HomeMy WebLinkAbout20150686 Ver 1_Figure 6 rev 9-1-15_20150901-11 --,. -, — .- „.-.- ,.,..T., , -- - 9n” nIPC nPQ wnPF PIPP
( `PF1 —PF5 WETLAND & STREAM
8" SDR 21 PIPE INSTALLED w
LTEMPORARY T. I~ Q TEMPORARY WETLAND IMPACT 5A
ch Xc1 —Xc8 ( +/— 460 SF)
INTERMITTENT w c i
PACT ( +/— 9 LF) z 140 +00
v � �
--- -'L6 -- --------- - - -- ---- -- .........
„'Lt5
I
'F5
A
N:26036R ga
30" RCP
NV =22.7'
24" RCP
NV =22.4'
%3-'�Xc1 —Xc8 WETLAND IMPACT 5A
—
,0, —
26
26
8" SDR 21 PIPE INSTALLED — 10" DIPS DR9 HDPE PIPE
BY OPEN CUT. INSTALLED BY HORIZONTAL
DIRECTIONAL DRILL.
WETLAND PG1 —PG5
(NO IMPACT)
s
N
PERENNIAL STREAM
(NO I M PACT)
('2-'�PG1 —PG5 WETLAND & STREAM
10" DIPS DR9 HDPE PIPE
BOX INSTALLED BY HORIZONTAL
r.1 II vP'RT Ir DIRECTIONAL DRILL.
8" SDR 21 PIPE INSTALLED
BY OPEN CUT.
z
%4-'�C131 —C136 WETLAND & STREAM
GRAPHIC SCALE
100 0 50 100 200 400 Figure 6 - WETLAND IMPACTS
PHASE 1 WATER SYSTEM EXPANSION
( IN FEET) MOORE'S CREEK WATER AND SEWER DISTRICT
1 inch = 100 ft.
INTERMITTENT STREAM
(NO I M PACT)
TV
THE WOOTEN COMPANY
E N G I N E E N I N G I P L A N N IN G I A N C H I T E C T G NE
5
INFRASTRUCTURE
ENGINEERING. P.C.
HIEPC Project No.: ####
September 1, 2015