HomeMy WebLinkAboutSW4231002_Stormwater Report_20231114 Stormwater Impact Analysis for Dollar Tree 5744 Old US Highway 52 Welcome, North Carolina October 16, 2023 Prepared for: Cedar Run Capital, LLC 2405 Nash Street N Wilson, North Carolina 27896 PRINT NAME: Josh Crumpler, P.E. ,,,, 4•v4AL ` - - SIGNATURE. 034994 = •y•F••••P' " REGISTRATION NO. PE-034994 CRUMPLER Consulting Services, PLLC Prepared by Grumpier Consulting Services, PLLC 2308 Ridge Road, Raleigh, North Carolina 27612 p 1919.413-1704 CRUMPLER Consulting Services, PLLC TABLE OF CONTENTS 1.0 STORMWATER NARRATIVE 2 2.0 DESIGN DATA AND METHODOLOGY 3 3.0 PRE-DEVELOPMENT STORMWATER RUN-OFF 4 4.0 POST-DEVELOPMENT STORMWATER RUN-OFF 5 List of Appendices Appendix A— IDF Rainfall Data Appendix B — SCM Sizing Calculations and Supplement EZ Form Appendix C— Pre/Post Development Peak Flow Tables (2-yr, 10-yr, and 100-yr) Appendix D — Drainage Area Maps 2308 Ridge Road I Raleigh, NC 27612 I p: 919-413-1704 I e:josh@crumplerconsulting.com 1.0 STORMWATER NARRATIVE Cedar Run Capital LLC is proposing to construct a commercial building on a 1.38 acre parcel located at 5744 Old US Highway 52 in Welcome, North Carolina that zoned Heavy Commercial (HC). This report represents the stormwater management design and hydrologic model results for the proposed project. As part of the stormwater design, Crumpler Consulting is proposing the installation of a wet detention basin. The wet detention basin has been designed to control and treat the estimated runoff generated from the first inch of rainfall per the requirements of the Neuse Watershed Nutrient Management Strategy and the NCDEQ's stormwater management design manual. The wet detention facility is anticipated to attenuate the peak flow rates for the 2-year, 10-year, and 100-year 24-hour storm events in accordance with NCDEQ's requirements. The nitrogen loading rates have been evaluated as part of this design and are anticipated to be reduced to acceptable rates through treatment by the detention facility and buy down methods. The existing parcel did have minimal existing impervious surfaces that included an existing driveway which totaled 16,631sf. The proposed impervious surface consists of the warehouse building, parking lot, driveways, and sidewalks. The proposed impervious area will total 38,133sf. The proposed grading conveys the majority of the runoff to the southeastern corner of the site, where the runoff is collected in a wet detention basin that discharges to the southeast side of the site. The Post-Development Drainage Map shows the stormwater grading and drainage plan and associated details. Page 2 October 23, 2023 2.0 DESIGN DATA AND METHODOLOGY The design of the proposed stormwater facilities was performed in accordance with the NCDEQ Stormwater SCM Manual. The site was designed to meet Runoff Treatment by utilizing a wet detention basin. It was sized using both Parts `B' and 'C' of the stormwater design manual along with the Supplement-EZ form provided by NCDEQ. In addition to the NCDEQ Stormwater SCM Manual, the Wet Pond was analyzed using Hydraflow Hydrographs. This software is a computer modeling software package, was used for the analysis of stormwater routing and hydrology of the existing and proposed watersheds. The hydrology calculations were performed using the Modified Rational Method and TR-55 methods. Franklin County lies within the Type II rainfall distribution. The rainfall amounts for the site were obtained from National Oceanic