Loading...
HomeMy WebLinkAboutHE0013_EC_PlansPROJECT BEGIN PROJECT END SOUTHERN RR LAURINBURG & -L- POC Sta. 13+00.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT HE-0013 -L- POT Sta. 43+00 END CONSTRUCTION END TIP PROJECT HE-0013 -SR2- POT Sta. 10+00.00 -L- POT Sta. 35+30.58= -SR2- POT Sta. 13+48.42 -SR1- POT Sta. 27+10.13= -SR1- POT Sta. 10+00.00 -L- POC Sta. 21+52.82= -DR1- POT Sta. 10+00.00 -L- POC Sta. 15+57.20= TO LAURINBURG - D R1- TO ABERDEEN ABERDEEN ROAD US 15-501 -L--SR2-R AILR O A D C O MP A N Y L A URINB UR G & S O UT HER N SCOTLAND COUNTY US 15-501 (ABERDEEN RD) NORTH OF DRAINAGE, PAVING, AND GRADING LOCATION: TYPE OF WORK: -DR1- Sta. 10+85.00 END CONSTRUCTION LAURINBURG pop. 15,895 CI TY LI MI TS ( I N)LAURI NBURG CITY LIMITS (IN) LAURINBURG -SR1- -SR2- Sta. 13+92.69 END CONSTRUCTION -SR1- Sta. 30+57.32 END CONSTRUCTION SR 1301 (PLANT RD) DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA PLAN FOR PROPOSED HIGHWAY EROSION CONTROL STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 11/13/2023HE-0013_EC_dsn_psh_01.dgnMEdwards EC-1 Prepared in the Office of: NAME LEVEL III CERTIFICATION NO. Designed by: MATTHEW C. EDWARDS, PE 3992 2024 STANDARD SPECIFICATIONS NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2019 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS reference hereby are considered a part of these plans. and the latest revision thereto are applicable to this project and by Department of Transportation - Raleigh, N. C., dated January 2024 The "Roadway Standard Drawings"- Roadway Design Unit - N. C. Roadway Standard Drawings VICINITY MAP NOT TO SCALE GRAPHIC SCALE 2550 0 50 100 PLANS SUNGATE DESIGN GROUP, P.A. ENG FIRM LICENSE NO. C-890 TEL (919) 859-2243 RALEIGH, NORTH CAROLINA 27606 905 JONES FRANKLIN ROADTIP PROJECT: HE-0013HE-0013 50700.1.1 PE Cemetery Memorial Hillside Cemetery Campbell Church First of Prophecy Church of God Baptist First FreewillShaw Cur ri e RdMcFarland Rd Laurel Hill Church Rd Sn e a d s Gr o v e Rd Sneads Grove Rd Rea Magnet Rd S Turnpike RdN King StPl a nt RdMcGirts Bridge Rd Lee's Mill Rd Log Cabin Rd Snea ds Gro ve Rd Plant Rd Highland RdN Gill StN Gill St McGirts Bridge Rd Lee's Mill Rd Morris DrHurley Dr Barnes Dr Highland Rd Pr o d u ce Mark et Rd Lee's Mill RdN Wilkinson DrMcGirts Bridge Rd Hig hla n d RdHeck Norton RdHeck Norton RdW Railroad St Elementary I.E. Johnson Hillside 501 15 Ministries Harvest Northview 401 Baptist Grove Union in Christ Church of God Temple Graham's of Prophecy of God Church 401 BYP 401 BUS BUS School Charter Laurinburg 15 BUS 501 Cemetery Elementary Laurinburg North 15 BYP 501 DrWilkinson N 501 15 15 -EY1- POT Sta. 10+00.00 -EY1- POT Sta. 15+40.43 -L- POC Sta. 11+40.96 = 4 5 6 NAD 83/ 2011 EC-02 PROJECT REFERENCE NO.SHEET NO. ENGINEER ROADWAY DESIGN HYDRAULICS ENGINEER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA Temporary Silt Ditch Temporary Diversion Temporary Silt Fence Special Sediment Control Fence Temporary Berms and Slope Drains Silt Basin Type B 1630.03 1630.05 1605.01 1606.01 1622.01 1630.02 1633.01 1633.02 1634.01 Description SymbolStd. # 1636.01 1636.02 Excelsior Matting and Flocculant 1633.03 A B C Stilling Basin Special Stilling Basin Skimmer Basin Tiered Skimmer Basin Infiltration Basin 1634.02 1635.01 1635.02 1630.04 1630.06 1632.01 1632.02 1632.03 Type A Type B Type C 1630.07 1630.08 1630.09 Earthen Dam with Skimmer 1636.03 Rock Inlet Sediment Trap: A B FCW EW 1636.01 1636.01 1636.01 1636.03 Description SymbolStd. # TSD TD Temporary Rock Silt Check Type A Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A with Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Rock Pipe Inlet Sediment Trap Type A Rock Pipe Inlet Sediment Trap Type B CFW Coir Fiber Wattle Check CFW CFW EW EW EW Excelsior Wattle Check Silt Fence Coir Fiber Wattle Break Excelsior Wattle Barrier Coir Fiber Wattle Barrier Silt Fence Excelsior Wattle Break Coir Fiber Wattle Check with Flocculant Excelsior Wattle Check with Flocculant EROSION & SEDIMENT CONTROL LEGEND HE-0013 A A BELOW GRADE WASHOUT STRUCTURE (TYP.) SIDE SLOPE 1:1 10 MIL PLASTIC LINING SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE PLAN SECTION B-B HIGH COHESIVE & LOW FILTRATION SOIL BERM 8"6" 2'-0" HIGH COHESIVE & LOW FILTRATION SOIL BERM (TYP.) 1:1 SIDE SLOPE PLASTIC LINING 10 MIL B B A OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) STRUCTURE WITH LINER ONSITE CONCRETE WASHOUT WASHOUT CONCRETE WASHOUT CONCRETE PLAN NOTING DEVICE (18"X24" MIN.) CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) CLEARLY MARKED SIGNAGE 10'-0" MIN.10'-0" MIN.10'-0" MIN.10'-0" MIN.3'-0" MIN. MIN. 3'-0" CLEARY MARKED WITH SIGNAGE NOTING DEVICE. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE INCHES OF FREEBOARD. ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 75% OF THE STRUCTURES CAPACITY TO PROVIDE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE 1. ACTUAL LOCATION DETERMINED IN FIELD NOTES: CLEARY MARKED WITH SIGNAGE NOTING DEVICE. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE INCHES OF FREEBOARD. ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 75% OF THE STRUCTURES CAPACITY TO PROVIDE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE 1. ACTUAL LOCATION DETERMINED IN FIELD NOTES: EC-2A HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 EXAMPLE OF PUMP-AROUND OPERATION CHANNEL STREAM EXISTING(SEE PROJECT SPECIAL PROVISIONS) IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) SPECIAL STILLING BASIN (SEE PROJECT SPECIAL PROVISIONS) IMPERVIOUS DIKE FLOW FLEXIBLE HOSE TEMPORARY PUMP-AROUND PUMP DEWATERING PUMP the work area. 5) Pumps and hoses shall be of sufficicient size to dewater sheeting, diversion pipes, pumps and hoses. to the work. This includes polyethylene 4) Maintenance of stream flow operations shall be incidental 3) All graded areas shall be stabilized within 24 hours. stream flow when necessary. 2) Impervious dikes are to be used to isolate work from sections of channel. 1) All excavation shall be performed in only dry or isolated NOTES: (SEE PROJECT SPECIAL PROVISIONS) IMPERVIOUS DIKE Clean Water a Special Stilling Basin If Pumping Utilize a Stabilized Outlet Instead of (SEE PROJECT SPECIAL PROVISIONS) SPECIAL STILLING BASIN HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. WITH SEED AND MULCH. 