HomeMy WebLinkAbout20150686 Ver 1_Application_20150901C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ❑ Buffers
® Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non -404, other) (acres)
Temporary (T)
Utility Line El Yes ® Corps
W1 E] P ®T I II Non - riparian 0.028
nsta anon
® No
® DWQ
W2 ❑ P ®T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.003
W3 ❑ P ®T
Utility Line
Installation
Riparian
El Yes
® No
® Corps
® DWQ
0.022
W4 ❑ P ®T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.013
W5 ❑ P ®T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.024
W5A ❑ P ® T
Utility Line
Riparian
® Yes
® Corps
0.011
Installation
❑ No
® DWQ
W6 ❑ P ® T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.007
W7 ❑ P ®T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.004
W8 ❑ P ®T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.023
W9 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.011
W10 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.003
W11 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.008
W12 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.001
W13 ❑ P ® T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.176
W14 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.005
W15 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.010
W16 ❑ P ® T
Utility Line
Installation
Non - riparian
El Yes
® No
® Corps
® DWQ
0.010
W17 ❑ P ®T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.005
W18 ❑ P ® T
Utility Line
Installation
Non - riparian
❑ Yes
® No
® Corps
® DWQ
0.003
W19 ❑ P ® T
Utility Line
Non - riparian
❑ Yes
® Corps
0.028
Page 5 of 13
PCN Form
— Version 1.3 December 10, 2008 Version
Installation ® No ® DWQ
W20 ❑ P ®T Utility Line Non - riparian ❑ Yes ® Corps 0.017
Installation ® No ® DWQ
2g. Total wetland impacts 0.412
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ❑ P ®T
Utility Line
NSA
❑ PER
® Corps
5
8
Installation
® INT
® DWQ
S2 ❑ P ®T
Utility Line
Mill Run
® PER
® Corps
10
8
Installation
❑ INT
® DWQ
S3 ❑ P ® T
Utility Line
NSA
❑ PER
® Corps
5
11
Installation
® INT
® DWQ
S4 ❑ P ®T
Utility Line
NSA
❑ PER
® Corps
5
9
Installation
® INT
® DWQ
3h.
Total stream and tributary impacts
36
3i. Comments:
Page 6 of 13