and Atmospheric Administration (NOAA) and are included in Appendix A. The stormwater analyses performed for this project include the 2-year, 10-year, and 100-year, 24-hour storm events. The Soil Survey of Davidson County, North Carolina, completed by the National Resource Conservation Service (NRCS), was reviewed for general information on the soils within the site area. Page 3 October 23, 2023 3.0 PRE-DEVELOPMENT STORMWATER RUNOFF The pre-development drainage areas were determined using site visits, visual observations, and surveyed topographic data. The peak flow rates for the specified storm events are based on topography, land use cover (such as open space, grass, woods), and soil type. Two drainage points were selected for analysis. The existing 1.125-acre watershed was modeled in HydraFlow as one subcatchment, as described below. Refer to Appendix F of this report for the pre-development watershed map. • Drainage Area 1 Drainage Area 1 is 1.125 acres and drains to the southeast corner of the property. A time of concentration was calculated and was found to be approximately 5 minutes. Therefore, 5 minutes was estimated as the time of concentration for this subcatchment. The HydroFlow analysis can be found in Appendices. The table below summarizes the hydrologic model results for pre-development peak flow rates of the existing 1.125-acre watershed. PRE-DEVELOPMENT STORMWATER RUNOFF STORM EVENT PRE-DEVELOPMENT PEAK FLOW 2-YEAR 2.552 CFS 10-YEAR 3.345 CFS 100-YEAR 4.629 CFS Page 4 October 23, 2023 4.0 POST-DEVELOPMENT STORMWATER RUNOFF An analysis of the post-development runoff was performed using the same methods, parameters, and assumptions as described in the pre-development analysis above. Based upon the calculations, the project reduces the nitrogen loading to acceptable levels for buy-down and does not create an increase in the peak runoff rate for the 2-year,10-year, and 100-year storm events. This will be achieved by constructing appropriate SCMs. The proposed site was divided into two subcatchments for post-development analysis. The subcatchments are described below. Refer to Appendix F of this report for the post-development watershed map. • Drainage Area 1 Drainage Area 1 is 0.87 acres and includes runoff is treated by the wet detention facility. Runoff that is treated by the wet detention facility is collected in a stormdrainage system and discharged overland in the southeast corner of the site. A time of concentration was calculated and was found to be lower than 5 minutes. Therefore, 5 minutes was estimated as the time of concentration for this subcatchment. • Drainage Area 2 (Bypass) Drainage Area 2 is 0.25 acres and drains offsite to the east bypassing the wet detention facility. A time of concentration was calculated and was found to be lower than 5 minutes. Therefore, 5 minutes was estimated as the time of concentration for this subcatchment. The HydraFlow analysis can be found in Appendices. The follow table summarizes the hydrologic model results for post-development peak flow rates of the 1.125-acre watershed. POST-DEVELOPMENT STORMWATER RUNOFF TOTAL TOTAL STORM EVENT POST-DEVELOPMENT POST-DEVELOPMENT PEAK FLOW PEAK FLOW WITH OUT SCM WITH SCM 2-YEAR 0.935 CFS 3.97 CFS 10-YEAR 1.224 CFS 5.203 CFS 100-YEAR 1.169 CFS 7.199 CFS Page 5 October 23, 2023 APPENDIX A IDF Rainfall Data Page 6 October 23, 2023 21 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,09/21 /2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:Raleigh.