8. REMOVE SPECIAL STILLING BASIN(S) AND BACKFILL. STABILIZE DISTURBED AREA OF THE IMPERVIOUS DIKE(S) FOR EACH DAY'S WORK. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION UPPER AND LOWER EXTENT OF WORK FOR EACH STREAM SEGMENT. THE THE IMPERVIOUS DIKE LOCATIONS AS SHOWN ON THIS SHEET ONLY SHOW THE THE PUMP AROUND AREAS BETWEEN THE IMPERVIOUS DIKES. 7. ALL GRADING AND STABILIZATION MUST BE COMPLETED IN ONE DAY WITHIN TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM IMPERVIOUS DIKES FIRST). OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL 5. PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLANS. BE EQUAL TO ONE DAY'S WORK. APPARATUS. DEWATER ENTRAPPED AREA. AREA TO BE DEWATERED SHALL 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING OPERATIONS FOR STREAM DIVERSION. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 1. INSTALL SPECIAL STILLING BASIN(S). SEQUENCE OF CONSTRUCTION FOR TYPICAL WORK AREA HE-0013 EC-2B SHEET NO.PROJECT REFERENCE NO. EC-3 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SOIL STABILIZATION SUMMARY SHEET HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) MATTING FOR EROSION CONTROL (STRAW) MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER TOTAL SAY LT15+00 15+20 HE-0013 SUBTOTAL for straw SUBTOTAL for excelsior -l- rt13+24 16+00 6454 0 MATTING FOR EROSION CONTROL (STRAW) 30 -sr1- lt13+58 15+50 2254-sr1- rt10+50 13+16 4004-sr1- rt16+00 17+50 3055-sr1- rt23+15 2055-sr1- rt27+50 28+50 1605-sr1- rt18+00 23+405-sr1-1,785 rt24+00 26+695-sr1-805 rt32+90 34+215 105-l- lt28+50 30+005 240-l- lt28+60 29+005 55-sr1- 4,960 6,760 11,720 12,000 SHEET NO.PROJECT REFERENCE NO. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER HE-0013 SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. EC-3A 11/13/2023HE-0013_EC_dsn_psh_04_cg.dgnMEdwards EC-04/CONST.04 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 CONSTRUCTION SHEET 04 EROSION CONTROL FOR CLEARING AND GRUBBING NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT NOTE: CONSTRUCT SPECIAL 2' BASE DITCH DURING CLEARING AND GRUBBING PHASE. STA. 13+24.4 TO 16+00 -SR1- RT. PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. NCDOT BEST MANAGEMENTAREA STABILIZED AND ACCORDING TO INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL NAD 83/ 2011 POC Sta. 24+00.00 - SHEET 5MATCH TO -L- POT Sta. 16+00 - SHEET 5MATCH TO -SR1- 221221221222222222222 222223223223 223 223224224224 224 2242 2 4 224224224225225225 22522 5225225225225 225 225225 225225226226226 226226226226226226226226226 226226226226226227227227227 227227 227227227 227227 227227227 227227227227227 227 2272 2 7 228228 228 228 228228228228228 228 228 228 228228228228228 228 2282282 2 8 228228 228228228228229229229 229229229229 229 2292292292292292 2 9 229229229 229229229229 2 3 0 2 3 0 230230230230230230 230 230 2302302302 3 0230230230230230 230230230230230230 230230231 231 2312312312 3 1 231231231231 231231231231 231232 232 232 2 3 2 2 3 2 232232 232232 232232 2322322 3 2 2 3 2 232232 232232232233 233 233 2 3 3233 233233 233233233 233233 233233233233233 233 233233233233233233234 234234234234 234 234 234234234234234 234234234 234 2342342342342 3 4 2 3 4234234234234 234234234 234 234 2342342342342342342342342342342342 3 4 234234234234234 234234234234234 2 3 4 234234234234234234234234234234234234235 235 235235235 235235235235235235 235235235235 2 3 5 2352352 3 5 235235235235235 2 3 5 235235235235235235235 235235 235235235235 235235235 235235235235235 235235235235236236236236 2362362362362362362 3 6236 237237 237237237237237 2372382 3 8 238 2382382382 3 8 239239 23923924024024024124124224218" RCP 18" RCP 24" RCP 15" RCP 15" RCP 15" RCP 18" RCP24" RCP FOOT BRIDGE72" CHL72" CHL CONC36" CHL36" CHL72" C HL 18" RCP 15" R C P 48" CMP 48" RCP18" RCP BURIED JB LT STEPS 2' WD WALL LT LT CONC G GR STEPS STEPS 1SFD DECK GRGR BST BST 39' BSTSR 1301 (PLANT ROAD) 22' BST LTLTLTLT BSTCONC GR G R S CONC SWING WOODS WOODS WOODS WOODS24" RCPHW CONC 2' WD WALLMON CONC NC 15/501 (ABERDEEN ROAD) 27' BST S SSS METER POWER 72" C HL LA URINB UR G & S O UT HER N R AILR O A D C O MP A N Y 2 3 20 21 23 24 25 NEW WILL LLC JOEL D & REBECCA LUCAS DANIEL A MADDEN CHARLES D NICHOLS CHARLES D NICHOLS 1001 CAROLINE DR LLC JOHN & JEFF SCHWARZ LLC S 88°11'07" W218.72'N 01°48'53" W 103.20' N 39°19'26" W255.67' N 50°45'15" E 366.05' N 39°19'26" W 60.02' S 15°29'09" E199.67' S 15°29'09" E426.27'S 86°05'17" W305.45'EIP EIP EIP S 70°54'32" W399.65' MON CONC EIP 24.85' 80.00' EXISTING R/W EXISTING R/W E XISTIN G R AILR O A D R/WE XISTIN G R AILR O A D R/WE XISTIN G R AILR O A D R/WEXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W MON CONC N 39°23'19" W 60.12' N 50°46'12" E 341.27' S 52°45'46" W448.54' L A U RIN B U R G CIT Y LI MITS LAURI NBURG CI TY LI MI TSEND NOT FOUNDBL-101 BL-102 TTTHHTT CHHTTSEOI EOI EOIEOIEOIEOIAT&T, COPPER, UNK. S PNG, 2", STEEL AT&T, COPPER, UNK. S AT &T, C OPPE R, U N K. S AT&T DUCT BANK SPECTRUM, CONDUIT, UNK. S AT&T, COPPER, UNK. S 12 ", AC P PNG, 2", STEEL 60.00'D B 1561 P G 41 60' E ASE ME NT SCOTLAND COUNTY, 6", PVC 19 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 18 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION 4 RYDER TRUCK R AILR O A D R/WE XISTIN G INV=N/A JB 18" RCP 30" CMP18" CMP 18" RCP 18" R CP GI P A VE D D RIVE -SR1- POT Sta. 10+00.00 -L- POC Sta. 21+52.82= -L- -L- POC Sta. 13+00.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT HE-0013 -DR1- POT Sta. 10+00.00 -L- POC Sta. 15+57.20= 100.00' STORAGE 100.00' TAPER 250.00' DECELERATION15 20-L- PC Sta. 10+00.00 -DR1- PC Sta. 14+79.17 -DR1- PT Sta. 15+66.4212'12'12'12'12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'PS2'PS2'GUTTER EXPRESSWAY PROP. CONC. 11'11' PS2'PS2' 12'12'12' PS 2' PS 2' .003 .003 .00 .01.01 .02.02EXIST.EXIST..02.0212'12'12'PS2'PS2'+40.06(TYP.)19'(TYP.)19'15.02 .02 .01 .01 .00 .02-SR1- PC Sta. 11+85.68 -SR1- PT Sta. 15+79.79 (TYP.) 19'(TYP.)19'15'R 1 4'R10'R 10'R 12' 10' 10'R 68'33'46'20'R20'R(TYP.)(TYP.)(TYP.)