Loading...
HomeMy WebLinkAbout20150885 Ver 1 _Paper Application Received _20150827(� DUKE ENERGY AUG 252015 Serial: BSEP 15 -0074 20150885 Brunswick Nuclear Plant P O. Box 10429 Southport, NC 28461 Ms. Karen Higgins NC Division of Water Resources ONI1irM3d a3iAne v iot7 1617 Mail Service Center s3orinos3d `l3 -LVM - s1\130 Raleigh, North Carolina 27699 -1617 -' Subject: Nationwide Permit 39 / DWR GC 3890 S1OZ L Z qnV Brunswick Steam Electric Plant — Parking Lot Project Brunswick County, North Carolina DKE -15010 Dear Ms. Higgins: Duke Energy Progress, LLC, is applying for a US Army Corps of Engineers (USACE) Nationwide Permit 39 and an NC Division of Water Resources (DWR) Water Quality Certification 3890 for proposed impacts to jurisdictional waters associated with a proposed supplemental parking lot at the Brunswick Steam Electric Power Plant site. The subject property and project area is located at Duke Energy's Brunswick Steam Electric Plant, on the east side of Cogentrix Drive, approximately 1/2 mile north of its intersection with East Leonard Street in Brunswick County, North Carolina. The project area drains to Gum Log Branch which is a designated SC;Sw;HQW within the in the Cape Fear River Basin. The following attachments are included as part of this permit application: • PCN Form • Application Fee - $240 Check • Fig.1 - USGS Quad —Southport • Fig.2 - Brunswick County Soil Survey (Sheets: 18) • Fig.3 - Existing Conditions • Fig.3.1 - Existing Conditions w. Aerial • Fig.4 - Overall Impact Map (Insets 1) • JD Request Package • Jurisdictional Wetlands Plat • Stormwater Management Plan • Copy of NCDENR Stormwater Permit (SW8- 150805) PROJECT LOCATION /HABITAT: The subject property and project area is located at Duke Energy's Brunswick Steam Electric Plant, on the east side of Cogentrix Drive, approximately 1/2 mile north of its intersection with East Leonard Street in Brunswick County, North Carolina. The project area is approximately 12.8 acres of primarily forested area, approximately 2,000 feet south of the generation facility and supporting infrastructure. Cogentrix Drive runs south to north along the west side with a gravel access drive running along the northern border of the project area. Land use within the vicinity of the project area is primarily heavy industrial - energy generation, with some wooded areas between the various uses.