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. Precip.file name:Sample.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 2.20 0.00 3.30 4.25 5.77 6.80 7.95 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff-1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 1.75 0.00 2.80 3.90 5.25 6.00 7.10 APPENDIX B SCM Sizing Calculations and Supplement EZ Form Page 7 October 23, 2023 I 113 - t) Op,. Ait. l(i, (03I 0. Ptaf05s0); S:4cw • s, '133sc 1.1 , 43isf A)e.0 40,4: n�:.,c��, ; ZS,6S354-- /&&)f$1; 9O22-sf ysos }- 11oa1^ /01oao5f. V•4 = ?1562 s-►- Csc k): S:Jt...61k •7 1, 76Cs ►�,nuosF 1;4-1 1.WA 2(4, Va5S1- O•Lolu T.t..}ea 2 t,, tta t s ?.G-#�J > A.) 13�1 h a> 1,to.4e.y.,..•.1- ; r,,c4- 151 s:Mrl� I�IG .>J .lyOl�al O.601 .L , 604 :w s,�- D,0 5•k . q .a`�-1=-(,7Z O. g 1.1-•A 1, Jd= 3t.300.0)C,4?2)(. .$))= 3) AA P._I S: s,1-/OA - bnl A(4�.e-.� -��.�.,,,:.�.s �� — Get A:ea .. Jva} f..bk z Go/ % Z.cl°( Co !/i 2 • L17 °-7 Sfd�w� r �}•,r � 2,Ct.) 70% - 2.5 Sh- t o•�� k 2-ti�)/,o- 93G s L, 27 90 SA Rocb"„cd C 5te. 3/3 )4•,w)t ,y)l- 4) P..I A..S 0.(11,1 eh...Is z \�4"S _ \I({ 2 -)?5° , 3. o s f=4- 2 .9)4 l V J 'Z50bs1- A.1 Z/3 Q= t.)Q,/ 21 z n. DI 2 3 c.-[5 Q= O. UIz3,-ts _ 0. 003( .W- (o. 003G) ,S ; n 067 ck- l O. g 1y u5C I " I,..1c L -12.14 4 } @ g�2 .o♦ 7) 5 L .. L' 2r = g62-- 1-11 2- !sa►.f y/ ClS .511 230.4 zoot �: f3G2. 15 33oS,F 1 IVI 1 LL IwILI\ I —LL VV V IL\ I /1 NJL FORMS LOADED ;OJECT INFORMATION 1 Project Name Dollar Tree-Welcome,NC —_ 2 Project Area(ac) 1.38 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No )MPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 5 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No IMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED :SIGNER CERTIFICATION 27 ,Name and Title: Joshua Crumpler,PE 28 Organization: Crumpler Consulting Services,PLLC 29 Street address: 2308 Ridge Road 30 City,State,Zip: _ Raleigh,NC 27612 31 Phone number(s): 919-413-1704 32 'Email: josh@crumplerconsulting.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer `IIIIIII,J 11� EAL.: Sig t of Designer 034 94 ,q A. CRv.0 n(� '1 ...sill.... Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area(sq ft) 49000 37710 6 Onsite drainage area(sq ft) 45950 34730 7 Offsite drainage area(sq ft) 3050 2980 8 Total BUA in project(sq ft) 38133 sf 26189 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) 21502 sf 26189 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: _ -Parking(sq ft) 25653 sf 14424 sf -Sidewalk(sq ft) 2480 sf 1765 sf -Roof(sq ft) 10000 sf 10000 sf -Roadway(sq ft) -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to i 15 permitting)(sq ft) 17070 sf 11846 sf 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) _ 18 Percent BUA 71% 69% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 2122 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 I 2 Minimum required treatment volume(Cu ft) 2122 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 Does the SCM have retaining walls,gabion walls or other 6 engineered side slopes? No 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? _ Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 857.