Loading...
HomeMy WebLinkAboutNCC216671_NOT Closeout Documents_20231109 Town of Fuquay-Varina FUQU4'(\/4R 1 NA Erosion Control/Stormwater Inspection Report Project: BENTWINDS POOL EC Permit No: EC-2021-24 River basin: 0 Neuse ❑ Cape Fear Disturbed Acreage: 4.7 ac Permit Issue Date: 12/15/2021 Permit Expiration Date: 5/13/2024 Person financially responsible:ERIN BROOKS Phone: 202-536-9057 Email:president[a)bentwinds.org Contractor/Other: Phone: Email: 1. Weather and soil conditions: SUNNY,DRY Z Workable ❑ Not workable 2.First inspection: ❑Yes FI No 3. ❑ Digital Pictures Taken(See No. 14.Site Visit Photographs) 4. Is site currently under notice of violation?❑Yes 11 No 5.Is the site in compliance with S.P.C.A.and rules? 11 Yes ❑ No If no,check below: 6. Has sedimentation damage occurred? ❑ a.No approved plan G.S.113A-57(4);15A N.C.A.0 4B.0107(c);LDO§9-1407(a)(4)(D); ❑ Yes 0 NO If yes,where?(Check all that apply) ❑ b. Failure to follow approved plan G.S.113A-57(5);15A NCAC 46.0113;LDO§9-1407(b)(1)(H) 0 Lake/natural watercourse on the tract ❑ c.Failure to submit revised plan G.S.113A-54.1(b);15A N.C.A.C.4B.0118(a);LDO§9-1407(c)(7) Eld. Failure to provide adequate groundcover G.S.113A-57(3);15A N.C.A.C.46.0107(b);LDO§9-1407(b)(1)(G) O Lake/natural watercourse off the tract ❑ e. Insufficient measures to retain sediment on site G.S.113A-57(3);LDO§9-1407(b)(1)(A) 0 Other property Elf. Failure to take all reasonable measures 15A N.C.A.C.46.0105;LDO§9-1407(a)(4)(E) Degree of damage: ❑ slight ❑ moderate 0 severe ❑ g. Inadequate buffer zone G.S 113A-57(1);LDO§9-1407(b)(1)(C) ❑ h.Graded slopes and fills too steep G.S.113A-57(2);15A N.C.A.C.4B.0124(e);LDO§9-1407(b)(1)(E) Stormwater Discharge Ouffall with sediment loss: ❑ i. Unprotected exposed slopes LDO§9-1407(b)(1)(G) ❑j. Failure to install and maintain measures 15A N.C.A.C.46.0113;LDO§9-140 7(e)(2) Description: ❑ k. Failure to self-inspect G.S.113A-54.1(e);15A N.C.A.C.46.0131;LDO§9-1407(e)(1) O I. Failure to renew Land Disturbance Permit LDO§9-1407(d)(4)(D) 7. Additional noncompliance with the TFV LDO observed: ❑ m.Illicit Discharge/Illicit Connection LDO§9-1408(g) ❑ n.Completion of Stormwater§9-1405(d)(4) ❑ o.Potential NPDES violation LDO§9-1407(e)(1) 8. Phase(s)of the Plan. Check all applicable boxes for completed or current phases(15A NCAC 04B.0131) 1/ Initial installation of erosion and sediment control measures;Compliance Inspection Date:12/10/2021 1/ Clearing and grubbing of existing ground cover 11 Completion of any grading that requires ground cover(establishment of slopes,culvert install,building pads) 11 Completion of all land-disturbing activity/construction/development(includes final stabilization and removal of all temporary measures) 9.Are Self-Inspection Records On-Site(G.S 113A-54.1(e))? 11 Yes ❑ No 10.Observations Bare and thin spots have been stabilized. Version 20221115 Town of Fuquay-Varina FUQU4`(\/4R 1 NA Erosion Control/Stormwater Inspection Report 11. Corrective actions needed for S.P.C.A.and rules: 12.Additional Corrective Actions: ❑ a. Submit an approvable sedimentation and erosion control plan, including ❑ I. The Land Disturbance Permit requires renewal.Submit EC appropriate review fee,covering all areas disturbed or to be disturbed. Transmittal Form and associated renewal fee to Town Hall. For ❑ Install and maintain all temporary and permanent erosion and sedimentation questions,contact Hannah Shaw. b control measures,as required by the approved plan.Measures includes groundcover requirements provided in the approved plan. ❑ m.Remediate illicit discharge/illicit connection: ❑ c ❑ Install and/or maintain concrete washout. Submit a revised sedimentation and erosion control plan. Provide permanent groundcover or convert temporary groundcover to ❑ Properly control waste such as discarded building ❑ d. permanent groundcover as soon as practicable but in no case longer than materials,concrete truck washout,chemicals,litter,and 90 calendar days after the last land disturbing activity including but not sanitary waste to avoid contact with surface limited to areas noted in 10. Observations. waters/wetlands/buffers and prevent discharge from site. ❑ e. Provide additional erosion and sediment control measures required to sufficiently to retain sediment on the tract. ❑f. Install erosion and sediment control devices sufficient to retain sediment on ❑ the tract including but not limited to areas noted in 10. Observations. ❑ g. Provide an adequate stream buffer zone of sufficient width to confine visible ❑ sedimentation within the 25%of the buffer nearer the land disturbance using natural or artificial means. Elh. Reduce the angle of graded slopes to an angle on which vegetative ground ❑ n. Install and/or convert stormwater control measures cover may be established including but not limited to areas noted in 10. (See TOFV SCM Completion Requirements) Observations. ❑ Email self-inspection records to hshaw@fuquay-varina.org ❑ i. Provide temporary or permanent ground cover,devices,or structures sufficient to restrain erosion on exposed slopes within seven(7)calendar for the following date range: days from the last date of land disturbing activity. Other: ❑j. Install and maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage. ❑ k Perform inspections of the area covered by the plan after each phase has ❑ been completed and after establishment of temporary ground cover as required by land disturbance permit. Maintain and make available a record of each inspection at the site. 13. For Final Inspections Only: 11 Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated. For projects permitted after April 1, 2019: Permanent ground cover sufficient to restrain erosion has been established. No additional self-inspection or monitoring is required,and the project is released. If this project has a Certificate of Coverage(COC)under the NCG01 permit,then complete the electronic Notice of Termination(eNOT)form at deq.nc.gov/NCG01. Report by: GARY JANSHEGO Others present: Date of inspection: 11/8/2023 Estimated Time on site: 10 min. Contact made with(name): Title: Inspection report: ❑ given or // sent to person financially responsible. Date given/sent: 11/8/2023 Deadline for Compliance: Click or tap to enter a date. 2IPage Version 20221115 �' Town of Fuquay-Varina FUQU4`(\/4R I A n Erosion Control/Stormwater Inspection Report 14.Site Photographs • • • • .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. • • • INTENTIONALLY LEFT BLANK • • • .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. • • • 3IPage Version 20221115