(TYP.) +62.30 5 0' R 50'R 2 5'R+42.70 .03 .04 +16.01 +54.46.03.04100' TAPER NOITARELECED '051 12'12'PS2'PS2'12'TAPER 100' +67.31 -DR1- POT Sta. 10+85.00 END CONSTRUCTION EGAROTS '84.26415 -EY1- POT Sta. 10+00.00 -EY1- POT Sta. 15+40.43 -L- POC Sta. 11+40.96 = 63.11' RT +30.67 -EY1- 83.14' RT +19.82 -EY1- 45.00' RT +35.00 -DR1- 61.00' LT +80.00 -DR1- 67.25' LT +67.63 -DR1- 64.00' RT +05.00 -L- 67.80' RT +63.29 -L- EX. R/W +77.66 -L- EX. R/W +81.75 -L- EX. R/W +83.24 -EY1- 102.07' LT +28.48 -L- EX. R/W +19.51 -L- EX. R/W +40.59 -L- 95.73' LT +47.45 -L- 66" RCP-IV FROM STA. 24+00 TO STA. 26+69 -SR1- RT FROM STA. 18+00 TO STA. 23+40 -SR1- RT SEE DETAIL 4-1 SPECIAL 2' BASE DITCH GTD GTD GTD GTD RETAIN RETAIN RETAINRETAINRETAIN REMOVE REMOVE REMOVE REMOVE18"TB 2GI TB 2GI TB 2GI RE MO VE RCP-V 2@48" RETAIN SEE DETAIL 4-7 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET REMOVE 18" RCP-IV 18" RCP-IV SEE DETAIL 4-3 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET RETAIN 3:1 3:1D ( Not to Scale) TAIL DITCH B d FROM STA. 11+82 -L- LT DETAIL 4-6 Ground Natural Ground Natural Geotextile B= 6 Ft. d= 4.0 Ft. Min. D= 4.0 Ft. (TYP) a Minimum of 1ft Tuck Geotextile On Banks Only Type of Liner= CL 'I' Rip-Rap SEE DETAIL 4-6 SLOPE=0.333% EST 240 CY DDE EST 361 SY GF EST 220 TONS ON BANKS ONLY W/CL 'I' RIP RAP TAIL DITCH RETAIN GTD 30" RCP-VCAPA 2@83"X57" d 3:1B D ( Not to Scale) 3:1 FROM STA. 15+30 TO STA. 15+64.5 -L- LT FROM STA. 10+90 TO STA. 12+00 -DR1- LT DETAIL 4-2 Ground Natural Ditch Slope Front Geotextile B=5.0 Ft. d=3.5 Ft. Min. D=3.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 5' BASE DITCH d 3:1B D ( Not to Scale) 3:1 FROM STA. 13+03.7 TO STA. 15+30 -L- LT DETAIL 4-4 Ground Natural B=5.0 Ft. d=3.5 Ft. Min. D=3.5 Ft. SPECIAL 5' BASE DITCH Ditch Slope Front Geotextile Minimum of 1ft (TYP) Tuck Geotextile a On Banks Only Type of Liner= CL 'I' Rip-Rap, Keyed-In SEE DETAIL 4-2 W/CL 'I' RIP RAP EST 537 SY GF EST 329 TONS BASE DITCH SPECIAL 5' SEE DETAIL 4-5 EST 367 SY GF EST 200 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 2' SEE DETAIL 4-4 EST 810 SY GF EST 485 TONS ON BANKS ONLY W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' SEE DETAIL 4-2 EST 124 SY GF EST 88 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' ( Not to Scale) DETAIL 4-3 Ground Natural Ground Natural d* PIPE INLET BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into BANKEXI STI NG BANKEXISTING (MATCH EXTG.) CHANNEL BED STA. 13+48.7 -SR1- LT Est.= 17 Tons Class 'I' Rip-Rap, Keyed-In. d=4.0 Ft. Length=15.0 Ft. Est. 32 SY Geotextile (Variable) Channel Bed (TYP) a Minimum of 1ft Tuck Geotextile (TYP) 2ft RCP-IV 15" d 3:1B D ( Not to Scale) OR FLATTER3:1 FROM STA. 16+46.9 TO STA. 17+44 -L- RT FROM STA. 15+64.5 TO STA. 17+18 -L- LT DETAIL 4-5 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH SEE DETAIL 4-5 EST 210 SY GF EST 126 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 2'Flatter3:1 or D B ( Not to Scale) Flatter3:1 or FROM STA. 13+24.4 TO STA. 16+00 -SR1- RT FROM STA. 10+50 TO STA. 13+16 -SR1- RT FROM STA. 13+57.8 TO STA. 15+50 -SR1- LT FROM STA. 10+50 TO STA. 13+48 -SR1- LT FROM STA. 15+00 TO STA. 15+36.6 -L- RT FROM STA. 10+67 TO 11+25 -DR1- RT DETAIL 4-1 B= 2.0 Ft. Min. D= 1.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' TB 2GI TB 2GI-D ( Not to Scale) Elevation Natural Bed STA. 13+21 -SR1- RT Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 4-7 1.5' Type of Liner= CL 'I' Rip-Rap - Keyed-In, Est. 33 Tons, Est. 52 SY Geotextile Length= 20 Ft. Geotextile* in Locations Directed by Engineer *Place Geotextile Under Riprap HW HW HW HW C F F F F F C F F F F F F F F F F F F F F F F F F F F F CCC C C C C C C C C C C C F C C C F CCCCCCC FCCCC CCC CC C C F F C C C CC CC ID 4.1 2 ft. weir height 8 ft. weir with Orifice Diameter with 0.75 inch 1.5 inch Skimmer D 0401 REMOVE 0 20'10'20' SCALE: 1"=20' 40' NAD 83/ 2011 DIKE #2 IMPERVIOUS DIKE #1 IMPERVIOUS DIKE #3 IMPERVIOUS SEE DETAIL 4-4 ON BANKS ONLY W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' SEE DETAIL 4-6 SLOPE=0.333% ON BANKS ONLY W/CL 'I' RIP RAP TAIL DITCH DDDSEE DETAIL 4-2 W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' 6.) EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. DITCH W/CL 'I' RIP RAP. CONSTRUCT SPECIAL 5' BASE DITCH W/CL 'I' RIP RAP ON BANKS ONLY; AND SPECIAL 5' BASE 5.) CONSTRUCT TAIL DITCH W/CL 'I' RIP RAP; INSTALL 2@48" RCP-V'S AND ASSOCIATED HEADWALL; 4.) REMOVE EXISTING 18" RCP. 3.) INSTALL IMPERVIOUS DIKES #1, #2, AND #3 AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 2.) INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 1.) UTILIZE SPECIAL STILLING BASIN(S) DURING PIPE INSTALLATION. BASIN(S) SPECIAL STILLING D8.) COMPLETE ROADWAY. AND DIVERT FLOW THROUGH 2@48" RCP-V'S. 7.) REMOVE IMPERVIOUS DIKES, ANY REMAINING SPECIAL STILLING BASIN(S), RCP-V 2@48" HYDRAULICS ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. PHASE I HE-0013 ROADWAY DESIGN EC-04A/CONST.04 UT TO LEITH CREEK (JOHNS POND) 2@48" RCP-V'S INSTALLATION SEQUENCE UNDER PLANT RD 0401A 18" R CP 18" RCP 18" RCP 15" R C P 18" RCP BURIED JB LT BST BST SR 1301 (PLANT ROAD) 22' BST LT NC 15/501 (ABERDEEN ROAD) 27' BST S S METER POWER L A URINB UR G & S O UT HE R N R AILR O A D C O MP A N Y EXISTING R/W EXISTING R/W EXISTING R/W BL-101 HHTT CHHTTSEOI EOI EOIEOIAT&T DUCT BANK SPECTRUM, CONDUIT, UNK. S AT&T, COPPER, UNK. S 1 2 ", A C P PNG, 2", STEEL INV=N/A JB 18" RCP 30" CMP-L- POC Sta. 13+00.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT HE-0013 12'12'12'PS2'PS2'11'11' PS2'PS2'EXIST.EXIST.15'R 1 4'R10'R 68'33'2 5'RBURIED 0.8' INV=221.3 HWBURIED 0.8' INV=220.9 C C C C C C C C C CC C F C 0 20'10'20' SCALE: 1"=20' 40' NAD 83/ 2011 DIKE #4 IMPERVIOUS SEE DETAIL 4-4 ON BANKS ONLY W/CL 'I' RIPRAP BASE DITCH SPECIAL 5'DSEE DETAIL 4-2 W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' HYDRAULICS ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. PHASE I HE-0013 ROADWAY DESIGN EC-04B/CONST.04 CAPA 2@83"X57" 0405 SEE DETAIL 4-2 W/CL 'I' RIP RAP BASE DITCH SPECIAL 5' DIKE #5 IMPERVIOUS DBASIN(S) SPECIAL STILLING D UT TO LEITH CREEK (JOHNS POND) 2@83"X57" CAPA'S UNDER -L- STA. 15+96 7.) COMPLETE ROADWAY. 2@83"X57" CAPA'S. 6.) REMOVE IMPERVIOUS DIKES, ANY REMAINING SPECIAL STILLING BASIN(S), AND DIVERT FLOW THROUGH 5.) EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. 4.) INSTALL 2@83"X57" CAPA'S AND CONSTRUCT SPECIAL 5' BASE DITCH W/CL 'I' RIP RAP. 4.) UTILIZE EXISTING 18" RCP FOR PUMP-AROUND OPERATION. 