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 857.50 22 Elevation of the bottom of the vegetated shelf(fmsl) 861.00 23 Elevation of the permanent pool(fmsl) 862.00 24 Elevation of the top of the vegetated shelf(fmsl) 862.00 25 Elevation of the temporary pool(fmsl) 862.41 26 Surface area of the main permanent pool(square feet) 2790 27 Volume of the main permanent pool(cubic feet) 7755 cf 28 Average depth of the main pool(feet) 3.08 ft 29 Average depth equation used Equation 2 30 If using equation 3,main pool perimeter(feet) 31 If using equation 3,width of submerged veg.shelf(feet) 32 Volume of the forebay(cubic feet) 1714 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 6 in 35 Design volume of SCM(cu ft) 2122 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 1 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance(inches) 48 in 44 Depth of forebay at exit(inches) 42 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? _ 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 8:29 PM 10/23/2023 Impervious** Surface Area Drainage Area 1 (SF) 3 of 3 Buildings 10,000 Streets 14,424 Parking 0 Sidewalks 1,765 Existing BUA 0 Total 26,189 MAIN POOL STORAGE TABLE Stage SURFACE AREA(SF) Volume (CF) 857 544 0 858 874 709 859 1,268 1,071 860 1,719 1,494 861 2,226 1,973 862 2,790 2,508 . Total 7,755 FOREBAY STORAGE TABLE Stage SURFACE AREA(SF) Volume (CF) 860 272 0 861 502 797 862 788 917 Total 1,714 TEMPORARY POOL STORAGE TABLE Stage SURFACE AREA(SF) Volume (CF) 862 3,578 - 863 5,250 5,633 864 6,229 Total 5,633 APPENDIX C Pre/Post Development Peak Flow Tables (2-yr, 10-yr, and 100-yr) Page 8 October 23, 2023 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 v I 4 Legend Hvd• Oriain Description 1 Mod. Rational PROPOSED POND 2 Reservoir Proposed Pond 3 Mod. Rational BY-PASS 4 Combine COMBINED SITE 5 Mod. Rational EXISTING SITE Project: Welcome-Proposed.gpw Monday, 10/ 16/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Mod. Rational 3.048 3.995 5.527 PROPOSED POND 2 Reservoir 1 0.016 0.019 0.022 Proposed Pond 3 Mod. Rational 0.922 1.208 1.672 BY-PASS 4 Combine 2,3 0.935 1.224 1.691 COMBINED SITE 5 Mod. Rational 2.552 3.345 4.629 EXISTING SITE Proj. file: Welcome-Proposed.gpw Monday, 10/ 16/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) I 1 Mod. Rational 3.048 1 5 1,829 PROPOSED POND 2 Reservoir 0.016 1 15 1,535 1 862.41 1,821 Proposed Pond 3 Mod. Rational 0.922 1 5 553 BY-PASS 4 Combine 0.935 1 10 2,089 2,3 COMBINED SITE 5 Mod. Rational 2.552 1 5 1,531 EXISTING SITE Welcome-Proposed.gpw Return Period: 2 Year Monday, 10/ 16/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 1 PROPOSED POND Hydrograph type = Mod. Rational Peak discharge = 3.048 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,829 cuft Drainage area = 0.870 ac Runoff coeff. = 0.76* Intensity = 4.609 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.600 x 0.95)+(0.270 x 0.35)]/0.870 PROPOSED POND 0 (cfs) Hyd. No. 1 --2 Year 0 (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 2 Proposed Pond Hydrograph type = Reservoir Peak discharge = 0.016 cfs Storm frequency = 2 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 1,535 cuft Inflow hyd. No. = 1 - PROPOSED POND Max. Elevation = 862.41 ft Reservoir name = Pond Max. Storage = 1,821 cuft Storage Indication method used. Proposed Pond 0 (cfs) Hyd. No. 2 --2 Year 0 (cfs) 4.00 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 — 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 2 Hyd No. 1 II 1 1 1 1 1 Total storage used = 1,821 cuft Pond Report 6 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Pond No. 1 - Pond Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=862.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 862.00 3,578 0 0 1.00 863.00 5,250 4,387 4,387 2.00 864.00 6,229 5,732 10,119 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 12.00 1.00 0.00 15.00 Crest Len(ft) = 9.42 10.00 0.00 0.00 Span(in) = 12.00 1.00 0.00 15.00 Crest El.