Loading...
HomeMy WebLinkAboutSW6230901_Design Calculations_20231115 (4) OUTLET PROTECTION DATE DESIGN PHASE DESIGN 6-8-2023 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / ROYAL FARMS PH II 1960 REVISION / / LOCATION BY RECORD / / Cumberland County, North Carolina BPB OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 1 OUT Qio/Qfull = 0.52 Pipe Dia= 24 in V/Vfull = 1.00 Q10= 8.24 cfs V= 5.1 fps Qfull = 16.00 cfs Vfull = 5.09 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in 11 :1 Riprap Class = B Apron Thickness = 18 in _Apron Length 12.0 ft • Apron Width @ Outlet = 6 ft •• •• ••• Apron Width @ End = 14.0 ft Length Storm Outlet Structure FES No.= PIPE 2 OUT Q1o/Qfull = 1.21 Pipe Dia= 18 in V/Vfull = MAX Qio= 8.05 cfs V= #VALUE! fps Qfull = 6.64 cfs Vfull = 3.75 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft L Length 1960-Storm Drainage for Spread.xls LATEST REVISION:11/15/2023 7:13 AM PAGE 1 OF 1