3.) INSTALL IMPERVIOUS DIKES #4 AND #5 AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 2.) INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 1.) UTILIZE SPECIAL STILLING BASIN(S) DURING PIPE INSTALLATION. 0405A 0406A 0406 18" R CP 18" RCP 24" RCP 15" RCP36" CHL36" CHL72" C HL 18" RCP LT GR BST 39' BSTSR 1301 (PLANT ROAD) 22' BST LTLTLTLT 2' WD WALLNC 15/501 (ABERDEEN ROAD) 27' BST S S 24 S 88°11'07" W218.72'EXISTING R/W EXISTING R/W L A U RIN B U R G CIT Y LI MITS BL-101TT EOIEOIEOIAT&T, COPPER, UNK. S PNG, 2", STEEL AT &T, C OPPE R, U N K. S SCOTLAND COUNTY, 6", PVC -L- 100.00' TAPER 250.00' DECELERATION12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'11'11' PS2'PS2'+40.0615'R 1 4'R10'R 10'R 12' 68'33'46'20'R(TYP.)(TYP.)2 5'R-DR1- POT Sta. 10+85.00 END CONSTRUCTION BURIED 1.0' INV=222.3 HW BURIED 1.0' INV=222.3 HW BURIED 1.0' INV=221.9 BURIED 1.0' INV=221.9 C F F F F F C C C C C C C C C C F C C CC F C C C 0 20'10'20' SCALE: 1"=20' 40' NAD 83/ 2011 DIKE #1 IMPERVIOUSD HYDRAULICS ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. PHASE I HE-0013 ROADWAY DESIGN EC-04C/CONST.04 DIKE #2 IMPERVIOUS DBASIN(S) SPECIAL STILLING DUT TO LEITH CREEK (JOHNS POND) 1@66" RCP-IV INSTALLATION SEQUENCE -SR1- STA. 13+34 SEE DETAIL 4-7 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET 0412 66" RCP-IV 0411 SEE DETAIL 4-3 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET 7.) COMPLETE ROADWAY. 1@66" RCP-IV. 6.) REMOVE IMPERVIOUS DIKES, ANY REMAINING SPECIAL STILLING BASIN(S), AND DIVERT FLOW THROUGH 5.) EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. AND PIPE INLET BANK STABILIZATION W/CL 'I' RIP RAP. 4.) INSTALL 1@66" RCP-IV, CONSTRUCT PIPE OUTLET BANK STABILIZATION W/CL 'I' RIP RAP, 3.) INSTALL IMPERVIOUS DIKES #1 AND #2 AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 2.) INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 1.) UTILIZE SPECIAL STILLING BASIN(S) DURING PIPE INSTALLATION. FOOT BRIDGE72" CHL72" CHL 2' WD WALL LT LT CONC G GR STEPS S CONC 20 DANIEL A MADDEN DB 1722 PG 139 N 50°45'15" E S 15°29'09" E199.67' S 15°29'09" E426.27'305.45'MON CONC 22 S 15°29'09" E426.27' INV=226.56' -DR1- PC Sta. 14+79.17 -DR1- PT Sta. 15+66.42 .00.01.01.02(TYP.) 19' (TYP.) 19' .03 .04 +11.46+54.46.03.04100' TAPER 150' DECELERATION NOITARELECED '051 12'12'PS2'PS2'12'TAPER 100' EGAROTS '84.264BURIED 1.0' INV=226.5 HW BURIED 1.0' INV=226.6 FCCCCC F FCC CC CFCC C 11/13/2023HE-0013_EC_dsn_psh_05_cg.dgnMEdwards EC-05/CONST.05 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 CONSTRUCTION SHEET 05 EROSION CONTROL FOR CLEARING AND GRUBBING NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT NAD 83/ 2011 POC Sta. 24+00.00 - SHEET 4MATCH TO -L- POT Sta. 37+00.00 - SHEET 6MATCH TO -L- POT Sta. 16+00 - SHEET 4MATCH TO -SR1- POT Sta. 29+00 - SHEET 6MATCH TO -SR1- 228228228 228228229229229 229229 229229229229 229229229230230230 230230230 230230230230230230230230230230 230230230230230230230230230 230230230230230230 230 2302 3 0 231231231231231 231231231231231231 231 231231231231231231 231 2 3 1231 231 231231231 231231 232232232232232232232 232 232232232232232232 232 232232232232 232232232232232 232232232232232232232 2322332332332332332 3 3 233 233 233233233233 2 3 3 233 233 233 233233233 233233233233233233 233233233 2332332332 3 3 233233233233233233233233233233 233 233 233233 233234 234234234234234 2342342342342342 34234234234 234234234234234 234234234 234234234234234234 234234234234234234 234234234234234234 234234 2342 3 4 2342342342342342342342342342342342342342342342 3 4 234 234234234234 234234234 2342342342342342 3 4 234234 2 3 4 234234234234234 2 3 4 234234234 234234234 2342 3 4 234234234234234234234234234234234234 234 234 234 2342342342342342342342342342342342342342342342 3 42342342342 3 4 234234234234 234234 234234 2 3 4 234234234234234234 2342342342 3 4 234234234234234234 234234234 234 234 234234234 234234234234234234234 234234234234234234234234234234 234 234234234234 234 2342342342342342342342342 3 4 234234234234 234234234234234234234234 234234234234234234235235 235235235235 235 235 235235 235235 235235 235235235235235235235235235235235235235235235235235235235235235235235235235235235235235 235235235235235235235235235235235235235235235235235235235235 2352352352352352352352352 3 5 235 235235 235 2352 3 5 2352352352 35235235235236 236236 236236236 236236236 236 2362362362362362 3 6 236 236236236236236236236236 236236237237 2372372372372 3 7 23823823823823923924" RCP 18" RCP18" RCP18" RCP18" HDPE 12" H DPE 15" RCP AREA UNDER CONSTRUCTIONSOIL36" WD BSTSOILSOIL SOIL WOODS WOODS WOODS WOODS SSS 15" RCP 4 5 6 7 8 18 19 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION N 66°41'14" W32.88'S 82°49'49" W 24.52' N 01°13'24" E 290.16'N 18°48'20" E410.37' EIP MON CONC S 6 2 ° 2 5' 3 2 " W12 3 8. 9 9'S 87°56'02" E383.37'EIP EIP EIP EIP S 88°48'32" W671.78'EXISTING R/W EXISTING R/W EIP MON CONCS 89°09'57" W162.40'N 01°22'06" W 158.84'S 89°09'57" W162.90'0.09' R/W-EIPEIP3.70' R/W-EIPN 46°46'09" W382.62' BL-103 TTEOIPNG, 2", STEEL AT&T, COPPER, UNK. S PNG, 2", STEEL AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S DB 14Z PG 282PIEDMONT NATURAL GAS COMPANY, INC.50.00' SCOTLAND COUNTY, 6", PVC SCOTLAND COUNTY, 6", PVC RYDER TRUCK WESTWOOD ASSOCIATES JAMES SMITH JAMES SMITH WESTWOOD ASSOCIATES 18A DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC S 15°29'09" E426.27' N 01°14'12" W 453.04' 18" RCP FESFES GRAVEL DRGR DRGR DR18" RCP 18" RCP FES FES FES FES DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC INV=224.88'87"x63" CMAPINV=226.24' WITH INV=224.88' PROPOSED 87"X63" CMAP -SR2- POT Sta. 10+00.00 -L- POT Sta. 35+30.58= -SR2- POT Sta. 13+48.42 -SR1- POT Sta. 27+10.13= 100.00' TAPER2530 35250.00' DECELERATION -L- PT Sta. 25+25.29 12'12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'PS2'12'12'12' PS 2' PS 2' 12'12'12' PS 2' PS 2'-SR2-12'12'PS2'PS2'.02.02 .02.02 .02.0212'12'12'PS2'PS2'-L-.02.0212'12'12'PS2'PS2'.02.02+00.872025-SR1- PC Sta. 22+99.74 -SR1- PRC Sta. 24+78.30 -SR1-.00.01.01.02.02.01.01.01.00.00.003.003.00.01.01.02.0212'12'PS2'PS2'12'12'PS2'PS2'(TYP.) 19' (TYP.) 19' (TYP.) 19' (TYP.) 19' -SR1- PT Sta. 26+53.97 23'20'R(TYP.)30'R3 0'R30'R 30'R20' R20'R 27' 26' 20'R 10 'R (TYP.) 40' 18'10'R(TYP.)