(ft) = 864.00 864.50 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 858.00 862.00 0.00 0.00 Weir Type = 1 Rect --- --- Length(ft) = 30.00 1.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 1.00 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 2.00 864.00 1.80 863.80 1.60 863.60 1.40 863.40 1.20 863.20 1.00 863.00 0.80 862.80 0.60 862.60 0.40 862.40 0.20 862.20 0.00 862.00 0.000 0.004 0.008 0.012 0.016 0.020 0.024 0.028 0.032 0.036 0.040 Total Q Discharge(cfs) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 3 BY-PASS Hydrograph type = Mod. Rational Peak discharge = 0.922 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 553 cuft Drainage area = 0.250 ac Runoff coeff. = 0.8* Intensity = 4.609 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.190 x 0.95)+(0.065 x 0.35)]/0.250 BY-PASS Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 3 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 4 COMBINED SITE Hydrograph type = Combine Peak discharge = 0.935 cfs Storm frequency = 2 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,089 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 0.250 ac COMBINED SITE Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 I 0.40 0.30 I■ EMEM--- 0.30 0.20 - 0.20 0.10 11 0.10 0.00 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 5 EXISTING SITE Hydrograph type = Mod. Rational Peak discharge = 2.552 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,531 cuft Drainage area = 1.130 ac Runoff coeff. = 0.49* Intensity = 4.609 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.380 x 0.95)+(0.750 x 0.25)]/1.130 EXISTING SITE Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 5 Time (min) 10 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Mod. Rational 3.995 1 5 2,397 PROPOSED POND 2 Reservoir 0.019 1 15 1,981 1 862.54 2,387 Proposed Pond 3 Mod. Rational 1.208 1 5 725 BY-PASS 4 Combine 1.224 1 10 2,706 2,3 COMBINED SITE 5 Mod. Rational 3.345 1 5 2,007 EXISTING SITE Welcome-Proposed.gpw Return Period: 10 Year Monday, 10/ 16/2023 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 1 PROPOSED POND Hydrograph type = Mod. Rational Peak discharge = 3.995 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,397 cuft Drainage area = 0.870 ac Runoff coeff. = 0.76* Intensity = 6.042 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.600 x 0.95)+(0.270 x 0.35)]/0.870 PROPOSED POND Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 2 Proposed Pond Hydrograph type = Reservoir Peak discharge = 0.019 cfs Storm frequency = 10 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 1,981 cuft Inflow hyd. No. = 1 - PROPOSED POND Max. Elevation = 862.54 ft Reservoir name = Pond Max. Storage = 2,387 cuft Storage Indication method used. Proposed Pond Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 2 Hyd No. 1 II 1 1 1 1 1 Total storage used = 2,387 cuft 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 3 BY-PASS Hydrograph type = Mod. Rational Peak discharge = 1.208 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 725 cuft Drainage area = 0.250 ac Runoff coeff. = 0.8* Intensity = 6.042 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.190 x 0.95)+(0.065 x 0.35)]/0.250 BY-PASS Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 2.00 2.00 1.00 t 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 3 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 4 COMBINED