Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0034102_Monitoring - 10-2023_20231114
Monitoring Report Submittal ................................................... Permit Number#* WQ0034102 Name of Facility:* Town of Fremont Month: * October Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2023 Upload Document* NDMR - October 2023.pdf 6.53MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). kstanley@fremontnc.gov Kenneth Stanley Reviewer: Wanda.Gerald 11 /14/2023 This will be filled in automatically Is the project number correct?* WQ0034102 Is the monitoring report accepted?* Yes No Regional Office* Washington Reviewer: _anonymous Review Date: 11/15/2023 FORrk NDMR 07-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0034102 Facility Name: Fremont WWTP Sprayfield County: Wayne Month: October Year: 2023 PPI: 001 Flow Measuring Point: [ilnfluent ❑Effluent []No flow generated Parameter Monitoring Point: C.Inruent ,_,Effluent CGrcundwater Lowering Csurface ti ater Parameter Code 50050 50060 00400 00310 00940 31616 00610 00620 00530 70300 00625 00600 00665 � FE O c O U 0 U. V- U E d _ CL 0 m N OF- s X. O O 0 L] 24-hr hrs GPD mg/L su mglL mg1L #1100 mL mg1L mg/L mg1L mg/L mgtL mg1L mg!L 1 0 2 10:15 2 0 3 10.30 2 0 4 08:45 2 0 5 C9:30 2 0 6 08:15 2 0 — 7 0 -- 9 10:30 1 0 — 10 11 0715 07:30 2.5 2.5 123.857 1151726 0.11 0.12 12 09:00 2 0 13 08:45 1 0 V 14 0 15 0 — 16 0730 1.5 0 17 10:30 2 5 84,729 0.07 18 C6:30 2.5 136:905 0.1 19 06:30 3 127.698 0.11 20 10:15 1 0 21 0 22 0 23 06:15 2 150-129 0.1 24 06:15 2 149.045 0.11 25 05:30 1.5 104,386 0.15 26 06:30 1.5 70,482 0.14 27 08:45 1 0 0.06 28 0 0.09 29 0 30 06:15 3 151,019 31 06:15 2.5 79,702 Average: 41,732 0.11 Daily Maximum: 151,019 0.15 Daily Minimum: 0 0.06 Sampling Type: Recorder Grab Gran Composite Composite Grab Composite Composite Cornpos+te Composite Grab Grab Grab Monthly Avg. Limit: 91,629 30 200 15 30 Daily Limit: Sample Frequency: daily I irrigation I da"y 4xyear 3.ryear I 4xyear I 4xyear I 4xyear 4xyear 3xyear 4xyear 4xyear 4xyear FORM: NDMR 07-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Sampling Person(s) Name: Kenneth Stanley Name: Certified Laboratories Name: Microbac, Fayetteville Divison. Cert#11 Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? (]Compliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in Eompliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary - Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Kenneth Stanley Permittee: Town of Fremont Certification No.: 997045 Signing Official: Darron Flowers Grade: SI Phone Number: 919-738-2982 Signing Official's Title: Mayor Has the ORC changed since the previous NDMR? ❑Yes [ No Phone Number: 919-242-5151 Permit Expiration: 2/28/2027 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00034102 Facility Name: Fremont WWTP Sprayfield County: Wayne Month: October Year: 2023 Did irrigation occur Field Na3rna:' i --m--------�----------� 1 Field Name: 2 Narna: Field ------ - 3 Field Name: 4 this facility? Area (acres): - -; k 218 - Area (acres): 3.19 Area (acres): 1,8�3 Area (acres): 2.29 at Cover Crop: E Bermuda Cover Crop: Bermuda - -- Cover Crop: Bermuda Cover Crop: Bermuda CYEs ❑rvo Hourly Rate (in).