(TYP.) 1 0'R( T YP.) 9'10'R(TYP.)10' 10'R 55'R200'R 200'R60'R +11.46100' TAPER .02+11.07.03.04.04.04.03.03.02.02.01.01(TYP.)19'.02.03.04(TYP.) 19'+25.51+68.77+80.17150' DECELERATION +79.79NOITARELECED 15'R 9' 100.00' STORAGE -SR2- POT Sta. 13+92.69 END CONSTRUCTION 20'R 135.00' LT +65.00 -SR1- 150.00' LT +90.00 -SR1- 35.00' LT +40.00 -SR1- 35.00' LT +05.00 -SR1- 75.00' RT +00.00 -SR1- 170.00' RT +20.00 -SR1- 160.00' RT +50.00 -SR1- 60.00' RT +50.00 -SR1- 60.00' RT 95.00' RT +90.00 -SR1- 95.00' RT +20.00 -SR1- 60.00' RT +55.00 -SR1- 45.00' LT 35.00' LT +20.00 -SR1- 60.00' LT +50.00 -SR2- 45.00' LT +90.00 -SR1- EX. R/W +95.00 -L-30" RCP-VSEE DETAIL 5-2 SPECIAL 4' BASE DITCH3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 24+00 TO STA. 26+69 -SR1- RT FROM STA. 18+00 TO STA. 23+40 -SR1- RT DETAIL 5-2 B= 4.0 Ft. Min. D= 3.0 Ft. Ground Natural SPECIAL 4' BASE DITCH Slope Ditch Front SEE DETAIL 5-2 SPECIAL 4' BASE DITCH SEE DETAIL 5-2 SPECIAL 4' BASE DITCH SEE DETAIL 5-1 SPECIAL 2' BASE DITCH RETAIN RETAIN RETAIN RETAIN 15" RCP-III RETAIN RE MO VE 18" RCP-III EST 22 SY GF EST 11 TONS CL 'I' RIP RAP 24" RCP-V 30" RCP-IV 24" RCP-IV SEE DETAIL 5-4 SLOPE=8.08% EST 22 CY DDE EST 75 SY GF EST 42 TONS W/CL 'I' RIP RAP HEAD DITCH SEE DETAIL 5-9 EST 327 SY GF EST 102 TONS W/CL 'B' RIP RAP SPECIAL 2' BASE DITCHRETAINDITCH 18" RCP AND CLEANOUT RETAIN AND SEE DETAIL 5-5 SLOPE=1.36% EST 58 SY GF EST 86 CY DDE EST 33 TONS LENGTH=22' W/CL 'I' RIP RAP TAIL DITCH 3:1 3:1D ( Not to Scale) TAIL DITCH B d STA. 20+67 -SR1- LT DETAIL 5-5 Ground Natural Ground Natural Geotextile B= 4 Ft. d= 3 Ft. Min. D= 2.5 Ft. (TYP) a Minimum of 1ft Tuck Geotextile Type of Liner= CL 'I' Rip-Rap SEE DETAIL 5-10 SLOPE=0.28% EST 39 CY DDE HEAD DITCH SEE DETAIL 5-1 BASE DITCH SPECIAL 2' EST 37 CY CHANNEL EXISTING FILL IN EST 270 CY CHANNEL EXISTING FILL IN SEE DETAIL 5-10 SLOPE=0.64% EST 240 CY DDE HEAD DITCH B 3:13:1D ( Not to Scale) HEAD DITCH STA. 23+15 -SR1- RT STA. 17+13 -SR1- RT DETAIL 5-10 B= 3.0 Ft. Min. D= 2.0 Ft. Ground Natural Ground Natural 3:1 3:1D ( Not to Scale) HEAD DITCH B d FROM STA. 29+12.7 -L- LT DETAIL 5-4 Ground Natural Ground Natural Geotextile B= 3 Ft. d= 1.5 Ft. Min. D= 1.5 Ft. (TYP) a Minimum of 1ft Tuck Geotextile Type of Liner= CL 'I' Rip-Rap d 3:1B D ( Not to Scale) OR FLATTER4:1 FROM STA. 35+79.1 TO STA. 37+00 -L- RT DETAIL 5-9 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'B' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH (Variable) Channel Bed (TYP) a Minimum of 1ft Tuck Geotextile (TYP) 2ft SEE DETAIL 5-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 5-1 BASE DITCH SPECIAL 2' BY OTHERS INSTALLED 87"X67" CMPA SEE DETAIL 5-7 EST 155 SY GF EST 85 TONS W/CL 'I' RIP RAP BASE DITCH SPECIAL 2' d 3:1B D ( Not to Scale) OR FLATTER3:1 FROM STA. 34+32.8 TO STA. 34+60.8 -L- RT FROM STA. 34+80 TO STA. 35+00 -L- LT FROM STA. 34+15.5 TO STA. 34+60 -L- LT DETAIL 5-7 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=2.0 Ft. Min. D=2.0 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH ( Not to Scale) DETAIL 5-3 Ground Natural Ground Natural d* PIPE INLET BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into BANKEXI STI NG BANKEXISTING (MATCH EXTG.) CHANNEL BED STA. 21+00 -L- RT d=3.0 Ft. Length=16.0 Ft. SEE DETAIL 5-8 EST 41 SY GF EST 20 TONS W/CL 'I' RIP RAP BANK STABILIZATION ( Not to Scale) STA. 20+67 -L- LT Ground Natural Ground Natural (Variable) CHANNEL BED EXI STI NG BANKd* BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into Keyed-In Est.= 20 Tons of Class 'I' Rip-Rap, d= 4.0 Ft. Length= 33 Ft. 48" RCP-IV SEE DETAIL 5-5 TAIL DITCH DETAIL 5-8 4 8" RCP-I V3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 10+62.6 TO STA. 13+15 -SR2- LT FROM STA. 27+50 TO STA. 28+50 -SR1- RT FROM STA. 16+00 TO STA. 17+50 -SR1- RT FROM STA. 28+60 TO STA. 29+00 -SR1- LT FROM STA. 27+56 TO STA. 28+12 -SR1- LT FROM STA. 28+50 TO STA. 30+00 -L- LT DETAIL 5-1 B= 2.0 Ft. Min. D= 1.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front REMOVE SEE DETAIL 5-6 EST 46 SY GF EST 29 TONS LENGTH=15' W/CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET SEE DETAIL 5-7 EST 87 SY GF EST 50 TONS W/CL 'I' RIP RAP BASE DITCH SPECIAL 2' 18" RCP-III SEE DETAIL 5-11 DITCH SPECIAL 'V'SEE DETAIL 5-11 DITCH SPECIAL 'V' Flatter3:1 or D3:1( Not to Scale) SPECIAL 'V' DITCH FROM STA. 32+90 TO STA. 34+26.3 -L- RT FROM STA. 31+00 TO STA. 32+50 -L- RT DETAIL 5-11 Min. D= 0.6 Ft. Ground Natural Slope Ditch Front SEE DETAIL 5-3 EST 59 SY GF EST 35 TONS LENGTH=18' W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET 15" RCP-V SEE DETAIL 5-1 BASE DITCH SPECIAL 2' ( Not to Scale) Elevation Natural Bed STA. 34+27.6 -L- RT Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 5-6 1.5' Type of Liner= CL 'I' Rip-Rap - Keyed-In Geotextile* in Locations Directed by Engineer *Place Geotextile Under Riprap HW HW F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FFFF F F FCF F F C F F F F F F F F F F F F F F F F F F F F FFC F F C C F F C C C C C C C F C C C C C F C C C C C C C C C C C C C C C CC C C C C C CCCCCC C C C C C F CC C 11/13/2023HE-0013_EC_dsn_psh_06_cg.dgnMEdwards EC-06/CONST.06 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 CONSTRUCTION SHEET 06 EROSION CONTROL FOR CLEARING AND GRUBBING NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT NAD 83/2011 POT Sta. 37+00.00 - SHEET 5MATCH TO -L- POT Sta. 29+00 - SHEET 5MATCH TO -SR1- 233 233 234234 234234234234 234 234234234 234234234234234 234 234234234234 2342342342342342342342342 3 4 234 234234234 2342342 3 4 234 234234234234234235235235235235 235235 235235235235235235235235235 2352 3 5 2352352352352352 3 5 235235235 235 235235235235235235 235 235235235 235235235 235235236236236236236236236236236236236236236236 236 236236236236236236236236 236236236236237237 23723715" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 18" RCP AREA UNDER CONSTRUCTION SOIL 9' GR10' GRNC 15/501 (ABERDEEN ROAD) 27' BST 9' GR9' GR9' GR12' SOILWOODS EIP EIP EIP 9 10 1112 13 14 15 16 17 18A 150.00'1.31' R/W-EIP1.77' R/W-EIPN 51°04'03" W126.11'N 88°10'51" W288.35'S 88°47'14" W166.93'N 34°18'13" E 45.98'N 34°18'13" E 244.83'N 34°18'13" E 175.58'N 34°18'13" E 99.27' S 5 7°0 8'50" W310.48'N 6 7 ° 1 3' 5 6 " E1 0 1. 7 2' N 01°14'12" W 453.04'N 6 7 ° 1 4' 5 8 " E2 7 5. 