARY WETLAND IMPACT PROPOSED VEGETATED AREA PROPOSED FLOW LINE DC EROSION CONTROL LEGEND: CONTROL PRODUCT ROLLED EROSION STABILIZATION CONSTRUCTION ROAD RECP CRS TEMPORARY SEEDING PERMANENT SEEDING TS PS DUST CONTROL SEDIMENT FENCE (SF) ROCK PIPE INLET PROTECTION (RPIP) SEE SHEET EC-11 FOR NOTES 20' x 40' TIMBER MATTING RIVER FLOOR EXISTING TRACK CL 5' FROM WETLAND WETLAND LIFT SPAN NAVASSA BRIDGE CSXT LIFT SPAN NAVASSA BRIDGE CSXT CORPS OF ENGINEERS) (OR AS DIRECTED BY THE ARMY BOTTOM TO THE BORE HOLE CLEARANCE OF 6' FROM THE RIVER MAINTAIN A MINIMUM VERTICAL ABUTMENT EXISTING TEMP. = 0.01 AC PERM. = 0.00 AC WETLAND IMPACT (I.E. NO WETLAND IMPACTS) THEN ATTACHED TO BRIDGE BALLAST UP TO THE BRIDGE, NEW CONDUITS BURIED IN (I.E. NO WETLAND IMPACTS) THEN ATTACHED TO BRIDGE BALLAST UP TO THE BRIDGE, NEW CONDUITS BURIED IN BOAT ACCESS EXISTING FENDER LIGHTS (TYP.) (TO REMAIN) EXISTING SUBMARINECABINETS (TO BE REMOVED) EXISTING CONTROL HOUSE (TO BE REMOVED) NEW 8'x12' PTMW CONTROL HOUSE NEW NAVIGATION HORN AND WEATHER STATION EXISTING SUBMARINE CABLE (TO BE REMOVED) NEW GENERATOR PAD NEW 8' x 12' PTMW CONTROL HOUSE EXISTING SIGNAL BUILDING (TO REMAIN) NEW 480/277V, 3 PHASE, 4W, 60 HZ