( Hourly Rate (in): Hourly Rate (m) � � Hourly Rate (in): Annual Rate (in): 54.78 j Annual Rate (in): 54.78 Annual Rate (wd 54.78 Annual Rate (in): 5478 Weather Freeboard Field irr ated?i g i _IYEs F-No Field Irrigated? ❑YES ❑No Field irric3atEd?l (_..!YES Elrao Field Irrigated? fires ❑rao N i C 0) E, 'a E com E a vm 0 is ,c E m E aaU ca0 ° ?sc _ = 1 £ CD a wC F- a 0 O p CL •aO xO OwE .,0. > .J J < > Q J = J OF in ft ft gal min in in gal min in in gal min in it) gal min in in 1 0 0 0 0.00 i 000 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 c 80 0 3.4 0 0 0.00 mo 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 3 C 79 0 3.4 0 I 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 c 77 0 3.4 0 0 0.00 - 0...0-0-�-" 0 0 1 0.00 0.00 0 G 0.00_ 0.00 0 0 0.00 0.00 5 C 80 0 3.4 0 k 0 0 00 j 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 c 78 0 3.48 0 0 0.00 0.00 0 0 0.00 0.00 0 t? p.00 i1.00 0 0 0.00 0.00 7 0 0 l 3 _0 00° 0.00 1 0 0 0.00 0.00 0 0 0.00 I 0,00 I 0 0 0.00 0.00 8 0 0 0^�^ 0.00 0.00 0 0 0.00 0.00 00 0.00 i 0.00 0 0 0.00 0.00 9 1 C 1 68 0 1 3.5 0 0 0.00 0.00 0 0 0.00 0.00 0 i 0 0,00 0.00 0 0 0.00 0.00 101 c 1 74 0 3.5 '11,999 90 0.19 013 14521 90 0.17 0.11 7,939 60 1 0.16 C. 116 9441 60 0.15 0.15 11 pc 73 0 3.6 8,058 60 0.43 0.13 9740 60 0.11 0.11 7,198 60 i 0 16 0.16 9500 ' 60 0,15 0.15 12 r 67 0.04 3.68 0 0 000 0.00 0 0 0.00 0.00 0 C I 0.00 0.00 0 0 0.00 0.00 13 PC 76 0 3.68 0 0 C 00 0,00 1 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 14 r 0.22 0 0 0.00 0.00 i 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 15 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 1 0,00 0 0 0.00 0.00 16 pc 62 0 3.68 0 0 000 0 00 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.00 17 pc 64 0 3.68 9 210 60 0,15 0.15 10892 60 0.13 0.13 9,450 60 0.18 013 10652 60 0.17 0.17 18 pc 68 0 3.68 i 3, 504 90 0_?.? ;LL 0,15 16026 90 0.19 0.12 8;942 E0 T0.18 018 10444 60 0.17 0.17 19 C 70 0 3.8 9 056 60 0.15 0.15 10738 60 0.12 0.12 8:996 60 0.18 0 18 10498 60 0.17 0.17 20 r 71 1.62 3.86 0 0 0,00 - 0,00 - 0 0 0.00 0.00 0 0 0.00 ) 0.00 0 0 0.00 0.00 21 0 0 l 0 0-0 0 0.00 0 0 0.00 0.00 0 00 00 0.00 0 0 0.00 0.00 22 0 0' 0' 0 00 0.00 0 0 0.00 0.00 0 0 0 00 " 0.00 0 0 0.00 0.00 23 c 64 0 3.24 13,882 90 0.22 0.15 16404 90 0.19 0.13 13,792 = 90 0.27 0.18 16044 90 0.26 0.17 24 c 69 0 3.2 13,766 90 0.22 0,15 16288 90 0.19 0.13 13,676 I 90' 0,271 r 0.18 15928 90 0.26 0.17 25 c 77 0 3.23 8 281 60 0.13 0.13 9963 60 0.12 0.12 8.221 60 0-.1�6-._. 016 9723 60 0.16 0.16 26 c 79 0 3.28 10,931 1 60 0.18 0.18 12613 60 0.15 0.15 5,435 30 � �0.1,: I 011 6187 30 010 010 27 c 79 0 3.34 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 28 0 0 0 0 00 0.00 0 0 0.00 0.00 Q fi 0.00 0.00 0 0 0.00 0.00 29 0 0 0 C.CO 0.