HomeMy WebLinkAboutNCG021026_Doc 2_20231114 W
�'�� / / \\ w �`W W W w • 0 TFALL #1
f° w
1 O'x 10' 12" C L B V W W W W V W W r L 3 0'
ENERGY DISSIPATER W �$D 2 W w w Y
TO GRADE I `L
0 W •Y
4� ATTACH SKIMMER TO
j LIMITS OF WETLANDS 'x ' OUTLET STRUCTURE 4" OUTLET PIPE W X ' �, '. �` 0
STUDY / ACOE JD / 6" SD OUTLET w. W v w W w W W SEE DETAIL w w gyp` ° Si t` ` ` cn
ITE ; �r / 120' OUTFALL 1 / ,,-- w w w �- ,% y W w w w _ Lr- Lj W W w z
\ 10'x1 O'x12" CL B W w w w w W y w w w w } r W W W I W W W o o J
0 ENERGY DISSIPATER 23m\� ✓ W w W �,•/ v w YAM w v/ ■I
�,4.y
+TOOGRADE �rzIC.7' V W ✓ W W W 7 CJ � cy-
a w w w y w z q` /'/ X w W W w W W W ,y. w v w ! W A.
/ �V�------" -'^.-34d � '�� r! \ � � f •6• W a, W `'\' W W ,� ®�p -
/ W w. w W w w W .V w W //Y' �� w j , y f'� r,� 0
j 120'x6O' y 3' 37
e-a I , W W W w W v WsiPO RODS BAFFLES �jOO e, I >.. . y,/y.V W .V '\•, ^
DEWANTERING I /'.<. • W ��8 w w W W SEE DETAIL w W `/;
W
VICINITY MAP :D
N.T.S. // �� �, y -� I a. ?,7� °
4
i
//9n✓ 00 >. y. Y
LIP �1p € (�)p,.�y� g.y / v W y J �gtp f �N % 1 W w wi1 V TEMPORARY i ✓`"��� `L w W ' — i
f�y•� /
DIVE i
- 40
ro
t�v°° AND
env
e 1 9
O Pad I ;, ,� $1, l�o�' �,� \ \ ,.> > � W y W / � A-A'\ o�
p°'.� \� j �feq, �. ,,�� �-- �\ / d's W w W y, ,.+—r—{,
yy l...J 1 � ii y�r •� � \ aC4�1 �\\ / W \L ,� N 4✓
1 D D I _` "may ' \ 1`�' W — v y' �1 u _ �
122
Y / 633 I W W r - lu
mac
0000
sk"
book 3 -
,S
PROPOSED
-
WIDE ID I
WIDE HAUL :. '`
II ,� LOCATED WITHIN , ZQ N I N( ® Q
60' ACCESS �/� � n
f EASEMENT.
' j
0' �� _ � z �
PROPOSEDgs
GATE \� LIMITS OF WETLANDS \ �+ z
f \ C/i O
�� STUDY / ACOE JD
Rom$
FM
t 1 j' II z cw/
CONSTRUCTION i NJF (�
ENTRANCE ' �eC'rCT11 E.
J r.
fTUX Sandra D.
c�s�, ParaP. n449 W
r , N
GREEN HILL ROAD 1410
�
m
V r�.
W Z I4
— Z
N ;.yC
NOTES:
1. MINING TO COMMENCE ON AN AS NEEDED BASS.
2. RECLAMATION IS REQUIRED PRIOR TO MINE CLOSE OUT.
3. NO PERMANENT STRUCTURES OR PERMANENT EMPLOYEES ARE
PROPOSED ON SITE,
4. THE HOURS OF OPERATION WILL BE MONDAY THRU FRIDAY FROM 7:30 Licence#C-3641.
AM TO 5:00 PM.
MINE AREA TABLE 5. BUFFERS SHALL BE NATURAL VEGETATION SUPPLEMENTED V;":TH 19016
PLANTINGS AS NECESSARY TO MEET UDO REQUIREMENTS.
ACREAGE 6. ALL REQUIREMENTS OF SECTION 5.3.7.G.VF THE UDO SHALL BE MET.
7. A 60�II ACCESS EASEMENT SHALL BE PROVIDED FOR ALL MINES TO DES. JKB
PARCEL PORTION OF 0690000301 ALLOW ACCESS TO GREEN HILL RD ALONG THE EXISTING HAUL RO. , CKD. JPN
TOTAL SITE AREA 119.18 8. MINE OPERATOR SHALL USE A WATER TRUCK TO CONTROL DUST ALONG
0 THE HAUL. ROAD AS NECESSARY. DR%N- ZAC
EXISTING WETLANDS 9. NO PORTION OF THE MINE OPERATION IS LOCATED WITHIN A 100 YEAR
DISTURBED WETLANDS 0 FLOOD PLAIN.
10. NO MINING OPERATIONS SHALL BE CONDUCTED WITHIN 50 FEET OF DATE 11/02 23
UNDISTURBED WETLANDS 0 ANY KNOWN WETLAND. ^;
1 1. SEE SAW-2023-00941 FOR VVEI LANDS STUDY AREA, ANY ADDITIONAL
WETLANDS DEPICTED SHOULD BE CONSIDERED PRELIMINARY & SUBJECT TOLEG PIN' D �t '®ff
ACOE VERIFICATION. 50' VEGETATED BUFFERS HAVE BEEN PROVIDED w ��• •°°• `"j ®®�
CATEGORY ACREAGE
IT BOUNDARY ADJACENT TO THESE AREAS AS A PRECAUTIONARY MEASURE. +�� ° •° •'-
PROPERTY LINE / MINE PERM 14.18
MINE EXCAVATION SEAL
--- - - HT OF WAY PROCESSING AREA/HAUL ROADS D 43 = S��((E A L rs
RIG 0.20 I ®� °�. ��t��0 •'• •
TAILINGS/SEDIMENT PONDS/DEWATERING BASIN �.
LOE LOE LIMITS OF EXCAVATION 0
STOCKPILES ."®®®°�'°GaN��••"•� �*
WASTE PILES 0
100%1
BUFFER AREA 10 S C A L ff
1
WETLANDS TOTAL AREA TO BE PERMITTED
19.91 w
0 1®0 200 30
-- _
-1 20' HAUL ROAD
UNDISTURBED BUFFER
- --- ------