Loading...
HomeMy WebLinkAbout20150125 Ver 1_DCM Permit_20150413Permit Class NEW .. ........................ Permit Number 45 -15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and n� " Coastal _Resources Commission r r mit for X Major Development in an Area of Er pursuant to NCGS 113A -118 - Excavation and/or filling pursuant to NCGS 113 -229 Issued to Roger Teague, 32 Pelican Drive, Wrightsville Beach, NC 28480 APR 13 2015 Authorizing development in New Hanover County at adi. to Banks Channel and Greenville Sound, 12 Corbett Road, Wr gh_tsville Beach, as requested in the permittee's application dated 12/26/14, incl:g_ the attached workman drawings (3).2 dated 12/26/14 and 1 dated received in the MHC office on 1/29/15 This permit, issued on April 1.2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facilitv 1) Unless specifically altered herein, this permit authorizes the docks, piers, boatlifts and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance.: Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. V (/ B Eton C. Davis, Director /Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Roger Teague Permit #45 -15 Page 2 of 3 ADDITIONAL, CONDITIONS 3), '. .No portion of the authorized docking facility shall exceed the established pier head line. 4) ' No' attempt•shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or, adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred-to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which -may be caused from existing -or future operations undertaken by the .United States in the.public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) This permit authorizes 2 additional formalized boatslips for a total of 4 formalized boat slips in association with this docking facility. Armv Corps of Engineers Conditions 9) An as built survey of the authorized structure shall be provided to the US Army Corps of Engineers. General 10) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause x: unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon Y due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 11) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, without permit modification. 12) - This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 13) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. .,. .................... .......mss. ....... ........ ..................................... ............................... .. i ....................... ....... .............,.............. Roger Teague Permit #45 -15 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796 -7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water k dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project No. 15 -0125. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 2015- 00395, which was issued on 3/6/15. r NOTE: An application processing fee of $250 was received by DCM for this project. ""'-0-0 -0-0C4?6�'-0-0-0-0- XJ�:�i4;,:;'.....: ",'.'40-0-004}0 -}�ti ......'i '�.... :. J ;' ..:.......:.........:.........::.:...... i'.'.:.: �}]! .......'..:....:..:........�... ................... ........ ..