©0 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 30 c 84 0 3.36 13,978 90 C 23 0,45 16500 90 0.19 0.13 13.888 90 0.27 0,18 16140 90 0.26 0.17 31 cl 67 0 3.44 8,582 60 0.14 0.14 10264 60 0.12 0.12 8,522 60 0.17 0.17 10024 60 0.16 0.16 Monthly Loading: 121 G47 "' " ` ?.96 _ 24 73 �,; 143,949 1.66 __ 106.559 2.09 124,581 ^ * 2.00 12 Month Floating Total (in): 21.8fi 23 4g 23.77 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? ElCompliant ❑Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? ❑� Compliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? ❑Compliant ❑Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? ECompliant []Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑Compliant ❑Non -Compliant If the facility is non -compliant, p!ease explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Kenneth Stanley Permittee: Town of Fremont Certification No.: 997045 Signing Official: Darron Flowers Grade: SI Phone Number: 919-738-2982 Signing Official's Title: Mayor Has the ORC changed since the previous NDAR-1? ❑ves ° : Phone Number: 919-242-5151 Permit Exp.: 2/28,'27 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Permit No.: W00034102 Facility Name: Fremont WWTP Sprayfield County: Wayne Month: October Year: 2023 Did irrigation occur Field Name: 5 Field Name: 6 Field Name:': 7 Field Name: 8 Area (acres): 2 14 Area (acres): 2.27 -� _--------- Area {acre) 2.5 -_ Area (acres): 2.39 at this facility? -- Cover Crop: Bermuda Cover Crop: Bermuda �------ �------ Cover troop>, .- Bermuda Cover Crop: Bermuda 7YES Hourly Rate (in)-, Hourly Rate (in): Hourly Bata (in): _ ` TT Hourly Rate (in): Weather Freeboard Annual Rate ('in):' Field irrigated? 2867 1-%JY�S ❑mu; Annual Rate (in): Field Irrigated? 54.78 'EYES ❑NO Annual Rate (in): Field drrirgatcd?l 43.83 1 IYES ❑wo Annual Rate (in): Field Irrigated? 43.83 2YES []NO > ® (D 0 U L m m ►E o a L a d m L ° m °' n m o m Ln m �y E' a ° 1 zg i a� a> M i to E 0) y L m E a o o m y E m Q o Q a m E ~ L ai T c o° E ai c E 7 a = o a� is E 2 ° o •:a ° �3 E r m ?+ c ,� 4 -c� E rn C: E s iS � �o y o E .2 a >° a o �' D E F °1 ai ?, c •M C3 0° E °i E �6 x O °F in ft It gal min in in gal min in in gal min in in gal min in in 1 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.30 0 00 0 0 0.00 0.00 2 c 80 0 3.4 0 0 0,00 _ 0;00 0 0 0,00 0.00 0 0 0.0'0 0.06 0 0 0.00 0.00 3 c 79 0 3.4 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 4 c 77 0 3.4 0 0 0.00 0.00 0 0 i 0.00 0.00 0 0 0.00 0.00 0 0 000 0.00 5 6 C c 80 78 0 6 3.4 3.48 0 0 0 0 0 00 0.00 0.00 0.00 0 0 0 0 0.00 0.00 0.00 0.00 G 0 0 0 60 0.00 0 00 0.00 i 0 0 0 0 0.00 0.00 000 0.00 7 0 0 I' 0 0 04- ; 0 CO 0 0 0.00 0.00 0 0 i 0.00+- n I 0 0 0.00 0.00 8 9 c 68 0 0 3.5 0 0 ; 0 0 0.00 ` 0.00 0,00 I 0,00 0 0 0 0 0,00 0.00 0.00 0.00 0 0 0 I 0 000 0 O0 € 0.00 0.00 0 0 0 0 0.00 0.00 0.00 0.00 10 c 74 0 3.5 9,319 60 0.16 0 16 8,661 60 0.14 0,14 8.781 60 € 0,13 111.13 10,579 60 0.16 0.16 11 PC 73 0 3.6 1 9378 60 0A6 0 ^6 8,720 60 0.14 0.14 8840 1 6^ 0.13 0.13 10,638 60 0.16 0.16 12 r 67 0.04 3.68 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0 00 0.00 0 0 0.00 0.00 13 PC 76 0 3.68 0 0 000 0.0.3 0 0 0.00 0.00 0 j 0 0.00 0 00 0 0 0.00 0.00 14 r 0.22 0 0 _ 0 000 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 15 0 0 0 000 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 16 pc 62 0 3.68 0 0 0.00 1 0 00 0 0 0.00 0.00 0 ? 0 G 00 0.00 0 0 0.00 0.00 17 PC 64 0 3.68 5,265 30 0.09 1 0,09 4,937 30 0.08 0.08 4,997 30 G.O' C. 0 0. 