SITE Hydrograph type = Combine Peak discharge = 1.224 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,706 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 0.250 ac COMBINED SITE Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 2.00 2.00 I 1.00 1.00 0.00 1 L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 5 EXISTING SITE Hydrograph type = Mod. Rational Peak discharge = 3.345 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,007 cuft Drainage area = 1.130 ac Runoff coeff. = 0.49* Intensity = 6.042 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.380 x 0.95)+(0.750 x 0.25)]/1.130 EXISTING SITE Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 5 Time (min) 16 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Mod. Rational 5.527 1 5 3,316 PROPOSED POND 2 Reservoir 0.022 1 15 2,636 1 862.75 3,305 Proposed Pond 3 Mod. Rational 1.672 1 5 1,003 BY-PASS 4 Combine 1.691 1 10 3,639 2,3 COMBINED SITE 5 Mod. Rational 4.629 1 5 2,777 EXISTING SITE Welcome-Proposed.gpw Return Period: 100 Year Monday, 10/ 16/2023 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 1 PROPOSED POND Hydrograph type = Mod. Rational Peak discharge = 5.527 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,316 cuft Drainage area = 0.870 ac Runoff coeff. = 0.76* Intensity = 8.360 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.600 x 0.95)+(0.270 x 0.35)]/0.870 PROPOSED POND Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 6.00 I 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 2 Proposed Pond Hydrograph type = Reservoir Peak discharge = 0.022 cfs Storm frequency = 100 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 2,636 cuft Inflow hyd. No. = 1 - PROPOSED POND Max. Elevation = 862.75 ft Reservoir name = Pond Max. Storage = 3,305 cuft Storage Indication method used. Proposed Pond Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 2 Hyd No. 1 1111111 Total storage used = 3,305 cuft 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 3 BY-PASS Hydrograph type = Mod. Rational Peak discharge = 1.672 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,003 cuft Drainage area = 0.250 ac Runoff coeff. = 0.8* Intensity = 8.360 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.190 x 0.95)+(0.065 x 0.35)]/0.250 BY-PASS Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 t 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 3 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 4 COMBINED SITE Hydrograph type = Combine Peak discharge = 1.691 cfs Storm frequency = 100 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,639 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 0.250 ac COMBINED SITE Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Hyd. No. 5 EXISTING SITE Hydrograph type = Mod. Rational Peak discharge = 4.629 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,777 cuft Drainage area = 1.130 ac Runoff coeff. = 0.49* Intensity = 8.360 in/hr Tc by User = 5.00 min IDF Curve = Raleigh.IDF Storm duration = 2.0 x Tc Target Q =n/a Est. Req'd Storage =n/a *Composite(Area/C)=[(0.380 x 0.95)+(0.750 x 0.25)]/1.130 EXISTING SITE Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 5 Time (min) 22 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 10/16/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name: Raleigh.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. Precip.file name:Sample.