HomeMy WebLinkAboutGW1--07104_Well Construction - GW1_20231103 j'
# TERRATHERM I SWBoring Construction Detail Revision#_0
' a Orr-ode CNkmy Release date:
Approved by: SL
In Well ID H-32 Date F. go --Pit 3.
Oversight • '`j:JV 4.
a� Job# R23-104
Driller 0IA- Desi Constructed Notes
(fill out if
different)
1/2"Thermocouple pipe? ^ '.' .." P
Thermocouple Length 58.67' —Heater Stick Up Height 30"is .
• !
—SIW Stick Up Height 18"
is .
Ground Surface 0.0'
Conductive HT Grout G' +•" Angie from Horizontal 90°,
Heater Can. f.� 1 ,
Schedule 80 rj
>,. • 1
Heater Can Length 59.5' ' ' Borehole Diameter 7" 1'
Heater Can Diameter 3'
.
SIW
',V . 5 Gal Buckets of Graphite 2.251 11'�
Riser Length 51.5 ft t41 -�,, " Bags of Silica 3 l AScreen Length 2 ft *' `„
,;-4 i ,I i
Screen Material Bags of Cement 10 I .1
Stainless Steel 34.
Fiberglass ),k Top of#00 Sand 30'
Other: ti:i,:
Wig, t.4ti 1.4,
;; C+G9a ;
SIW Slot Size 10 #A akt PI?, Bags of Sand 7S
SA .:Trr.
Screen Diameter 1" 5', ` }'
k ,i' Gallons of Limestone 7.5
•
Installation Method kt;z k t
Sonic Top of Screen 50'
Direct Push ` ! f V."4=sir
Hollow Stem Auger x - ''
Mud Rotary, � rY
G• CAL'
Other +,. s Bottom of Screen 52'
J #'
Lam; "c'
LDS ki
;gin.,:45 Bottom of#00 Sand 54'
Conductive High Temp Grout h x `
F
y ,' .:,, Bottom of Borehole 57'
Post-Installation QC(to be performed 24hrs after installation) PIO Log:NMakelModel:
1)Confirm well isfreeofgrout Design Constructed Time: 3't r Reading: (9- PPM
Depth to bottom'of well[ft bTOC]: S9 c' Time: Reading:; PPM
if greater than or equal to ift less than designed alert the office Time: Reading: I PPM
2)Confirm grout plug reaches ground surface Time: Reading: I PPM
repeat daily until depth to grout is Oft. : Time: Reading: PPM
Date • Depth to Grout[ft bgs] Notes:
•
1