Loading...
HomeMy WebLinkAboutGW1--07104_Well Construction - GW1_20231103 j' # TERRATHERM I SWBoring Construction Detail Revision#_0 ' a Orr-ode CNkmy Release date: Approved by: SL In Well ID H-32 Date F. go --Pit 3. Oversight • '`j:JV 4. a� Job# R23-104 Driller 0IA- Desi Constructed Notes (fill out if different) 1/2"Thermocouple pipe? ^ '.' .." P Thermocouple Length 58.67' —Heater Stick Up Height 30"is . • ! —SIW Stick Up Height 18" is . Ground Surface 0.0' Conductive HT Grout G' +•" Angie from Horizontal 90°, Heater Can. f.� 1 , Schedule 80 rj >,. • 1 Heater Can Length 59.5' ' ' Borehole Diameter 7" 1' Heater Can Diameter 3' . SIW ',V . 5 Gal Buckets of Graphite 2.251 11'� Riser Length 51.5 ft t41 -�,, " Bags of Silica 3 l AScreen Length 2 ft *' `„ ,;-4 i ,I i Screen Material Bags of Cement 10 I .1 Stainless Steel 34. Fiberglass ),k Top of#00 Sand 30' Other: ti:i,: Wig, t.4ti 1.4, ;; C+G9a ; SIW Slot Size 10 #A akt PI?, Bags of Sand 7S SA .:Trr. Screen Diameter 1" 5', ` }' k ,i' Gallons of Limestone 7.5 • Installation Method kt;z k t Sonic Top of Screen 50' Direct Push ` ! f V."4=sir Hollow Stem Auger x - '' Mud Rotary, � rY G• CAL' Other +,. s Bottom of Screen 52' J #' Lam; "c' LDS ki ;gin.,:45 Bottom of#00 Sand 54' Conductive High Temp Grout h x ` F y ,' .:,, Bottom of Borehole 57' Post-Installation QC(to be performed 24hrs after installation) PIO Log:NMakelModel: 1)Confirm well isfreeofgrout Design Constructed Time: 3't r Reading: (9- PPM Depth to bottom'of well[ft bTOC]: S9 c' Time: Reading:; PPM if greater than or equal to ift less than designed alert the office Time: Reading: I PPM 2)Confirm grout plug reaches ground surface Time: Reading: I PPM repeat daily until depth to grout is Oft. : Time: Reading: PPM Date • Depth to Grout[ft bgs] Notes: • 1