3 0'0.70' R/W-EIPS 62°13'03" E898.03'N 82°50'18" W551.17'EIP EIP EIPN 76°14'47" E129.44' EIP EXISTING R/W EXISTING R/W N 01°22'06" W 88.91'N 89°09'52" E163.18'N 51°04'03" W662.39'N 75°51'11" W226.64'N 83°04'03" W447.88'S 88°47'36" W274.55'S 88°47'14" W301.24'S 88°47'14" W131.89'N 01°12'46" W 200.00'24.18'BL-104 BL-105 TTTPNG, 2", STEELPNG, 2", STEEL AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S15' SOILN 34°18'13" E 227.17' 70.00' 70.00'MB 12 PG 362PIEDMONT NATURAL GAS COMPANY, INC.MB 12 PG 362PIEDMONT NATURAL GAS COMPANY, INC.SCOTLAND COUNTY, 6", PVC SCOTLAND COUNTY, 6", PVC 50.00'PER CITY OF LAURINBURG UTILITIES DIRECTOR50' UTILITY EASEMENTCRAIG & DIANE VAN PELT PHILIP H MCRAE WALTER & GAIL MCRAE WALTER & GAIL MCRAE ROBIN S OSWALD SAMUEL E & ELEANOR SNEAD WALTER & GAIL MCRAE WALTER & GAIL MCRAE WALTER & GAIL MCRAE DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 18 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 8 JAMES SMITH 6 WESTWOOD ASSOCIATES CONC FLOOR FES FES 18" RCP -L- -L- POT Sta. 43+00.00 END CONSTRUCTION END TIP PROJECT HE-00134045 12'12'12'12'12'PS2'PS2'PS2'-L- POT Sta. 49+69.02 3015 12'PS2'12'PS2'.02.0212'12'12'PS2'PS2'.02.02EXIST.EXIST.300' TRANSITION +50.12PS2'30-SR1- -SR1- POT Sta. 31+37.46 -SR1- POT Sta. 30+57.32 END CONSTRUCTION30'R15'R(TYP.) 12' 98' 97'30'R(TYP.) 14'10'R30'R 45.00' LT 35.00' LT +20.00 -SR1- 15" RCP CLEANOUT RETAIN AND SEE DETAIL 6-1 SPECIAL 2' BASE DITCH ELEV=233.1 18" RCP FES TIE TO EXISTING RETAIN RETAIN RETAIN RETAIN RETAIN RETAINRETAINRETAIN3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 38+57.2 TO STA. 40+00 -L- RT DETAIL 6-1 B= 2.0 Ft. Min. D= 2.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front d 3:1B D ( Not to Scale) OR FLATTER4:1 FROM STA. 37+00 TO STA. 37+18 -L- RT DETAIL 5-9 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'B' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH SEE DETAIL 5-9 EST 327 SY GF EST 102 TONS W/CL 'B' RIP RAP SPECIAL 2' BASE DITCH F F F F F F F F F F F F F F F F F F CF F F F F F C F C C C F F F C C 11/13/2023HE-0013_EC_dsn_psh_07_fg.dgnMEdwards EC-07/CONST.04 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 CONSTRUCTION SHEET 04 EROSION CONTROL FOR FINAL GRADING NOTE: IMPOUNDMENT OF RUNOFF IN ROADWAY OPEN TO TRAFFIC. ROCK INLET SEDIMENT TRAPS, TYPE-C AS DIRECTED TO AVOID UTILIZE FABRIC INSERT INLET PROTECTION DEVICES IN LIEU OF NAD 83/ 2011 POC Sta. 24+00.00 - SHEET 5MATCH TO -L- POT Sta. 16+00 - SHEET 5MATCH TO -SR1- 18" RCP 18" RCP 24" RCP 15" RCP 15" RCP 15" RCP 18" RCP24" RCP FOOT BRIDGE72" CHL72" CHL CONC36" CHL36" CHL72" C HL 18" RCP 15" R C P 48" CMP 48" RCP18" RCP BURIED JB LT STEPS 2' WD WALL LT LT CONC G GR STEPS STEPS 1SFD DECK GRGR BST BST 39' BSTSR 1301 (PLANT ROAD) 22' BST LTLTLTLT BSTCONC GR G R S CONC SWING WOODS WOODS WOODS WOODS24" RCPHW CONC 2' WD WALLMON CONC NC 15/501 (ABERDEEN ROAD) 27' BST S SSS METER POWER 72" C HL LA URINB UR G & S O UT HER N R AILR O A D C O MP A N Y 2 3 20 21 23 24 25 NEW WILL LLC JOEL D & REBECCA LUCAS DANIEL A MADDEN CHARLES D NICHOLS CHARLES D NICHOLS 1001 CAROLINE DR LLC JOHN & JEFF SCHWARZ LLC S 88°11'07" W218.72'N 01°48'53" W 103.20' N 39°19'26" W255.67' N 50°45'15" E 366.05' N 39°19'26" W 60.02' S 15°29'09" E199.67' S 15°29'09" E426.27'S 86°05'17" W305.45'EIP EIP EIP S 70°54'32" W399.65' MON CONC EIP 24.85' 80.00' EXISTING R/W EXISTING R/W E XISTIN G R AILR O A D R/WE XISTIN G R AILR O A D R/WE XISTIN G R AILR O A D R/WEXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W MON CONC N 39°23'19" W 60.12' N 50°46'12" E 341.27' S 52°45'46" W448.54' L A U RIN B U R G CIT Y LI MITS LAURI NBURG CI TY LI MI TSEND NOT FOUNDBL-101 BL-102 TTTHHTT CHHTTSEOI EOI EOIEOIEOIEOIAT&T, COPPER, UNK. S PNG, 2", STEEL AT&T, COPPER, UNK. S AT &T, C OPPE R, U N K. S AT&T DUCT BANK SPECTRUM, CONDUIT, UNK. S AT&T, COPPER, UNK. S 12 ", AC P PNG, 2", STEEL 60.00'D B 1561 P G 41 60' E ASE ME NT SCOTLAND COUNTY, 6", PVC 19 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 18 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION 4 RYDER TRUCK R AILR O A D R/WE XISTIN G INV=N/A JB 18" RCP 30" CMP18" CMP INV=226.56' INV=225.95' 18" RCP 18" R CP GI P A VE D D RIVE -SR1- POT Sta. 10+00.00 -L- POC Sta. 21+52.82= -L- -L- POC Sta. 13+00.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT HE-0013 -DR1- POT Sta. 10+00.00 -L- POC Sta. 15+57.20= 100.00' STORAGE 100.00' TAPER 250.00' DECELERATION15 20-L- PC Sta. 10+00.00 -DR1- PC Sta. 14+79.17 -DR1- PT Sta. 15+66.4212'12'12'12'12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'PS2'PS2'GUTTER EXPRESSWAY PROP. CONC. 11'11' PS2'PS2' 12'12'12' PS 2' PS 2' .003 .003 .00 .01.01 .02.02EXIST.EXIST..02.0212'12'12'PS2'PS2'+40.06(TYP.)19'(TYP.)19'15.02 .02 .01 .01 .00 .02-SR1- PC Sta. 11+85.68 -SR1- PT Sta. 15+79.79 (TYP.) 19'(TYP.)19'15'R 1 4'R10'R 10'R 12' 10' 10'R 68'33'46'20'R20'R(TYP.)(TYP.)(TYP.)(TYP.) +62.30 5 0' R 50'R 2 5'R+42.70 .03 .04 +16.01 +54.46.03.04100' TAPER NOITARELECED '051 12'12'PS2'PS2'12'TAPER 100' +67.31 -DR1- POT Sta. 10+85.00 END CONSTRUCTION EGAROTS '84.26415 -EY1- POT Sta. 10+00.00 -EY1- POT Sta. 15+40.43 -L- POC Sta. 11+40.96 = 63.11' RT +30.67 -EY1- 83.14' RT +19.82 -EY1- 45.00' RT +35.00 -DR1- 61.00' LT +80.00 -DR1- 67.25' LT +67.63 -DR1- 64.00' RT +05.00 -L- 67.80' RT +63.29 -L- EX. R/W +77.66 -L- EX. R/W +81.75 -L- EX. R/W +83.24 -EY1- 102.07' LT +28.48 -L- EX. R/W +19.51 -L- EX. R/W +40.59 -L- 95.73' LT +47.45 -L- 66" RCP-IV FROM STA. 24+00 TO STA. 26+69 -SR1- RT FROM STA. 18+00 TO STA. 23+40 -SR1- RT SEE DETAIL 4-1 SPECIAL 2' BASE DITCH GTD GTD GTD GTD RETAIN RETAIN RETAINRETAINRETAIN REMOVE REMOVE REMOVE REMOVE18"TB 2GI TB 2GI TB 2GI RE MO VE RCP-V 2@48" RETAIN SEE DETAIL 4-7 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET REMOVE 18" RCP-IV 18" RCP-IV SEE DETAIL 4-3 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET RETAIN 3:1 3:1D ( Not to Scale) TAIL DITCH B d FROM STA. 11+82 -L- LT DETAIL 4-6 Ground Natural Ground Natural Geotextile B= 6 Ft. d= 4.0 Ft. Min. D= 4.0 Ft. (TYP) a Minimum of 1ft Tuck Geotextile On Banks Only Type of Liner= CL 'I' Rip-Rap SEE DETAIL 4-6 SLOPE=0.333% EST 240 CY DDE EST 361 SY GF EST 220 TONS ON BANKS ONLY W/CL 'I' RIP RAP TAIL DITCH RETAIN GTD 30" RCP-VCAPA 2@83"X57" d 3:1B D ( Not to Scale) 3:1 FROM STA. 15+30 TO STA. 15+64.5 -L- LT FROM STA. 10+90 TO STA. 12+00 -DR1- LT DETAIL 4-2 Ground Natural Ditch Slope Front Geotextile B=5.0 Ft. d=3.5 Ft. Min. D=3.