Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220101_Design Calculations_20231113 (4)
4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Pass the storm event Creekside Oaks South-Detention Pond#1 Pre-Development Runoff-100-yr Drainage Area,(DA)= 19.03 acres Intensity,(I)= 5.09 inches/hr Composite Runoff Coefficient,(C)=> 0.31 Maximum Release Rate,(Qloo)=> 30.03 cfs Creekside Oaks South-Detention Pond#1 Post-Development Runoff-100-yr Drainage Area,(DA)= 19.03 acres Intensity,(I)= 9.92 inches/hr Composite Runoff Coefficient,(C)=> 0.60 Peak Release Rate,(Qloo)=> 113.27 cfs Detention Pond Stage-Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage(S) (Z) (ft) (sf) (cf) (cf) (ft) In(S) In(Z) Z est 287.0 21,182 - - - 287.5 23,464 11,162 11,162 0.50 9.32 -0.69 0.55 288.0 24,626 12,023 23,184 1.00 10.05 0.00 1.04 288.5 25,803 12,607 35,791 1.50 10.49 0.41 1.51 289.0 26,993 13,199 48,990 2.00 10.80 0.69 1.98 289.5 28,198 13,798 62,788 2.50 11.05 0.92 2.46 290.0 29,417 14,404 77,192 3.00 11.25 1.10 2.94 290.5 30,650 15,017 92,209 3.50 11.43 1.25 3.43 291.0 31,897 15,637 107,845 4.00 11.59 1.39 3.93 291.5 33,158 16,264 124,109 4.50 11.73 1.50 4.44 292.0 34,433 16,898 141,007 5.00 11.86 1.61 4.96 292.5 35,722 17,539 158,546 5.50 11.97 1.70 5.49 293.0 37,026 18,187 176,733 6.00 12.08 1.79 6.03 293.5 38,344 18,843 195,575 6.50 12.18 1.87 6.58 294.0 39,676 19,505 215,080 7.00 12.28 1.95 7.15 294.5 41,022 20,175 235,255 7.50 12.37 2.01 7.72 Regression Output: b= 1.15 (X Variable Coeff) Ks= 22,246 (eY-intercept) Stage-Storage Equation is of the form:S=(Ks)(Z)b printed: 11/1/2023 1.00 PM Page 1 of 3 4D Site Solutions, Inc. Primary Spillway Barrel Number of Barrels= 1 Dia.of Barrel= 30 inches Area of Barrel,(Ab)= 4.91 sf Pipe Length,(L)= 70 feet Friction Coeff.,(Kp)= 0.00786 Inv.of Barrel= 285.00 feet Riser Elev.of Riser Crest= 292.50 feet Rectangular Length Weir= 36 inches Width Weir= 48 inches Total Weir Length= 14.00 feet Area of Riser= 12.00 sq.ft. Orifice in Riser Dia.of Orifice= 3.00 inches Number of Orifices= 1 Area of Orifice,(Ab)= 0.05 sf Orifice Coefficient(CO= 0.60 Inv.of Orifice= 287.00 feet Length of weir 1.00 feet Top of weir= 289.55 feet Weir Coefficient(Cw)= 3.00 Emergency Spillway Width of Spillway(Approx.)= 25 feet Weir Coefficient= 3.3 Crest Elevation= 293.50 feet Summary of Results Maximum Release Rate,(Qloo)= 30.03 cfs Release Rate,(Q1oo)= 91.18 cfs Normal Water Surface Elev.= 287.00 feet Water Surface Elev.@ Outlet(Q100)= 293.68 feet printed: 11/1/2023 1.00 PM Page 2 of 3 4D Site Solutions, Inc. Inflow Hydrograph-100-yr Peak Inflow,(Qp)_> 113.27 cfs Time to Peak Calculation: CN= 83 P= 8.35 in. S= 2.05 in. Q*= 6.31 in. (depth of runoff) Vol= 436,037 cf (vol.of runoff) Time to Peak,(Tp)=> 46.2 minutes (SCS TR-55) printed: 11/1/2023 1:00 PM Page 3 of 3