Loading...
HomeMy WebLinkAboutSW6230901_Design Calculations_20231115 (3) 4D Site Solutions, Inc. PIPE CALCULATIONS NOTE:sheet only set up to handle Tc from 5 min to 30 min A. Cross-pipes to use 25-yr storm inensity 1960-Royal Farms Ph II Rainfall Intensity Storm Event 5 in 15-min 10-yr 7.94 6.35 5.36 3.88 25-yr 8.92 7.1 6 4.45 50-yr 9.64 7.67 6.47 4.88 100-yr 10.3 8.21 6.92 5.3 Tc Drainage Storm Rainfall Pipe No. C Kerby Kirpich Intensity Q(cfs) Area(ac) Event(yr) Total Tc Tc Used (in/hr) L(ft) n s Toy, L(ft) S Tch 1 2.90 0.40 n/a 600.0 0.003 10.06 10.06 10 25-yr 7.1 8.24 2 2.98 0.45 n/a 1100.0 0.005 13.18 13.18 15 25-yr 6 8.05 printed: 11/15/2023 7:11 AM Page 1 of 1