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 5' BASE DITCH d 3:1B D ( Not to Scale) 3:1 FROM STA. 13+03.7 TO STA. 15+30 -L- LT DETAIL 4-4 Ground Natural B=5.0 Ft. d=3.5 Ft. Min. D=3.5 Ft. SPECIAL 5' BASE DITCH Ditch Slope Front Geotextile Minimum of 1ft (TYP) Tuck Geotextile a On Banks Only Type of Liner= CL 'I' Rip-Rap, Keyed-In SEE DETAIL 4-2 W/CL 'I' RIP RAP EST 537 SY GF EST 329 TONS BASE DITCH SPECIAL 5' SEE DETAIL 4-5 EST 367 SY GF EST 200 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 2' SEE DETAIL 4-4 EST 810 SY GF EST 485 TONS ON BANKS ONLY W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' SEE DETAIL 4-2 EST 124 SY GF EST 88 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' ( Not to Scale) DETAIL 4-3 Ground Natural Ground Natural d* PIPE INLET BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into BANKEXI STI NG BANKEXISTING (MATCH EXTG.) CHANNEL BED STA. 13+48.7 -SR1- LT Est.= 17 Tons Class 'I' Rip-Rap, Keyed-In. d=4.0 Ft. Length=15.0 Ft. Est. 32 SY Geotextile (Variable) Channel Bed (TYP) a Minimum of 1ft Tuck Geotextile (TYP) 2ft RCP-IV 15" d 3:1B D ( Not to Scale) OR FLATTER3:1 FROM STA. 16+46.9 TO STA. 17+44 -L- RT FROM STA. 15+64.5 TO STA. 17+18 -L- LT DETAIL 4-5 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH SEE DETAIL 4-5 EST 210 SY GF EST 126 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 2'Flatter3:1 or D B ( Not to Scale) Flatter3:1 or FROM STA. 13+24.4 TO STA. 16+00 -SR1- RT FROM STA. 10+50 TO STA. 13+16 -SR1- RT FROM STA. 13+57.8 TO STA. 15+50 -SR1- LT FROM STA. 10+50 TO STA. 13+48 -SR1- LT FROM STA. 15+00 TO STA. 15+36.6 -L- RT FROM STA. 10+67 TO 11+25 -DR1- RT DETAIL 4-1 B= 2.0 Ft. Min. D= 1.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' TB 2GI TB 2GI-D ( Not to Scale) Elevation Natural Bed STA. 13+21 -SR1- RT Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 4-7 1.5' Type of Liner= CL 'I' Rip-Rap - Keyed-In, Est. 33 Tons, Est. 52 SY Geotextile Length= 20 Ft. Geotextile* in Locations Directed by Engineer *Place Geotextile Under Riprap HW HW HW HW C F F F F F C F F F F F F F F F F F F F F F F F F F F F CCC C C C C C C C C C C C F C C C F CCCCCCC FCCCC CCC CC C C F F C C C CC CC CC C C C ID 4.1 2 ft. weir height 8 ft. weir with Orifice Diameter with 0.75 inch 1.5 inch Skimmer D 11/13/2023HE-0013_EC_dsn_psh_08_fg.dgnMEdwards EC-08/CONST.05 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 CONSTRUCTION SHEET 05 EROSION CONTROL FOR FINAL GRADING NAD 83/ 2011 POC Sta. 24+00.00 - SHEET 4MATCH TO -L- POT Sta. 37+00.00 - SHEET 6MATCH TO -L- POT Sta. 16+00 - SHEET 4MATCH TO -SR1- POT Sta. 29+00 - SHEET 6MATCH TO -SR1- 24" RCP 18" RCP18" RCP18" RCP18" HDPE 12" H DPE 15" RCP AREA UNDER CONSTRUCTIONSOIL36" WD BSTSOILSOIL SOIL WOODS WOODS WOODS WOODS SSS 15" RCP 4 5 6 7 8 18 19 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION N 66°41'14" W32.88'S 82°49'49" W 24.52' N 01°13'24" E 290.16'N 18°48'20" E410.37' EIP MON CONC S 6 2 ° 2 5' 3 2 " W12 3 8. 9 9'S 87°56'02" E383.37'EIP EIP EIP EIP S 88°48'32" W671.78'EXISTING R/W EXISTING R/W EIP MON CONCS 89°09'57" W162.40'N 01°22'06" W 158.84'S 89°09'57" W162.90'0.09' R/W-EIPEIP3.70' R/W-EIPN 46°46'09" W382.62' BL-103 TTEOIPNG, 2", STEEL AT&T, COPPER, UNK. S PNG, 2", STEEL AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S DB 14Z PG 282PIEDMONT NATURAL GAS COMPANY, INC.50.00' SCOTLAND COUNTY, 6", PVC SCOTLAND COUNTY, 6", PVC RYDER TRUCK WESTWOOD ASSOCIATES JAMES SMITH JAMES SMITH WESTWOOD ASSOCIATES 18A DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC S 15°29'09" E426.27' N 01°14'12" W 453.04' 18" RCP FESFES GRAVEL DRGR DRGR DR18" RCP 18" RCP FES FES FES FES DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC INV=224.88'87"x63" CMAPINV=226.24' WITH INV=224.88' PROPOSED 87"X63" CMAP -SR2- POT Sta. 10+00.00 -L- POT Sta. 35+30.58= -SR2- POT Sta. 13+48.42 -SR1- POT Sta. 27+10.13= 100.00' TAPER2530 35250.00' DECELERATION -L- PT Sta. 25+25.29 12'12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'PS2'12'12'12' PS 2' PS 2' 12'12'12' PS 2' PS 2'-SR2-12'12'PS2'PS2'.02.02 .02.02 .02.0212'12'12'PS2'PS2'-L-.02.0212'12'12'PS2'PS2'.02.02+00.872025-SR1- PC Sta. 22+99.74 -SR1- PRC Sta. 24+78.30 -SR1-.00.01.01.02.02.01.01.01.00.00.003.003.00.01.01.02.0212'12'PS2'PS2'12'12'PS2'PS2'(TYP.) 19' (TYP.) 19' (TYP.) 19' (TYP.) 19' -SR1- PT Sta. 26+53.97 23'20'R(TYP.)30'R3 0'R30'R 30'R20' R20'R 27' 26' 20'R 10 'R (TYP.) 40' 18'10'R(TYP.)(TYP.) 1 0'R( T YP.) 9'10'R(TYP.)10' 10'R 55'R200'R 200'R60'R +11.46100' TAPER .02+11.07.03.04.04.04.03.03.02.02.01.01(TYP.)19'.02.03.04(TYP.) 19'+25.51+68.77+80.17150' DECELERATION +79.79NOITARELECED 15'R 9' 100.00' STORAGE -SR2- POT Sta. 13+92.69 END CONSTRUCTION 20'R 135.00' LT +65.00 -SR1- 150.00' LT +90.00 -SR1- 35.00' LT +40.00 -SR1- 35.00' LT +05.00 -SR1- 75.00' RT +00.00 -SR1- 170.00' RT +20.00 -SR1- 160.00' RT +50.00 -SR1- 60.00' RT +50.00 -SR1- 60.00' RT 95.00' RT +90.00 -SR1- 95.00' RT +20.00 -SR1- 60.00' RT +55.00 -SR1- 45.00' LT 35.00' LT +20.00 -SR1- 60.00' LT +50.00 -SR2- 45.00' LT +90.00 -SR1- EX. R/W +95.00 -L-30" RCP-VSEE DETAIL 5-2 SPECIAL 4' BASE DITCH3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 24+00 TO STA. 26+69 -SR1- RT FROM STA. 18+00 TO STA. 23+40 -SR1- RT DETAIL 5-2 B= 4.0 Ft. Min. D= 3.0 Ft. Ground Natural SPECIAL 4' BASE DITCH Slope Ditch Front SEE DETAIL 5-2 SPECIAL 4' BASE DITCH SEE DETAIL 5-2 SPECIAL 4' BASE DITCH SEE DETAIL 5-1 SPECIAL 2' BASE DITCH RETAIN RETAIN RETAIN RETAIN 15" RCP-III RETAIN RE MO VE 18" RCP-III EST 22 SY GF EST 11 TONS CL 'I' RIP RAP 24" RCP-V 30" RCP-IV 24" RCP-IV SEE DETAIL 5-4 SLOPE=8.08% EST 22 CY DDE EST 75 SY GF EST 42 TONS W/CL 'I' RIP RAP HEAD DITCH SEE DETAIL 5-9 EST 327 SY GF EST 102 TONS W/CL 'B' RIP RAP SPECIAL 2' BASE DITCHRETAINDITCH 18" RCP AND CLEANOUT RETAIN AND SEE DETAIL 5-5 SLOPE=1.36% EST 58 SY GF EST 86 CY DDE EST 33 TONS LENGTH=22' W/CL 'I' RIP RAP TAIL DITCH 3:1 3:1D ( Not to Scale) TAIL DITCH B d STA. 20+67 -SR1- LT DETAIL 5-5 Ground Natural Ground Natural Geotextile B= 4 Ft. d= 3 Ft. Min. D= 2.5 Ft. (TYP) a Minimum of 1ft Tuck Geotextile Type of Liner= CL 'I' Rip-Rap SEE DETAIL 5-10 SLOPE=0.28% EST 39 CY DDE HEAD DITCH SEE DETAIL 5-1 BASE DITCH SPECIAL 2' EST 37 CY CHANNEL EXISTING