Loading...
HomeMy WebLinkAboutNCC223691_MODIFICATION Supporting Doc (ADDL LOTS)_20231110 4r4 Muf A.01, v. ROY COOPER �� -A Governor d 71 l{ ELIZABETH S.BISER ��` � a Secretary ` WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality November 7,2023 LETTER OF APPROVAL NVR,Inc. 5734 Trinity Road, Suite 200 Raleigh,NC 27606 RE: Project Name:Coble Farms Lots 87,111,124,129 Acres Approved: 0.64 Application ID: PA-001218 Permit Number: HARNE-2024-0101 Address: Rawls Church Road City: Fuquay-Varina County: Harnett River Basin: Cape Fear Stream Classification: WS-IV: Water Supply IV Plan Type:New Plan Dear Madam(s)and/or Sir(s): This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the$120 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO I. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. -\ North CaroillelinaRegional DepaOfrtmentfi 1 of225 EnvGreenironmental Street.QSuiteuality71 I 4 DIivisionFayettevi of Energy. 11North MineralCarolina and Land28301 Resources , . �,D ce e. o_.ltolFAoo�+ariawr /°� 910.433.3300 Letter of Approval NVR,Inc. November 7,2023 Page 2 of 2 Title 15A NCAC 4B .0118(a)and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1.The approved E&SC plan as well as any approved deviation. 2.The NCGO1 permit and the COC,once it is received. 3.Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations,and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Titi4tothy L. Labo n Regional Engineer/Supervisor DEMLR Enclosures: Certificate of Approval NPDES NCGOI Fact Sheet ec: Jamie Guerrero,Morris and Ritchie Associates of NC,PC Jay Sikes, Harnett County Inspections Office cc: DEMLR-Fayetteville Regional Office CA � Z a, w W4 01-1 �! u ..l y 1,1 u I � ? o tE C w v �'' C CO A- 4-4 C • cu ..41!t "c3 414 .1-a> 5 : co r-, INkr, N. Ctvi x O 4 ei ".4 n /* . , -‘44, ,. tl . 0 : cjj ci.) o = el et MO ICI1itit ,"t5ti a__ .5, , # b lc' , cLeO : ar - O _, i "'\ :.-7i Side_- — .. .a �' Z E-* m O a ,� at h Cr - u •rml= a. E H O .G v +� U O Wo CO L" - — = ;'" t C!! Ct O • O C.) aa , W C.J , O �. �+ v (") 6 e o C •,� 'tz Cl bA •O elc�.y = CJ • a Co ct E-+ cl ec V =, L) Fact Sheet on the New NCG01 Permit ril 2019 D_E Q4f A p The NC Construction General Permit (also known as "NCG01") was renewed on April 1, 2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or (919) 707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; a-NOI: Notice of Intent, application form for the NCGO1 permit • Is clearly organized by topic; and e-NOT: Notice of Termination, form for closing out the NCGO1 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 • Technical Updates . The new permit: r • Requires that the E&SC Plan meet SWPPP requirements (p. 2); 1� • Provides a list of items that must be '`� included in the SWPPP, such as the _ construction sequence, plans, calculations, etc. (p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); staasiteit ~' • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days" for clarity and The new NCG01 applies to permits approved on or after April 1, 2019. consistency(p. 11 14);Z Permittees will no longer receive a copy of the NCGO1 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours) to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 0.5 inch);3 and Under the new NCGO1 process, construction sites will continue to • Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCGO1 by place (p. 23). completing an e-NOI (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. This list is based on website guidance by the DEMLR Sediment Program. Initially, there will be no charge associated with applying for an NCGO1 2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $ 9 selected to be as equivalent as annual general permit fee as required per§143-215.3D. i ",() possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at DEMLR.