07 5,895 30 0.09 0.09 18 PC 68 0 3.68 10,322 60 018 1 0.18 9,664 60 0.16 0.16 9784 60 014 0,14 11,582 60 0.18 0.18 19 c 70 0 3.8 10,376 60 018LL ' 018 9,718 60 0.16 0.16 9838 60 0,14 0,14 11.636 60 0.18 0.18 20 r 71 1.62 3,86 0 0 _ 1:00 0.00 0 0 0.00 0.00 0 i o i Q.00 0 �JO 0 0 0.00 0.00 21 0 0 0 0 00 1 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 22 0 0 0 1 0 fl _ j T 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 c 64 0 3.24 10,575 60 0.18 0. 8 9,917 60 0.16 0.16 10,037 60 0.15 I v,5 11,835 60 0.18 0.18 24 c 69 0 3.2 10,497 i 60 0.18 0.18 9,839 60 0.16 0.16 9,959 60 415 0A5 11,757 60 0.18 0.18 25 c 77 0 3.23 9,601 60 t 017 017 8,943 60 0.15 0.15 9,063 a 60 0,13 [ 0.13 10,861 60 0.17 0.17 26 c 79 0 3.28 0 0 �0.00 �0,00 17,389 90 0.28 0.19 11,713 60 0,1.7 ^0.1' 0 0 0.00 0.00 27 c 79 0 3.34 0 0 0.00 0.00 0 0 0.00 0.00 0 1 D _�.._.. DOG 0.00 0 0 0.00 0.00 28 0 0 0 0.00 0 0 0.00 0.00 00 0.00 0s00 0 0 0.00 0.00 29 0 _ 0 0 _0,0_0_ T O 00 C.00 0 0 0.00 0.00 0 f 0 0.00 0.00 0 0 0.00 0.00 30 c 84 0 3.36 , 10,638 60 01'8 0.18 9,980 60 0.16 0.16 10,1L0 60 0.15 0,15 11,898 60 0.18 0.18 31 cl 67 0 3.44 4.950 30 0.09 E3,f _ 4,622 30 0.07 0.07 4,6&2 ' 30 97,794 { 0107 1.44 1817 Q,07 ,; 5,580 102,261 k 30 0.09 0.09 Monthly Loading: 12 Month Floating Total (in): 90,921 1.56 1515 a, 102,390 ! 1.66 1.58 21.23 17.43 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? Compliant ❑Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? EDCornpliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? pcompliant ❑Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? ❑✓Compliant ❑Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? E/lCompliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification ORC: Kenneth Stanley Certification No.: 997045 Grade: SI Phone Number: 919-738-2982 Has the ORC changed since the previous NDAR-1? E]Yes P No Signature / Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge Permittee Certification Permittee: Town of Fremont Signing Official: Darron Flowers Signing Official's Title: Mayor Phone Number: 919-242-5151 Permit Exp.: 2/28127 Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00034102 Facility Name: Fremont WWTP Sprayfield County: Wayne Month: October Year: 2023 Did irrigation Field Name: -- 9 Field Name: 10 Reid Name 11 Field Name: 12 occur Area (acres). ! 1.85 Area (acres): 2.93 Area (acres) 2,5 Area (acres): 2.6 at this facility? Cover �ro4 =e Bermuda � Cover Crop: p: Trees � Gbver Cro _� pj _. Bermuda Cover Crop: Bermuda EYES ❑No Hourly Rate (in): Hourly Rate (in): Hourly Rate (in):;, Hourly Rate (in): Annual Rate (in): 4383 Annual Rate (in): 54.78 Annual Rate (in): 4,1183 Annual Rate (in): 43.83 v CDC U.0 Weather .. °F o in Freeboard 0 ya !n ft f0 Q LO ft Fiold Irrigated' �2 t E gal rain i-, YES ro 0 in r N^ E Cyr Eris" p in Field Irrigated? a� n �ad - gal a E min '[EYES @ 0 p in �No E E in _ 'Field Irrigated?. a� zs C cgaI �0 ' min QY c in 0NO i Q_ in Field Irrigated? m a E d 0a > gal a � min AYES rn ?pC .iaE=a Cc in ENO E rn C N7` Ox in 1 0 0 0 0.00 �0.00 0 00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 2 c 80 0 3.4 0' 0 0.00 0 0 0.00 0.00 0 0 000 0.03 0 0 0.00 0.00 3 c 79 0 3.4 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.30 1 0 0 0.00 0.00 4 c 77 0 3.4 G 0 0 00 0.0G 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 c 80 0 3.4 0 0 000 0 0103 0 0 0.00 1 0.00 0 0 000 0.00 0 0 0.00 0.00 6 c 78 0 3.48 0 0 0 00 0.00 0 0 0.00 0.00 0 1 0 0.00 0.00 0 0 0.00 0.00 7 0 �..