FILL IN EST 270 CY CHANNEL EXISTING FILL IN SEE DETAIL 5-10 SLOPE=0.64% EST 240 CY DDE HEAD DITCH B 3:13:1D ( Not to Scale) HEAD DITCH STA. 23+15 -SR1- RT STA. 17+13 -SR1- RT DETAIL 5-10 B= 3.0 Ft. Min. D= 2.0 Ft. Ground Natural Ground Natural 3:1 3:1D ( Not to Scale) HEAD DITCH B d FROM STA. 29+12.7 -L- LT DETAIL 5-4 Ground Natural Ground Natural Geotextile B= 3 Ft. d= 1.5 Ft. Min. D= 1.5 Ft. (TYP) a Minimum of 1ft Tuck Geotextile Type of Liner= CL 'I' Rip-Rap d 3:1B D ( Not to Scale) OR FLATTER4:1 FROM STA. 35+79.1 TO STA. 37+00 -L- RT DETAIL 5-9 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'B' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH (Variable) Channel Bed (TYP) a Minimum of 1ft Tuck Geotextile (TYP) 2ft SEE DETAIL 5-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 5-1 BASE DITCH SPECIAL 2' BY OTHERS INSTALLED 87"X67" CMPA SEE DETAIL 5-7 EST 155 SY GF EST 85 TONS W/CL 'I' RIP RAP BASE DITCH SPECIAL 2' d 3:1B D ( Not to Scale) OR FLATTER3:1 FROM STA. 34+32.8 TO STA. 34+60.8 -L- RT FROM STA. 34+80 TO STA. 35+00 -L- LT FROM STA. 34+15.5 TO STA. 34+60 -L- LT DETAIL 5-7 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=2.0 Ft. Min. D=2.0 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH ( Not to Scale) DETAIL 5-3 Ground Natural Ground Natural d* PIPE INLET BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into BANKEXI STI NG BANKEXISTING (MATCH EXTG.) CHANNEL BED STA. 21+00 -L- RT d=3.0 Ft. Length=16.0 Ft. SEE DETAIL 5-8 EST 41 SY GF EST 20 TONS W/CL 'I' RIP RAP BANK STABILIZATION ( Not to Scale) STA. 20+67 -L- LT Ground Natural Ground Natural (Variable) CHANNEL BED EXI STI NG BANKd* BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into Keyed-In Est.= 20 Tons of Class 'I' Rip-Rap, d= 4.0 Ft. Length= 33 Ft. 48" RCP-IV SEE DETAIL 5-5 TAIL DITCH DETAIL 5-8 4 8" RCP-I V3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 10+62.6 TO STA. 13+15 -SR2- LT FROM STA. 27+50 TO STA. 28+50 -SR1- RT FROM STA. 16+00 TO STA. 17+50 -SR1- RT FROM STA. 28+60 TO STA. 29+00 -SR1- LT FROM STA. 27+56 TO STA. 28+12 -SR1- LT FROM STA. 28+50 TO STA. 30+00 -L- LT DETAIL 5-1 B= 2.0 Ft. Min. D= 1.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front REMOVE SEE DETAIL 5-6 EST 46 SY GF EST 29 TONS LENGTH=15' W/CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET SEE DETAIL 5-7 EST 87 SY GF EST 50 TONS W/CL 'I' RIP RAP BASE DITCH SPECIAL 2' 18" RCP-III SEE DETAIL 5-11 DITCH SPECIAL 'V'SEE DETAIL 5-11 DITCH SPECIAL 'V' Flatter3:1 or D3:1( Not to Scale) SPECIAL 'V' DITCH FROM STA. 32+90 TO STA. 34+26.3 -L- RT FROM STA. 31+00 TO STA. 32+50 -L- RT DETAIL 5-11 Min. D= 0.6 Ft. Ground Natural Slope Ditch Front SEE DETAIL 5-3 EST 59 SY GF EST 35 TONS LENGTH=18' W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET 15" RCP-V SEE DETAIL 5-1 BASE DITCH SPECIAL 2' ( Not to Scale) Elevation Natural Bed STA. 34+27.6 -L- RT Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 5-6 1.5' Type of Liner= CL 'I' Rip-Rap - Keyed-In Geotextile* in Locations Directed by Engineer *Place Geotextile Under Riprap HW HW F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FFFF F F FCF F F C F F F F F F F F F F F F F F F F F F F F FFC F F C C F F C C C C C C C F C C C C C F C C C C C C C C C C C C C C C CC C C C C C CCCCCC C C C C C F CC C D DB ID 5.1 2.75 ft. weir height 13 ft. weir with Orifice Diameter with 0.875 inch 1.5 inch Skimmer ID 5.2 2.75 ft. weir height 15 ft. weir with Orifice Diameter with 0.75 inch 1.5 inch Skimmer 11/13/2023HE-0013_EC_dsn_psh_09_fg.dgnMEdwards EC-09/CONST.06 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HE-0013 CONSTRUCTION SHEET 06 EROSION CONTROL FOR FINAL GRADING NAD 83/2011 POT Sta. 37+00.00 - SHEET 5MATCH TO -L- POT Sta. 29+00 - SHEET 5MATCH TO -SR1- 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 18" RCP AREA UNDER CONSTRUCTION SOIL 9' GR10' GRNC 15/501 (ABERDEEN ROAD) 27' BST 9' GR9' GR9' GR12' SOILWOODS EIP EIP EIP 9 10 1112 13 14 15 16 17 18A 150.00'1.31' R/W-EIP1.77' R/W-EIPN 51°04'03" W126.11'N 88°10'51" W288.35'S 88°47'14" W166.93'N 34°18'13" E 45.98'N 34°18'13" E 244.83'N 34°18'13" E 175.58'N 34°18'13" E 99.27' S 5 7°0 8'50" W310.48'N 6 7 ° 1 3' 5 6 " E1 0 1. 7 2' N 01°14'12" W 453.04'N 6 7 ° 1 4' 5 8 " E2 7 5. 3 0'0.70' R/W-EIPS 62°13'03" E898.03'N 82°50'18" W551.17'EIP EIP EIPN 76°14'47" E129.44' EIP EXISTING R/W EXISTING R/W N 01°22'06" W 88.91'N 89°09'52" E163.18'N 51°04'03" W662.39'N 75°51'11" W226.64'N 83°04'03" W447.88'S 88°47'36" W274.55'S 88°47'14" W301.24'S 88°47'14" W131.89'N 01°12'46" W 200.00'24.18'BL-104 BL-105 TTTPNG, 2", STEELPNG, 2", STEEL AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S15' SOILN 34°18'13" E 227.17' 70.00' 70.00'MB 12 PG 362PIEDMONT NATURAL GAS COMPANY, INC.MB 12 PG 362PIEDMONT NATURAL GAS COMPANY, INC.SCOTLAND COUNTY, 6", PVC SCOTLAND COUNTY, 6", PVC 50.00'PER CITY OF LAURINBURG UTILITIES DIRECTOR50' UTILITY EASEMENTCRAIG & DIANE VAN PELT PHILIP H MCRAE WALTER & GAIL MCRAE WALTER & GAIL MCRAE ROBIN S OSWALD SAMUEL E & ELEANOR SNEAD WALTER & GAIL MCRAE WALTER & GAIL MCRAE WALTER & GAIL MCRAE DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 18 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 8 JAMES SMITH 6 WESTWOOD ASSOCIATES CONC FLOOR FES FES 18" RCP -L- -L- POT Sta. 43+00.00 END CONSTRUCTION END TIP PROJECT HE-00134045 12'12'12'12'12'PS2'PS2'PS2'-L- POT Sta. 49+69.02 3015 12'PS2'12'PS2'.02.0212'12'12'PS2'PS2'.02.02EXIST.EXIST.300' TRANSITION +50.12PS2'30-SR1- -SR1- POT Sta. 31+37.46 -SR1- POT Sta. 30+57.32 END CONSTRUCTION30'R15'R(TYP.) 12' 98' 97'30'R(TYP.) 14'10'R30'R 45.00' LT 35.00' LT +20.00 -SR1- 15" RCP CLEANOUT RETAIN AND SEE DETAIL 6-1 SPECIAL 2' BASE DITCH ELEV=233.1 18" RCP FES TIE TO EXISTING RETAIN RETAIN RETAIN RETAIN RETAIN RETAINRETAINRETAIN3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 38+57.2 TO STA. 40+00 -L- RT DETAIL 6-1 B= 2.0 Ft. Min. D= 2.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front d 3:1B D ( Not to Scale) OR FLATTER4:1 FROM STA. 37+00 TO STA. 37+18 -L- RT DETAIL 5-9 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'B' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH SEE DETAIL 5-9 EST 327 SY GF EST 102 TONS W/CL 'B' RIP RAP SPECIAL 2' BASE DITCH F F F F F F F F F F F F F F F F F F CF F F F F F C F C C C F F F C C