HomeMy WebLinkAboutNCC233404_ESC Approval Submitted_20231115 Iredell County Planning & Development
Erosion Control Section
I R E D E L L 349 North Center Street
P.O. Box 788
Statesville, NC 28687
Date: November 611' 2023
LETTER OF APPROVAL
Kathryn Klink
K&T Properties II, LLC
141 South Longfellow Ln.
Mooresville,NC 28117
RE: Project Name: Woodstone at Mills Garden
Acres Approved: 11.64
Project ID: IREDE-2024-038
Project Location: PIN 4775719422.000
Submitted By: Don Allen & Associates, P.A.
Date Received: October 26`1' 2023
Plan Type: New
Dear Mrs. Klink:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this letter of Approval. The Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval as is required by Title 15A NCAC 4B.0129 and Appendix
I-I of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Appendix 1-1 of the Iredell County Land Development
Code requires that a copy of the approved erosion control plan be on file at the job site.
Any amendments and/or revisions to the approved plan must be reviewed and approved
prior to implementation in order for the site to remain in compliance. Failure to submit
plans for approval may result in administrative actions and/or penalties as indicated in the
Iredell County Land Development Code. Also, this letter gives notice as required by G.S.
113A-61.1(a) and Appendix I-I of the Iredell County Land Development Code, of our
right of periodic inspection to insure compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Iredell County Land
Development Code and the Sedimentation Pollution Control Act of 1973, (North
Letter of Approval
Woodstone at Mills Garden
November 6 '2023
Page 2 of 3
Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
arid State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does
not supersede any other permit or approval. It is the responsibility of the applicant to
obtain all other required permits or approvals.
As of April 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (eNOl) form requesting a Certificate of Coverage (COC)
under the NC0010000 Construction General Permit. After the form is reviewed and
found to be complete, you will receive a link with payment instructions for the applicable
annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project,you
MUST obtain the COC prior to commencement of any land disturbing activity. The eN01
form and fee details may be accessed at deq.nc.gov/NCGOI. Please direct questions about
the eN01 form to the Storm water Program staff in the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form,which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In
addition, it is required that this office to be notified of the proposed starting date for this
project. Failure to notify this office of the starting date may result in a Notice of
Violation and civil penalty. As required in the approved plan construction sequencing,
please schedule a preconstruction conference with our staff prior to land disturbing
activity.
Your cooperation is appreciated.
Sincerely,
Jonathan Williams, CESSWI
Erosion Control Coordinator
Enclosures: Fact Sheet on the New NC001 Permit
Permit
Letter of Approval
Woodstone at Mills Garden
November 611t 2023
Page 3 of 3