� -0 i 0 0.00 0 - 0 0 0 0 0.00 0.00 0 D 0.00 0,00 0 0 0,00 0.00 8 0 1 0 u 0.00 0,00 0 0 0.00 0.00 0 0 0 00 0.0G 0 0 0.00 0.00 9 c 68 0 3.5 0 y-- 0 00 0 010 0 0 0.00 0.00 0 0 0.00 0,30 0 0 0.00 0.00 10 c 74 0 3.5 9,799 6E 0.20 + 0.20 0 0 0.00 0.00 12.079 60 0.18 018 9,501 60 0.13 0.13 11 PC 73 0 3.6 9,858 6G 0.20 0.20 0 0 0.00 0.00 12;138 60 _ 0,18 0.18 9,560 60 0.14 0.14 12 r 67 0.04 3.68 } 0 000 l 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 PC 76 0 3.68 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0;00 0 0 0.00 0,00 14 r 0.22 0 0 0.00 1 0.00 0 0 0.00 0.00 0 0 mo 1 0.00 0 0 0.00 0.00 15 0 0 0 0.00 ' 0.00 0 0 0.00 0.00 0 -0 0,00 0,00 0 0 0.00 0.00 16 pc 62 0 3.68 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 17 PC 64 0 3.68 5,505 30 0.11 6 ,1 0 0 0.00 0.00 6,645 30 0,10 0,10 5,357 30 0.08 0.08 18 pc 68 0 3.68 10,802 60 0 22 022 0 0 0.00 0.00 13,082 60 0 19 019 10,504 60 0.15 0.15 19 c 70 0 3.8 10.856 60 0,22 0.22. 0 0 0.00 0.00 13,136 60 0.19 0,19 10.558 60 0.15 0.15 20 r 71 1.62 3.86 0 0 � 10,00 0.00 0 0 0.00 0.00 0 0 0.00 i' 0.00 0 0 0.00 0.00 21 0 0 0 0.0(} 0.00 0 0 0.00 0.00 0 0 0.00 `I 0.03 0 0 0.00 0.00 22 0 0 0 000 0.00 0 0 0.00 0.00 0 0 3 0.00 0.00 0 0 0.00 0.00 23 c 64 0 3.24 11,055 60 0.22 0.22 0 0 0.00 0.00 13,035 , 60 i 020 0.20 10,757 60 0.15 0.15 24 c 69 0 3.2 10,977 '' 60 0.22 0.22 0 0 0.00 0.00 13.257 60 :�0,20 0.20 10,679 60 0.15 0.15 25 c 77 0 3.23 6. 20 i 40 0,13 0 13 0 0 0.00 0.00 1 2,361 60 018 0.18 4,892 30 0.07 0.07 26 c 79 0 3.28 0 0 0:00 _ 0.00 0 0 0.00 0.00 .e...�. 3 _ 0 0.00 _ 0.00 6,217 30 0,09 0.09 27 c 79 0 3.34 0 0 0.00 0.00 0 0 0.00 0.00 0 0 L 0.00 0.00 0 0 0.00 0.00 28 0 0 0 0.00 0:60 0 0 0.00 0.00 Q l 0 0.00 0.00 0 0 0.00 0.00 29 0 0 0 1 000 0.00^+' 0 0 0.00 0.00 0 0 0:00 0:00 0 0 0.00 0.00 30 c 84 0 3.36 11,118 60 0.22 0.22 0 0 0.00 0.00 13.393 6D 0 20 0 20 10,820 60 0.15 0.15 31 cl 67 - 0 3.44 1 5.190 30 0.10 0 0 0.00 0.00 6,033 30 0.09 0,09 5,042 30 0.07 0.07 Monthly Loading: 91,80 ..,... 13 0 0.00 115.761 1.71 ? 93.887 1.33 12 Month Floating Total (in): _ _ _ 1�,19 - •. - f 0.00 1'4.60 -- 17.49 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment D of your permit? OCompliant []Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? ECompliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? ECompliant ❑Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? OCompliant ❑Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ElCompliant []Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Kenneth Stanley Permittee: Town of Fremont Certification No.: 997045 signing Official: Darron Flowers Grade: SI Phone Number: 919-738-2982 Signing Official's Title: Mayor Has the ORC changed since the previous NDAR-1? ❑yes QNo Phone Number: 9197242-5151 Permit Exp.: 2/28/27 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered'and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0034102 Facility Name: Fremont WWTP Sprayfield County: Wayne Month: October Year: 2023 Did irrigation occur g at this facility? Field Naum: - Area (acres): _..