HomeMy WebLinkAboutNCG050280_Rescission Insp Rpt_20231107 Compliance Inspection Report
Permit:NCG050280 Effective: 06/01/23 Expiration: 05/31/28 Owner: Berry Plastics Corporation
SOC: Effective: Expiration: Facility: BPRex Healthcare Packaging, Inc.
County: Nash 6941 Corporation Pkwy
Region: Raleigh
Battleboro NC 27809
Contact Person:Chris Gettings Title: Phone:
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 11/07/2023 Entry Time 11:30AM Exit Time: 12:25PM
Primary Inspector:Thaddeus W Valentine Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG050280 Owner-Facility:Berry Plastics Corporation
Inspection Date: 11/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
I reviewed the facility again and found that all cleanuop had been accomplished to varying degrees. The tanks, wash station,
drums and waste container has been removed.
The spill clean up was performed, but there are no confirmation samples for the soil removal next to the spill and it appears
that very little to no soil was removed. Without confirmation samples we can't state that all spilled material was removed
from the soil. Buyers should be aware of this fact
Everything that could be a potential stormwater issue fromwhat we can see and from what information we've been provided,
has been removed from the site. I recommend the facility permit rescission.
Page 2 of 3
Permit: NCG050280 Owner-Facility:Berry Plastics Corporation
Inspection Date: 11/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑
Comment: Everything is in order for the rescission of the permit
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment: Good
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Good
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment: Good
Page 3 of 3