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 2.20 0.00 3.30 4.25 5.77 6.80 7.95 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff-1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 1.75 0.00 2.80 3.90 5.25 6.00 7.10 APPENDIX D Drainage Area Maps Page 9 October 23, 2023 LEGEND l 1' ' /11 \V // I I II I \VA EXISTING PROPERTY LINEV / I I I y v o o l \-- I / / I I \ \ I EXISTING ABUTTING PROPERTY LINE1 i 1JNI / - \\ \ / I II------�\\ \ I EXISTING RIGHT-OF-WAY ,L_I 11 Nl , �I _ \V I 1 I I II AVA A OHW OHW EXISTING OVERHEAD POWER LINE h/ /I 3 _ / I I EXISTING INGIRESS/EGR¢SS EASEMENT I \ \ I EXISTING ABUTTING PROPERTY LINE "��11 U X g 7,, In / c I 1( ((l ER DB 2197,PG 1803 I 9 Ui2 01 / �� / IITO BE REMOVED lII , -----_ \\�\ EXISTING BUILDING SETBACK LINE i � �/ IIl _ / I 1 I 1 I , \y\\\ EXISTING PARKING SETBACK LINE N o°°' 1 oz RIM 7258' l / I; /� l t--I I / , I 1 \\\\ \ EXISTING EDGE OF PAVEMENT a INV.IN=863.03' / ( 1 INV.OUT=862.88' N l l / I / I / / I I I —\\\ EXISTING PAVEMENT - K / 1h- h\ I / II �/ J / // / I �A \ ��������������� TO BE REMOVED 5 1 ��/ ( \ I I v�v Et Le v 1 ��� W � V� Av v j 10 I ON OH / w V I / W 11 \ \\ \\ \\ \ I1 I \1 0 , 1 / • / I \ \ \ I ,,�„ I1I 1 FIBER OPTIC / / A A\ \V A I I I I I ylPy/EAL _ ti I VAULT / / / ii3° \ \ \ \ \ I I I i. 034994 . '37' 1 dPi/ / \ 184.6, `r-r�=�.. I I I I I .0'. CAI 4r?,= \ �XT \ T I S ' OINE Q ZJ 6" &\4" PVC PIPE \ \I I vi� 1 Ili \ \ W/ ELECTRICAL \\ I\ 111 I 1 S I SS / Ar \\\<��• . .•N t�V\ES \\\ \\ I \\ \ I 1 \,/ s SS ; / I 11 I / I ISSUED FOR // tN I I I� ®j ��j A 1 CONSTRUCTION rh I I� S 1 1 I 1 I I �- � • I, ,, A4pHA ® \ I, \ 1 \ 1 PARKING \ I I �,/ aToERE � \ �\ I11 1.. M 11 1 1 11 /� �? li W CO EXISTING BUILDING • I II III �// I 01 o � P' (TO BEPREMOVED) � /, II /Ii % I i /,I j1 �/ / 1 /APPROXIMATE LOCATIONNI.., I 1 /, II OF EX UNKNOWN MATERIAL1 / / I 11 / l I SANITARY SEWER MAINI I , / 1 / I I I DCONTRACTOR TO VERIFY �� I / I I / I 1 I 1l Z MATERIAL,LOCATION,AND SIZE42' IPRE-DEVELOPMENT DRAINAGE AREA: 1 �� ' / I 1z "' / I a O 2 I 1.125 AC I i I lilt rr co- b a o I' / I O P O // C=0.49 / 1 CO ce 07 -I (0 I I / I ��iir® / I I `' p o APPROXIMATE LOCATION I I f;/ �1® ��� / I I U OF EX WATER MAIN 1 I-/ I / ��'/1y�7"' / // I wCONTRACTOR TO VERIFY / ,II / I a LOCATION AND SIZE 0 11 d i , /, / '� 1 / / I I I I II 1 I / I r , // , 1 I H i I I // // I / // , I 1 I v, 1 I � / / I I 1 1 I , , / , /____ , I 1 / I / I / 1/ / w d/ , // p I // I i ,' I / I I 1 re I / 11 I / I , / I ��, �/� Ij I/ / / I / / '' II / / Q 0 /I 1 / �I I/ / ,' // r / / I I / 1 2 I // I l I I EX OVERHEAD .� // i' i' i// I j I I LU / 1 1 , l I UTILITIES /I I / / I / I cs, . / , // _ / I 1 / / /,1 / I / Z z �I I / I / /II I I y O Il I/ I / 'I / I I Q w >- O I I / // I I ,l I I __ I I I I I � LLJ ¢ Q / / I I ,/ I / / I I / I l I 0 C = v I I T / / I I I I ~ = it 1f / /� 1 1_ / I ♦ ZV) O , �� / ; / I J oz / EX. SMH �I o 1%/%• �� 1 1 1 I 0 0 o U / �2/b1-867.50' I 1 I l ♦♦ 93 I 0'J 1 I I I I J Lc) W INV.IN=858.85' o / / INV.OUT=858.75' II I l ♦.1 11 / 1 I LLI u // / 13 �ELEPHONE ♦ / / 1 I I BOX ♦ / 1 W // / 1p I/ / ♦♦ 1 1 ♦ 11 15.00' 1 '_ / 06W OHW 3I OHW 11_I 9V' j/ / SIDE LJJ w RE ��♦ STREET / • E /// \ - /1 I 1 •♦♦ SETBACK / / I� I / i I 0_ 3 /// \ \ 'p I I T— / / 1/ 1 \ \ E.18„RC,. lug_ ♦ / ____ I / I 5 0) \ \INV.OUT=862.