______._____ Cover Crop: 13 2.64 _ _ Bermuda Field Name: Area (acres): Cover Crop: 14 0.44 Bermuda Held Name Area (acres) Cover Crop: -- # ,_..�_.____._._.__..-_ Field Name: Area (acres): Cover Crop: YES ❑ND Hourly Rate Lin) Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 4383 Annual Rate (in): 28.67 Annual Rite (in):: Annual Rate (in): Weather Freeboard Field Irrigated?i' JYF T NU" i Field Irrigated? �_AYES = ND Field Irrigated? {_;YFS 1 INr' Field Irrigated? DYES D N D M $ 0 OF a in y It m � D, a ft gal - I min I in E �r in E >a gal m ->. � � in cto 0 J in E crn Em _ _j in Ca� .v rs . > gal - ....� _min !{ csr in E �+ tar _4 in Em 2mis O > gal min rn �a _j in � ES i=a _acj E a O 0 in 1 0 0 0 0:00 0.06 0 0 0.00 0.00 2 c 80 0 3.4 0 0 0.00 0.00 0 0 0.00 0.00�-� 3 c 79 0 3.4 0 0 0.00 0.00 0 0 0.00 0.00 ; 4 5 c c 77 80 0 0 3.4 3.4 0 0 0 I 0 0 00 0 Of)-' 0.0 0 - 0.0 ., 0 0 0 0 0 0.00 0.00 0.00 0.00 _. . _ 6 c 78 0 3.48 0 = 0,00 0.00 0 0 0.00 0.00 7 8 1 0 0 0 0 0 0 0 00 0.00 ~ 0.00 0100 0 0 0 0 0.00 0.00 0.00 0.00 l_ 9 C 68 0 3.5 0 0 0.00 U0 0 0 0.00 0.00 10 11 c pc 74 73 0 0 3.5 3.6 11.241 11;300 60 60 0.16 0.16 016 0.16 0 0 0 0 0.00 0.00 0.00i 0.00 12 131 r PC 67 76 0.04 0 3.68 3.68 0 0 0 0 0 CO^� 0 0n, 0:00 0.00 0 0 0 0 0.00 0.00 0.00 0.00 14 r 0.22 0 0 0,00 0.00 0 0 0.00 0.00 -~ 15 0 0 0 0.00 0.00 0 0 0.00 0.00 16 PC 62 0 3.68 1 0 0 0.00 0.00 0 0 0.00 0.00 17 PC 64 0 3.68 6 22'r 30 0.09 0.D9 0 0 0.00 0.00 18 PC 68 0 3.68 12,244 t 60 _0,17 0.17 0 0 0.00 0.00 19 c 70 0 3.8 12,298 60 0,17 0.17 0 0 0.00 0.00 20 r 71 1.62 3,86 0 0 0.00 0.00 0 0 0.00 0.00 l 21 0 0 t 0 0 00 0.00 0 0 0.00 0.00 22 0 0 0 0.00 0,00 0 0 0.00 0.00 23 c 64 0 3.24 12.497 60 r 017 0,17 0 0 0.00 0.00 24 c 69 0 3.2 12.419 60 0.17 �0.08 0.17 0 0 0.00 0.00 25 c 77 0 3.23 5.7U 30 0 08 ! 0 0 0.00 0.00 26 c 79 0 3.28 0 0 0.00 0.00 0 0 0.00 0.00 27 c 79 0 3.34 a 0 0.00 0.00 0 0 0.00 0.00 28 0 0 0 0.00 0.00 0 0 0.00 0.00 f 29 0 i 0 0 0.00 i 0.00 0 0 0.00 0.00 30 c 84 0 3.36 12,560 60 018 0.18 0 0 0.00 0.00 31 cl 67 0 3.44 5,912 30 i? I 0 0 0.00 0.00 Monthly Loading: 102,460 t4, 0 0.00 1 0 I 0 00 0 0.00 12 Month Floating Total (in): 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? CCompliant ❑Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? (]Compliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? OCompliant []Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? CCompliant ❑Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? (]Compliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Kenneth Stanley Permittee: Town of Fremont Certification No.: 997045 Signing Official: Darron Flowers Grade: SI Phone Number: 919-738-2982 Signing Official's Title: Mayor Has the ORC changed since the previous NDAR-1? Eyes EINo Phone Number: 919-242-5151 Permit Exp.: 2/28/27 11-)V- 3 ��t 11 Signature IN Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. the information submitted is. to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617