Loading...
HomeMy WebLinkAbout20150686 Ver 1_Figure 6 rev 9-1-15_20150901-11 --,. -, — .- „.-.- ,.,..T., , -- - 9n” nIPC nPQ wnPF PIPP ( `PF1 —PF5 WETLAND & STREAM 8" SDR 21 PIPE INSTALLED w LTEMPORARY T. I~ Q TEMPORARY WETLAND IMPACT 5A ch Xc1 —Xc8 ( +/— 460 SF) INTERMITTENT w c i PACT ( +/— 9 LF) z 140 +00 v � � --- -'L6 -- --------- - - -- ---- -- ......... „'Lt5 I 'F5 A N:26036R ga 30" RCP NV =22.7' 24" RCP NV =22.4' %3-'�Xc1 —Xc8 WETLAND IMPACT 5A — ,0, — 26 26 8" SDR 21 PIPE INSTALLED — 10" DIPS DR9 HDPE PIPE BY OPEN CUT. INSTALLED BY HORIZONTAL DIRECTIONAL DRILL. WETLAND PG1 —PG5 (NO IMPACT) s N PERENNIAL STREAM (NO I M PACT) ('2-'�PG1 —PG5 WETLAND & STREAM 10" DIPS DR9 HDPE PIPE BOX INSTALLED BY HORIZONTAL r.1 II vP'RT Ir DIRECTIONAL DRILL. 8" SDR 21 PIPE INSTALLED BY OPEN CUT. z %4-'�C131 —C136 WETLAND & STREAM GRAPHIC SCALE 100 0 50 100 200 400 Figure 6 - WETLAND IMPACTS PHASE 1 WATER SYSTEM EXPANSION ( IN FEET) MOORE'S CREEK WATER AND SEWER DISTRICT 1 inch = 100 ft. INTERMITTENT STREAM (NO I M PACT) TV THE WOOTEN COMPANY E N G I N E E N I N G I P L A N N IN G I A N C H I T E C T G NE 5 INFRASTRUCTURE ENGINEERING. P.C. HIEPC Project No.: #### September 1, 2015