HomeMy WebLinkAbout20150122 Ver 1_DCM Permit_20150413,... .....-0,,� .....................
Permit Class Permit Number
NEW 47 -15
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and D
Coastal Resources Commission
ermit
for
X Major Development in an Area of Environment of p�
pursuant to NCGS I I3A -118
Excavation and/or filling pursuant to NCGS 113 -229
Issued to River Forest Partners, LLC., 738 East Main Street, Belhaven, NC 27810
APR 13 2015
Authorizing development in Beaufort County adi. to PunRo Creek, at 738 East Main Street, in
the Town of Belhaven , as requested in the permittee's application dated 115115, including the
attached workplan drawings (1), dated revised 115115.
This permit, issued on _April 6. 2015 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Marina
1) Prior to the occupancy of any new slips authorized under this permit, the existing marina pumpout
sewage disposal facility shall be repaired/replaced or otherwise be in working condition. The
pumpout shall be operable and maintained for the life of the marina.
2) Unless specifically altered herein, this permit authorizes only the reconfiguration and replacement of
the previously authorized marina facility and uses located in or over the water that are expressly and
specifically set forth in the permit application. No other structure, whether floating or stationary,
shall become a permanent part of this marina facility without permit modification. No non -water
dependent uses of structures may be conducted on, in or over public trust waters without permit
modification.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on -site to Department �C
personnel when the project is inspected for compliance. '
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
) W
LBraxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
x
Y
Signature of Permittee
...:::...:.............:. ........:.:.»c.:.............:: :.....:.......: .ao-roat�aoaaotv�,ro-�oa;r�,w -+.t - .00-�; -. wtc...,...... ............,�,,... .......
,...,
River Forest Partners, LLC. Permit # 47 -15
Page 2 of 2
ADDITIONAL CONDITIONS
3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
4) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
5) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee will not be entitled to compensation for damage to the authorized structure or work, or injury
Y which may be caused from existing or future operations undertaken by the United States in the public
s interest.
Y
v
6)
7)
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
This permit authorizes 10 additional slips for a total 31 formalized boat slips.
General
8) The permittee understands and agrees that, 'if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
10) The permittee and/or contractor shall meet with a representative of the Division of Coastal Management
prior to project initiation in order to discuss the conditions set forth in this permit.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946 -6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many development or
land disturbing activities are not allowed within the Environmental Management Commission's
Tar Pamlico River Basin. Contact a representative of the Division of Water Resources at (252)
946 -6481 for more information concerning allowable uses within the Tar Pamlico River Buffer.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW- 201500214.
:.........:
.:...:......:......:.........................:...:...... ..............,�:�:,
3:
z