•�e �d 1_,,\�- - ♦ _ EG NTER4N?ef"I"I iI������— I \/ \ \ m Cl EX.15"RCP\ \ 1 > - - }� //STREAM TOP OF BANK I / PROJECT NO.: 23024 y ' INV.IN=866.75 \ 1 1 \ \ ,\\`— — // —1— _ / — OF STREAM I \ p 1 1 \ - _ _ _ 1 / N DRAWN BY: JAC \ 1 1 \ \ \ —�,__—_ / —--__- - _ CHECKED BY. JAC o i \ \ \ ___ .._ ___ _- _.. - - DATE: 09/08/23 \� // /) AV \V / /_ \\ SCALE: e / / • / - / _-__ \ \ / I 20 10 0 20 u I / // / / \ GSTWI \ - GRAVEL DRIVEWAY / \ / \ SCALE:1 INCH=20 FEET EX-1 • LEXINGTON AVE. \'/ I 1 of 1 �N I / ) I I V LEGEND 1, I i� II \\ /// I I I 1 A A\ EXISTING PROPERTY LINE J (� A l / / I I �\\ I EXISTING ABUTTING PROPERTY LINE T i T N / \ \ I I 1 /—————— \\ \ I EXISTING RIGHT-OF-WAY ,L_I 11 N I I AV I I I I I I `V A A OHW OHW EXISTING OVERHEAD POWER LINE o c / /I / \ / I I I I I I I V A\ I EXISTING ABUTTING PROPERTY LINE "��11 U x /1 // �5�.39'ifE 1 1 / I I •Ell ? a°q� / /1 // — T �O� I I I I 1 —_-----\ \\\ EXISTING BUILDING SETBACK LINE �E�a / �I —— I �( / I I 1 `/ y\ \ EXISTING PARKING SETBACK LINE N o °? l 1I p _f---- — 1 1 / / / I I \\\ �a EXISTING EDGE OF PAVEMENT I / // / // /1 I \ V A PROPOSED EDGE OF PAVEMENT / I I I / / I�� I / / 1 1// // // / I I �`AV V .. PROPOSED ASPHALT PARKING 5 / / I^ �J / 1 3 \I I // // // / I \VAS PROPOSED CONCRETE Et Le I I I rn \ \ V A \ / ` ` PROPOSED CONTOUR MAJOR "' q� % W ni. \ \ \ \ \ \ \\ \1 PROPOSED CONTOUR MINOR I (/ / 1 \ \ \ \ I I PROPOSED STORMDRAINAGE / I ''' •'SAE / V / / \ \ A co I I I O'1i;ii PROPOSED DROP INLET p .••" • I / / ♦ ����T�� - \\ \ I I I yQ/ E I I / l 1 -/I' I �� �'3�' ���� PROPOSED FLARED END SECTION I EAL \ \ I ® 034994 / I I/ �J% 184.68' T "1'r=.. / 1 ! I/ \ '�q�AICPO7�' / I - A ll I ♦ I' POST-DEVELOPMENT DRAINAGE BYPASS: I / IF 0.25AC :SSUED FOR cNizo 1� I ' C=0•80CNSTRUCTION l� II/� I ♦ �� •�� IAI,I �l / I • ' A� 1 \I I 1. w co 0) m CO I `I--- I ♦ r-__2'X_60'LOA I/ \ 1 I \ \ \TOW=865.00/ 0 ==� ���KWA� 1 IBOC=862.00 a Cq I 7- \ •• I� I II 1 1 I� I:), I L__ Ill I 1 1 1 I I 1 I W I 1 I 1 ifl 1 / ROPgSED 1 1 I 10141 ®# il y / �� I reETAII ING WALL 1 I I I'� �� 1 l I 1 1 --. I I 1 ' I I TOW 865.00 I I�I i I �ii 1 I 1 / i IBOC=63.00 11 Iml _ Z 42' I /I 1 1 POST-DEVELOPMENT DRAINAGE AREA 21 z W EX EOP I / 11 / I PFOPOS D 5'SIDEWALK 1� a O iia: t------ 1 0.87 AC / M o U 21 / // / l C=0.76 / § F T eao m w I I// I I111 �� / /quIll 1 I I a 0 LU 1 b U I u/ iiii a. I z ii, 1 I I i \ - ii / ,i • ii - I n a l I / I� I / ' 1uu1wi _uij I IIIIS /ift / 16 ir w I / I / 11/// I I I j j t I I N �.o it I d I / / V/ / I II I Ift I I 11 /' 1 1 I1 W 1 Il 1 Il 1 11 .-'- -' I III 0 / I II I� I Z z g. — I W n Il II I I — � � 1 — Q `. I //// 1 II / II ` ' — _ / I j 1 W Q 0 _- I I1 p = a /' / I II 1 /l // I % I l I / I I Z I II TTT Ili �/ / I ♦ I W O 868 __ � I i / 1 I J -1 w ' I ��� • I I 1 1 1 o ° o // -- 1 ,�� �� I I I ii 1 I I O p w q / / 1 l •�e. � 11 W I I > 5 I I I ♦ 11 .o I e /// A <se J LT:, , ,s i \ /\ o_ r _ ay'i'. ��LL�����/ I✓/ I I NOTES _ _ _ _ _ i•-. PROJECT NO.: 23024 •a ` ` 1 1 \\\ ���yam— — —I _ 51��� ='� �.=_i'•' I I 1. BOUNDARY,TOPOGRAPHY,AND EXISTING CONDITIONS SURVEY o , `\ 1 11 \ \\ N� �=_ ——1— - �sr.-EXE • / N PROVIDED BY STEWART-PROCTOR ON 07-11-2023. DRAWN BY: JAC \ j I \\ \ \\ \ --�.__ — _ ------ — CHECKED BY. JAC —— — \ 2.THE PROPERTY IS LOCATED IN ZONE X AREA DETERMINED TO BE \ \ \ A ——_ ——___ — 1 OUTSIDE THE 0.2%ANNUAL CHANCE AND FUTURE 1%ANNUAL CHANCE o \ \ \ ` —— - — —--- --- .=— FLOODPLAIN)BASED ON THE FEMA MAP NUMBER 3710672800J DATED DATE: 09/08/23 7 \i > \ — MARCH 16,2009. // / - \ \\. / /-- V\ SCALE: a / - / / - - / ——— N \ / I 20 10 0 20 3. NO ONSITE STREAMS OR WETLANDS HAVE BEEN IDENTIFIED WITHIN THE $ / / / ` - \ / SCALE 1 INCH=20 FEET GSTWI PROJECT OR PARCEL AS SHOWN. / / -\ GRAVEL DRIVEWAY • / \ EX-1 i / // \\ ___ - - / I 4.THIS DRAWING IS NOT FOR RECORDATION. / LEXINGTON AVE. �'/ 1 of 1